Forwards Minutes & Addendum for Regional Review Committee Feb 1984 Meeting Re Insps on Loss of Offsite & Onsite Power & Safeguards & Emergency Preparedness
ML20210T968
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/21/1984
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davis A, James Keppler, Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20210T938 List:
References
FOIA-86-266 NUDOCS 8606020138
Download: ML20210T968 (2)


Text

s

, 4.

FEB 2 1 1984 MEMORANDUM FOR: James G. Keppler, Regional Administrator A. B. Davis, Deputy Regional Administrator R. L. Spessard, Director, Division of Engineering C. E. Norelius, Director, Division of Project and Resident Programs J. A. Hind, Director, Division of Radiological and Materials Safety Programs FROM: W. D. Shafer, Chief, Projects Branch No. 2-

SUBJECT:

[

MINUTES OF PALISADES RRC MEETING TOR FEBRUARY 6, 1984 Q >

Attached for your review are the minutes and addendum for the February 1984 meeting.

There were two special inspections conducted relating to the loss of off-site and on-site power; Safeguards and Emergency Preparedness. The results of these inspections will be addressed in the next RRC meeting.

Should you have any questions regarding this memorandum, I will be happy to meet with you.

" Original signed.by W. D. Shafer" W. D. Shafer, Chief Projects Branch No. 2

Attachment:

As stated 8606020138 860516 PDR FOIA MURPHY 86-266 PDR RIII L

0 d/o2

Jhe -

. :^2__ _ _ ' _ _ _ __ """

"r" _ ________ _.__--..l_...._,..._.. '

I coil, wh{ch resulted in 80% of the tube showing indications in ge ator i

"A" and 95% of the tubes with indications in generator "B" he licensee i i

attributed this to intergranular attack (IGA). Th' indications appeared i to be similar to the ones found in 1970.

1 The licensee is developing a ogram (Laboratory Analysis Program) and j l

conducting research o ,amples supplied by Combustion Engineering (CE) to determine the se and depth of the indications. W. Key will submit a copy o e licensee's data to be used for developing the new program and l

1

2. LER 83 Valves Failed _to Meet "As Found" Acceptance Criteria I The Lead Project Manager of Mechanical Engineers was to report to NRR as i

to their findings on this LER. No report was made but W. Paulson is e taking this as an Action Item to followup.

e r m m .- m u,.x . en. n_,-+m. u..-- 3.

m i

I The licensee and Byron Jackson, the pump manufac nave anay1 zed the  !

l failure. The licensee concurs that speller was damaged by impact from I

some part or parts unkn ich caused the crack to initiate over a period i cf time. T censee will submit a written report to describe their l J.._ ... _. -