ENCLOSURE 3 PLANT HATCH - UNIT 1 NRC DOCKET 50-321 l
OPERATING LICENSE DPR-57 REQUEST TO REVISE TECHNICAL SPECIFICATIONS:
SURVEILLANCE TESTING OF MAIN STEAM ISOLATION VALVES PAGE CHANGE INSTRUCTIONS 1
The proposed change to. the Plant Hatch Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:
Remove Page iniefr_t_Page 3,7-14 3.7-14 l
h i
1 8712300127'871221
?
PDR ADOCK 05000321 i
]
P DCD 1869C E-3 12/21/87 SL-3819
e LIMITING CONDITIONS FOR OPERATION SURVEltLANCE RE0VIREMENTS 4.7,0.1.
Surveillance of Operable Valves (Continued) b.
At least once per operating cycle the reactor ioolant system instrument line excess flow check valves shall be-tested for proper operation, c.
At least once per quarter, l
i all normally open, power-operated isolation valves (except for the main steam line power-operated isolation valves) shall be fully closed and reopened, d.
The isolation time of each main steam line isolation valve, shall be determined to be within its limit when tested, pursuant to Specification 4.6.K.
e.
At least once per week the main ste3m line power-oper-ated isolation valves shall I
be exercised one at a time by partial closure and sub-sequent reopening, j
3.7.D.2.
Operation with Inoperable Valves
?.
Surveillance of lines with an Inoperable Valve In the event any isolation valve Whenever an isolation valve specified in Table 3.7-1 becomes listed in Table 3.7-1 is inoperable, reactor power operation inoperable the position of at may continue provided at least one least one other isolation valve isolation valve in each line having in each line having an inoperable an inoperable valve is in the mode isolation valve shall be verified corresponding to the isolated con-to be in its isolated position dition.
daily.
3.
Shutdown Requirements If Specification 3.7.D.l. and 3.7.D.2.
cannot be met, an orderly shutdown shall be initiated and the reactor shall be placed in the Cold Shut-down Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
i I
1 HATCH - UNIT I 3.7-14 Proposed TS/0146q/355-0