Forwards Amends 103 & 93 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Modify Tech Specs Re Requirement to Shut Down When Coolant Iodine Exceeds 1 Uci/G Dose Equivalent I-131 for 800 H in 12-month Period
ML20205Q877
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/26/1987
From: Norris J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20205Q881 List:
References
NUDOCS 8704060100
Download: ML20205Q877 (2)


Text

- . - - . .

f
c. [ March 26,1987 Docket Nos. 50-295 DISTRIRllTION and 50-304 'J5E W "W FP E. Jordan NRCPDR B. Grimes Local PDR J. Partlow Mr. D. L. Farrar PDf3 Rdg. T. Barnhart(8)

Director _ of Nuclear Licensing T. Novak W. Jones Comonwealth Edison Company

~

C.'Vogan- E.. Butcher'

~ Post Office Box 767 J. Norris- N.. Thompson Chicago, Illinois 60690 OGC V.-Benaroya L. Harmon ACRS (10)

Dear Hr. Farrar:

OPA LFMB i

The Commission has issued the enclosed Amendment No.103to Facility Operating License No. DPR-39 and Amendment No. 93 to Facility Operating License No. .

DPR-48 for the Zion Nuclear Power Station, Unit Nos. I and 2, respectively.

~

The amendments consist of changes to the Technical Specifications in response l

to your application transmitted by letter dated October 15, 1986.

These amendments would modify the Zion Technical Specifications in accordance with the guidance contained in the referenced letter, Generic Letter 85-19.

These changes will eliminate the reauirement to shutdown if the coolant iodine exceeds one micro - curie per gram dose equivalent iodine 131 for 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> in a twelve month period.

. In addition, the reporting requirements regarding iodine spiking and a number of' other minor administrative changes are also included. These minor administrative

changes include correction of position title, special reporting requirement i changes, and the specific activity reporting requirements discussed above.

A copy of the related Safety Evaluation is enclosed. A Notice'of Issuance will be included in the Commission's next regular bi-weekly Federal Register notice.

Sincerely.

Jan A. Norris, Senior Project Manager PWR Proje9t Directorate #3, Division of PWR Licensing-A, NRR I

Enclosures:

1. Amendment No.103 to DPR-39 4
2. Amendment No.93 to DPR-48 3.~- Safety Evaluatlon i

cc: w/ enclosures See next page

/

, PD#3 y [PD#3 f -

1,OG  : PD#

i CVogan (JNoyr s //l*s m*h [d4 Var 3/{L/87 \3/ gEf/ 3/JJ87p, # 3/26 87  ;

i 8704060100 870326 ADOCK 0500 S (/ l PDR P

Mr. D. L. Farrar 71on Station Commonwealth Edison Company )

cc: Mr. Michael C. Parker, Chief Robert J. Vollen, Esquire Division of Engineering 109 North Dearborn Street Illinois Department of Nuclear Chicago, Illinois 60602 Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Flocr Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicaoo 100 East Erie Street Chicago, Illinois 6061I Mr. P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza 51st Floor Chicago, Illinois 60602 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor

! Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Regien III U.S. Nuclear Reoulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 k