ML20237F211

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info Re Proposed Rev to TS Certified Fuel Handler
ML20237F211
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/28/1997
From: Fartile M
NRC (Affiliation Not Assigned)
To: Feigenbaum T
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20237F129 List:
References
FOIA-98-175 TAC-M98998, NUDOCS 9809020126
Download: ML20237F211 (3)


Text

/ /--

eseu,t

  • UNITED STATES

\

fl NUCLEAR REQULATORY COMMISSION wAseeton, o.a. seese.eset j

August 2A, 1997 s..*

i /

pr. Ted C. Fe10enbaum becutive Vice President

!/ o Mr. Russell Mellor firector of Site Operations

,onnecticut Yankee Atomic Power Co.

l@2 injun Hollow Road Ost Hampton, Connecticut 06424 3099 ,

LUBJECT: CERTIFIED FUEL HANDLER TECHNICAL SPECIFICATION CHANQt REQUEST (T AC NO. M98998)

Seer Mr Folgenbaum:

the Connecticut Yankee Atomic Power Company (CYAPCol Dy letter dated May 30.1997, requested a change to the Heddam Neck Stetton Technical Spectf) cationsSrsnch in regards to (HHFB) cnttestin0 a Certified Fuel Handler Program. The Human Factors Assessment Nes completed en initial review of your program and needs additional informetk>n to complete the review. The enclosure to this letter provides the needed mformet6on.

This inf ormation should be submitted in a timely menner so that we can meet yovf schedule f or implementation of this program.

The reporting requirements contained in this letter effect only the CYAPCo; therefore.

OMB clearance is not required in accordence with P. L. 96 511.

Asese contact me et (30114151442 with any questions you may have about this request.

Sincerely.

1 Ns% K .-

[W(% Il-Morton B. Fairtile, Senior Project Manager Non-Power Reactors and Decommisskming Project Olrectorate Division of Reactor Program Menegement Of fice of Nuclear Reactor Regulation Docket No 50 213 Cinclos ur e - As noted cc: See next page 9809020126 980827 j )

PDR FOIA ( /}

BLOCK 99-175 PDR Yb 0 D2O l 2b 3f'j'O.

e .

= REQUEST FOR ADDITIONAL INFORMATION REGARDING e PROPOSED REVISION TO THE TECHNICAL

  • SPECIFICATIONS CERTIFIED FUEL HANDLER FOR THE HADDAM NECK PLANT (989981 Docket Number 50 213 Topic 1 Table 6.21
  • MINIMUM SHIFT CREW COMPOSITION.* of Attachment 1
  • Marked Up Pages.* does not reflect any change to either STA staffing or to the STA footnote, in Attachment 3. " Description of Changes," the statement is rnede on page 1 that "The existing footnote, ** The STA... Specification 6.3.1.2.1.* becomes the second footnote by addition of an additional satorisk (** *).* However, the revised Table 6.21 in Attachment 2, " Retyped Pages' does not include any reference to the STA position. How will the STA position be f actored into crew staffin0 wh4e permanently shutdown and what to CFR 50.120 regised train!ng wl'1 be prov6ded to the STAS?

Topic 2 Page 1 of Attachment 4,

  • Safety Assessment and No Significant Hazards Consideration
  • refers to the proposed changes to Technical Specification Section 1.3. The HHFB Review copy dcas not contain tNs section, is this section to be reviewed or is this a typographical error?

Topic 3 Future candidates f or the Equipment Operator position well complete a formal training program having its origins in the Current Reactor Opef ator and Nuclear Systems Operator training programs. Describe the process that will be used to determine the content of tNs program.

Topec 4 The ' Connecticut Yankee Certified Fuel Handler Decertification Training Program Description." Training Program Number NTM 7.084, found in Attachment 5 contains the Certified Fuel Handler Task List. Describe the process that wea used to develop this list The Connecticut Yankee Certified Fuel Handler Initial Certification Training program description (NTM 7.083) does not describe the tasks to be trained in the initial certification training, what are those tasks and how were the taska determined?

O Northeast Utilities Service Company Haddam Neck Plant

  • Docket No. 50-213 CC:

Lillian M. Cuoco. Esq. Resident inspector Senior Nuclear Counsel Haddam Neck Plant Northeast Utilities Service Company c/o U.S. Nuclear Regulatory Commission P. O. Box 270 361 Injun Hollow Road Hartford, CT 06141-0270 East Hampton, CT 06424-3099 Mr. Kevin T. A. McCarthy, Director Mr. James S. Robinson Monitoring and Radiation Olvision Manager Nuclear investments and Department of Environmental Administration Protection New England Power Company 79 Elm Street 25 Research Drive Hartford, CT 06106-5127 Westborough, MA 01582 Mr. Allan Johanson Mr. G. P. van Noordonnen Assistant Director Manager - Nuclear Licensing Of fice of Policy and Management Northeast Utilities Service Company Policy Development and Planning 362 Injun Hollow Road Division East Hampton, CT 06424-3099

) 450 Capitol Avenue-mss 52[NR P. O. Box 341441 Ms. Deborah B. Katz, President t Hartford, CT 06134-1441 Citizens Awareness Network P. O. Box 83 Mr. F. C. Rothen Shelburne falls, MA 01370-0083 Vice President - Work Services Northeast Utilities Service Company P. O. Box 128 l

Waterford, CT 06385 Mr. D. M. Goebel Vice President - Nuclear Oversight Northeast Utilities Service Company P. O. Box 128 Waterford, CT 06385 Mr. J. K. Thayer Recovery Officer, Nuclear Engineering and Support Northeast Utilities Service Company P. O. Box 128 Waterford, CT 06385 Regional Administrator Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Selectmen Tcwn Office Building Haddam, C7 06438