ML18114A538

From kanterella
Jump to navigation Jump to search

Assigns Responsibility for Prompt Meeting Notification Re 790313 Show Cause Orders
ML18114A538
Person / Time
Site: Beaver Valley, Surry, Maine Yankee, FitzPatrick  Dominion icon.png
Issue date: 03/29/1979
From: Stello V
Office of Nuclear Reactor Regulation
To: Neighbors J, Nelson C, Polk P
Office of Nuclear Reactor Regulation
References
TAC-11431, NUDOCS 7905080347
Download: ML18114A538 (5)


Text

..

MARCH NOTE FOR:

J. D. Neighbors C. Nelson P. Polk D. t*Jigginton

  • DISTRIBUTION:

Central F' s

RB-1 Reading NRR Reading Local PDR

_ MRC PDR ( BT1-28U1/281

~3.

50-334 50-309)

FROM:

Victor Stello, Jr., Director, Division of Operating Reactors SUBJtCT:

PROMPT NOTIFICATIONS* FOR ALL MEETINGS TO BE HELD RELATED TO SHOl4 CAUSE ORDERS ISSUED MARCH 13, 1979 ON BEAVER VALLEY UNIT l, FITZPATRICK, MAINE YANKEE AND SURRY UNITS 1 AND 2 As di~tussed with you on-March 20, 1979, all plant specific meetings*

on the subject matter are to be scheduled by or through you. You are responsible for promptly preparing a meeting notice fqr such meetings and assuring that interested parties are promptly made aware of*each meeting schedu1 ed.

  • A check list, Attachment 1, is provided to assist you. A copy of your meeting notices should go to those listed on Attachment 3 of this note.

Also attached for information is acopy of the first post Order Notice (March 15, 1979) of a meeting on this subject.

By copy of this note, other NRR supervisors who need to schedule meetings related to the March 13, 1979 Orders are requested to clear all plant specific meetings wi_th the responsible -project manager.

For generic meetings with Stone and \\~ebster or others that are not-plant specific, notices of such meetings should be promptly given in the *same manner as des~ribed above for plant s~ecific meetings *.

Enclosures:

l. Check Li st
2.

Sample Notice

. 3. Distribution List P

'nal Signed by (}J~

ictor Stello Victor Stello, Jr., Director.

Divi~ion of Operating Reactors 7905080S<fl

  • cc w/ enc 1 osures:

See next page

.\\

OOR:OR, D~:. S&P DOR:DIR t *

  • ii'*.,.

OFFICE:)>

.*,............ l.........,,..........................,........................................................... """"""""\\"

,,........ -t~-W.;/*. r.:.e.P.~,...... 7

~r........... ;~t~.1-~~ -~~-

~;q;~.... :.. ~-.......................,.......... \\:.... ~\\

OATII..

,,,JJ.,,/J.....,.....,,,.,,,.lf.J;/....,,,,...,,..,,....,.. /............ "* 3. ".. *.. ".., ""... *",,, "" """ ""," * "' "*....,....... "*""'"'.

U~~. GOVERNMENT PRINTING OFFICE: t 978 - 266 - 769

Multiple Addressees,

fllit\\RGH 2 9 19?g cc w/enclosures:

H. R. Denton E. G. Case R. Mattson R. Boyd R, DeYoung D. Eisenhut J. Scinto J. Souder R. Fraley E. Jordan

c. Kammerer J. Fouc;hard R. Vo~ lm~r*

R. Denise.*

J. P. Knight T. Ippolito

v. Noonan*

R. Reid A. Schwencer F. Schauer R. Bosnak N~ Haller K. Wichman t-J. T. Russell B. Grimes

s. Hosford F. Miraqlia J. Fair J. *Giannelli p ~ Riehm R. Bosnak M. Hartzman K. Desai

.A. Lee D. Eisenhut D. Crutchfield

\\

\\

  • t

.. 1 *

  • 1 t

t.

I.

OFFICE~

~.~......,

......... :.... ************** ******.***************~***********...... ~.:........... **********

DATE,I> * -......................... **_'................. * *... * *......... *....... *... *. * *.

NJLC FORM 318 (9-76) 'NRCM 0240

' '* u.s. GOVERNMENT PRINTING c:.FFICE: I 978 - *** - 769

ENCLOSURE NO.' 1,i.

The following persons or offices are to be promptly notified by telephone*

of licensee and vendor meetings scheduled to discuss matters related to the March 13, 1979 Orders to Show Cause.

Followup promptly with copy of typed Notice (to be transmitted by Blue Bag or handcarry).

Blue Bag (BB)* or Hand Carry (HC)

N*oti f,l Teleehone No.

Mail Stoe Tyeed Notice

w. Dorie, DCM***
  • 634-3271 8-1149 (BB)

K. Muchetti, DCM***

634-1462 H-114Q (BB)

Use one J. Guibert, DCM***

634-1435 H-1149 (BB)

Blue Bag H. Thompson, OCM***

  • 634-3308 H-1149 (BB)

. G. Sauter, OCM***

634-1457 H-1149 (BB)

R. Fraley, ACRS 634-3265 H-1016 BB C. Kammerer, CA 634-1443 H-1159

. BB J. Fouchard, PA

  • 634-3304 or H-1143 or BB 492-7121 3709 (MNBB)

L Scattolini, PDR (634-3273)**

H..;Street Lobby BB J. Souder, LPDR (492-7536)**

309 HC H. Denton, NRR*

492-7691

  • P-428 HC E. Case, NRR 492-7726 P~428 HC J. Scinto,'*,OELD 492-7494 9604 (MNBB)

BB., -

E. Jordan, I&E 492-8180 EW-3-59 BB or Telecopy

v. Stello, DOR 492-7672
  • 528
  • HC R. Mattson, DSS 492-7517.

P-il02 HC R. DeYoung, DSE -

492-7207 P-202 HC

... J.P. Knight,DSS 492-7733 p..:932B HC R. Vollmer, DOR 492-8256 542 HC-B. Grimes~* DOR 492-7415 340 l'lC

v. Noonan, -DOR 492-8060 440 HC W. Russell 492-7609 540 HC
  • Bluebag or Hand Carry if meeting will be-held within 3 working days* from the day the notice is prepared.
    • Contact when typed notice is avai 1 ab 1 e and ask for 11expedited II insertion*

in PDR and LPDR.

      • The Project Team Coordinator, \\,/. T.
  • Russell will notify the Commissioner's Assistants.
  • I

I I

I.-

ENCLOSURE NO. 2 u:::rEo STATES

, :I NUCLEAR REGULATOFW COi.':i.':lv0 ON

'NASHii,GTON, D. C. 20555 Docket Nos. 50-334 50-280 50-281 50-333 50.-309 March 15, 1979 MEMORANDUM FOR:

Ha*rold R. Denton, Director Office of Nuclear Reactor Regulation FROM:

Victor Stello, Jr., Director Division of Operating Reactors

SUBJECT:

FORTHCOMING MEETING WITH STONE AND WEBSTER ENGINEERING CORPORATION ON ANALYSES FOR REINSTATING OPERATION AT-FACILITIES RECEIVING SHUTDOWN ORDERS ON MARCH 13, 1979 Date and Time:

March 16, 1979, 8:00 a.m.

March 17, 1979, 8:00 a.m., if necessary Location:

Phillips Building Room P-118

Purpose:

Discuss Stone and Webster proposals regarding soil structures interactions and renalays.is and modifica-

. tion efforts by Stone and Webster.

Participants:

Stone and Webster D. King D. Cuini s key C. Reeves J. Ha 11 J. Christian

_ A. Banerjel E. Causel

  • Affected licensees have also been invited.

/-

NRC DOR: ---rri"gineering Branch DSS:

Mechanical Eog~. Branch DSE:

Geosciences Branch DSS:

Structural Engr. Branch

  • B. Grimes J. Knight R. Denise Victor Stello, Jr., Director Division of Operating Reactors*

cc:

See next page

~

._I

ENCLOSURE NO. 3 DISTRIBUTION LIST FOR MEETING NOTICES FOR*

MATTERS RELATING TO MARCH 13, 1979 SHOW CAUSE ORDERS Docket Files NRC PDR Local PDR ORB Reading NRR Reading C. Kammerer J. Foucha rd R. Fraley, ACRS (16)

  • H. R. Denton E.. G. Case V. Stello R. Mattson R. Boyd R. DeYoung D. Eisenhut R. Vollmer B. Grimes R. Denise J. P. Knight A. Schwencer D. Ziemann T. Ippolito R~ Reid P. Check G. Lainas D. Davis
  • V. Noonan F. Schauer
  • R. Bosnak L. Heller K. Wichman D. Brinkman Project Managers (4). (C. Nelson, J. D. Neighbors, P. Polk, D. Wigginton)

OELD J. Scinto OI&E (3)

M. W. Peranich, I&E OSD (3)

S. _Showe, I&E E. Jordan, I&E Licensing Assistant(s) of affected plants Principal Staff Participants Receiptionist, Bethesda (for meetings held *in Bethesda)

Program Support Branch J. Souder (LPDR Advance Copy)