ML20207D480

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for All Records Re 851104 Rept on Harassment & Intimidation.Forwards Documents in App B
ML20207D480
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/15/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20205D361 List:
References
FOIA-85-799 NUDOCS 8607220121
Download: ML20207D480 (5)


Text

- - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

UNITED STATES W ol6

/ p ueg}o NUCLEAR REGULATORY COMMISSION g g W ASHINGTON. D. C. 20SSS U :j

%,...../

Ms. Billie Pirner Garde. Director MR.151986 Environmental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO FOIA-85-799

Dear Ms. Garde:

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

l_ This is a partial response to your request. We will notify you upon completion of search for and review of any additional records subject to your request.

The staff has completed the search for and review of records subject to your request, and this is the final response to your request.

The NRC has no recorda subject to your request.

l Records subject to your request are available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted p.

on the enclosure (s). The PDR accession number is identified beside each record description.

J __ Records subject to your request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC l 20555, in the PDR file folder under the above number and your name. These records are listed on the enclosure (s).

__ We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.

Sincerely, gyi f M ,6 :s0c Donnie H. Grimsley, Director Division of Rules and Records Office of Administration Enclosure (s): As stated 8607220121 860715 PDR FOIA OARDE85-799 PDR

Re: FOIA-85-799 APPENDIX B

1. Undated (85) Matrix on 01 material reviewed by intimidation panel w/ handwritten note on content by Jim G. (2 pgs)
2. Various dates Data sheets on the review of depositions and testimony w/ handwritten note on content by Jim G. (26 pgs)
3. Undated Listings of depositions and testimonies regarding
  • interviews with allegers (28pgs)
4. Undated Analysis of Intimidation and Discrimination at Comanche Peak, Arvil Dillingham (2pgs)
5. Undated Analysis of Intimidation and Discrimination at Comanche [

Peak, Robert Messerly (2pgs)

6. Uadated Time-Line of CPSES alleged incidents of intimidation (4pgs) 7, Undated Draft of original Safety Evaluation Report (SSER) for TUCCo (30pgs)
8. 5/25/85 Draft 2 of SSER (32pgs)
9. Undated Analysis of Intimidation and Discrimination at Comanche Peak (3pgs)
10. 6/10/85 ,

Draft 3 of SSER, with comments from the panel (42pgs)

11. 6/10/85 Draft 3 (final version) of SSER (41pgs)
12. 5/85 Draft 6 of Study Team Report (50pgs)
13. 8/8/85 Draft 8 of Study Team Report (74 pgs)
14. 1/10/84 irandwritten note, Conrad to vince/ Jim w/att, page from transcript pg no. 22788 (2 pgs)
15. Undated llandwritten note from Jim, (lpg)
16. 1/2&/85 Note to Jim Gagliardo, subject: " Allegation of Improper Disclosure of Confidential Information by and 01 Investigator" (1 pg)

7 Re: F01A-85-799 17, Undated Draft SSER, unnumbered (28pgs)

18. 7/17/85 Facsimile from J. E. Cagliardo to Charlie Trammell (2 copies) and Sumnary of Comanche Peak Intimidation Panel Meeting on June 28, 1985 (4 pgs)
19. 9/85 Draf t of " Report of The Review And Evaluation Of Allegations Of Intimidation And Harrassment Of Employees At Comanche Peak Steam Electric Station Units 1 and 2" (9pgs)
20. 9/4/85 Handwritten memo from Jim C. to CP Intimidation Panel Study Team (lpg)
21. Undated Draf t memo from Comanche Peak Intimidation Panel J. Cagliardo to Vincent Noonan w/att of draft of Intimidation Panel Report (14 pgs)
22. Undated Draft memo from James Cagliardo to Vincent S. Noonan, 2 subject: " Report of Comanche Peak Intimidation Panel" w/ report attached, Final draft report of Comanche Peak Intimidation Panel (11 pgs)
23. 10/16/85 Memo from J. . E. Cagliardo to Comanche Peak Intimidation Panel and Advisors, subject: " Study Team Report" (lpg)
24. 10/18/85 Memo from J. E. Cagliardo to Comanche Peak Intimidation Panel, subject: " Briefing of Senior Management" (lpg)
25. 10/18/85 Memo from James E. Gagliardo to Vincent S. Noonan, subject: " Report of Comanche Peak Intimidation Panel transmits final report, Comanche Peak Steam Electric Station. Alleged Climate of Intimidation (48 pgs)
26. 9/85 Comanche Peak Steam Electric Station: Alleged Climate of Intimidation Supplementary Report (50pgs)
27. 10/28/85 Memo from J. E. Cagliardo to E. L. Jordan, subject: Report of Comanche Peak Intimidation Panel" (lpg)
28. 11/1/85 Memo from James E. Cagliardo to Vince Noonan, subject:

" Additional Effort and Input Needed From The 1611 Panel"(lpg)

29. 4/2/85 llandwritten note from Jim Gagliardo to Study Team Members (2pgs)

9 Re: FOIA-85-799

30. 1/30/85 Memo from S. Treby to J. Gagliardo, subject: " Transmitting June 14, 1984 TR and Staff Filings" (lpg)
31. Undated Handwritten note, Jim (lpg)
32. 4V9/85 Memorandum from Vincent Noonan to James Gagliardo, subject:

" Alleged Intimidation" (lpg)

33. 4/16/85 Memorandum from Vincent Noonan to James Gagliardo, subject:

" Record Review Group Findings" w/att. " Summary Allegations Lacking Number Identification" (6 pgs) '

34. 6/3/85 Handwritten note, Jim G to TRT group leaders v/att, pages from SSER (out of context) (7 pgs)
35. 9/26/85 Memorandum from Vincent S. Noonan to J. Gagliardo (and others) subject: " Internal NRC Directors Meeting (Comanche Peak)"

, w/att, Agenda for Meeting , Gagliardo's briefing notes, (4 pgs)

36. 6/5/85 Memorandum from Vincent S. Noonan to Jim Gagliardo, subject:

"NRC Staff Meeting on Comanche Peak w/ agenda, ,

briefing notes, (5 pgs)

37. 1/15/85 Note from Vincent Noonan to Jim Gagliardo, subject: (lpg),

"ASLB Deposition of Evert Mouser"

38. 11/4/85 Letter (w/ distribution sheet), Vincent S. Noonan to W. G. Counsil.

TUGCo, subject: " Report of Comanche Peak Intimidation Panel" (4pgs)

Re: F01A-85-799

39. Comanche Peak Intimidation Panel Meeting Sumary for 1/4/85 Meeting.

(9 pages)

40. Time-Line analysis of alleged incidents of intimidation at Comanche Peak plant. (4 pages)
41. 01 assignments to Intimidation Panel. (1 page)
42. Comanche Peak Intimidation Panel Meeting Sumary for 12/14/84 meeting.

(6 pages) .

. 43. Memorandum from J. Gagliardo to Intimidation Panel Members dated 1/2/8 6 .

regarding summary of 12/21/85 Panel meeting. (3 pages)

44. Comanche Peak Intimidation Panel Meeting Summary for 1/7/85 meeting.

(2 pages)

45. Memorandum from J. Gagliardo to Intimidation Panel Members dated 1/30/85 regarding the revised schedule for Panel activities. (3 pages)
46. Comanche Peak Intimidation Panel Meeting Sumary for 1/25/85 meeting.

(1 page)

47. Comanche Peak Intimidation Panel Meeting Summary for 2/1/85 meeting.

(1 page) 48.~ Memorandum from J. Gagliardo to Intimidation Panel Members and Advisors dated 10/16/85 regarding the Study Team Report. (1 page)

49. Memorandum from J. Gagliardo to E. Jordan dated 10/28/85 regarding the '

Report of the Comanche Peak Intimidation Panel. (1 page) k

50. Possible Definitions of Intimidation, Harassment, and Discrimination.

(1 page)

51. Comanche Peak Allegatinns. (1 page)

,,,r --- - - , , ,-,-- v,e-w- - - . - , - --- - , - - - - . - - - , - -y , , . -c- n , ,, e n