ML20210R723
ML20210R723 | |
Person / Time | |
---|---|
Site: | Grand Gulf, 05000000 |
Issue date: | 06/28/1985 |
From: | Chilk S NRC OFFICE OF THE SECRETARY (SECY) |
To: | Plaine H NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
Shared Package | |
ML20210R558 | List:
|
References | |
FOIA-86-56, REF-10CFR9.7 NUDOCS 8605190215 | |
Download: ML20210R723 (2) | |
Similar Documents at Grand Gulf, 05000000 | |
---|---|
Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217M6061999-10-20020 October 1999
[Table view]Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20204B3041999-03-15015 March 1999 Notification of Licensee Meeting with Util in Energy Svc Ctr,Grand Gulf Site on 990415 to Discuss Plant Performance Review Results.Meeting Open to Public ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20151X1651998-09-14014 September 1998 Notification of Significant Licensee Meeting W/Util on 980929 to Discuss Emergency Preparedness Activities & Issues ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M0751998-06-0909 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Installation & Design of Suppression Pool ECCS Strainer to Meet NRC Bulletin 96-003 ML20248B4181998-05-26026 May 1998 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 980330- 0403 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216H9441998-03-19019 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md for Licensee to Brief Staff on Risk Mgt for Upcoming 9th Refueling Outage Scheduled to Begin on 980411.Licensee Will Do Presentation to Meet NRC Bulletin 96-003 ML20216J4051998-03-18018 March 1998 Forwards SER Authorizing Licensee 980211 & 0310 Ltrs, Requesting Approval of Alternative Reactor Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii) for Plant for Next 2 Operating Cycles ML20217F2521998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet NRC Bulletin 96-003.Meeting Cancelled as of 980326 ML20216C8601998-03-11011 March 1998 Notification of 980331 Meeting W/Util in Rockville,Md to Discuss Design of Suppression Pool Strainer to Meet Bulletin 96-03 ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20198M7531998-01-12012 January 1998 Notification of Meeting W/Entergy Operations,Inc,On 980123 in Rockville,Md to Discuss Plans to Change Radiological Emergency Response Plan ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20217D0461997-09-29029 September 1997 Notification of Significant Licensee Meeting W/Util on 971029 to Discuss Systematic Assessment of Licensee Performance ML20141E8501997-06-27027 June 1997 Notifies of 970710 Meeting W/Licensee in Rockville,Md Re Appeal of Decision by Nrc,In ,That Changes in Rev 28.001-95 of Plant Emergency Plan Not within 10CFR50.54(q) & Can Not Be Implemented W/O Prior NRC Approval ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20135F8581997-03-13013 March 1997 Notification of 970424 Licensee Meeting W/Util in Arlington, Tx to Discuss Current Performance ML20135F0921997-03-0606 March 1997 Notification of Significant Licensee Meeting W/Util on 970319 to Discuss Current Performance.Meeting Cancelled ML20135D8531997-03-0303 March 1997 Notification of 970325 Meeting W/Util in Port Gibson,Ms to Discuss MOV Thurst Methodology Developed by Util.Subj Methodology Being Applied in Licensee Response to GL 95-07 ML20135D7791997-02-27027 February 1997 Notification of Significant Licensee Meeting W/Entergy Operations,Inc on 970319 in Arlington,Tx to Discuss Current Performance ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20135B6231996-11-27027 November 1996 Notification of 961217 Licensee Meeting W/Util in Arlington, Tx to Discuss Evaluation Approach & Results of UFSAR Assessments at Each Facility ML20134L6121996-11-19019 November 1996 Notification of 961121 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Views on Funding for Decommissioning Costs of Nuclear Power Plants as May Apply for Each of Four Nuclear Plant Sites ML20129K1821996-11-0606 November 1996 Notification of 961121 Visit to Plant to Review Component Procurement Packages Using Graded Quality Assurance That Have Been Completed by Licensee ML20134C9121996-10-0808 October 1996 Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSAR for Each Plant Site ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20029C5751994-03-24024 March 1994 Submits Info Re GL 92-01,rev 1, Reactor Vessel Structural Integrity. Record Copy ML20149D7871993-12-20020 December 1993 Provides Interim Guidance to Regions for Review of Licensee Action to Address Pressure Locking & Thermal Binding of Valves Until New Generic Communication Issued ML20058G5601993-11-30030 November 1993 Notification of 931206 Meeting W/Util in Rockville,Md to Discuss Licensee 931021 Request to Be Allowed to Use Alternatives to Requirements of 10CFR50.55a(f) & (G) ML20057B1281993-09-14014 September 1993 Forwards Page 33 of Rev 5 to GGNS Training & Qualification Plan,Transmitted Via .Page Inadvertently Omitted from Subj Transmittal.Page Withheld ML20057A4581993-09-0101 September 1993 Notification of Significant Meeting W/Util in Atlanta,Ga on 930916 to Discuss Refueling Outage Number 6 Plan & Current Plant Issues ML20056G4521993-08-30030 August 1993 Notification of Meeting W/Util in Rockville,Md to Discuss Plans & Schedule for Activities During Upcoming Grand Gulf Refueling Outage 6,shutdown Risk Assessment & 50.59 Reload Analysis for Outage 1999-09-02 Category:STAFF REQUIREMENTS MEMORANDUMS MONTHYEARML20246D8841989-06-19019 June 1989
[Table view]Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20153B1141988-06-29029 June 1988 Staff Requirements Memo Re Commission 880621 Briefing on TVA Reorganization & Status of Plants ML20147H6231988-03-0404 March 1988 Staff Requirements Memo Re Briefing on Status of Near Term Operating Licenses on 880224.Staff Committed to Provide Commission W/Util Projected Response Date to Questions on Potential Upgrading of Containment Bldg ML20236Y1501987-12-0707 December 1987 Staff Requirements Memo Re 871125 Affirmation/Discussion & Vote.Commission Approved Order Directing Aslab to Issue Decision by 880131 Re Installation of high-density Spent Fuel Racks & Order Vacating Stay for Low Power Operations ML20215L3101987-05-0707 May 1987 Staff Requirements Memo Re Commission 870430 Affirmation/ Discussion & Vote in Washington,Dc on SECY-87-68A Concerning Order to Rescind 861020 Order Directing Licensee to Show Why OL Should Not Be Modified.Order Signed on 870501 ML20213H1031986-11-17017 November 1986 Staff Requirements Memo Re Commission 861107 Affirmation/ Discussion & Vote in Washington,Dc on SECY-86-325A,approving Order Authorizing Issuance of Full Power License to Perry 1 & SECY-86-292/292A,approving Order Against Matls Disclosure ML20206L5601986-08-0808 August 1986 Staff Requirements Memo Re 860731 Affirmation/Discussion & Vote in Washington,Dc Re SECY-86-203,SECY-86-221,SECY-86-168 & SECY-86-184 ML20207Q7071986-08-0707 August 1986 Staff Requirements Memo Requesting Provision of point-by- Point Response of Generic Safety Concerns Outlined in ASLB .Response to 860609 & 0710 Requests Re Adequacy of Alert Sys During Stormy Winter Nights Also Requested ML20210J6121986-03-27027 March 1986 Staff Requirements Memo on 860320 Affirmation/Discussion & Vote in Washington,Dc Re SECY-84-4, Final Rule to Modify GDC 4 of App A,10CFR50, SECY-86-44, Review of ALAB-819, SECY-86-54,SECY-86-64 & SECY-86-80 ML20154G8601986-03-0303 March 1986 Staff Requirements Memo Re 860219 Briefing in Washington,Dc on Status of Isap for Operating Nuclear Power Plants. Commissioner Asselstine Requested Staff to Identify Fees Collected from Plants Involved in Isap Pilot Program ML20154A3421986-02-25025 February 1986 Staff Requirements Memo Re 860213 Affirmation/Discussion & Vote in Washington,Dc.Order Denying Suffolk County 860122 Motion Re Shoreham Emergency Exercise Approved.Order Denying Met Ed Employee 860114 Motion Also Approved ML20137R6991986-02-0707 February 1986 Staff Requirements Memo Re 860129 Affirmation/Discussion & Vote in Washington,Dc Concerning SECY-86-25 on Shoreham Cancellation of Emergency exercise,SECY-86-27 on Waterford & ALAB-812 & SECY-85-386 on Sixty Minutes Broadcast ML20141E2171986-01-0202 January 1986 Staff Requirements Memo Re 851218 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-241A & SECY-85-39 (ALAB-818).Board Established by Order to Preside Over Hearing on RCS Leak Rate Data Falsifications at TMI-2 ML20138N5501985-12-19019 December 1985 Staff Requirements Memo Re 851212 Affirmation/Discussion & Vote in Washington,Dc Re SECY-85-367A on Proposed Transaction for Refinancing Interest in Palo Verde 1 & Fee Refund for Black Fox ML20137Z3631985-12-0505 December 1985 Staff Requirements Memo Re Affirmation/Discussion & Vote on Extension of 851130 Deadline for Environ Qualification & Revised Post 851130 Environ Qualification Extension Request ML20137P5401985-11-25025 November 1985 Staff Requirements Memo Re 851119 Affirmation/Discussion & Vote in Washington,Dc on Order Extending 851130 Deadline for Environ Qualification at Listed Plants ML20137D3791985-11-21021 November 1985 Staff Requirements Memo Re 851114 Affirmation/Discussion & Vote in Washington,Dc.Orders Granting & Denying Extension of 851130 Equipment Qualification Deadline for Nine Mile Point & Brunswick,Respectively,Approved ML20140H5691985-09-0707 September 1985 Staff Requirements Memo Re 850903 Briefing in Washington,Dc on near-term Ols.Acrs Requested to Provide Updated Position on Prior to Anticipated Low Power or Full Power OL Decision, If ACRS View Differs from 811215 Rept ML20210R7231985-06-28028 June 1985 Partially Withheld Staff Requirements Memo Approving Draft Ltr to Congressman Markey & Memo Encl in SECY-85-93 Re Ofc of Inspector & Auditor Rept on Region II Handling of Falsification of Operator Qualifications.W/O Encls ML20128G7621985-06-28028 June 1985 Staff Requirements Memo Re 850620 Affirmation/Discussion & Vote in Washington,Dc.Edo & RES Should Forward Fr Notice Re Approved Final Rule on Pressurized Thermal Shock for Signature & Publication ML20133K5231985-04-0101 April 1985 Staff Requirements Memo Re Commission 850315 Briefing in Washington,Dc Concerning Continuance for NRC Investigation of TMI-2 Operators at Facility.Investigation Should Continue.Action on COMNP-85-14 & COMJP-85-1 Complete ML20117C2041984-08-0707 August 1984 Staff Requirements Memo Re 840803 Discussion/Possible Vote in Washington,Dc on Revised Draft Order on Need to Consider Complicating Effects of Earthquakes on Emergency Planning for Facility.Order Approved in Two Parts ML20133G5951984-08-0303 August 1984 Staff Requirements Memo Re 840731 Briefing in Washington,Dc on Investigation & Possible Enforcement Action.Ofc of Inspector & Auditor Noted That New Info Might Necessitate Correction of Previous Info Given to Congress ML20117C1771984-08-0101 August 1984 Staff Requirements Memo Re 840730 Discussion in Washington, DC Re Draft Order on Need to Consider Complicating Effects of Earthquakes on Emergency Planning.Commission Will Consider Affirming Revised Draft Order on 840802 ML20138Q8591984-05-23023 May 1984 Staff Requirements Memo Re Commission 840522 Meeting in Washington,Dc on Two Certified Questions by Aslab Concerning Facility Proceeding.Ofc of General Council Requested to Revise Proposed Order Attached to SECY-84-206 ML20126D9981984-05-18018 May 1984 Staff Requirements Memo Re 840516 Meeting on Continuation of Review of Proposed Shoreham Order.General Agreement Reached on Proposed Order as Modified at Meeting ML20138Q0931984-05-17017 May 1984 Staff Requirements Memo Re Commission 840424 Meeting in Washington,Dc on Representative Markey on Facility Proceeding & Request for Documents.Commission Will Not Provide Documents ML20126E0621984-05-16016 May 1984 Staff Requirements Memo Re 840511 Continuation of Discussion or Oral Presentations & Proposed Order Re OL Proceeding.Portions Deleted ML20138P8011984-05-0202 May 1984 Staff Requirements Memo Re Commission 840426 Meeting in Washington,Dc to Discuss Draft Order Directing Parties & Board to Establish New Schedule for Further Proceedings. Proposed Order Should Be Issued ML20209B7241984-01-25025 January 1984 Staff Requirements Memo Re Commission Affirmation/Discussion & Vote on 840123 in Washington,Dc Approving Order Modifying Commission 861108 Order CLI-83-27,authorizing Operation Under Modes 4 & 3 in Addition to Modes 6 & 5 ML20211D9021982-02-17017 February 1982 Staff Requirements Memo Re Phase II of Insp Rept of Seismic Reverification Program.Commission Agreed to Take No Action Re Eligibility of Rl Cloud Assoc,Inc to Be Independent Auditor for Reverification Program & to Release Phase II ML20133M2931979-06-0404 June 1979 Staff Requirements Memo Re 790530 Briefing in Washington, DC on Pipe Stress Issue at Beaver Valley.Subsequent Briefings on Seismic Reanalysis Matters Scheduled for Near Future.No Requirements as Result of Meeting 1989-06-19 |
Text
. _.
pa rec
/
og'o UNITED STATES I-NUCLEAR REGULATORY COMMISSION g
j
, g W ASHINGTON, D.C. 20555 t,
s
,9 4
'%/
June.28, 1985 OFFICE OF THC SECRETARY MENORANDUM EVR:
HerzelH.E.Plaine, Genera)pounsel 7
FBCM:
Sanuel J. Chilk, Secretary SUBJECI:
STAFF REQUIREMENIS - SECY 93 -
CONCWSIONS OF OIA REPORE 0B0 REGION II's HAtOLING OF GRAND GUIE FAISIFICATICN OF OPERA'IOR QUALIFICATIONS IN RESPONSE
'IO CI:NGRESSMAN MARKEY's QUESTIONS
'Ihe Ccmnission has approved your draft letter to Ccngressman Markey and the draft SRM presented as attachments to SECY-85-93, subject to the following modifications to the letter and SRM:
O cePas *=*> wwyp,.w..
..,+ s e me ar
.e.es.,,,., rap
,s.,>
ey4. es4.,,esen 6
9 8605190215 860417 PDR FOIA PDR RYANS6-56 h
I l
- =
4 r 6
nm Ccmnission has also voted 3-2 (with Camissioners Bernthal and Roberts disagreeing) not to release the OGC analysis to Region II prior to providing it with the letter to Congressman Markey.
Attachments:
As Stated cc: Chairman Palladino Ca missioner Roberts Cannissioner Asselstine Ccanissioner Bernthal Cmmissioner Zech OPE i