ML20205A286
| ML20205A286 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/14/1985 |
| From: | Cummings G, Wade W EG&G, INC., LAWRENCE LIVERMORE NATIONAL LABORATORY |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20205A195 | List: |
| References | |
| CON-FIN-A-0753, CON-FIN-A-753, CON-FIN-B-8552 WOW:85-09, WOW:85-9, NUDOCS 8504250469 | |
| Download: ML20205A286 (10) | |
Text
_.
Vg Lawrence Uvermore Nati@el Laboratory
& JAH Ih ty ;<3 ; ;
January 14, 1984 SECb '-
WOW: 85-09 Mr. Dennis F. Kirsch U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 PROGRESS REPORT, DECEMBER, 1984 TECHNICAL ASSISTANCE FOR INSPECTION OF REACTORS UNDER CONSTRUCTION, FIN A0753, FIN B8552.
1.
PROJECT DESCRIPTION The Lawrence Livermore National Laboratory (LLNL) is providing tecn-nical assistance to the Region V offices of the U.S.. Nuclear Regula-tory Commission (NRC) for conducting inspections at selected nuclear reactor sites.
1.1 Task 1 - Diablo Canyon, Unit 2 - Design Verification Program As a consequence of an independent design verification program, many nodifications and additions to the piping and electrical raceway support systems and building structural steel are being implemented at Diablo Canyon, Unit 2.
The LLNL is assisting the NRC in assess-ing the adequacy of this, work.
1.2 Task 2 - Palo Verde Nuclear Power Plant - Inspection of Reactors Under Construction The construction of~ Unit 1 is nearing completion and a number of inspection requirements are to be accomplished before the initial fuel loading can begin.
LLNL is assisting the NRC in completing this work.
2.
PROGRESS - DECEMBER, 1984 2.1 Task 1 - Diablo Canyon, Unit 2 Inspections were conducted of electrical raceway and HVAC supports during the weeks of December 3 and 17 A detailed list of the items inspected is provided on Attachment C.
Several design deviations t
were noted among the items inspected and MVR's were prepared for all of them by the licensee, 8504250469 850404 PDR ADOCK 05000275 O
?'.E:'.:t'CWxyEv.c.th.wy &Ce"rva. PO B3 SOS Leemye Cav.a N!ED Teseow ' !*G~ "C
- kd*c-A%c=*
' ~ '
" ' =
y;
.i
. Mr. ' Dennis F. Kirsch January 14, 1984 Page~2 4
2.2 Task 2 - Palo Verde, Unit 1 2.2.1 Subtask 1 - Radiography Examination This work was completed in September.
'2.2.2 Subtask' 2 - Fire Protection Systems Inspection A summary letter report of the findings of this inspection was received from NATLSCO and informally transmitted to the staff for review and comment on December 20, 1984.
Twenty items were iden-tified for follow-up.
2.2.3 Subtask 3 - Desian Control System Inspection The final report for this subtask was transmitted to Paul Narbut on December 13, 1984.
Several significant discrepancies identified during the inspection will require some follow-up and LLNL expects to be asked to participate in this effort.
3.
FUNDING A detailed report of expenditures for this report period is provided in Attachments A & B.
4 PERSONNEL, SUBCONTRACTS, AND CONSULTANTS This work is being conducted with assistance from EG8G Energy Measurements, Inc. of San Ramon, California and the National loss Control Service Corporation.
5.
MEETINGS / TRAVEL Paul Chan and Gary Johnson traveled to Diablo Canyon for - Task 1 inspections during the weeks of December 3 and 17, 1984 respec-ti vely.
6.
CONCERNS None 7.
PLANS On-site inspection work at Diablo Canyon (Task 1) will be dis-continued at the end of January consistent with the direction received from Phil Morrill and Bob Dodds on December 28, 1984.
y
,('.
.Mr.-D:nnis F.-Kirsch January 14, 1985 Page 3 7
7
-WALLACE 0.-WADE
~
PROJECT MANAGER EG8G MECHANICAL ENGINEERING DEPARTMENT-Apprdved:
't
./
s
/
- [ I 4 GARTH E. CUMMINGS DEPUTY PROGRAM LEADER NUCLEAR SYSTEMS SAFETY PROGRAM Attachment Distribution:
LLNL NRC EG8G/SR0 G. Cumings, L-91 R. Gilbert C. Morton J. Johnson, L-91' A. Chafee C. Simkins
.R. Langland, L-90 P. Morrill M. Eli, L-390 E. Frigillana C. Meier, L-90 L. Miller R. White, L-777-P. Narbut-G. Johnson, L-228 R. Dodds P. Chan, L-777
pr-t Page 1 of 3 ATTACHMENT A ESTIMATED PROJECT FINANCIAL STATUS:
DECEMBER FY 1985 FIN A0753 Palo Verde COST ANALYSIS:*
December Year to Date I.
Direct Staff Effort:
0.0 FTE-Mo 0.1 FTE-Yr II.
Direct Labor Costs S 0.0 5
0.8K Materials & Services 0.0 0.0 ADP Support 0.0 0.0 Subcontracts 0.0 20.8 Travel Expenses 0.4 0.2 Indirect Labor Costs 0.0 0.9 Other (Recharges) 0.0 0.5-Other (FY'84 Unbilled Costs) 0.0 0.0 General & Administrative 1.9 1.6 Total Costs S 2.3K
$ 27.1K Liens S 32.3K Total Costs & Liens S 59.4K Percentage of Available Funds _
87%
III. Funding Status:
P rior. Year FY 1985 Projected FY 1985 Funds FY 1985 Funding Carryover-Funding Level Rec'd to Date Bal. Needed
$48.3K
$68.3K S20.0K
$0.0K
- NOTE: These figures are for cost analysis only, and may differ slightly from Tinil billing figures.
7 Page 2 of 3 ATTACHMENT A ESTIMATED PRCJECT FINANCIAL STATUS:
DECEMBER FY 1985 FIN A0753 Diablo Canyon COST ANALYSIS:*
December Year to Date I.
Direct Staff-Effort:
0.0 FTE-Mo 0.0 FTE-Yr II. Direct Labor Costs
$ 0.0
- 0. 0K-Materials & Services 0.0 0.0 ADP Support 0.0 0.0 Subcontracts 0.0 0.0 Travel Expenses 0.0 0.0
-Indirect Labor Costs 0.0 0.0 Other (Recharges) 0.0 0.0 Other (FY'84 Unbilled Costs) 0.0 0.0 General & Administrative 0.0 0.0
. Total ' Costs '
S 0.0K 0.0K Liens
$ 0.0K Total Costs & Liens 0.0K Percentage of Available Funds. '
O.0%
III. Funding Status:
Prior Year FY 1985 Projected FY 1985 Funds FY 1985 Funding Carryover Funding Level Rec'd to Date Bal. Needed l
$17.6K
$17.6K
$0.0K
$0.0K-
- NOTE: These figures are for cost analysis only, and may differ slightly from Tins'l billing figures.
$7 Page 3 of 3 ATTACHMENT A ESTIMATED PROJECT FINANCIAL STATUS: DECEMBER FY 1985 FIN B8552 Diablo Canyon COST ANALYSIS:*
December Year to Date I.
Direct Staff Effort:
0.8 FTE-Mo 0.5 FTE-Yr II.
Direct. Labor Costs S 2.9K
$ 6.6K Materials & Services 0.0 0.0 ADP Support 0.0 0.0 Subcontracts 0.0 8.1 Travel Expenses 0.5 2.1 Indirect Labor Costs 3.7 8.2 Other-(Recharges) 0.2 0.6 Other (FY'84 Unbilled Costs) 0.0
<1.1)
General 8 Administrative 2.8 2.8 Total Costs S 10.1K
$ 27.2K Liens S 31.9K Total Costs & Liens S 59.1K Percentage of Available Funds 58.6".
III. Funding Status:
Prior Year FY 1985 Projected FY 1985 Funds FY 1985 Funding Carryover Funding Level Rec'd to Date Bal. Needed
$100.9K
$100.9K
$0.0K S0.0K
- NOTE: These figures re for cost analysis only, and may differ slightly from final billing figures.
V, Page 1 of 1 ATTACHMENT B FIN:
.189 A0753 and 189 B8552 TITLE:
' Technical Assistance for Inspection of Reactors Under q
,b Construction - (A0753) t 1
"' f
.Techncial Assistance for. Inspection of Diablo Canyon -
Design Verification Program - (B8552) s I
PERIOD: December, 1984
[ - O 8
s Costs *
' Cucul ati ve*-
. Facility Identi-this Fiscal Facility Name/
. Docket / Report fication per Report Title Number Number Period fear-
.p TASK I
.Diablo Canyon - 2 10.0 e 27.2 Design Verifica-
,j_
tion TASK II
.Palo Verde - 1 y'
Completed Radiography O.0 0.0 Subtask 1 Examination (completed) fy '-
Subtask 2 Fire Protection 0.0
-0.0 t
System Inspection
- /,,
^
Subtask 3 Design Control 2.3 27.Y Inspection r
\\*%
49%
/
- Figures may' differ slightly from final billing.
l' f
W g.-
<w w
~
e*
4 f
f.r
?
f 4
,~
- ^
e
~.
g y# _
e' 3.
P 1
m~...,..
T Page 1 of 3 N
ATTACHMENT C U
N LOG I
PART START COMPLETE STATUS HN4 fLH;
- LOC T
ITEM NtHBER DATE DATE CRIT CONTACTS AFF STATUS DATE INSP HRS E1094 AtDC BLDG 2 RACEMY SUPPORT S-4018-94-115-3-122 5/21/8412/13/84 QCP E9 MORRISG4 PG NCR C m 5.0 8802-1277 5/31/84 ACCEPTED 12/1V84
- C1095 TLC 81NEBLDG 2 RACEWf SUPPORT S-1022-C-119-1-2 5/21/84 12/13/84 QCP E9 MORRISON PG 1R CM 5.0 88-02-2312 5/21/84 ACCEPTED 12/13/84
- E1104 TURBINE BLDG 2 RACEM Y SUPPORT S-176A-A-104-5-15 5/30/84 12/13/84 QCP E9 MORRIS 34 PG WR E-2846 5/31/84 CW 4.0 M
F0 ACCEPTED 12/13/84
's WILS01 F0 E1103 CORAllf1ENT 2 RACEmY SLE*0RT S-217-3-G-91-1-156 5/30/8412/13/84 QCP E9 MORRISON PG WR E-3847 5/31/84 CM 4.0 M
F0 ACCEPTED 12/13/84 WILS71 F0 i1100 CO RAllf1ENT 2 RACEMY SUPPORT S-221-F-91-3-14 5/30/8412/13/84 QCP E9 MORRIS 0N PG WR 2848 5/31/84 Cm 3.0 M
F0 ACCEPTED 12/13/84
~
WILS34 F0 L_1110 AW BLDG 2 MCEWY SUPPORT S-243-8-C-104-1-5 6/14/8412/13/84 QCP 5A MORRIS 34 F3 NCR 6/14/84 CBS 1.0 QCPES M F0 8802-1309 6/14/84 Cm 1.0 ACCEPTED 12/13/84 2 MCEMY SUPPORT S-264A-GE-100-6-10 12/04/8412/04/84 QCP E9 MORRISON EE ACCWO-M 12/04/84 PMC 1.0
- 1129 /MJLUS M
F0 41130 CQiTAl MENT 2 RASY SUPPORI S-E4-1-G-117-5-184 12/04/8412/04/84 QCP 9 ' MORRISON BE ACCWO-M 12/04/64 PMC 1.0 QCP E9 M F0 E1131 COUAl*ENT 2 MCEmY SUPPORT S--226G-F-91-8-146 12/04/8412/04/84 QCP E9 MORRIS 01 EE ACCWO-M 12/04/84 PMC 1.0 m
F0
'E1132 TUR8INE BLOG 2 MCEMY SUPPORT S-289-38-D-119-1-18 12/04/84 QCP E9 MCRRISG1 EE WELD 12/04/84 PMC 1.0 y
M F0 WR E3101 12/04/84 PMC
- E1133 TUR8!NF BLDG 2 RACEMY SUPPORT S-289-18-C-119-1-3 12/04/8412/04/84 QCP 9 MORRIS 34 EE ACC W O-M 12/04/84 PMC 1.0 ES M
F0 t
-E1134 TUR8INE BLDG 2 MCEMY SUPPORT S-33-XX-A-104-3-98 12/04/8412/04/84 QCP 9 MORRISON BE /.CCWO-0A 12/04/84 PMC 1.0 E9 -
M F0 iE1135TURBINEBLDG
-s 34CEMY SUPPORT S-415-6-9-85-6-10 12/05/8412/05/84 QCP E9 MORRISON BE ACCWO-0A 12/05/84 PMC 2.0
.E1136 TURBINE BLDG 2 kCEMY SLPPORT S-196-7-2A-104-1-16 12/16/8412/18/84 QCP 5A MORRIS 0N PG ACCEPTED 12/18/84 6LJ 1.0 QCP.E9. M F0 12/18/8412/18/84 QCP E9 MORRISON PG ACCEPTED 12/18/84 GLJ 1.0 J1137 TURBINE BLDG 2 MCEmY SUPPORT S-84A-2A-104-2-111 M
F0 E1138 TUR8INE BLDG 2 RACEmY SUPPORT S-246-2-2A-85-15-18212/18/8412/18/84 QCP 9 MORRISG4 PG ACCEPTED 12/18/84 GLJ 1.0 QCP ES M F0
- E1139 TURBINE BLO6 +.2 RACEMY SUPPORT.S-372-A-2A-85-15-12312/18/8412/18/84 QCP 9 HORRISON PG ACCEPTED 12/18/84 GLJ 1.0
/
QCPE9 M F0 11140 TUC81NE BLDG, 2 RACEMY SUPPORT S-393-A-2A-85-9-2
'12/18/8412/18/84 QCP 5A MORRIS 34 PG ACCEPTED 12/18/84 GLJ 1.0 QCP E9 m F0 E11411Cis!NE BLDG 2 RACEMY SUPPORT S-298A-2A-104-2-81 12/18/8412/18/84 QCP 5A MORRISG4 PG ACCEPTED 12/18/84 GLJ 1.0 QCP E9 M F0 u
- /1142 TURBINE'BLCG - 2 RACEWAY SUPPORT S-2020-2A-104-1-10 12/18/84 QCP 5A MORRIS 04 PG PHYSICAL.12/18/34 GLJ 1.0 OCP E9 M F0 W R 3144 12/18/84 6LJ 1.0 "f
y QCP 5A MORRISON PG PHYSICAL 12/18/84 GLJ 1.0 E1143 TUR8INE BLDG 2 RACE 4 W SUPPORT S-244-43-2A-104-2140 12/1 U S4 QCP E9 M F0 WR E-314712/it/84 6LJ 1.0 y
i
,g-
.-r
- ~,
f Page 2 of 3
. s E1144 CO RAI N 2 RACDMY SUPPORT S-221-A-2F-91-3-16 12/19/8412/19/84 QCP 5A MORRISai PG ACCEPTED 12/19/84 GLJ 1.C QCPE9 M4 F0 E114] CaiTAltNENT 2 RACDMY SUPPORT S-223-A-2F-140-1-28 12/19/8412/19/84 QCP 5 MORRIS 31 PG ACCEPTED 12/19/84 GLJ 1.0 QCPE9 N1 F0 E1146 Ca #AllNENT 2 RACDMY SUPPORT S-87-1-2F-117-2-74 l/19/8412/19/84 QCP 54 MORRISON P6 ACCEPTED 12/19/64 6LJ 1.0 QCP 9 N4 F0 QCP E9
~E1147 CDUAltNENT 2 MCDMY SUPPORT S-18-2-2F-140-3-79 12/19/8412/19/84 QCP 5A MORRISM PS ACCEPTED 12/19/84 GLJ 1.0 CCP E9 HAlti F0 E1148 CaiTAltNDU 2 FKDMY SUPPORT MC28-2F-117-3-91 12/19/84 12/19/84 QCP % MORRIS 31 P6 ACCEPTED 12/19/84 6LJ 1.0 QCP E9 WJf4 F0 E1149 CaiTAllNENT 2 RACDMY SUPPORT HC28-2F-117-3-89 12/19/8412/19/84 EP 5A MORRISON P6 ACCEPTED 12/19/84 GLJ 1.0 QCP E9 W4N F0 E1150 CDUAltNENT 2 RACDMY SUPPORT MC28-2F-117-3-90 12/19/84 QCP 5A MORRIS 0N P6 C0F16'N 12/19/84 6LJ 1.0 QCP E9 PHYSICAL 12/19/81 GLJ M E-314512/19/84 6LJ E1151 CalTAlthENT 2 MCDMY SUPPORT S-275A-2F-91-5-1 12/19/84 QCP 5A MORRIS 31 F6 CONFIG'N 12/19/84 GLJ 1.0 QCPS PHYSICAL 12/19/84 GLJ QCP E9 tWR E-314612/19/84 GLJ 1.0 E1152 AW BLDG 2 FKDMY SUPPORT S-473-1-2H-100-5-17 12/19/8412/19/84 QCP 9 MORRISW P6 ACCEPTED 12/19/84 EJ 1.0 QCP E9 E1153 AW BLDG 2 RACDMY SUPPORT S-48-8-2H-115-1-54 12/19/8412/19/84 QCP S MORRISE P6 ACCEPTED 12/19/84 SLJ 1.0 DCP E9 E1154 A W BLDG 2 FEDMY SUPPORT S-7H-H-85-3-6 12/19/84 12/19/84 KP ES MORRIS 0N P6 ACCEPTED 12/19/84 GLJ 1.0 E1153 AW ELDG 2 P/,CDMY SUPPORT S-289-25-2H-100-4-1712/19/0412/19/84 QCP 5A MORRIS 0N PG ACCEPTED 12/19/84 GLJ 1.0 QCP 9 QCP E9 E'1 % AW ELDG '
2 FKDMY SUPPORT S-202R-2H-100+ 76 12/19/8412/19/64 CP 5A MORRISON PG ACCEPTED 12/19/84 SLJ 1.0 QCPE9
'I1157 AW BLDG 2 F K DMY SUPPORT S-33T-2H-100-3-21 12/19/84 12/19/84 QCP E9 MORRIS W PB ACCEPTED 12/19/84 SLJ 1.0 E1158 AW BLDG 2 RACDMY SUPPORT S-94-4-2H-85-1-1A 12/19/8412/19/84 QCP 5A MORRISW PG ACCEPTED 12/19/F4 GLJ 1.0 00P 9 QCPE9 E1159 A W ELDG 2 F/$0DMY SUPPORT S-27-Q-2H-115-1-336 12/19/8512/19/85 QCP E9 MORRISW P6 ACCEPTED 12/19/84 EJ 1.0 I'160 A W ELDG 2 FKDMY SUPPORT S-289-K-2H-100-6-78 12/19/E412/19/84 QCP E9 MORRISW PG ACCEPTED 12/19/04 GLJ 1.0
'E1161 AW BLDG 2 FKDMY SUPPORT S-87-38-2H-100-5-91 s12/19/8412/19/84 QCP SA MORRISM P6 ACCEPTED 12/19/84 6LJ 1.0 QCP 9 QCPE9
'E11C2 AW ELDG 2 RACDMY SUPPORT S-102-20-2H-115-3-1912/19/8412/19/84 QCP 5A MORRIS 0N PG ACCEPTED 12/19/84 6LJ 1.0 QCP 9 QCP E9 E1163 AW BLDG 2 RACDMY SUDPORT S-18-9-2H-115-7-6 12/19/8412/19/84 QCP S MORRISON P6 ACCEPTED 12/19/84 GLJ 1.0 QCP E9 E1164 AW BLDG 2 RACOMY SUPPORT S-583-A-2H-115-7-65 12/19/8412/19/84 QCP E9 MORRIS 0N P6 ACCEPTED 12/19/84 GLJ 1.0 E1165 A W ELDG 2 RACD MY SUPPORT S-101-C-2H-115-8-34 12/19/8412/19/84 QCP E9 MORRISON PG ACCEPTED 12/19/84 GLJ 1.C 0106 AW BLDS 2 FKDMY SUPPORT S-11713-24-100-4-63 12/19/84 QCP9 MORRIS 31 PG PHYSICAL 12/19/84 SLJ 1.0 QCP E9 M E-314812/19/84 GLJ 1.C M1083 CORA!WDR 2 PIPE IWiGER 7-56R 4/24/8412/1FB4 ESD 223 KULIK0RSKI BE tWR M-4705 4/19/84 QN 3.0 ESD 216 BERtMSCWI EE ACCEPTED 12/13/84 M1085 VDRILATION 2 PIPE H WGER 333-42R 4/24/8412/13/84 ESD 223 KULIKORSKI BE PWR M-4706 4/26/84 DN 3.0 BERtMSCai! BE ACCEPTED 12/13/84
Y
.y, c-Page 3 of 3
'107 Cat #AlW.ENT 2 PIPE HANGER 8-46R 5/03/8412/0U84 ESD 223 WERTS BE WR 4711 5/03/84 JCS 3.0 BE M SC0NI BE ACCEPTED 12/06/84 WCW 1.0 1118 A W BLDG
'2 PIPE N GER 413-295R 4/09/8412/12/84 ESD 223 KULIK0WSKI BE WR M-4715 4/10/84 CW 5.0 BEPfeSCONI BE ACCEPTED 12/13/84 1133 CORAlmENT 2 PIPE N GER 7-9'N 5/' /8412/06/84 ESD 223 KULIKWSKI BE WR 4724 5/24/84 JCS 2.0 J
BE M SC0N1 BE ACCEPTED 12/06/84 WCW 1.0 11136 AW BLDG 2 PIPE HANGER 414-207R 5/23/8412/06/84 E3D 223 KULIKWSKI BE WR 4725 5/24/84 JCS 3.0 BE M SCONI BE ACCEPTED 12/0UB4 WG4 1.0 1141 C04TAIMEhT 2 PIPE N GER 70-28SL 5/23/8412/06/84 ESD 223 KULIKWSKI BE WR 4724 5/24/84 JCS 2.0 BE M SCall BE ACCEPTED 12/06/84 WCW 1.0
- 144 AW BLDG 2 P!PE HANGER 948-36G 5/24/8412/0U84 ESD 223 KULIK0RSKI BE WR 4724 5/24/84 JCS 3.0 BE M SCGil BE ACCEPTED 12/06/84 WOW 1.0
.;143 AW BLDG 2 PIPE N GER 414-231A 5/24/8412/06/84 ESD 223 KULIKG4 SKI BE RECORDS
'i/24/84 JCi, 2.0 BE M SCONI BE ACCEPTED 12/0UB4 WOW 1.0
.176 #NULUS 2 PIPE M GER 73-44SL 6/13/84 6/14/84 ESD 223 BERNASCCNI EE M 4733 6/14/84 AGD 4.0 KULIK0WSKI BE ACCEPTED 12/10/84
- 209 FUEL W DLING 2 P!PE M GER 414-20BR 6/26/84 12/13/84 ESD 223 KULIK34 SKI BE CONFIG'N BER% SCQil BE MJR H-4741 6/2U 64 Cm 3.0 ACCEPTED 12/13/84
.211 CDUAlWENT 2 FIPE M GER 96-25R 6/2UB412/13/84 ESD 223 KULIK0WSKI BE ORIENT'N 6/28/84 Cm 3.0 BE M SCWI BE ACCEPTED 12/13/84 1213 A W BLDG 2 PIPE E GER 413-526V U27/8412/13/84 ESD 223 KULIKWSKI BE PHYSICAL BEMSCD11 BE M M-4742 6/28/84 Cm 3.0 ACCEPTED 12/13/84 123 AW BLDG 2 HAC S'.8PPORT SKC-W2-422 7/10/8412/13/84 CCP 5A DAUGHTERY EE CONFIG'N 7/12/64 C m 4.0 OCP 9 ALLEN F0 NCR WLDRQA 8827-105 7/12/84 ACCEPTED 12/13/84 1224 TURBINE ELDG 2 HMC SUPPORT SKC-W2-396 7/10/8412/13/84 OCP 5A DAUGHTERY BE CONFIG'N 7/12/84 C}N 4.0 OCP 9 JOSLIN FO NCR WLDR @ BR0lN F0 8527-104 7/12/84 ACCEPTED 12/13/84
- 250 CONTA! WENT 2 WAC SUPPORT SKC-W2-196 7/24/8412/13/84 QCP 5A STWA F0 PNfSICAL 7/26/84 C m 3.0 OCP 9 BILLINGS F0 M WLDR M M-4768 7/2US4 ACCEPTED 12/13/84 1272 CORAI W a #
2 PIPE W GER 78-4185L 7/25/8412/10/84 ESD 223 KULIKG4 SKI BE CONFIG'N 7/2U84 CB3 2.0 BE M SC011 BE M 4798 7/2UB4 ACCEFTED 12/10/84
-0280 AW BLDG 2 RUPTURE RESTRNT M 139-1-W2-715 12/05/84 OCP 5A SimS F0 WELD 12/05/84 PMC 1.0 QCP 9 PHYSICAL 12/05/84 WLDR @
12E1 AW BLDG 2 H&C SUPPORT M 139-W2-78 12/05/84 QCP 5A SimS F0 WELD 12/05/84 PMC 1.0 OCP 9 PHYSICAL 12/05/84 WLDR QA 3282 AW BLDG 2 H AC SUPPORT BM 170-W2-725 12/05/84 OCP 5A SimS F0 WELD 12/05/84 PMC 1.0 OCP 9 PHfSICAL 12/05/84 WLDR m 1233 AW BLDG 2 H&C SUPPORT m 170-W2-726 12/05/84 OCP 5A S!mS F0 WELD 12/05/84 PMC 1.0 WLDR QA PKfSICAL 12/05/84 H 052 CORA1 WENT 2 #NULUS 10003-C2-13-238 3/20/84-12/13/84lQCP 5A-ftNR0 -- - BE RECORDS 3/21/84 C M 3.0 QCP C7 l&LLER PU ACCEPTED 12/13/84 QCP 9 WOOD PU