g.
DOCKET NO.
'50-483 UNIT NAME CALLAWAY UNIT 1 DATE 10/6/86 (Revised 11/7/86)'
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 f
i f
PART A OPERATIONS SUff8ARY J
Unit operated at 100% power with one exception:
On 9/9/86, a low flow reactor trip occurred during replacement / restoration of a loop flow transmitter.
The plant was returned to operation within three hours.
i 4
1 PART B PORY AND SAFETY VALVE SLMfARY None
}-
i b
1 4
9 i
CA-#804 04/10/85 i-
?"'
8701290479 861117 QDP-ZZ-04204 PDR ADOCK 05000483 R
ppg
)
Page 1 of 4 4
4
4
{
9 Part C AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 10/f/86 (Rev.11/7/86)
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:
SEPTEMBER 1986 AVERACE DAILY POWER LEVEL AVEkAGE DAILY P0kTR LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1094 17 1100 2
1093 18 1097 3
1070 19 1087 4
1084 20 1086 5
1106 21 1085 6
1110 22 1086 7
1116 23 1094 8
1116 24 1087 9
648 25 1083 10 713 26 1089 11 1099 27 1092 12 1097 28 1086 13 1106 29 1091 14 1105 30 1099 15 1100 31 16 1103 CA-#804 04/10/85 QDP-ZZ-04204 Page 2 of 4
e s
Part D OPERATING DATA REPORT DOCKET NO.
50-483' UNIT NAME CALLAWAY UNIT 1 DATE 10/6/86 (Rev.11/7/86)
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 OPERATING STATUS (YTD CUM )
1.
REPORTING PERIOD: September 1986 GROSS HOURS IN REPORTING PERIOD:
720 (6551 15613.5) 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1120 DESIGN ELECTRICAL RATING (MWe-Net):
1171*
- At stretch power level which is not currently authorized under the Operating License.
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
100%
4.
REASONS FOR RESTRICTION (IF ANY):
THIS MONIH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...............
718.6 5097.6 13561.1 6.
REACTOR RESERVE SHUTDOWN HOURS.....................
0 0
0 7.
HOURS CENERATOR ON LINE............................
717.2 4915.5 13102.9 8.
UNIT RESERVE SHUTDOWN HOURS........................
0 0
0 9.
CROSS THERMAL ENERGY GENERATED (MWH)...............
2,395,748 15,596,462 41,614,015
- 10. CROSS ELECTRICAL ENERGY GENERATED (MWH)............
807,309 5,235,976 14,049,919
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)..............
768,584 4,969,478 13,338,265
- 12. REACTOR SERVICE FACTOR.............................
99.8%
77.8%
86.9%
- 13. REACTOR AVAILABILITY FACTOR........................
99.8%
77.8%
86.9%
- 14. UNIT SERVICE FACIOR................................
99.6%
75.a 83.9%
l
- 15. UNIT AVAILABILITY FACIOR...........................
99.6%
75.0%
83.9%
i l
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
95.3%
67.7%
76.3%
~
- 17. UNIT CAPACITY FACTOR (Using Design MWe)............
91.2%
64.8%
73.0%
l 1 18. UNIT IVRCED OUTAGE RATE............................
0.4%
4.8%
5.7%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): None l
20.
IF SHUT DOWN AT END OF REPORTING PERTOD, ESTIMATED DATE OF STARTUP:
l CA-#804 l
04/10/85 l
QDP-ZZ-04204 l
l Page 3 of 4 I
1
. ^
Part E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAME CALIAWAY UNII 1 DATE 10/6/86 (Rev. 11/7/86)
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: SEPTEMBER 1986 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 20.
9/9/86 F
2.8 A
3 Reactor trip on Icv loop 2 RCS flow signal while returning a flow transmitter to service following its replacement.
LER 66-030-00
SUMMARY
REAS(N METHOD A: E(UIPMENT FAILURE (EXPLAIN) 1: MANUAL B: M4 INT. OR TEST 2: MANUAL SCRAM C: RETUELING 3: AUTOMATIC SCRAM D: PlGULATORY RESTRICTION 4: OTHER (EXPLAIN)
E: OTERATOR TRAINING AND LIGNSE EXAMINATION F: AIMINISTRATIVE C: 0:EMTIONAL ERROR (EXPLAIN)
CA-#804 H: O'1IER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4