5 DOCKET No.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 6/6/86 (Revised 8/5/86)(Revised 11/7/86)
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 PART A OPERATIONS
SUMMARY
Plant operated at 100% power with the following exceptions:
Date Duration Reason 5/18/86 208.5 hrs.
Repair leak on "C" S/G Feedwater Check Valve.
5/30/86 18.4 hrs.
Investigate / repair hot spot on isophase bus duct.
Requalification training for Licensed Operators is currently in progress.
PART B PORV AND SAFETY VALVE
SUMMARY
None 8701290469 B61117 PDR ADOCK 05000483 PDR CA-s804 R
04/10/85 QDP-ZZ-04204 Page 1 of 4
4 e
Part C AVERACE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 6/6/86 (Rev. 8/5/86)
(Rev. 11/7/86)
COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:
MAY 1986 AVERACE DAILY POWER LEVEL AVERACE DAILY PokTR LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1109 17 726 2
1101 18 27 3
1114 19 0
4 1109 20 0
5 1105 21 0
6 1103 22 0
7 1103 23 0
8 1101 24 0
9 1101 25 0
10 977 26 0
11 996 27 538 12 1077 28 1050 13 1100 29 1071 14 1107 30 439 15 1103 31 314 16 1090 CA-#804 04/10/85 QDP-ZZ-04204 Page 2 of 4
m-M..
Pr.rt D OPERATING DATA REPORT DOCKET NO.
50-483 UNIT NAME CALIAWAY UNIT 1 DATE 6/6/86 (Rev. 8/5/86)
~(Rev. 11/7/86)
COMPLETED BY S. R. EVANS l
TELEPHONE 314/676-8742' i
I OPERATING STATUS (YTD CUM )
1.
REPORTING PERIOD: May 1986 CROSS HOURS IN REPORTING PERIOD:
744 (3623 12685.5) l 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411' MAX. DEPEND. CAPACITY (MWe-Net):
1120 l
DESIGN ELECTRICAL RATING (MWe-Net):
1171*
- At stretch power level which is not currently authorized under the Operating License.
3.
POWER IIVEL TO WHICH RESTRICTED (IF AhT) (MWe-Net):
100%
i 4.
REASONS FOR RESTRICTION (IF ANY):
I THIS M0fflH YR 10 DA1T CUMULATIVE 5.
NUMBER OF HOURS REACIOR WAS CRITICAL...............
566.8 2337.9 10801.4 i
6.
REACTOR RESERVE SHUTDOWN HOURS.....................
0 0
0
[
I' 7.
HOURS CENERATOR ON LINE............................
517.1 2204.5 10391.9
)
8 UNIT RESERVE SHUTDOWN HOURS........................
0 0
0 9
CROSS THERMAL ENERCY CENERATED (MWH)...............
1,628,231 6,793,090 32,810,642
- 10. CROSS ELECTRICAL ENERGY CENERATED (MWH)............
546,059 2,297,253 11,111,196 l
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)..............
517,736 2,179,382 10,548,169 i
i
- 12. REACTOR SERVICE FACTOR.............................
76.2%
64.5%
85.1%
- 13. REACTOR AVAILABILITY FACTOR........................
76.2%
64.5%
85.1%
l 14 UNIT SERVICE FACTOR................................
69.5%
60.8%
81.9%
i
- 15. UNIT AVAILABILITY FACTOR...........................
69.5%
60.8%
81.9%
i
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
62.1%
53.7%
74.2%
r 4
4
- 17. UNIT CAPACITY FACTOR (Using Design MWe)............
59.4%
51.4%
71.0%
1 118. UNIT FORCED OUTACE RATE............................
3.5%
1.5%
5.2%
r
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): None
)
i
- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STAR 11TP:
CA-#804 j
04/10/85 i
QDP-ZZ-04204 Page 3 of 4 1
v er v,--
,e---,.
,y
,,--,-n.,_,
wn-,ne~.n..
-,.,,,,.,,ve,-,-
-nn.
.--,-.--~--,,ww,----
e-,-,-----
}
Part E
{
CNIT SHUIDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAE -
CALIAWAY UNIT 1 g 86 g
/5/86)
DATE COMPLETED BY S. R. EVANS i
TELEPHONE 314/676-8742 REPORT MONTH: MAY 1986 ETHOD OF j
TYPE SPUTTING DOWN F: FORCED DURATION THE REACIOR OR DATE S: SCHEDULED (HOURS)
REASON REDLTING POWER mRRECTIVE ACTIONS /COMNTS
'l 19.
5/18/86 S
208.5 3
1 Repair leak on "C" S/G Feedwater Check Valve.
10.
5/30/86 F
18.9 A
1 Hot spot in isophase bus duct.
SIPEARY:
REASON ETHOD A EQUIPENT FAILURE (EIPLAIN) 1: MANUAL B: MAINT OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISIRATIVE G: OPERATIONAL ERROR (EXPLAIN)
CA-#804 H: OTHER (EXPIAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4