$O I C
- July 14,1987 Docket No. 50-412 DISTRIBUTION Pocket FHe P. Tam Mr. J. J. Carey, Senior Vice President NRC & Local PCRs OGC-Bethesda Duquesne Light Company PDI-4 Reading E. Jordan Nuclear Group S. Varga J. Partlow Post Office Box 4 B. Boger ACRS (10)
Shippingport, Pennsylvania 15077 S. Norris.
CWillis
Dear Mr. Carey:
SUBJECT:
BEAVER VALLEY UNIT 2 - 0FFSITE DOSE CALCULATION MANUAL, ODCM (TAC 63996) l By letter dated June 9, 1987, you formally submitted the ODCM. Before that submittal..you provided the draft ODCM for staff review in early 1986.
We have completed review of the ODCM and found it acceptable except for the two concerns given below which need resolution:
(1) The note on page 2-8 (regarding noble gas nuclides) should be deleted as agreed to by your staff, and (2) Pages 2-21 and 2-22 should be revised to require the use of short-term X/Q values in calculating doses from any containment purge where the value of the T factor (addressed on pages 2-8 and 2-9) is greater than 1.
We request your response to these two issues within 90 days of receipt of this letter.
The recordkeeping/ reporting requirements of this request affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely,
/s/
Peter S. Tam, Project Manager Project Directorate I-4 Division of Reactor Projects 1/11 cc: See next page LAPDT 4 PDI-4 A 9 hi 4
SNorris PTam:46 JW 7/ /87 7/ly87 7/
B7072OO4GO B70714 DR ADOCK 0500 2
.)
d
i l
1 l
I
'Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station cc:
Gerald Charnoff, Esq.
Mr. R. E. Martin, Manager Jay E, Silberg, Esq.
Regulatory Affairs l
Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 ii Sin:et, N,W.
Beaver Valley Two Project Washington, DC 20037 P. O. Box 328 l
l Shippingport, Pennsylvania 15077 i
Mr. C. W. Ewing, Quality Assurance Pennsylvania Office of Consumer Manager Advocate l
Quality Assurance Department ATTN: Michael Bardee Duquesne Light Company 1425 Strawberry Square P. O. Box 186 Harrisburg, Pennsylvania 17120 Shippingport, Pennsylvania 15077 John D. Burrows, P.E.
Director, Pennsylvania Emergency Director of Utilities l
Management Agency State of Ohio Room B-151 Public Utilities Comission.
Transportation & Safety Building 180 East Broad Street Harrisburg, Pennsylvania 17120 Columbus, Ohio 43266-0573 Mr. T. J. Lex Bureau of Radiation Protection Westinghouse Electric Corporation PA Department of Environmental Power Systems Resources P. O. Box 355 ATIN-R. Janati l
Pittsburgh, Pennsylv6nia 15230 P.O. Box 2063 l
Harrisburg, Pennsylvania 17120-I Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor i
P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 U. S. NRC John A. Lee, Esq.
i P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre l
301 Grant Street Regional Administrator, Region I Pittsburgh, Pennsylvania 15279 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l
4 l
l l
l l
-,. -