MONTHYEARML20211K7841985-04-25025 April 1985 Forwards Affidavit for Withholding Proprietary McGuire Units 1 & 2 Tubesheet Region Plugging Criterion (Ref 10CFR2.790).Nonproprietary Version Encl.Proprietary Version Withheld Project stage: Other ML20127P5321985-05-0909 May 1985 Summary of 850502 Meeting W/Util & Westinghouse in Bethesda,Md Re Steam Generator Tube Plugging for Indications within Tubesheet Region.List of Attendees & Viewgraphs Encl Project stage: Meeting ML20195E2821986-05-28028 May 1986 Proposed Tech Spec 3/4.6.2.3,deleting Drywell Air Lock Seal Pressure Instrumentation 31-day Channel Functional Test from Surveillance Requirement 4.6.2.3.d.1 Project stage: Other ML20211K7711986-06-24024 June 1986 Application for Amends to Licenses NPF-9 & NPF-17,modifying Steam Generator Tube Plugging Criteria to Allow Evaluations of Degraded Tubes to Be Performed within Tubesheet.Fee Paid Project stage: Request ML20211K7791986-06-24024 June 1986 Proposed Tech Specs,Changing Steam Generator Tube Plugging Criteria to Allow Evaluations of Degraded Tubes to Be Performed within Tubesheet Project stage: Other ML20206U0001986-07-0101 July 1986 Forwards Revised Marked Up Proposed Tech Specs,Re Criterion for Plugging Steam Generator Tubes,Reflecting Change in Wording of Proposal.Changes Not Functionally Different from Changes in 860624 Submittal Project stage: Other ML20203A5051986-07-10010 July 1986 Informs of Present Schedule for Ongoing Refueling Outage,Per Proposed Changes to Tech Specs Submitted in 860624 & 0701 Ltrs.Approval of Change Required Prior to Entry Into Mode 4, Presently Scheduled for 860822 Project stage: Request ML20207B1381986-07-11011 July 1986 Disagrees That Proposed Amends to Licenses NPF-9 & NPF-17, Eliminating Need to Plug Steam Generator Tubes,Would Not Involve Significant Hazards Consideration.Notice of Opportunity for Prior Hearing Re Amends Encl Project stage: Other ML20207B1531986-07-11011 July 1986 Notice of Consideration of Issuance of Amends to Licenses NPF-9 & NPF-17 & Opportunity for Prior Hearing Re Elimination of Requirements for Plugging Steam Generator If Defect 2 Inches Below Top of Tube Sheet Project stage: Other ML20211P2621986-07-16016 July 1986 Notification of 860725 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Proposed Tech Spec Change Re Plugging of Steam Generator Tubes W/Defects in Tubesheet Region Project stage: Meeting ML20212B8841986-07-31031 July 1986 Nonproprietary Tubesheet Region Plugging Criterion for Duke Power Co McGuire Nuclear Station Units 1 & 2 Steam Generators Project stage: Other ML20212B8741986-08-0101 August 1986 Requests That WCAP-11224 Tubesheet Region Plugging Criterion for Duke Power Co McGuire Nuclear Station Units 1 & 2 Steam Generators Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl Project stage: Other ML20212B8661986-08-0505 August 1986 Proposed Tech Specs,Incorporating Revised Steam Generator Plugging Criteria Project stage: Other ML20212D0061986-08-0505 August 1986 Suppls 860320 Application for Amends to Licenses NPF-9 & NPF-17,permitting Use of multi-element TN-8 & TN-8L Spent Fuel Casks for Receipt of Irradiated Fuel.Info Re Environ Impacts Per 10CFR51.52 Encl Project stage: Request ML20205H8161986-08-11011 August 1986 Environ Assessment & Finding of No Significant Impact Re Application for Amends to Licenses NPF-9 & NPF-17 to Revise Tech Spec 3/4.4.5, Steam Generators Project stage: Other ML20206M2951986-08-13013 August 1986 Supplemental Application for Amends to Licenses NPF-9 & NPF-17,revising Tech Specs Re RCS Surveillance Requirements for Steam Generator Tube Plugging.Tubes Will Be Inspected During Each Inservice Insp Project stage: Supplement ML20206M3031986-08-13013 August 1986 Proposed Tech Specs Re RCS Surveillance Requirements for Steam Generator Tube Plugging Project stage: Other ML20206M2821986-08-18018 August 1986 Forwards Revised marked-up Pages to Proposed Tech Specs Re Criterion for Plugging Steam Generator Tubes Reflecting Change in Wording of Proposal.Changes Not Functionally Different from Changes in 860813 Submittal Project stage: Other ML20206N9981986-08-19019 August 1986 Notice of Issuance of Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML20206N9811986-08-19019 August 1986 Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively, Modifying Steam Generator Tube Plugging Requirements for Tube Defects Located in Tubesheet Region Project stage: Other ML20206N9861986-08-19019 August 1986 Safety Evaluation Supporting Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively,modifying Steam Generator Tube Plugging Requirements for Tube Defects Located in Tubesheet Region Project stage: Approval ML20206P8861986-08-25025 August 1986 Approves Withholding WCAP-10949, Tubesheet Region Plugging Criterion for Full Depth Hardroll Expanded Tubes, Per Util 860723 Application & Recipient 860722 Affidavit (Ref 10CFR2.790) Project stage: Other ML20210S5421986-09-22022 September 1986 Submits Addl Info Re Radiochemistry Program for Primary to Secondary Leakage Detection & Quantification,Per 860812 Telcon Request Project stage: Other ML20203N6881986-10-15015 October 1986 Agrees to Withhold Proprietary Version of McGuire Units 1 & 2 Tubesheet Region Plugging Criterion, (Ref 10CFR2.790) Per 860801 Request Project stage: Other 1986-07-16
[Table View] |
Text
'
\\
om
[
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
l 3
-E WASHINGTON, 9. C. 20555 o,
5 p#
AUG 2 r ;gg; Docket Nos.
50-369 and 50-370 Robert A. Wiesemann, Manager Regulatory & Legislative Affairs Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvanis 15230-0355
Dear Mr. Wiesemann:
i
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-86-061)
By application dated July 23, 1986, Duke Power Company submitted WCAP-10949 titled "Tubesheet Region Plugging Criterion for Full Depth Hardroll Expanded Tubes" along with your affidavit dated July 2E,1986, and requested that they be withheld from public disclosure pursuant to 10 CFR 2.790.
Your affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
1.
The infomation sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
2.
The infomation is of a type customarily held in confidence by Westing-house and not customarily disclosed to the public.
3.
The infonnation was transmitted to the Consnission in ccnfidence.
4.
The infomation sought to be protected is not available in public sources.
~
5.
Public disclosure of this infomation would cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar analytical documentation and licensing defense services for comerical power reactors without commensurate expenses.
We have reviewed your application and the material based on the requirements and criteria of 10 CFR 2.790 and, on the basis of your state:nents, have deter-mined that the submitted infomation sought to be withheld contains trade secrets or proprietary consnercial information.
Therefore, the version of the submitted infonnation marked as p(roprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b) 5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
8608270374 e60825 PDR ADOCK 05000369 P
PDR 1
F AUG 2 5 1986 Mr. R. A. Wiesemann Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure tlat the consultants have signed the appropriate agreement for handling proprietary information.
t If th'e basis for withholding this information from public inspection should change in the future such that the infonnation could then be made available for public inspection, you should promptly notify the NRC.
You should also under-
[
stand that the NRC may have cause to review this determination in the future, such as, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a detenaination ad-verse to the above, you will be notified in advance of any public disclosure.
l I
Sincerely,
@\\
i Darl Hood, Project Manager j
PWR Project Directorate #4 Division of PWR Licensing-A DISTRIBUTION:
DOCKET.- F1le :
NRC PDR Local PDR PWR#4 Reading CJYoungblood Reading OELD EJordan BGrimes JPartlow MDuncan DHood ACRS(10)
RBallard i
O asB bW
/
P,W8 PWR-A PWR#4/DPWR-A EB'/DPk -A MDdh@ tan / rad
- 00) fmaker d'thesda DHood RBallard E5ho 07/Zf/86 07/gf/86 07/3)/86 q/g/86 h
PWR#4/DPWR-A i
g BJYoungblood 0$/2.2-/86
..