MONTHYEARML20211K7841985-04-25025 April 1985 Forwards Affidavit for Withholding Proprietary McGuire Units 1 & 2 Tubesheet Region Plugging Criterion (Ref 10CFR2.790).Nonproprietary Version Encl.Proprietary Version Withheld Project stage: Other ML20127P5321985-05-0909 May 1985 Summary of 850502 Meeting W/Util & Westinghouse in Bethesda,Md Re Steam Generator Tube Plugging for Indications within Tubesheet Region.List of Attendees & Viewgraphs Encl Project stage: Meeting ML20195E2821986-05-28028 May 1986 Proposed Tech Spec 3/4.6.2.3,deleting Drywell Air Lock Seal Pressure Instrumentation 31-day Channel Functional Test from Surveillance Requirement 4.6.2.3.d.1 Project stage: Other ML20211K7711986-06-24024 June 1986 Application for Amends to Licenses NPF-9 & NPF-17,modifying Steam Generator Tube Plugging Criteria to Allow Evaluations of Degraded Tubes to Be Performed within Tubesheet.Fee Paid Project stage: Request ML20211K7791986-06-24024 June 1986 Proposed Tech Specs,Changing Steam Generator Tube Plugging Criteria to Allow Evaluations of Degraded Tubes to Be Performed within Tubesheet Project stage: Other ML20206U0001986-07-0101 July 1986 Forwards Revised Marked Up Proposed Tech Specs,Re Criterion for Plugging Steam Generator Tubes,Reflecting Change in Wording of Proposal.Changes Not Functionally Different from Changes in 860624 Submittal Project stage: Other ML20203A5051986-07-10010 July 1986 Informs of Present Schedule for Ongoing Refueling Outage,Per Proposed Changes to Tech Specs Submitted in 860624 & 0701 Ltrs.Approval of Change Required Prior to Entry Into Mode 4, Presently Scheduled for 860822 Project stage: Request ML20207B1381986-07-11011 July 1986 Disagrees That Proposed Amends to Licenses NPF-9 & NPF-17, Eliminating Need to Plug Steam Generator Tubes,Would Not Involve Significant Hazards Consideration.Notice of Opportunity for Prior Hearing Re Amends Encl Project stage: Other ML20207B1531986-07-11011 July 1986 Notice of Consideration of Issuance of Amends to Licenses NPF-9 & NPF-17 & Opportunity for Prior Hearing Re Elimination of Requirements for Plugging Steam Generator If Defect 2 Inches Below Top of Tube Sheet Project stage: Other ML20211P2621986-07-16016 July 1986 Notification of 860725 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Proposed Tech Spec Change Re Plugging of Steam Generator Tubes W/Defects in Tubesheet Region Project stage: Meeting ML20212B8841986-07-31031 July 1986 Nonproprietary Tubesheet Region Plugging Criterion for Duke Power Co McGuire Nuclear Station Units 1 & 2 Steam Generators Project stage: Other ML20212B8741986-08-0101 August 1986 Requests That WCAP-11224 Tubesheet Region Plugging Criterion for Duke Power Co McGuire Nuclear Station Units 1 & 2 Steam Generators Be Withheld from Public Disclosure (Ref 10CFR2.790).Affidavit Encl Project stage: Other ML20212B8661986-08-0505 August 1986 Proposed Tech Specs,Incorporating Revised Steam Generator Plugging Criteria Project stage: Other ML20212D0061986-08-0505 August 1986 Suppls 860320 Application for Amends to Licenses NPF-9 & NPF-17,permitting Use of multi-element TN-8 & TN-8L Spent Fuel Casks for Receipt of Irradiated Fuel.Info Re Environ Impacts Per 10CFR51.52 Encl Project stage: Request ML20205H8161986-08-11011 August 1986 Environ Assessment & Finding of No Significant Impact Re Application for Amends to Licenses NPF-9 & NPF-17 to Revise Tech Spec 3/4.4.5, Steam Generators Project stage: Other ML20206M2951986-08-13013 August 1986 Supplemental Application for Amends to Licenses NPF-9 & NPF-17,revising Tech Specs Re RCS Surveillance Requirements for Steam Generator Tube Plugging.Tubes Will Be Inspected During Each Inservice Insp Project stage: Supplement ML20206M3031986-08-13013 August 1986 Proposed Tech Specs Re RCS Surveillance Requirements for Steam Generator Tube Plugging Project stage: Other ML20206M2821986-08-18018 August 1986 Forwards Revised marked-up Pages to Proposed Tech Specs Re Criterion for Plugging Steam Generator Tubes Reflecting Change in Wording of Proposal.Changes Not Functionally Different from Changes in 860813 Submittal Project stage: Other ML20206N9981986-08-19019 August 1986 Notice of Issuance of Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML20206N9811986-08-19019 August 1986 Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively, Modifying Steam Generator Tube Plugging Requirements for Tube Defects Located in Tubesheet Region Project stage: Other ML20206N9861986-08-19019 August 1986 Safety Evaluation Supporting Amends 59 & 40 to Licenses NPF-9 & NPF-17,respectively,modifying Steam Generator Tube Plugging Requirements for Tube Defects Located in Tubesheet Region Project stage: Approval ML20206P8861986-08-25025 August 1986 Approves Withholding WCAP-10949, Tubesheet Region Plugging Criterion for Full Depth Hardroll Expanded Tubes, Per Util 860723 Application & Recipient 860722 Affidavit (Ref 10CFR2.790) Project stage: Other ML20210S5421986-09-22022 September 1986 Submits Addl Info Re Radiochemistry Program for Primary to Secondary Leakage Detection & Quantification,Per 860812 Telcon Request Project stage: Other ML20203N6881986-10-15015 October 1986 Agrees to Withhold Proprietary Version of McGuire Units 1 & 2 Tubesheet Region Plugging Criterion, (Ref 10CFR2.790) Per 860801 Request Project stage: Other 1986-07-16
[Table View] |
Text
.-- -- __.
m
[
.Je 4
i DUKE POWER COMPANY P.O. mOx 33189 j.
CHARLOrTE, N.C. S8948 HAL B. TUCKER TELEF9 BONE
== renamen (704) 3MF4esa j
i July 10, 1986 5
1 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation
{
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTENTION: Mr. B.'J. Youngblood, Director PWR Directorate No. 4 j
Subject:
McGuire. Nuclear Station
}-
Docket No. 50-369, 50-370
)
i
Dear Mr. Denton:
i The purpose of this letter is to inform the NRC staff of the present schedule for j
the ongoing Unit i refueling outage, as Duke Power has proposed changes to the
]
McGuire Technical Specifications for which NRC approval is required prior to restart of the unit.
The first Specification in question concerns steam generator tube plugging j
criteria. This change was requested by letter of June 24, 1986 and supplemented July 1, 1986. Approval of this change is required prior to unit entry into i
operational Mode 4 (hot shutdown, Tave greater than 200 ' degrees F1 If approval of l
this specification is not received, it will be necessary to either extend the t
j outage pending approval, or extend the outage in order to plug the approximately i
one hundred affected tubes. Entry into Mode 4 is presently scheduled for August 4
22, 1986.
l.
The second proposed change to the Technical Specifications involves the proposed I
change to the moderator temperature coefficient (MTC) and specifications relating i
to relaxed axial offset control (RAOC) as transmitted by letter of May 15, 1986 i
with related transtaittals dated May 23, June 6, and June 30,'1986. Approval of this proposal is highly desirable (to prevent operating restrictions as explained in the May 15 letter) prior to startup. Criticality following the outage is scheduled for August 26, 1986.
j i
j A third submittal, concerning containment penetrations and dated May 14, 1986, initially requested approval by the end of the outage, but as it has been determined that since the outage service penetrations do not bypass containment I
they (the penetrations) do not need to be added to the table and thus the proposed j
change is not needed by the'end of the outase.
A' supplemental proposal detailing
{
j this will be-forthcoming.
i o
[
gf9%d!ME$f$
l 1
P i
. m,, _ r.-
_.-,--.---_--.-,.-m
-,-_....,-.,---.-...-__,._,--.._.-_.,_.,-m_
--v.
_.,, ~ _,, - -,
c.v
.w.
Mr. Harold R. Denton, Director j
July 10, 1986 Page 2 In the event of substantial changes in the schedule, we will keep the NRC staff informed.
Very truly yours, F
1 Sw.
l Hal B. Tucker JBD/43/jgm Attachment xc:
Dr. J. Nelson Grace Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900
+
Atlanta, Georgia 30323 Mr. W.T. Orders NRC Resident Inspector McGuire Nuclear Station 7
Mr. Darl Hood, Project Manager Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.