Proposed Tech Spec Changes Re Table 15.3.5-5, Instrumentation Sys, Containment Hydrogen Monitors & Administrative Changes
ML20207N943
Person / Time
Site: Point Beach  
Issue date: 01/08/1987
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20207N776 List:
References
NUDOCS 8701140507
Download: ML20207N943 (4)


Text

.

~.. -

TABLE 15.3.5-5 (Continued) l 1

2 3

MINIMUM NO. OF OPERABLE OPERATOR ACTION IF CONDITIONS OF COLUMN 2 NO.

FUNCTIONAL UNIT CHANNELS CHANNELS CANNOT BE MET

~

Containment High Range 3

2 If operability cannot be restored within 7.

Radiation Monitor seven days after failure, prepare a special j

report to be submitted within thirty days in accordance with.15.6.9.2.D.

8.

Containment High Range 2

1 If operability cannot be restored within 48 Pressure Monitor hours, be in hot shutdown within twelve hours.

9.

a. Containment Water Level 2

1 Operation may continue up to thirty days.

If.

Keyway operability cannot be restored, be in hot j

shutdown within the next twelve hours.

i

b. Containment Water Level 2

1 If the operability cannot be restored within j

Sump B Continuous Indication 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, be in hot shutdown within twelve j

hours.

I 10.

Containment Hydrogen Monitors 2

1 If operability cannot be' restored within 72 l

hours, be in hot shutdown within the next six hours.

i 11.

Reactor Vessel Fluid Level 4

1 If operability cannot be_ restored within 48 System hours, be in hot shutdown within the next twelve hours.

l 12.

In-Core Thermocouples 4/ core 2/ core If operability of at least two thermocouples quadrant quadrant per core quadrant cannot be restored within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, be in hot shutdown within the next j

twelve hours.

13.

Main Steam Line Radiation 1/ steam 1/ steam If operability cannot be restored within seven j

Monitors (SA-11) line line days, prepare a special report to be submitted j

within thirty days in accordance with j

15.6.9.2.E.

i 8701140507 870108 T

PDR ADOCK 05000266

  • i j

P PDR i

1 I

1 TABLE 15.3.5-2 INSTRUMENT OPERATION CONDITIONS FOR REACTOR TRIP 1

2 3

4 5

OPERATOR ACTION NO. OF MIN.

MINIMUM PERMISSABLE IF CONDITIONS OF NO. OF CHANNELS OPERABLE DEGREE OF BYPASS COLUMN 3 OR 4 NO. FUNCTIONAL UNIT CHANNELS TO TRIP CHANNELS REDUNDANCY CONDITIONS CANNOT BE MET 1.

Manual 2

1 1

Maintain hot shutdown 2.

Nuclear Flux Power Range **

2 of 4 power range Maintain hot low setting 4

2 3

2 channels greater than shutdown high setting 4

2 3

2 10% F.P. (low setting only) 3.

Nuclear Flux Intermediate Range 2 1

1 2 of 4 power range chan-Maintain hot nels greater than 10% F.P. shutdown.

Note 1 4.

Nuclear Flux Source Range 2

1 1

1 of 2 intermediate range Maintain hot chaggelsgreaterthan shutdown.

Note 1 10 amps 5.

Overtemperature AT 4

2 3

2 Maintain hot shutdown 6.

Overpower AT 4

2 3

2 Maintain hot shutdown 7.

Low Pressurizer Pressure 4

2 3

2 Maintain hot shutdown 8.

Hi Pressurizer Pressure 3

2 2

1 Maintain hot shutdown 9.

Pressurizer-Hi Water Level 3

2 2

1 Maintain hot shutdown

10. Low Flow in one loop (>50%

3/ loop 2/ loop 2/ loop 1/ loop Maintain hot F.P.)

(any loop) shutdown Low Flow Both Loops (10-50% 3/ loop 2/ loop 2/ loop 1/ loop F.P.)

(both loops)

TABLE 15.3.5-2 (Cent'd) 1 2

3 4

5 OPERATOR ACTION NO. OF MIN.

MINIMUM PERMISSABLE IF CONDITIONS OF NO. OF CHANNELS OPERABLE DEGREE OF BYPASS COLUMN 3 OR 4 NO. FUNCTIONAL UNIT CHANNELS TO TRIP CHANNELS REDUNDANCY CONDITIONS CANNOT BE MET

11. Turbine Trip 3

2 2

1 Maintain <50% of rated power

12. Steam Flow - Feed Water 2/ loop 1/ loop 1/ loop 1/ loop Maintain hot Flow mismatch shutdown
13. Lo Lo Steam Genetitor 3/ loop 2/ loop 2/ loop 1/ loop Maintain hot j

Water Level shutdown

14. Undervoltage 4 KV Bus 2/ bus 1/ bus 1/ bus Maintain hot (both buses) shutdown
15. Underfrequency 4 KV Bus 2/ bus 1/ bus 1/ bus Maintain hot (both buses) shutdown NOTE 1: When block condition exists, maintain normal operation.

F.P.

Full Power

=

  • Not Applicable
    • One additional channel may be taken out of service for low power physics testing.

i Page 2 of 2 i

~

TABLE 15.3.5-1 (Continued)

+

~"

j

-(Page 2 of 2)

NO.

FUNCTIONAL UNIT CHANNEL SETTING LINIT j

9.

Degraded Voltage (4.16 KV)

Disconnection of affected

>3797.5 volts l

bus from offsite power Time delay:

less than 60 sec at 0-100% of voltage l

setting 10.

Loss of Voltage a.

4.16 KV Disconnection of affected a.

>3155.6 volts bus from offsite power Time Delay: <1.1 sec Start Diesel at 0-100% of voltage setting l

l b.

480 V Load shedding b.

>248.32 volts Time delay:

-<.825 sec at 0 volts l

<4.2 sec at 90% of voltage setting 3

I 4

j i

i i

!