Rev 19 to ICP 2.3, Periodic Test Reactor Protection Sys Logic
ML20214F187
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/07/1987
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20214F173 List:
References
ICP-2.3, NUDOCS 8705220441
Download: ML20214F187 (29)


Text

7-

a. --.

Unit '. ICP 2.3 Date MAJOR Power Level Revision 19 05-07-87 PERIODIC TEST REACTOR PROTECTION SYSTEM LOGIC-1.0 PURPOSE 1.1- To test'the relay logic for the following reactor trips:

1.1.1 Turbine trip 1.1.2 Safety injection 1.1.3 Low feedwater flow 1.1.4 Low-low steam generator level

1. . 5 Pressurizer high level 1.1 '. 6 Pressurizer low pressure 1.1.7 Pressurizer high pressure 1.1.8 Undervoltage 1.1.9 Reactor coolant pump breakers

-1.1.10 Reactor coolant flow low 1.1.11 Overtemperature AT

-1.1.12 Overpower AT-

~1.1.13 Nuclear power 1.1.14 Verify operability of reactor trip breakers and bypass breakers, r?

N-8705220441 870515 PDR ADOCK 05000266PDR 7-p L:

- }:: .f r /

s ICP 2.3-Page 2 1

+ -

2.0 -REQUIREMENTS' O.

1 Technical Specification Requirements:

2.1 - ' Section 15.4, Table 15.4.1-1, Items 1,4;5,6',7,8,11, and 12.

2.2 Perform this test'conthly (every four' weeks).

g' ~ '

3.0~ CONDITIONS.

'May be performed at any plant power from cold shutdown =to full power.

j: Permissive buttons must be used above or below certain power levels. ,

j /4.0 PRECAUTIONS' i 4 .1 '- Test only one train ("A" or "B") at a. time.

4. 2 D'u ring at-power testing, only one auto shunt trip panel cell-cubicle ("A" or "B") is to be opened at a time.~

. '4. 3 ' All test switches must be returned to normal before testing the.-

t- other train.

4.4 After testing is completed in either-train and before the trip

.. breakers are returned'to normal configurations, check that all p the RT relays are energized by observing the relay " button"'is 1 pulled in.

' 4 . 5 .. After-testing all trip combinations of relays listed under each ~

protective. function, verify that operation of a single relay will not cause the trip to occur by operating each relay individually and

[. noting no trip occurs.

l 4.6- Steps 5.2.14 and 5.2.15 shall not be perfonmed'if ang of the following systems are considered inoperable:

[ 4.6.1 The "B" train diesel (G02) 4.6.2 The "B" train motor-driven auxiliary feed pump system i

i

<4.6.3 For Dual Unit Operation The steam-driven auxiliary feed pump system in either unit

~

For Single Unit Operation . ,

The steam-driven auxiliary feed pump system of the unit in operation

[

1 l..-

. ,.-..;-_.--...._,.m.. . . . _ .... . , . ' , _ .. .. -._ , . - _ . _ . _ , . , , - . . . .

....-c.- , _ , . - - - , , , . . - , . , , , , , - ,

ICP 2.3 Page 3 4.7- Steps 5.3.14 and 5.3.15 shall not be performed if any of the following systems are considered inoperable:

4.7.1 .The "A" train diesel (G01) 4.7.2 The "A" train motor-driven auxiliary feed pump system-

'4.7.3 For Dual Unit Operation The' steam-driven auxiliary feed pump system in either unit For Single Unit Operation The steam-driven auxiliary feed pump system of the unit in operation 5.0 PROCEDURE. Initials 5.1 Obtain DSS permission to start test. DSS reviews Steps 4.6 and'4.7 under " PRECAUTIONS" with technician and determines whether precautions apply-,

(DSS) 5.2 Train "A" 5.2.1 Preliminary - Verify the following relays are energized:

RT-1 RT-7 RC-1 RT-2 RT-8 RC-2 RT-3 RT-9 RC-3 RT-4 RT-10 RC-4 RT-5 RT-11 RT-6 RT-12 Checkoff 5.2.2 Put the "A" train bypass breaker in the test position.

5.2.3 Close the "A" train bypass breaker using the local breaker control pushbutton.

5.2.4 open the "A" train bypass breaker from the Train "B" logic test panel. Verify this locally at the "A" train bypass breaker.

5.2.5 Insert bypass breaker "A" and verify the breaker open on the Train "B" logic test panel and in the control room.

.ICP 2.3

'Page 4 Checkoff 5.2.6 Close bypass breaker "A" from'the train "B" logic test panel. Verify.this on the Train "B" logic test panel and in the control room.

5.2.7 AFTER VERIFYING THE "A". BYPASS BREAKER CLOSED, SHUT THE-"B" LOGIC TEST PANEL DOOR.

5.2.8 'OPEN THE "A" LOGIC TEST PANEL DOOR AND BEGIN "A" TRAIN LOGIC TESTS.

5.2.9 Turbine trip - auto stop (Train "A")

a. Interlocks - P7, P9
b. Trip logic --2/3
c. Selector switch position - 19
d. Relays - S2 - 63/AST3

-S3 - 63/AST4 S4 - 63/AST5 CAUTION: DURING'AT-POhER TESTING, ONLY ONE AUTO SHUNT TRIP PANEL CELL CUBICLE ("A" OR-

"B")'IS TO BE OPEN AT A TIME.

e. Open the cell cubicle at the reactor trip switchgear containing the auto shunt trip panel "A."
f. Depress the "A" train " shunt block" push-button and hold.
g. Depress the "A" train " shunt trip" push-butten and verify that the "A" train trip

(: breaker does not trip'.

h. Release the " shunt. trip" pushbutton only.

Hold the " shunt block" pushbutton in-the depressed position.

i. At the Train "A" logic test panel, make up trip combination with switches S2 and S3.
j. Verify that the "A" train reactor trip breaker opens by observing the breaker position lamps on the main control board 1C04 (2C04).

ICP 2.3 f - Page 5 Checkoff k.- Reclose reactor trip breaker "A" from the-main control board and verify closing by observing the breaker position lamps on

.the main control board IC04 (2C04).

1. Release the " shunt block" pushbutton.
m. Depress the "A" train " shunt trip" push-button momentarily. Close the cell cubicle containing the auto shunt trip panel "A."

- n. Verify that the "A" train reactor trip breaker opens by observing the breaker position lamps on the main control board IC04 (2C04).

(See Note 1)

o. Test the following trip combinations:

S2 - 54 S3 - S4 5.2.10 Turbine trip - stop valves closed (Train "A")

a. Interlocks - P7, P9
b. Trip logic - 2/2
c. Selector. switch position - 24
d. Relays - S2 - 33AC-SL S3 - 33AC-SR
e. Trip combinations S2 - S3 4

5.2.11 Safety injection (Train "A")

a. Interlocks - none
b. Trip logic - 1/2

{, c. Selector switch position - 26 1

. y , , , - - ,__-_____.._,._,,......_,,.c . , _ . , , , _ , _ . . . ....,.,,-,.._...,,_..m.,,,_,.._.._.,..m..

ICP 2.3 Page 6

d. Relays - S2 - SI11X-A S3 - SI21X-B
e. _ Trip combinations S2 S3 5.2.12 Low feedwater flow steam generator "A" (Train "A")-
a. Interlocks - none
b. Trip logic - 1/2 + 1/2
c. Selector switch position - 9
d. Relays - S2 - FC-466C S3 - FC-467B S4 - LC-462C SS - LC-463E
e. Trip combinations 52 - 54 S3 - 54 S2 - SS S3 - S5 5.2.13 Low feedwater flow steam generator "B" (Train "A")
a. Interlocks - none i
b. Trip logic - 1/2 + 1/2
c. Selector switch position - 10
d. Relays - S2 - LC-472C S3 - LC-473F S4 - FC-476C SS - FC-477B
e. Trip combinations 52 - S4 S3 - S4 S2 - SS S3 - S5 t

-, , c - - .,- --,,. -,,---- ,- ,- , , , - , , , , , .- , , . . - . , - - ~ , - , - . - - - - , ,

ICP 2.3

. Page . 7 --

5.2^.14 Low-low steam generator "A" level (Train "A")

CAUTION: PERFORM THIS STEP ONLY-IF CONDITIONS-OF PRECAUTION STEP 4.6 Akr. MET.

a. Interlocks - none'

- b. Trip logic - 2/3

c. Selector switch position - 20
d. Relays - S2 - LC-461B S3 --LC-462A S4 - LC-463C
e. Trip combinations S2 - S3 S2 - S4 S3 - 54

. f. Auxiliary feed pump start combinations .

S2 - S3 S2 - S4 S3 - S4 4

5 l

1 i

4 J

f

.v- --

e , . w s,e e,- , - - . . e.---m. m.,, , , s,----mm.-,mm.e,, , - ,, ,.se--.-:----.---,----..e--n,--en.---e,,,-,.n--.., ,,-m,,--,n,rw.+ - -- - -

n- .

ICP 2.3 Page 8 5.2.15. Low-low steam generator "B". level'(Train "A")

-CAUTION: PERFORM THIS STEP ONLY IF CONDITIONS OF PRECAUTION STEP 4.6 ARE MET.

a. Interlocks - none
b. Trip logic - 2/3 P
c. Selector switch position - 21
d. Relays - S2 - LC-472A S3 - LC-473C S4 - LC-471B
e. Trip combinations-S2 - S3 S2 - S4 S3 - S4
f. Auxiliary feed pump start combinations S2 - S3 S2 - S4 S3 - S4 5.2.16 Pressurizer high level (Train "A")
a. Interlocks - P7
b. Trip logic - 2/3
c. Selector switch position - 15
d. Relays - S2 - LC-426A S3 - LC-427A S4 - LC-428A I e. Trip combinations S2 - S3

> S2 - S4 S3 - S4 i

, , - ,----,-...,,,,.....-,-,-,,r- ,-,.,.,.---,,,-w, - - , , - - - . , . - . . - -,,,----m-----m -- -r.,wve,-,, -,-,.v. - , , ,.., - ~ , . ,-< - - - - - - -

ICP 2.3 Page 9 5.2.17 Pressurizer low pressure (Train "A")

a. Interlocks - P7
b. Trip logic - 2/4
c. Selector switch po,ition - 6
d. Relays - S2 - PC-4.i)E -

S3 - PC-430H S4 - PC-431J SS - PC-449A ,

e. Trip combinations S2 - 53 S2 - S4 S2 - S5 S3 - S4 S3 - SS S4 - SS 5.2.18 Pressurizer high pressure (Train "A")
a. Interlocks - none
b. Trip logic - 2/3
c. Selector switch position - 18
d. Relays - S2 - PC-429A S3 - PC-430A S4 - PC-431A
e. Trip combinations S2 - S3 S2 - S4 S3 - S4

~. m ICP 2.3' o

Page 10 Undervoltage (Train "A")~

~

5 '. 2'.19

a. Interlocks - P7
b. Trip logicL- 1/2 + 1/2
c. Selector switch position'- 14
d. Relays S2 - 273/A01 S3 - 274/A01 S4 - 273/A02.

S5 - 274/A02

e. . Trip combinations S2 'S4' S2.- SS S3 - 54 S3 - S5

'5.2.20' Reactor coolant pump breakers (Train "A")

a. Interlocks - P7, P8

.b. Trip logic - 1/2 or 2/2 -

c. Selector switch position - 23
d. Relays - S2 - Reactor coolant pump "A" S3 - Reactor coolant pump "B"
e. Trip combinations one loop S2 S3 Two loops S2 - 53 i

b i

ICP 2.3 Page 11 5.2.21 Reactor. coolant flow low loop "A" (Train "A")

a. Interlocks - P7, P8
b. Trip logic - 2/3
c. Selector switch position - 16
d. Relays - S2 - FC-411 S3 .?C-412 S4 - FC-413
e. Trip combinations S2 - S3 S2 - S4 S3 - S4 5.2.22 Reactor coolant flow low loop "B" (Train "A")
a. Interlocks --P7, P8
b. Trip logic - 2/3
c. Selector switch position - 17
d. Relays - S2 - FC-414 S3 - FC-415 S4 - FC-416
e. Trip combinations S2 - 53 S2 - S4 S3 - 54

ICP 2.3 Page 12 5.2.23 Overtemperature AT trip (Train "A")

a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position - 7
d. Relays -'S2 - TC-405C S3 - TC-406C S4 - TC-407C SS - TC-408C
e. Trip combinations S2 - S3 S2 - S4 S2 - SS

!- S3 - S4 S3 - 55 S4 - SS 5.2.24 Overpower AT trip (Train "A")

a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position - 8
d. Relays - S2 - TC-405A S3 - TC-406A S4 - TC-407A SS - TC-408A
e. Trip combinations S2 - S3 S2 - 54 S2 - SS S3 - S4 S3 - SS S4 - S5 l

ICP 2.3 Page 13 5.2.25 Power range high setpoint trip (Train "A")

a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position --11
d. Relays - S2 - NC-41R S3 - NC-42R S4 - NC-43R SS - NC-44R
e. Trip combinations S2 - S3 S2 - 54 S2 - SS S3 - S4 S3 - SS S4 - SS 5.2.26 Power range low setpoint trip (Train "A")

CAUTION: PERFORM THIS CHECK ONLY IF REACTOR POWER IS BELOW P10.

a. Interlocks - Blocked above P10
b. Trip logic - 2/4
c. Selector switch position - 3
d. Relays NC-41P S3 - NC-42P S4 - NC-43P S5 - NC-44P
e. Trip combinations S2 - S3 S2 - S4 S2 - S5 S3 - S4 S3 - S5 S4 - S5

ICP 2.3 Page 14-Checkoff 5.2.27. Reposition selector switch to Position 30.

5.2.28 Verify the following first out alarms on 1C04 (2C04):

NIS PR High STPT Steam Generator "A" Low-Low Water Level

'NIS PR Low'STPT-Overtemp AT Steam Generator "B" Low-Low Water Level Overpower AT Steam Generator "A: Low FWF-PRZR High Level Steam Generator "B" Low FWF PRZR High Press RC Low Flow Loop "A" PRZR Low Press RC Low Flow Loop "B" Turbine Trip RC Pumps Tripped 4 KV Bus 1A01 (2A01) and 1A02 (2A02) Under Voltage Verify RCP BKR Ch Alert.

5.2.29 Have a operator clear the above alarms.

5.2.30 Verify the following relays are energized for

-the specified condition:

No Reactor Trips RT-1 RT-2 6 3 RT-4 RT-5 RT-6 RT -RT-8 RT-9 RT-10 RT-11 RT-12 RC Flow - Loop "A" RC-1 RC-2 RC Flow - Loop "B" RC-3 RC-4

______________________ ____ ____ ___._____.___j

ICP 2.3 Page 15 Checkoff No Special Conditions I/N39AX I/N39BX Source Range Trip Blocked SRB-1 SRB-2 Intermediate Range Trip Blocked IRB-1 IRB-2 Low Power Range Trip Blocked PRB-1 PRB-2

<10% Power <49% Power P7-1 P8-1 P7-2 P8-2 P7-3 *P9-1

  • P9-2 P10-1 P10-2
  • Also when one cire pump running and >22" condenser vacuum.

5.2.31 Condact a continuity check of the following auxiliary feedwater pump auto start relays if they are deenergized. Test points are located on the logic test panel.

LCAA TP1 to 'cmmon N320 ohms LCBA TP2 to Lommon N320 ohms 5.2.32 Close reactor trip breaker "A" from the main control board.

5.2.33_ Open bypass breaker "A" from the Train "B" logic test panel.

5.2.34 Place bypass breaker "A" in the pullout position.

ICP 2.3 Page 16 5.3 Train "B" checkoff 5.3.1 Preliminary - Verify the following relays are energized:

RT-1 RT-7 RC-1 RT-2 RT-8 RC-2 RT-3 RT-9 RC-3 RT-4 RT-10 RC-4 RT-5 RT-11 RT-6 RT-12 5.3.2 Put the "B" train bypass breaker in the test position.

5.3.3 Close the "B" train bypass breaker using the local breaker control pushbutton.

5.3.4 Open the "B" train bypass breaker from the Train "A" logic test panel. Verify this locally at the "B" train bypass breaker.

5.3.5 Insert bypass breaker "B" and verify the breaker open on the Train "A" logic test panel and in the control room.

5.3.6 Close bypass breaker "B" from the train "A" logic test panel. Verify this on the Train "A" logic test panel and in the control room.

5.3.7 APTER VERIFYING THE "B" BYPASS BREAKER CLOSED, SHUT THE "A" LOGIC TEST PANEL DOOR.

5.3.8 OPEN THE "B" LOGIC TEST PANEL DOOR AND BEGIN THE "B" TRAIN LOGIC TESTS.

5.3.9 Turbine trip - auto stop (Train "B")

a. Interlocks - P7, P9
b. Trip logic - 2/3
c. Selector switch position - 19
d. Relays - S2 - 63/AST3 S3 - 63/AST4 S4 - 63/AST5

r- , .

, . ICP 2.3 Page 17 Checkoff-CAUTION: DURING AT-POWER TESTING,'ONLY ONE AUTO SHUNT TRIP PANEL CELL CUBICLE ("A" OR "B") IS TO BE OPEN AT A TIME.

e. Open the cell cubicle at the reactor trip switchgear containing the auto shunt trip panel "B."
f. Depress the "B" train " shunt block" push-button and hold.
g. Depress the "B" train " shunt trip" push-button and ver ify that the "B" train trip .

b c}ker does not trip.

h. Ralease the " shunt trip" pushbutton only.

hold the " shunt block" pushbutton in'the (

' depressed position.

i. At the Train "B" logic test panel, make up trip combination with switches S2 and S3.
j. Verify that the "B" train reactor trip breaker opens by observing the breaker position lamps on the main control board 1C04 (2C04).
k. Reclose ceactor trip breaker "B" from the main control board and verify closing by observing the breaker position lamps on the main control board 1C04 (2C04).
1. Release the " shunt block" pushbutton.
m. Depress the "B" train " shunt trip" push-button momentarily. Close the cell cubicle containing the auto shunt trip panel "B."
n. Verify that the "B" train reactor trip breaker opens by observing the breaker position lamps on the main control board 1C04 (2C04).

(See Note 2)

o. Test the following trip combinations:

S2 - S4 S3 - S4 Igu - . - . - . -

o

. .c ICP 2.3 Page 18 5.3.10 Turbine trip - stop valves closed (Train "B")

a. Interlocks - P7, P9
b. . Trip logic - 2/2
c. Selector switch position - 24
d. Relays - S2 - 33AC-SL S3 - 33AC-SR
e. Trip combinations S2 - S3 5.3.11' Safety' injection (Train "B")
a. Interlocks - none
b. Trip logic - 1/2 g c. Selector switch position - 26
d. Relays - S2 - SI11X-A S3 - SI21X-B
e. Trip combinations S2 S3 5.3.12 Low feedwater flow steam generator "A" (Train "B")
a. Interlocks - none
b. Trip logic - 1/2 + 1/2
c. Selector switch position - 9
d. Relays - S2 - FC-466C S3 - FC-467B S4 - LC-462C 55 - LC-463E
e. Trip combinations S2 - S4 S3 - 54 S2 - S5 S3 - SS

ICP 2.3 Page 19 5.3.13 Low feedwater flow steam generator "B" (Train "B")

a. Interlocks - none
b. Trip logic - 1/2 + 1/2
c. Selector switch position - 10
d. Relays - S2 - LC-472C S3 - LC-473F S4 - FC-476C S5 - FC-477B
e. Trip combinations S2 - S4 S3 - S4 S2 - S5 S3 - S5 5.3.14 Low-low steam generator "A" level (Train "B")

CAUTION: PERFORM THIS STEP ONLY IF CONDITIONS OF PRECAUTION STEP 4.7 ARE MET.

a. Interlocks - none
b. Trip logic - 2/3
c. Selector switch position - 20
d. Relays - S2 - LC-461B S3 - LC-462A S4 - LC-463C
e. Trip combinations S2 - S3 S2 - S4 S3 - S4
f. Auxiliary feed pump start combinations S2 - S3 S2 - S4 S3 - S4

ICP 2.3 Page 20 5.3.15 Low-low steam generator "B" level (Train "B")

CAUTION: PERFORM THIS STEP ONLY IF CONDITIONS OF PRECAUTION STEP 4.7 ARE MET.

a. Interlocks - none-
b. Trip logic - 2/3
c. Selector switch position - 21
d. Relays - S2 - LC-472A S3 - LC-473C S4 - LC-471B
e. Trip combinations S2 - 53 S2 - S4 S3 - S4
f. Auxiliary feed pump start combinations S2 - S3 S2 - S4 S3 - S4 5.3.16 Pressurizer high level (Train "B")
a. Interlocks - P7
b. Trip logic - 2/3
c. Selector switch position - 15 i
d. Relays - S2 - LC-426A S3-- LC-427A S4 - LC-428A
e. Trip combinations S2 - S3 S2 - S4 S3 - S4 5.3.17 Pressurizer low pressure (Train "B")
a. Interlocks - P7
b. Trip logic - 2/4

ICP 2.3 Page 21

c. Selector switch position - 6
d. Relays - S2 - PC-429E S3 - PC-430H S4 - PC-431J SS - PC-449A
e. Trip combinations S2 - S3 52 - S4 S2 - SS S3 - S4 S3 - S5 S4 - 55 5.3.18 Pressurizer high pressure (Train "B")
a. Interlocks - none
b. Trip logic - 2/3
c. Selector switch position.- 18
d. Relays - S2 - PC-429A S3 - PC-430A S4 - PC-431A
e. Trip combinations S2 - S3 S2 - S4 S3 - S4 5.3.19 Undervoltage (Train "B")
a. Interlocks - P7
b. Trip logic - 1/2 + 1/2
c. Selector switch position - 14 4

, - --n-,- -,--- -,,,-- .,-- ----, , - - , , , , , - - -,- ,n,- -w e.--.

'ICP 2.3 Page 22

d. Relays - S2 - 273/A01 S3 - 274/A01 S4 - 273/A02 S5 - 274/A02
e. Trip combinations S2 - S4 S2 - S5 S3 - S4 S3 - S5 5.3.20 Reactor coolant pump breakers (Train "S")
a. Interlocks - P7, P8
b. Trip logic - 1/2 or 2/2
c. Selector switch position - 23
d. Relays - S2 - Reactor coolant pump "A" S3 - Reactor coolant pump "B"
e. Trip combinations One loop S2 15 3 Two loops S2 - S3 5.3.21 Reactor coolant flow low loop "A" (Train "B")
a. Intetuocks - P7, P8
b. Trip logic - 2/3 ,
c. Selector switch position - 16 i d. Relays - S2 - FC-411 S3 - FC-412 i S4 - FC-413
e. Trip combinations S2 - S3 l S2 - S4 S3 - S4

ICP 2.3 Page 23 5.3.22 Reactor coolant flow low loop "B" (Train "B")

a. Interlocks - P7, P8
b. Trip logic - 2/3
c. Selector switch position - 17
d. Relays - S2 - FC-414 S3 - FC-415 S4 - FC-416
e. Trip combinations S2 - S3 S2 - S4 S3 - S4 5.3.23 overtemperature AT trip (Train "B")
a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position - 7
d. Relays - S2 - TC-405C S3 - TC-406C S4 - TC-407C S5 - TC-408C
e. Trip combinations S2 - S3 S2 - S4 S2 - S5 S3 - S4 S3 - S5 S4 - SS 5.3.24 Overpower AT trip (Train "B")
a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position - 8 t

. _ __ , . _ _ _ _ _ _ _ ~ - . . _ -

ICP 2.3 Page 24

d. Relays - S2 - TC-405A S3 - TC-406A S4 - TC-407A SS - TC-408A
e. Trip combinations S2 - S3 S2 - S4 S2 - SS S3 - S4 S3 - SS S4 - SS 5.3.25 Power range high setpoint trip (Train "B")
a. Interlocks - none
b. Trip logic - 2/4
c. Selector switch position - 11
d. Relays - S2 - NC-41R S3 - NC-42R S4 - NC-43R SS - NC-44R
e. Trip combinations S2 - S3 S2 - S4 S2 - SS S3 - S4 S3 - SS S4 - S5 5.3.26 Power range low setpoint trip (Train "B")

CAUTION: PERFORM THIS CHECK ONLY IF REACTOR POWER IS BELOW P10.

a. Interlocks - Blocked above P10
b. Trip logic - 2/4
c. Selector switch position - 3

ICP 2.3 Page 25

d. Relays - S2 - NC-41P S3 - NC-42P S4 - NC-43P S5 - NC-44P
e. Trip combinations S2 - S3 52 - S4 S2 - S5 S3 - 54 S3 - SS S4 - S5 Checkoff 5.3.27 Reposition selector switch to Position 30.

5.3.28 Verify the following first out alarms on IC04 (2C04):

NIS PR High STPT Steam Generator "A" Low-Low Water Level NIS PR Low STPT Overtemp AT Steam Generator "B" Low-Low Water Level Overpower AT Steam Generator "A" Low FWF PRZR High Level Steam Generator "B" Low FWF PRZR High Press RC Low Flow Loop "A" PRZR Low Press RC Low Flow Loop "B" Turbine Trip RC Pumps Tripped 4 KV Bus 1A01 (2A01) and 1A02 (2A02) Under Voltage Verify RCP BKR Ch Alert on IC04 (2C04).

5.3.29 Have operator clear the above alarms.

5.3.30 Verify the following relays are energized for the specified condition:

No Reactor Trips RT-1 RT-2 RT-3 RT-4 RT-5 RT-6 RT-7 RT-8 RT-9 RT-10 RT-11 RT-12

ICP-2.3 Page 26 RC Flow - Loop "A" RC-1 RC-2 RC Flow - Loop "B" RC-3 RC-4 No Special Conditions I/N39AX I/N39BX Source Range Trip Blocked SRB-1 SRB-2 Intermediate Range Trip Blocked IRB-1 '

IRB-2 Low Power Range Trip Blocked PRB-1 PRB-2

<10% Power <49% Power P7-1 P8-1 P7-2 P8-2 P7-3 *P9-1

  • P9-2 P10-1 P10-2
  • Also when one circ pump running and >22" condenser vacuum.

5.3.31 Conduct a continuity check of the following checkoff auxiliary feedwater pump auto start relays if they are deenergized. Test points are located on the logic test panel.

LCAB TP1 to Common %320 ohms LCBB TP2 to Common $320 ohms

ICP 2.3 Page 27 Checkoff 5.3.32 Close reactor trip breaker "B" from the main control board.

5.3.33 Open bypass breaker "B" from the Train "A" logic test panel.

5.3.34 Place bypass breaker "B" in the pullout position.

5.3.35 Notify DSS upon completing this test.

(DSS)

NOTE 1: Reactor trip breaker "A" will trip on this step. Do not reclose this breaker until Step 5.2.32. Verify loss of voltage to the undervoltage coil for all other Train "A" trip combinations by use of the white light on the Train "A" test panel.

NOTE: 2: Reactor trip breaker "B" will trip on this step. Do not

reclose this breaker until Step 5.3.32. Verify loss of voltage to the undervoltage coil for all other Train "B" trip combinations by use of the white light on the Train "B" test panel.

- _ ,--..-__...,__._..-.,~...-_-_,_.._._,__._.-,_..,_,.-_.___..._,__,....,m___.._-.._ ._.._,. . _ -__ ,__,.. -._,_ -_.__

. ~ .- . . . , . . - . . . . - . . .

ICP 2.3 Page 28 6.0 PROBLENS Problesi:

i Action Taken:

4 i

a Followup Action Required: Yes No Test Equipment Used:

, Test Completed Reviewed Technician I&C Supervisor Date Date Approved Superintendent-I&C Date i

f 4

i i

l i

i

ICP 2.3 Attachment "A" CONTROL OPERATORS ALARH ANNUNCIATOR VERIFICATION RECORD "A" TRAIN Step 5.2.28 First out alarms on IC04 (2C04)

NIS PR High STPT Steam Generator "A" Low-Low Water Level NIS PR Low STPT Overtemp AT Steam Generator "B" Low-Low Water Level Overpower AT Steam Generator "A" Low FWF PRZR High Level Steam Generator "B" Low FWF PRZR High Press RC Low Flow Loop "A" PRZR Low Press RC Low Flow Loop "B" Turbine Trip RC Pumps Tripped 4 KV Bus 1A01 (2A01) and 1A02 (2A02) Under Voltage Verify RCP Breaker Ch. Alert on 1C04 (2C04)

"B" TRAIN Step 5.3.28 First out alarms on 1C04 (2C04)

NIS PR. High STPT Steam Generator "A" Low-Low Water Level NIS PR. Low STPT Overtemp AT Steam Generator "B" Low-Low Water Level Overpower AT Steam Generator "A" Low FWF PRZR High Level Steam Generator "B" Low FWF PRZR High Press RC Low Flow Loop "A" PRZR Low Press RC Low Flow Loop "B" Turbine Trip RC Pumps Tripped 4 KV Bus 1A01 (2A01) and 1A02 (2A02) Under Voltage Verify RCP Breaker Ch. Alert on IC04 (2C04)