MONTHYEARML18113A9961979-03-13013 March 1979 Order to Show Cause Re Potentially Deficient Piping Design. Orders Facility to Be Placed in Cold Shutdown within 48-h Project stage: Other ML19282C6771979-03-15015 March 1979 Summary of 790308 Meeting W/S&W to Discuss Pipe Stress Calculations Using Pipestress Code Project stage: Meeting ML18113A9671979-03-15015 March 1979 Notification of 790316 & 17 Meeting W/S&W in Bethesda,Md to Discuss Reinstating Operation at Facilities Which Received Shutdown Orders on 790313 Project stage: Meeting ML18113A9661979-03-20020 March 1979 Summarizes 790320 Telcon W/S&W Re Future Actions to Resolve Outstanding Seismic Concern of Five Shutdown Plants.Requests Reanalysis Results of safety-related Piping Sys & Supports Project stage: Other ML19263D8341979-03-26026 March 1979 Discusses 790301 Telcon W/Util & S&W.Nrc Requested Copy of Pipestress Computer Code to Compare W/Nupipe.S&W Stated Policy of Not Releasing Codes or Calculations.Meeting on 790308 for S&W to Bring Pipestress to NRC for Review Project stage: Meeting ML18114A5381979-03-29029 March 1979 Assigns Responsibility for Prompt Meeting Notification Re 790313 Show Cause Orders Project stage: Meeting ML20244A5561979-03-31031 March 1979 Answer to NRC 790313 Order to Show Cause.Will Reanalyze Seismic Loads on Piping Sys & Will Modify Sys Where Necessary.Expects to Submit Documented Results by 790424. Believes NRC Should Examine S&W Analyses Project stage: Other ML20244A5501979-03-31031 March 1979 Forwards Formal Util Response to NRC 790313 Order to Show Cause Re Potentially Unsafe Piping Sys Project stage: Other ML19261C9841979-04-0202 April 1979 Forwards Description of Info to Be Documented for NRC Review for Facility.Requests Schedule for Submittal of This Info Prior to Plant Startup Project stage: Other ML19344D7361979-04-10010 April 1979 Record of Telcon W/D Ford (Ucs) on 790320 Re Chronology of NRC Activities Re Pipestress Issue Project stage: Other ML19289E9721979-04-10010 April 1979 Summary of 790329-30 Meeting W/Util & S&W in Boston,Ma Re Progress to Date & Early Analysis of Pipe Stresses in safety-related Sys Project stage: Meeting ML19270G5371979-04-11011 April 1979 Delineates Criterion to Develop plant-specific Info Packages on Site Visits Project stage: Request ML20244A6471979-04-17017 April 1979 Licensees Response to 790402 Request of PA Public Util Commission for Hearing & Petition to Intervene Re 790313 Show Cause Order.Urges NRC to Hold Ruling in Abeyance. Certificate of Svc Encl Project stage: Other ML19289F0811979-04-20020 April 1979 Summary of 790411-12 Meeting W/Util & S&W in Boston,Ma Re Status of Reanalysis Efforts & Review of Packages Completed to Date Project stage: Meeting ML18114A6121979-05-18018 May 1979 Summarizes Procedures & Calculational Techniques Used in Reanalysis of Piping Sys Designed W/Shock II Computer Program.Reanalysis Will Satisfy 790313 Order to Show Cause Project stage: Other ML19224C7941979-05-18018 May 1979 Requests Addl Info in Order for NRC to Review Proposed Amplified Response Spectra Using Soil Structure Interaction Project stage: Other ML19269D6151979-05-23023 May 1979 Responds to NRC .Forwards Amplified Response Spectra Based on Soil Structure Interaction.Details Result of Analysis of Small Strain Valves of Plus or Minus 50% Project stage: Other ML18114A7201979-05-25025 May 1979 Discusses Position Re Use of Soil Structure Interaction for Seismic Pipestress Analyses Being Performed.Approves Methodology,Provided That Seismic Stresses Calculated Are Increased by Factor of 1.5 Project stage: Other ML19246A7211979-05-25025 May 1979 Submits Identified Areas to Be Addressed During Seismic Pipestress Reanalysis Project stage: Other ML19241B2111979-05-25025 May 1979 Discusses Areas to Be Covered in Interim or Final Rept on Seismic Pipestress Reanalysis,Including Stresses Due to Seismic Anchor Movements,Support Stiffness Accountability & Criteria for Pipe Support & Design Project stage: Other ML19289F6761979-06-11011 June 1979 Discusses Present Status of Piping Sys Reanalysis.Reanalysis Complete & Two Hydraulic Snubbers Installed.No Pipe Is Overstressed in Event of Safe Shutdown Earthquake.Rept Supporting 790706 Request to Be Submitted by 790618 Project stage: Other ML19241B8541979-06-14014 June 1979 Summary of 790524 Meeting W/S&W & Util in Bethesda,Md Re Amplified Response Spectra Developed W/Consideration of Soil Structure Interactions Project stage: Meeting ML19225C0641979-07-23023 July 1979 Requests Termination of 790313 Order to Show Cause Re safety-related Piping Sys Project stage: Other ML19249A7131979-08-0303 August 1979 Draft Safety Evaluation Supporting Resumption of Operation Per Required Mods to Seven Supports,Addition of Three Others & Approval of Two Supports Not Yet Found to Be Acceptable Project stage: Draft Approval ML19249A7091979-08-0303 August 1979 Draft Order Not Requiring Continued Shutdown of Facility or Termination Proceeding Initiated by 790313 Order.Analysis & Mod to Fuel Pool Cooling & Purification Sys Required Before Further Use Project stage: Draft Other ML19249A7041979-08-0303 August 1979 Forwards for Consideration Draft Order & Draft Safety Evaluation Re Facility Shutdown Per Lack of Assurance That Analysis of Piping Sys for Seismic Loads Provided Proof of Safe Shutdown During Seismic Event Project stage: Draft Approval ML19207B0861979-08-0808 August 1979 Safety Evaluation Supporting Order Terminating Proceeding Initiated by 790313 Show Cause Order Re Cold Shutdown Condition.Facility May Resume Power Operation Project stage: Approval ML19207B0791979-08-0808 August 1979 Order Terminating Proceeding Initiated by 790313 Show Cause Order Re Cold Shutdown Condition Project stage: Other 1979-04-02
[Table View] |
Text
'Mu_gbtDON c
l w
l
.y '6[O ' Nr
\\
April 17, 1979 g
%Y g% gb k4 NUCLEAR REGULATORY COMMISSION e
UNITED STATES OF AMERICA Be, the Atomic Safety and Licensing Board i
f k
G l 2.3 N
In the Matter of
)
y/ac, //43/
)
DUQUESNE LIGHT COMPANY, et al. )
Docket No. 50-344
)
(Beaver Valley Power Station,
)
Facility Operating Unit No. 1)
)
License No. DPE-66 LICENSEES' RESPONSE TO REQUEST AND PETITION OF PENNSYLVANIA PUBLIC UTILITY COMMISSION By Order dated March 13, 1979, the Commission ordered the Beaver Valley facility to be placed in a cold shutdown condition.
The Order also afforded interested persons the opportunity to request a hearing on the issue of whether operation of the plant should be suspended until certain seismic analyses and modifications related to piping systems have been completed.
In response to that Order, the Pennsylvania Public Utility Commission
(" Peti tioner" ), on April 2, 1979, filed a request for a hearing and petition for leave to intervene.
Petitioner stated its concerns that the ordered shutdown will result in substantial increases in the cost of electricity, may result in unjust and unreasonable rates, and may jeopardize the continued supply of safe, adequate, (s 79$53f$l$y
~
a and reliable electric service in Pennsylvania.
On April 10, Petitioner amended its petition to state that it was re-questing a hearing only if one or more of the following conditions should exist:
(a) any other party is granted hearing; (b) it is determined by the staff of the Nuclear Regulatory Commission that an extended period of cold shut down for Beaver Valley No. 1 shall be necessary in order to make safety related modifi-cations; (c) the Nuclear Regulatory Commission Staff determination vis-z-viz the shut down at Beaver Valley No. 1 is not forthcoming within a reasonable period of time.
Because none of the three events has occurred, it is clear that Petitioner is not presently asking for a hearing.
Licensees therefore suggest that the Commission hold in abeyance its ruling on the matter until such time as Petitioner notifies the Commission that one or more of the events has occurred.
Respectfully submitted, SHAW, PITTMAN, POTTS AND TROWBRIDGE i
By A
/ /,i Brfce W" Churchill Counsel for Licensees 1800 M Street, N.W.
Washington, D.C.
20036
(.! O 2 ) 331-4100 Dated:
April 17, 1979
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
Docket No. 50-344 DUQUESNE LIGHT COMPANY, et al. )
)
Facility Operating (Beaver Valley Power Station,
)
License No. DPR-6C Unit No. 1)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the " Licensees' Response to Request and Petition of Pennsylvania Public Utility Commission," dated April 17, 1979, were served upon those persons on the attached Service List by deposit in the United States mail, postage prepaid, this 17th day l
l of April, 1979.
l 1
(
/
a W ruce W.
Churchill Dated:
April 17, 1979 i
~.
.2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
Docket No. 50-344 DUQUESNE LIGHT COMPANY, et al. )
)
Facility Operating (Beaver Valley Power Station,
)
License No. DPR-66 l
Unit No. 1)
)
SERVICE LIST l
John A. Levin, Esq.
Assistant Counsel Pennsylvania Public Utility Commission P.
O. Box 3265 Harrisburg, Pennsylvania 17120 James P. Murray, Jr., Esq.
Office of Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Docketing and Service Section Office of the Secretary l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
l
_ _ _. _ _ _. _ _. - _ _ _ _ _ _ - _