ML20205A189
| ML20205A189 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/04/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20205A195 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8504250450 | |
| Download: ML20205A189 (2) | |
See also: IR 05000275/1985014
Text
~ sg
, , .* /,,o,,
.
,
UNITED STATES
!
~
g
NUCLEAR REGULATORY COMMISSION
5
- j
REGION V
O
&
1450 MARIA LANE SulTE 210
D
,o
WALNUT CREE K, CALIFORNIA 94596
- *
APR
4 1985
.
Docket Nos. 50-275, 50-323
Pacific Gas and Electric Company
77 Beale Street, Room 1435
San Francisco, California 94106
'
Attention:
Mr. J. D. Shiffer, Vice President
Nuclear Power Generation, Licensing
Gentlemen:
Subject: NRC Inspection of Diablo Canyon Units 1 and 2
,
This refers to the inspection conducted by Messrs. J. F. Burdoin, R.T. Dodds
and Ms. L. R. Kanow of this office on March 4-8, 1985 and inspections
conducted by NRC Contract (LLNL) inspectors during November, December, 1984
and January 1985, of activities authorized by NRC License No. DPR-76 and
Construction Permit No. CPPR-69 and to the discussion of our findings with
Messrs. R.R. Lieber, and other members of your staff on March 8,1985.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
No violations of NRC requirements were identified within the scope of these
inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
-y.
-
-
-
8504250450 850404
hd/l
ADOCK 05000275
G
d!
m
- .
.
.
>
.
,
.
.
.
Pacific Gas and Electric Company
-2-
Should you have'any questions concerning this inspection, we will be glad to
discuss them with your.
Sincerely,
D. F. Kirsch, Acting Director
Division of Reactor Safety
and Projects
Enclosure:
A.
Inspection Report Nos. 50-275/85-14,50-323/85-02
B.
November 1984 LLNL Design Verification Report
C.
December 1984 LINL Design Verification Report
D.
-January 1985 LLNL Design Verification Report
cc: w/ enclosures
Dick Vollmer, NRR
,
S. D. Skidmore, PG&E
R. C. Thornberry, Plant Manager, PG&E (Diablo Canyon)
P. A. Crane, Jr., Attorney, PG&E
D. A. Taggert, Supervisor, Quality Assurance
R. Weinberg, News Service
State of CA (Johnson)
bbe:
RSB/ Document Control Desk (RIDS)
Mr. Martin
Resident' Inspector
l
4
s
>
b
RVd
Mg
N
Kir[sch
Bus
- az
Kanow
You
Patq
D
s
C
ee
4/g 85
4/3/85 4/ /85
4/[/85
4/f/85 4/J /85
4/
85
,
' '
'
'
___m____x_____m_..__.___.____.__.m_
_ _ _ _ _ _ _ _ _ _ _ _
_ . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _