Advises That 880225 Issue 2,Rev 0 & Issue 1,Rev 1 to Offsite Dose Calculation Manuals Acceptable
ML20235U287
Person / Time
Site: Beaver Valley
Issue date: 03/02/1989
From: Tam P
Office of Nuclear Reactor Regulation
To: Sieber J
DUQUESNE LIGHT CO.
References
TAC-63996, TAC-67421, NUDOCS 8903090128
Download: ML20235U287 (2)


Text

_ - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ ____ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ - _ _ -

March 2,- 1939

'=

i

~

Docket Nos. 50-334 DISTRIBUTION w/o enclosure 50-412 tDocket File BGrimes NRC & Local PDRs ACRS(10)

Mr. J. D. Sieber, Vice President Plant File i

Duquesne Light Company Glainas Nuclear Group SVarga j

Post Office Box 4 SNorris Shippingport, PA 15077 PTam OGC

Dear Mr. Sieber:

EJordan l

SUBJECT:

BEAVER VALLEY UNIT 1 & 2 - ACCEPTANCE OF THE OFFSITE DOSE CALCULATION MANUALS (TAC 63996 AND 67421)

The Offsite Dose Calculation Manuals (030a) of both units were found I

acceptable by us (letter transmitting Aceadment No. 66 dated March 28, 1983 and letter dated July 14,1987). By letter dated February 25, 1988 you submitted revised versions of each ODCM:

Issue 2, Revision 0 for Unit 1 and i

Issue 1, Revision 1 for Unit 2.

Each of these documents became effective July 24, 1987.

We have completed review of your revised ODCMs and results are documented in our contractor's technical evaluation report EGG-PHY-8194 and EGG-PHY-8217 (accession numbers 8902170169and8902170175). These reports are incorporated by reference. We agree with the contractor's statement that your ODCMs are well written and are acceptable for use in demonstrating compliance j

with the radiological effluent technical specifications.

We do have a few minor concerns and these are delineated in Sections 4 of each technical evaluation report. You should consider these comments for future ODCM revisions. However, the present versions of your ODCMs, as submitted by your February 25, 1988 letter, are acceptable as stated above. This completes our efforts. Our reviewer was W. Wayne Meinke.

Sincerely,

acA n

Peter S. Tam, Senior Project Manager

]

Project Directorate I-4 l

Division of Reactor Projects I/II i

Office of Nuclear Reactor Regulation

Enclosures:

TERs w/o enclosure cc w/o enclosure:

See next page

[ DOCKET NO. 50-334,412]

4WEBu m m88 M ENET 1

PD:PDI-4 PM:PDI-4[

JStolz h #

LA:FDI PTam:cb S

s f0t

/89 R / S/89 seyz./89 s

9 8903090128 890307 PDR ADOCK 05000334 i

P PDC

.j

9

}

Mr. J. Sieber Beaver Valley Power Station Duquesne Light Company Units 1 & 2 l

cc:

Jay E. Silberg, Esquire Bureau of Radiation Protection i

Shaw, Pittman, Potts and Trowbridge Pennsylvania Department of 2300 N Street, N.W.

Environmental Resources Washington, DC 20037 ATTN:

R. Janati Post Office Box 2063 l'

Kenny Grada, Manager - w/ enclosure Harrisburg, Pennsylvania 17120 Nuclear Safety Duquesne Light Company Mayor of the Borrough of P. O. Box 4 Shippingport Shippingport, Pennsylvania 15077 Post Office Box 3 l

Shippingport, Pennsylvania 15077 John A. Lee, Esquire Ashley C. Schannauer Duquesne Light Company Assistant City Solicitor One Oxford Centre City of Pittsburgh 301 Grant Street 313 City-County Building Pittsburgh, Pennsylvania 15279 Pittsburgh, Pennsylvania 15219 W.F. Carmichael, Commissioner Regional Administrator, Region I Department of Labor U.S. Nuclear Regulatory Comission 1800 Washington Street East 475 Allendale Road Charleston, West Virginia 25305 King of Prussia, Pennsylvania 19406 John D. Borrows Resident Inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 181 180 East Broad Street Shippingport, Pennsylvania 15077 Columbus, Ohio 43266-0573 Director, Pennsylvania Emergency Management Agency Post Office Box 3321 Harrisburg, Pennsylvania 17105-3321 4

A