Forwards Proposed Agenda for NRC Mgt Meeting Scheduled for 850612 in Arlington,Va to Discuss Issues That Must Be Resolved to Reach Licensing Decision on Comanche Peak
ML20207D822
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/05/1985
From: Noonan V
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To: Eisenhut D, Hayes B, Taylor J
NRC
Shared Package
ML20205D361 List:
References
FOIA-85-799 NUDOCS 8607220198
Download: ML20207D822 (5)


Text

.. . .

~

  1. %'o, UNITED STATES ~h

[ "j NUCLEAR REGULATORY COMMISSION ,

'j wassmeton, o. c. nosss

'g * * . .

JHb 19b5 MEMORANDW1 FOR: D. Eisenhut .

J. Taylor B. Hayes E. Christenbury R. Martin , Region IV E. Jordan J. Axelrad J. Gagliardo FROM: Vincent S. Noonan, Director Comanche Peak Project

SUBJECT:

NRC STAFF MEETING ON COMANCHE PEAK The attached is my proposed outlined agenda for the NRC management meeting schedule for June 12, 1985 to be held at Region IV offices in Arlington, Texas. Each key aren/ participant is asked to present a prepared paper on his assigned area focusing on the identification of all issues that need to be

[ resolved in order to reach a licensing decision on Comanche Peak. Each

(;, presenter should be sure to identify all problems or potential problems including management issues and resource requirements. This meeting is scheduled to start at 12:30 p.m.

4#

M

, Director

~

omanche P ak P joct cc: H. Denton J. Taylor G. Cunningham L. Shao J. Calvo C. Tramell l 'A. Vietti S. Burwell

~

l l

8607220190 060715 DE 99

%/36

.. . - .- . . .. - ~. . -. . .. - . - . . .

~

s

.c%

\.

AGENDA -

i

June 12, 1985 s t 1

l l I. Opening Coments D. Eisenhut/V. Noonan 12:30 4

II. Status of Licensing C. Tramell 1:b0 l A.,71etti-Cook S.'Burwell r

3 Routine Licensing I -

FSAR (open, confirmatory issues '

! licensing conditions, technical ,

,i specifications)

- Protective Coatings -

1 III. Status of Engineering Issues L. Shao 1:30 (DesignandContruction) +

- Cygna Issues /SSER #5 t -

Designallegations(Walsh/Doyle) .

TRT Design and Construction

(

Implementation Issues identified ,

i' in SSER's 7-11

- TRT Concluding Actions (staff /TUEC)

Design and Construction *ssues/results/ conclusions i IV. Status of Electrical / Operational J. Calvo -

2:00 1

Issues (DesignandConstruction) i

- Cygna Issues /SSER #5

! - TRT Design and Construction Implementation

t Issues identified in SSER's 7-11 ,

i -

TRT concluding actions (staff /TUEC) '

- Design and Construction Issues /results/cc'iclusions 3 I

! V. Status of Intimidation / Harassment J. Gagliardo/ 2:30 ,,.

Panel J. Axelrad Overall results of review e Future Activities Evaluation Issued /SSER Schedule

! BREAK 2:45-3:00  !

l VI. Status of Region IV, including e.g.; R. Martin 3:00 1

- Routine Regional Inspe.ctionc .

1 - Open Inspection Itenis 50.55(E) Items t

- IE Inspections SSER Confimatory items sa.--wo.en- ,e- -pr-,-+- --m w

c

- 2-VII. Status of Hearing E. Christenbury 3:30

- Design QA/QC (adequacy of pipe support design)

Construction QA/QC

- Intimidation VIII. Status of Investigatiens B. Hayes 4:00 Status of Open Cases Best guess outcomes C#Ge+ j 77CT,.: - s [Mg ,7 M77 j. j IX. Contention 5 Panil Coments E. Jordan 4:30 X. Status of Enforcement Issues Region IV/J. Axelrad 4:45 XI. Conclusion - Future ,

V. Noonan 5:15

- Review of Program Plan Various Roles ye f .- .*e-+e = ***e-ge=== y ee ,= *-e =-e- -e. . . . . .

.----n. - . - - , . . - . - ., -- , , . - - - - -. , . , . , - . . - - . - - - . - - - - - - - _ . - - - - - - - - . - - - -

_ _, ~

A REPORT OF CP INTIMIDATION PANEL STATUS Reviews by Panel and by Study Team

1. Charter
2. DStudyTeam
a. Parallel paths
b. Similar findings
c. Study Team, consultant to the Panel
d. Study Team reports to be part of SSER Definition of Intimidation Review Status
1. All reviews under initial scope complete.
2. Consultants review of transcripts raised additional ._ ' ;"

potential intimidation incidents.

Overall Results of Review

1. Ten incidents of intimidation /
2. Intimidation incidents not pervasive
a. By def of Study Team not a Climate of Intimidation
b. Right Chemistry for Intimidation .
3. Management Style-Autocratic / Bureaucratic and sometimes A'rrogant
a. Way intimidation incidents handled
b. Fearofemployees-(fromTRT)

.........._.3._--~~g;..r.~..-...---.

. . . - - - - ;_-~- ; .: = ; . _.;__ _ ._ _ . . . . ~+ . . .. .c

4. Applicants actions
a. Need to restore" Quality First Attitude"
b. Trust of employees
c. Recommend third party study Future Activities
1. Meeting with all parties to finalize report.
2. Meet with intervenor group and Applicant on June 27 for closing arguments. '
3. Intervenors want meeting with allegers.
4. Meeting with Applicant after SSER issuance on CA.

Evaluation Issued /SSER Schedule

1. SSER schedule to be issued week after June 28 meeting.
2. Only issues are
a. Allegations not reviewed
b. Concern by ELD on Study Team Report

y h UAN 15 1985 Note to: Jim Gagliardo

Subject:

ASLB Deposition of Evert Mouser During his deposition of January 3,1984, Mr. Evert Mouser, a former QC inspector at Comanche Peak, described meetings between himself and TUGC0 QA management that may have been an example of intimidation. Judge Bloch at

p. 22788 expressed hope that, "the Staff working intimidation will consider what Mr. Mouser has said and his familiarity with these questions." This matter is being examined by the TRT staff, but is being brcught to the attention of the Intimidation Panel as wel I have enclosed the pertinent transcript excerpt.

on

Enclosure:

As stated cc: S. Treby, OELD D. Eisenhut TWA-5-149 l

/

M){ ,w jp py g %r{ 1hO avy N 1-3 '

[(f'

  1. 5 UNITED STATES 8 ~ ,7, NUCLEAR REGULATORY COMMISSION i  : E WASHINGTON, D. C. 20555

\.../ i j

NOV 0 4 35 .

Docket Nos.: 50-445 and 50-446 Mr. W. G. Counsil Executive Vice President Texas Utilities Generating Company Skyway Tower ,

400 North Olive Street, L.B. 81 Dallas, Texas 75201

Dear Mr. Counsil:

SUBJECT:

REPORT OF COMANCHE PEAK INTIMIDATION PANEL The enclosed report documents the results of the review and evaluation of allegations of intimidation and harassment at the Comanche Peak Steam Electric Station (CPSES). This review was performed by the Comanche Peak Intimidation Panel (Panel) and by a Study Team composed of a group of consultants.

The Study Team perfomed an in depth review and evaluation of alleged incidents of intimidation and harassment (Attachment 1 and 2 of report). The Study Team concluded and the Panel concurred that, while some instances of intimidation did occur, there was no pervasive climate of intimidation at CPSES.

As recommended by the Panel, you are requested to perfom an assessment of the incidents described in this report, as well as the current condition at the site. You should also address your comitment to assure the establishment of a quality first attitude by your management and employees, as well as describe any evaluation, programs or other efforts underway or to be undertaken m

directed at this situation.

Your written response to the foregoing matters should be provided within 30 days of your receipt of this request.

//

. ontIf

, - o.anche P k Prciect cc: See next page Pb%-S"!r-W

~_

bc / J W / pW6

, T>/3B _

Distribution:

Docket File [,) h NRC PDR L PDR jb kffr}

NSIC NOV I 2 igg l PRC System l '

LBil Reading File M. Rushbrook

'X Attorney, OELD -

ACRS (16)

J. Partlow E. Jordan B. Grimes

  • A. Vietti-Cook J. Calvo L. Shao S. Burwell V. Noonan C. Traninell W. Dircks H. Denton D. Eisenhut H. Thompson G. Cunningham, ELD E. Christenbury, ELD J. Taylor, IE R. Vollmer, IE R. Martin R. Denise T. Westerman G. Gagliardo J. Axelrad. IE J. Lieberman, IE D. Hunter, RIV

W. G. Counsil Comanche Peak Steam Electric Station Texas Utilities Generating Company Units 1 and 2 cc:

  • Nicholas S. Reynolds, Esq. Resident Inspector / Comanche Peak Bishop, Liberman, Cook, Nuclear Power Station Purcell & Reynolds e/o U.S. Nuclear Regulatory Commission 1200 Seventeenth Street, NW P. O. Box 38 Washington, D.C. 20036 Glen Rose, Texas 76043 Robert A. Wooldridge, Esq. Regional Administrator, Region IV Worsham, Forsythe, Sampels & U.S. Nuclear Regulatory Commission Wooldridge 611 Ryan Plaza Drive, Suite 1000

' 2001 Bryan Tower, Suite 2500 Arlington, Texas 76011 Dallas, Texas 75201 Mr. Homer C. Schmidt Larry A. Sinkin Manager - Nuclear Services 3022 Porter Street, NW #304 .

Texas Utilities Generating Company Washington, D.C. 20008 Skyway Tower 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Mr. Robert E. Ballard, Jr. Ms. Billie Pirner Garde Director of Projects Citizens Clinic Director Gibbs and Hill, Inc. Government Accountability Project 11 Pen Plaza 1901 Que Street, NW New York, New York 10001 Washington, D.C. 20009 David R. Pigott, Esq.

Mr. A. 7. Parker Orrick, Herrington & Sutcliffe Westinghouse Electric Corporation 600 Montgomery Street P. O. Box 355 San Francisco, California 94111 Pittsburgh, Pennsylvania 15230 Anthony Z. Roisman, Esq.

Renea Hicks, Esq. Trial Lawyr:rs for Public Justice Assistant Attorney General 2000 P. Street, NW Environmental Protection Division Suite 611 P. O. Box 12548. Capitol Station Washington, D.C. 20036 Austin, Texas 78711 Nancy E. Wiegers Mrs. Juanita Ellis, President Spiegel & McDiarmed Citizens Association for Sound Energy 1350 New York Avenue, NW -

1426 South Polk Washington, D.C. 20005-4798 Dallas, Texas 75224 Ms. Nancy H. Williams CYGNA 101 California Street San Francisco, California 94111

Texas Ut'ilities Electric Company Comanche Peak Electric Station Units 1 and 2 cc:

Resident Inspector - Comanche Peak '

c/o U.S. Nuclear Regulatory Commission P. O. Box 1029 Granbury, Texas 76048 Mr. .lohn W. Beck Vice President Texas Utilities Electric Company .-

Skyway Tower 400 t!. Olive Street, LB781 Dallas, Texas 75201 Mr. Jack Redding Licensing -

Texas Utilities Generating Company 4901 Fairmont Avenue Bethesda, Maryland 20814 William A. Burchette Esq.

Heron, Burchette, Ruckert & Rothwell Suite 700 1025 Thomas Jefferson Street, NW Washington, D.C. 20007 Mr. James McGaughy Southern Engineering Company of Georgia 1800 Peachtree, Street, NW Atlanta, Georgia 30367-8301 Administrative Judge Peter B. Bloch U.S. Nuclear Regulatory Commission Washington, DC 20555 Herbert Grossman Alternate Chairman ASLB Panel U.S. Nuclear Regulatory Commission Washington, DC 20555 Dr. Kenneth A. McCollom, Dean Division of Engineering, Architecture and Technology -

Oklahoma State University Stillwater, Oklahoma 74074 Dr. Walter H. Jordan 881 W. Outer Drive Oak Ridge, Tennessee 37830

-,.e- - -,