Text
.
o o
UNITED STATES g
[
g Nt.fCLEAR REGULATORY COMMISSION j
WASHINGTON, D. C. 20555 7,
May 1,1986 Docket No. 50-213/245 Mr.- John F. Opeka, Senior Vice President Nuclear' Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141
Dear Nr. Opeka:
}
SUBJECT:
GENERIC ISSUES MANAGEMENT TRACKING SYSTEM The Comptroller General in a Report to the Congress, dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the status of power reactor licensees' implementation of approved regulatory improvements.
)
To assist me in developing this information for the Haddam Neck Plant and Millstone Unit 1, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed / implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the 1, tem was completed.
For requirements that have not l
been completed / implemented, provide the projected date and enter " projected" y
under the Status column.
I do not expect, or want, a major effort made to obtain j
precise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented.
For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for. requirements completed after that time.
For projected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a marked up listing by May 31, 1986.
In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.
g8PS888A8t88ba
il 4
2-i This request is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, y % E-Christopher I. Grimes, Director integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosures:
As Stated cc: See Next Page 1
2 m
4-May 1,1986
-=
~,
This request is covered by OMS-Clearance Number 3150-0011, which expires September 30, 1986.
Sincerely, Original signed by: C..I.' Grimes Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosures:
DISTRIBUTION c
3 As Stated t!DDckettffle #
ISAP~Rea' ding ~
cc: See Next Page Local PDR NRC PDR CGrimes
'JShea FAkstulewicz HSmith f
SScott-MBoyle FMiraglia OELD EJordan BGrimes JPartlow
' PAnderson ACRS (10)
NSIC' f
.g.
a
- ISAP:DPL-B h k ISA :D L-B ISAP:DPL-B ISAP:DPL-
?
FAkstulewid:lt x JShea PAnderson CGrimes 04/g/86 04/y/86 04/$o/86 04p86 i
I.Nw E
', y tw
_.'A o
L.
I.
o Mr. John F. Opeka Haddam Neck Plant &
Connecticut Yankee Atomic Power Company ni11 stone Nuclear Power Station, Northeast Nuclear Energy Company Unit Nc. 1 cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Board of Selectmen Northeast Utilities Service Company Town Hall Post Office Box 270 Haddam, Connecticut 06103 Hartford, Connecticut 06141-0270 Superintendent State of Connecticut Haddam Neck Plant Office of Policy and Management RFD #1 ATTN: Under Secretary Energy Post Office Box 127E Division East Hampton, Connecticut 06424 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Plant Richard M. Kacich, Supervisor c/o U.S. NRC Operating Nuclear Plant Licensing East Haddam Post Office Northeast Utilities Service Company East Haddam, Connecticut 06423 Post Office Box 270 Hartford, Connecticut 06141-0270 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 1
Northeast Nuclear Energy Company ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128 Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385
=.
R-1208731-001 REOULATORY INF0RMATION TRACKINO SYSTEM PAGE NO.
200 FACILITY IMPLEMENTATION 03/31/86 FACILITY: NADDAM NECK PLANT LOCATION: 13 MI E OF MERIDEN, CONN LICENSED POWER: 1825 MHT PROJECT MANAGER: F. AKSTULEHICZ DOCKET NUMBER: 050-00213 DESIGN POWER:
0582 MNE BRANCH CHIEF:
C. GRIHES ARCH / ENGINEER: S&W NSSS VENDOR:
HEST LIC. ASSISTANT:
P. ANDERSON IE INSPECTOR:
P. SHETLAND LIC ACT LICENSEE TAC NO.
MPA 9 TITLE COMPLETE STATUS PAIE M08301 A-01 10 CFR 50.55 A(G) - ISI 01/01/70C M06968 A-01 10 CFR 50.55 A(G) - ISI 02/28/81C M08098 A-02 APPENDIX I - ALARA 09/05/85C M06967 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/28/79C M08859 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 05/07/82C M08470 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 10/01/80C M10935 A-10 CONTINGENCY PLANNING 04/07/83C M10933 A-11 GUARD TRAINING PLANS 01/29/82C M10934 A-12 VITAL AREA ANALYSIS 04/15/82C M11234 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 12/29/83C M47106 A-16 0UALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 11/17/81C M51095 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 07/30/86 M55712 A-18 TECN SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 04/30/86 C59100 A-20 t o CFR 50.62 OPERATING REACTOR REVIENS 04/30/86 s
M59957 A-21 10 CFR 50.61, PRESSURIZED THERMAL SNOCK RULE 07/30/86 M07893 B-01 DI,ESEL GENERATOR LOCKOUT 02/28/81C M06624 B-02 FINE PROTECTION 10/03/78C M08382 B-03 PHR MODERATOR DILUTION 11/16/81C M07053 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION 06/01/80C M07803 B-07 STEAM GENERATOR FEEDHATER FLOW INSTABILITY 02/26/80C
. -. - =
I R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 201 1
FACILITY IMPLEMENTATION 03/31/86
, NADDAM NECK (CONTINUATION)
I LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS RAlf I
M07847 B-09 CHARGING SYSTEMS PIPE VIBRATIONS 06/30/80C M08857 B-14 CEA GUIDE TUBE HEAR 07/10/80C M12142 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C M08465 B-17 TECH SPEC SURVEILLANCE FOR NYDRAULIC SNUBBERS 12/30/85 M10281 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 01/03/79C M10343 B-21 LDSS OF 125-V DC BUS VOLTAGE NITN LOSS OF ANNUNCIA 02/28/82C M08469 B-22 TECN SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 12/30/85 M10025 B-23 DEGRADED GRID VOLTAGE 07/09/82C M10197 B-24 VENTING AND PURGING CONTAINMENTS HNILE AT FULL PON 09/01/80C i
M42610 B-24 VENTING AND PURGING CONTAINMENTS HNILE AT FULL PON 12/18/81C M10242 B-26 INADVERTANT SAFETY INJECTION DURING COOLDDHN 09/14/79C M49425 B-32 BLOCKED SI SIGNAL DURING COOLDONN 03/24/83C j M08690 5-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS 11/13/80C M11113 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 11/20/81C M43625 B-41 FIRE PROTECTION - FINAL TECN SPECS (INCLUDE'i SER S 11/14/84C M11748 B-42 TMI FOLLOW UP - ALL PLANTS 11/01/80C I'M11851 B-43 PHR FEEDHATER LINE CRACKS 01/04/80C i
l M43137 B-43 PHR FEEDHATER LINE CRACKS-05/25/82C M12438 B-44
[ESSONSLEARNEDIMPLEMENTATION 04/01/81C
!'M12916 B-45 NdSN 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 02/28/81C M12597 B-46 ANALYSIS OF TURBINE DISC CRACKS 10/28/81C M12782 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 03/23/82C M47401 B-49 PHR CONTROL ROD MISALIGNMENT 03/19/82C
{.
3..
i
R-1208731-001 REGULATORY INF0RMATION TRACKING SYSTEM PAGE NO.
202 FACILITY IMPLEMENTATION 03/31/86 NA90AM NECK (CONTINUATION)
LIC ACT LICENSEE TAC NO.
MPA 9 TITLE COMPLETE STATUS R8J1 i
IM42911 3-59 MASONRY NALL DESIGN 05/30/86 M42521 3-60
, ENVIRONMENTAL QUALIFICATION 03/30/86
- M42674 3-61 LOSS OF NON CLASS IE ISC PONER 07/28/82C IM42745 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 05/08/81C
!M43901-B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 08/27/81C M47171 B-66 NATURAL CIRCULATION C00LDONN 07/26/83C
,M46836 3-69 IEB 80-4 MAIMSTEAM LINE BREAK HITH CONTINUED FEEDM 04/28/83C M46609 B-7 0 FATIGUE TRANSIENT LIMIT TS 05/25/82C
- M49735 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 01/30/84C jM52762 3-76 ITEM 1.1 - POST TRIP REVIEN; PROGRAM DESCRIPTION &
03/20/85C M52843 3-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 09/30/86 7
- M52924 B-78 ITEMS 3.1.1 8 3.1.2 -POST MAINTENANCE TEST PROCEDU 02/21/86C M53005 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 10/16/85C M53073 B-80 ITEM 4.1.- REACTOR TRIP SYSTEM RELIABILITY
.VENDO 02/21/86C
,!M53126 B-81 ITEMS'4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R 07/01/85C
)M53175 B-82 ITEM 4.3 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC 11/28/84C lM54538 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-11/30/85 t
lM53594
-B-85 SALEM ATHS 1.2 DATA CAPABILITY 07/03/85C MS3677
-B-86 SALEM ATHS 2.2 S-R COMPONENTS 12/31/86
)*M53760 B-87
-SALEM ATHS 3.2.1 8 3.2.2 S-R COMPONENTS 02/21/86C M33843 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/16/85C 4 M53913 B-89 SALEM ATHS 4.2.3 in 4.2.4 LIFE COMPONENTS 11/30/86 M55357-B-90 SALEM ATHS 4.3 H AND B&W T.S.
11/28/84C i
).
H l
(
t-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
203 FACILITY IMPLEMENTATION 03/31/86 IADDAM NECK (CONTINUATION)
LIC ACT LICENSEE
'AC NO.
MPA 8 TITLE COMPLETE STATUS Halg 154070 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 02/21/86C 153987 B-93 SALEM ATHS 4.5.2 8 4.5.3 TEST ALTERNATIVES 05/30/87 108237 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 01/19/83C 106119 C-04 FILTER TECH SPECS 08/05/82C 108464 C-06 PUMP SUPPORT-LAMELLAR TEARING 04/17/81C 108860 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 03/05/79C 107993 C-10 CONTROL OF HEAVY LDADS OVER SPENT FUEL POOL (PHASE 10/31/84C I43639 C-14 AUXILIARY FEEDHATER SEISMIC QUALIFICATION 04/15/82C 152233 C-15 CONTROL OF HEAVY LOADS - PHASE II (FDLLOHUP OF MPA 06/28/85C 158063 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 12/11/85C 111976 D-04 PHR REACTOR VESSEL CAVITY SEAL RING MISSILE POTENT 02/01/84C 108463 D-10 ASYMMETRIC LOCA LOADS 02/01/84C 110064 D-11 FISSION GAS RELEASE 12/01/80C 112288 D-15 HIGN ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/28/81C 143048 D-17 DEFINITION OF OPERABLE 12/21/81C 155864 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 09/06/85C 407406 E-02 FUEL CASK DROP 01/01/70C 144024 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 03/31/82C 144093 F-02 I.q.1.3 SHIFT MANNING 06/30/83C 144165 F-03 I.'A.2.1 UPGRADING OF RO AND SRO TRAINING 12/15/82C 144236 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 06/07/84C 144306 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 05/30/86 147219 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/08/82C l
. - - _ ~ ~ -
R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
204 FACILITY IMPLEMENTATION 03/31/86 I HADDAM NECK (CONTINUATION) 2 LIC ACT LICENSEE
' TAC NO.
MPA 0 TITLE COMPLETE STATUS DAIE f M47291 F-07 I.C.6 CORRECT PERFORMANCE.0F OPERATING ACTIVITI 02/08/82C M51165 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRA 05/30/86 M51245 F-09 1.D.2 SAFETY PARAMETER DISPLAY SYSTEM 12/31/86 M44377 F-10 II.B.1 RCS HIGH POINT VENTS 09/01/83C M47942 F-11 II.B.2 PLANT SHIELDING 07/26/83C M41066 F-12 II.B.3 POST ACCIDENT SAMPLING 06/05/84C M44515 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 12/15/82C M44585 F-14 II.D.1 RV AND SV TRAINING 05/30/86 I
M44638 F-15 II.E.1.1 AFH SYSTEM EVALUATION 11/09/82C M44680 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 10/05/82C
- M44717 F-17 II.E.1.2.2 AFH SYSTEM FLON INDICATION 10/05/82C j
M44783 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION 04/15/82C M44854 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 10/04/82C M44925 F-20 II.F.1.1 NOPLE GAS MONITOR 11/23/81C M44996 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/23/81C M45067 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 01/15/82C 1 M47603 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 06/24/85C M47674 F II. F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 06/24/85C M47745 F-25
,II.F.1.6 CONTAINMENT HYDROGEN MONITOR 06/24/85C'
'M45138 F-26 If.F.2 INSTRUMENTS FOR DETECTION ON INADEGUATE 03/31/87 a
M46885 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 06/13/84C M47801 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/22/83C M45235 F-36 II.K.3.1 AUTO PORV ISOLATION 09/09/83C i
1
'R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
205 i
FACILITY IMPLEMENTATION 03/31/86 INADDAM NECK (CONTINUATION)
LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS RAlg M45281 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/09/83C M45347 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 04/15/82C M45398 F-39 II.K.3.5 AUTO TRIP OF RCPS 02/22/83C
>M45447 F-40 II.K.3.9 PID CONTROLLER 11/30/81C iM45477 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 11/30/81C M45507 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 11/30/81C M45633 F-47 II.K.3.17 ECCS OUTAGES 08/08/83C
,M48420 F-53 II.K.3.25 POWER ON PUMP SEALS 05/01/85C M45830 F-57 II.K.3.30 SB LOCA METHODS 10/30/86 M48169 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 10/31/86 M45949 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 12/31/86 M46020 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/31/86 4
M46092 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 12/31/86 M46164 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46236 F-67 III.A.2.1 EMEP.GENCY PLAN UPGRADE TO MEET RULE 05/13/83C lM46308 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 12/31/86 M46379 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 06/29/82C iM46450 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 07/20/82C iM56128 F-71 1.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO 10/30/86
'M49667 G-01 RdACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 01/30/86
I el
, R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE No.: 200 FACILITY IMPLEMENTATION 04/14/86 FACILITY: HADDAM NECK PLANT LOCATION: 13 MI E OF MERIDEN, CONN LICENSED POWER: 1825 MNT PROJECT MANAGER: F. AKSTULEMICZ DOCKET NUMBER: 050-00213 DESIGN POWER:
0582 MNE BRANCH CHIEF:
C. GRIMES ARCN/ ENGINEER: S&W NSSS VENDOR:
NEST LIC. ASSISTANT:
P. ANDERSON IE INSPECTOR:
P. SNETLAND TAC NO.
MPA 9 TITLE
- M07893 B-01 HADDAM NECK - DIESEL GENERATOR LOCKOUT M08301 A-01 HADDAM NECK 10 CFR 50.55A(G) INSERVICE INSPECTION 1
] M06968 A-01 HADDAM NECK - INCORPORATE 10 CFR 50.55 A(G) PROVISIONS INTO TECHNICAL SPECIFICATIONS j
M49667 G-01 HADDAM NECK - REACTOR COOLANT PUMP TRIP M08237 C-01 HADDAM NECK - PNR SECONDARY MONITORING REQUIREMENTS GENERIC IC l M44024 F-01 HADDAM NECK - NUREG-0737 I.A.1.1 STA LONG TERM REQUIREMENTS j M44093 F-02 HADDAM NECK - NUREG-0737 I.A.1.3.1, SHIFT MANNING OVERTIME LIMITS
- M08uy8 A-02 HADDAM NECK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN
! M07406 E-02 HADDAM NECK - RADIOLOGICAL CONSEQUENCE OF SPENT FUEL CASK DROP M06624 B-02 HADDAM NECK - FIRE PROTECTION I M06967 A-03 HADDAM NECK - PHYSICAL SECURITY PROGRAM j M08382 3-03 HADDAM NECK - GENERIC - PHR MODERATOR DILUTION l M40165 F-03 HADDAM NECK - NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING M44236 F-04 HADDAM NECK - NUREG-0737 I.C.1.2.A, INADEQUATE CORE COOLING GUIDELINES
{ M11976 D-04 HADDAM NECK - REACTOR CAVITY SEAL RING GENERIC ISSUE M07053 B-04
,HADDAM NECK - REACTOR VESSEL OVERPRESSURE PROTECTION
- "M08859 A-04 HADDAM NECK - CONTAINMENT LEAK TESTING - APPENDIX J CGENERIC)
M06119 C-04 HADDAM NECK - AIR FILTRATION SYSTEM i M44306 F-05 HADDAM NECK - PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)
M08464 C-06 HADDAM NECK - PHR PUMP S/G SUPPORTS - LAMELLAR TEARING & FRACTURE TOUGHNESS
~
+
a
~ _ -. - _ - - -
I 4
i R-1208731-001 REGULATORY INF0RMATION TRACKIN0 5Y$ TEM PAGE N0.8 201 FACILITY IMPLEMENTATION 04/14/86 HADDAM NECK (CONTINUATION) i i TAC NO.
MPA 0 TITLE M47219 F-06 HADDAM NECK - FEEDBACK OF OPERATING EXPERIENCE (AP I.C.5) i M47291 F-07 HADDAM NECK - CORRECT PERFORMANCE OF OPERATING ACTIVITIES (API.C.6)
N07803 3-07 HADDAM NECK - NATER HAMMER FEEDNATER LINE M68860 C-07 HADDAM NECK - FUEL HANDLING ACCIDENT INSIDE CONTAINMENT NT M51165 F-08 HADDAM NECK - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN F-08 i M51245 F-09 HADDAM NECK - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM M07847 B-09 HADDAM NECK - PIPE VIBRATION PROBLEMS IN CVC SYSTEM N08470 A-09 HADDAM NECK - REVIEN MATERIAL SURVEILLANCE RESULTS M44377 F-10 HADBAM NECK - NUREG-0737 II.B.1, RCS NIGH POINT VENTS
! N08463 D-10 HADDAM NECK - REVIEN OF ASYMMETRIC LOCA LOADS SUBMITTAL l M07993 C-10 HADDAM NECK -CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL PLANTS (NUREG 0612)
' M10935 A-10 HADDAM NECK - CONTINGENCY PLAN REVIEW
.M10064 D-11 HADDAM NECK GH BURNUP LHR FUEL
- M10933 A-11 HADBAM NECK - GUARD TRAINING PLAN REVIEN i
M47942 F-11 HADBAM NECK - PLANT SHIELDING MODIFICATIONS (II.B.2.2)
M10934 A-12 HADDAM NECK - VITAL AREA ANALYSIS 1 M41066 F-12 HADDAM NECK - NUREG-0737 - II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS i
{ M44515 F-13 HADDAM NECK - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE j M44585 F-14
,HADDAM NECK - RV AND SV TESTING "M11234 A HADDAM NECK - INSERVICE TESTING (IST)
I M43639 C-14 HADDAM NECK - SEISHIC QUALIFICATION OF THE AUXILIARY FEEDWATER SYSTEM M08857 B-14 HADDAM NECK - CONTROL ROD GUIDE TUBE HEAR
!'; M12288 D-15 HADDAM NECK - HELB AND CONSEQUENTIAL SYSTEM FAILURE HADDAN NECK i
1
.a s--
i R-1298731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
202 FACILITY IMPLEMENTATION 04/14/86 HADDAM NECK (CONTINUATION)
TAC NO.
MPA 9 TITLE M52233 C-15 HADDAM NECK - CONTROL OF HEAVY LOADS - PHASE II (FOLLONUP OF MPASC-10) i M44638 F-15 HADDAM NECK - NUREG-0737 II.E.1.1, AFM SYSTEM EVALUATION i M44680 F-16 HADDAM NECK - NUREG-0737 II.E.1.2.1, AFM SAFETY GRADE AUTO INITIATION M47106 A-16 HADDAM NECK - QUALIFICATIONS OF INSP., EXAM, TEST, AUDIT PERSONNEL jM12142 ~
B-16 HADDAM NECK M58063 C-16 HADDAM NECK - UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERNING STEAM GENERATORS (GL 85-02)
M51095 A-17 HADDAM NECK - INSTRUMENTATION TO FOLLDH THE COURSE OF AN ACCIDENT (RG 1.97)
. M44717 F-17 HADDAM NECK - NUREG-0737 II.E.1.2.2, AFH SAFETY GRADE FLON INDICATION
,!M08465 B-17 HADDAM NECK - TECH SPEC SURVEILLANCE FOR HYD. SNUBBERS M43048 D-17 HADDAM NECK - TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY SYSTEMS
,M44783 F-18 HADDAM NECK - NUREG-0737 II.E.4.1.2, DEDICATED HYDROGEN PENETRATIONS lM55712 A-18 HADDAM NECK - TECH. SPECS, AFFECTED BY 50.72 AND 50.73 (GL 83-43)
- M55864 D-19 HADDAM NECK - DIESEL GENERATOR RELIABILITY TECH. SPECS.
(GL 84-15)
M40854 F-19 HADDAM NECK - NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENDABILITY j M44925 F-20 HADDAM NECK - NUREG-0737 II.F.1.1, NOBLE GAS MONITOR 1 M59100 A-20 HADDAM NECK - 10CFR50.62 OPERATING REACTOR REVIENS lM10281 3-20 HADDAM NECK - CONTAINMENT LEAKAGE DUE TO SEAT DETERIORATION
- M10343 B-21 HADDAM NECK - LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIATOR SYSTEM M59957 A-21 HADDAM NECK - 10CFR50.61 PRESSURIZED THERMAL SHOCK RULE REQUIREMENTS, PHASE 1 "M44996 F-21 HEDDAM NECK - NUREG-0737 II.F.1.2, IDDINE/
PARTICULATE SAMPLING M45067 F-22 HADDAM NECK - NUREG-0737 II.F.1.3, CONTAINMENT HIGH RANGE MONITOR M08069 B-22 HADDAM NECK - TECH SPEC SURVEILLANCE FOR MECH. SNUBBERS j M10025 B-23 HADDAM NECK - POTENTIAL EQUIPMENT FAILURES ASSOCIATED HITH GRID VOLTAGE i
t
- es R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
203 FACILITY IMPLEMENTATION 04/14/86 i
HADDAM NECK (CONTINUATION)
TAC NO.
MPA 0 TITLE M47603 F-23 HADDAM NECK - NUREG 0737 ITEM II F1.4 - CONTAINMENT PRESSURE INSTRUMENT
! M47674 F-24 HADDAM NECK - NUREG 0737 ITEM II F1.5 CONTAINMENT HATER LEVEL MONITOR M10197 B-24 HADDAM NECK - CONTAINMENT PURGE i M42610 B-24 HADDAM NECK - LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-24)
M47745 F-25 HADDAM NECK - NUREG 0737 ITEM II F1.6 CONTAINMENT HYDROGEN MONITOR M10242 B-26 HADDAM NECK - INADVERTENT SAFETY INJECTION DURING COOLDOHN (PHR'S)
M45138 F-26 HADDAM NECK - NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION M46885 F-30 HADDAM NECK - II K2.13 THERMAL MECHANICAL REPORT M49425 B-32 HADDAM NECK - BLOCKING SI SIGNAL DURING C00LD0HN l M47801 F-33 HADDAM NECK - NUREG 0737 ITEM II K2.17 POTENTIAL FOR VOIDING IN RCS
] M45235 F-36 HADDAM NECK - NUREG-0737 II.K.3.1, AUTO PORV ISOLATION M45281 F-37 HADDAM NECK - NUREG-0737 II.K.3.2, REPORT ON PORV FAILURES M45347 F-38 HADDAM NECK - NUREG-0737 II.K.3.3, REPORT ON RV/SV FAILURES j
! M45398-F-39 HADDAM NECK - NUREG-0737 II.K.3.5, AUTO TRIP OF RCPS i
M08690 5-39 HADDAM NECK - PHR PRESSURE-TEMPERATURE TECH SPECS M45447 F-40 HADDAM NECK - NUREG-0737 II.K.3.9, PID CONTROLLER
} M45477 F-41 HADDAM NECK - NUREG-0737 II.K.3.10, ANTICIPATORY TRIP MODIFICATIONS M43625 3-41 HADDAM NECK - APPENDIX P-EXEMPTION REQUEST M11113 B-41 pADDAM NECK - FIRE PROTECTION SER SUPPLEMENT
!"M11748 B-42 HADDAM NECK - TMI FOLLON UP HORK M45507 F-42 HADDAM NECK - NUREG-0737 II.K.3.12, ANTICIPATORY TRIP DN TURBINE TRIP j M43137 B-43 HADDAM NECK - PHR FEEDHATER LINE CRACKS LONG TERM CORRECTIVE ACTION M11851 B-43 HIDDEN NECK PHR FEEDHATER LINE CRACKS i
l
~
jsi R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 204 i
j FACILITY IMPLEMENTATION 04/14/86 i HADDAM NECK (CONTINUATION)
TAC NO.
MPA 9 TITLE j M12438 B-44 HADDAM NECK - LESSONS LEARNED IMPLEMENTATION M12916 B-45 HADDAM NECK - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES M12597 B-46 HADDEN NECK - ANALYSIS OF TURBINE DISC CRACKS a
! M45633 F-47 HADDAM NECK - NUREG-0737 II.K.3.17, ECC SYSTEM OUTAGES M12782 B-48 HADDAM NECK - ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES
! M47401 3-49 HADDAM NECK - CONTROL ROD MISALIGNMENT
- M48420 F-53 HADDAM NECK - NUREG 0737, II.K.3.25 POWER ON PUMP SEALS fM45830 F-57 HADDAM NECK - NUREG-0737 II.K.3.30, SB LOCA OUTLINE I
M48169 F-58 HADDAM NECK -NUREG 0737 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 M42911 B-59 HADBAM NECK - MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11 M42521 3-60 HADDAM NECK - ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI-21)
M42674 B-61 HADDAM NECK - IE BULLETIN 79-27, LOSS OF NON CLASS IE INST & CONTR. POWER. REV. 8 EVAL. RESPONSES M42745 B-62 HADDAM NECK - ESF RESET CONTROL DESIGN DEFICIENCY - ISE BULLETIN 80-06 l M43901 B-63 CONNECTICUT YANKEE (HADDAM NECK) STATION BLACKOUT PROCEDURES & TRAINING
- M45949 F-63 HADDAM NECK - NUREG-0737 III.A.1.2, TECHNICAL SUPPORT CENTER
! M46020 F-64 HADDAM NECK - NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER'
'. M46092 F-65 HADDAM NECK - NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY M47171 B-66 HADDAM NECK NATURAL CIRCULATION COOLDONN (GENERIC LTR 81-21)
{ M46164 F-66 fADDAM NECK - III.A.2 NUCLEAR DATA LINK DATA i "M46236 F-67 MdDDAM NECK - III. A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE M46308 F-68 HADDAM NECK - NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE 1
M46836 B-69 HADDAM NECK 1 - PHR MSLB HITH CONTINUED FEEDHATER ADDITION 4 M46379 F-69 HADDAM NECK - NUREG-0737 III.D.3.3, INPLANT RADIATION MONITORING i
l
(.
l l
R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
205 I
FACILITY IMPLEMENTATION 04/14/86 HADDAM NECK (CONTINUATION) 4 TAC NO.
MPA 9 TITLE
. M46609 B-70 HADDAM NECK - MONITORING OF FATIGUE TRANSIENT LIMITS FOR THE REACTOR COOLANT SYSTEM M46450 F-70 HADDAM NECK - NUREG-0737 III.D.3.4, CONTROL ROOM HABITABILITY l
M56128 F-71 HADDAM NECK - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
SUMMARY
REPORT - F-71 M49735 B-72 HADDAM NECK *NUREG 0737 TECH SPECS (GENERIC LETTER 82-16 82-16 OR 83-02)"
M52762 B-76 HADDAM NECK - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES
]
M52843 B-77 HADDAM NECK - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52924 B-78 HADDAM NECK - ITEMS 3.1.1 & 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONE MS3005 B-79 HADDAM NECK-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS M53073 B-80 HADDAM NECK - REACTOR TRIP SYSTEM RELIABILITY - VENDOR RELATED MODIFICATIONS (4.1)
I M53126 B-81 HADDAM NECK - ITEMS 4.2.1 & 4.2.2 - PREVENTATIVE MAINT PROGRAM FOR REACTOR TRIP BREAKERS - MAINTENANCE & TREND M53175 B-82 HADDAM NECK - ITEM 4.3 - AUTDAMTIC ACTUATION OF SHUNT TRIP-ATTACHMENT FOR H AND B & N PLANTS M54538 B-83 HADDAM NECK - TECHNICAL SPECIFICATIONS COVERED BY GENERIC L ETTERS 83-36, 83-37 FOR NUREG-0737 M53594 B-85 HADDAM NECK - ITEM 1.2 - POST TRIP REVIEM-DATA AND INFORMATION CAPABILITY i
M53677 B-86 HADDAM NECK - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53760 3-87 HADDAM NECK-ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONEN
)
MS3843 B-88 HADDAM NECK - ITEM 3.2.3 - POST-MAINTENANCE TESTING
-CHANGES TO TECH. SPEC. - ALL SR COMPONENTS M53913 B-89 HADBAM NECK - ITEMS 4.2.3 & 4.2.4-PREVENTATIVE MAINT.
PROGRAM FOR RX TRIP BREAKERS - LIFE TESTING 8 REPLACEME M55357 B-90 HADDAM NECK - ITEM 4.3(TS) - AUTOMATIC ACTUATION OF SHUNT TRIP FOR H AND B&W PLANTS - TECH SPECS M54070 B-92, HADDAM NECK - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES "M53987 B-93 HdDDAM MECK - ITEMS 4.5.2 a 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVALS 4
)
R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
268 FACILITY IMPLEMENTATION 03/31/86 FACILITY: MILLSTONE 1 PLANT LOCATION: 5 MI SH OF NEN LONDON, CONN LICENSED POWER: 2011 MNT PROJECT MANAGER: J. SHEA DOCKET NUMBER: 050-00245 DESIGN POWER:
0660 MNE BRANCH CHIEF C. GRIMES ARCN/ ENGINEER: ESASCO NSSS VENDOR:
GE LIC. ASSISTANT:
P. ANDERSON IE INSPECTOR:
T. SHEDLOSKY t
LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS Dalg M08294 A-01 10 CFR 50.55 A(G) - ISI 09/19/79C M06626 A-01 10 CFR 50.55 A(G) - ISI 07/06/78C M08115 A-02 APPENDIX I - ALARA 08/31/83C M10137 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 05/10/85C M07919 A-05 GE MARK I CONTAINMENT TECH SPECS-SHORT TERM 07/06/78C M08178 A-07 APPENDIX G - FRACTURE TOUGHNESS 06/01/79C M11367 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 05/19/80C M10412 A-10 CONTINGENCY PLANNING 04/05/83C M10IO8 A-11 GUARD TRAINING PLANS 04/08/82C M10410 A-12 VITAL AREA ANALYSIS 04/12/82C M51106 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 07/01/86 M55722 A-18 TECH SPECS AFFECTED BY 58.72 AND 50.73 (GL 83-43) 04/10/86 M59113 A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S /
- M46665 B-05 STRESS CORROSION CRACKING - BNR RCSPB 06/20/84C M08221 3-05 STRESS CORROSION CRACKING - BNR RCSPB 01/30/81C M08197 B-06 pHR RELIEF VALVE 05/29/79C
'M12136 3-16 ENERGENCY PLANNING AND REVISIONS 01/01/70C M12137 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C M08417 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 12/28/81C 1
i E-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 10/25/80C
!'M19286
i R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
269 FACILITY IMPLEMENTATION 03/31/86 t
i MILLSTONE 1 (CONTINUATION) i LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS RAIE M10348 B-21 LOSS OF 125-V DC BUS VOLTAGE WITN LOSS OF ANNUNCIA 02/09/82C M08415 B-22 TECN SPEC SURVEILLANCE REQUIREMENTS FOR MECNANICAL 12/28/81C t
l M10033 B-23 DEGRADED GRID VOLTAGE 06/01/83C M42612 B-24 VENTING AND PURGING CONTAINMENTS HNILE AT FULL PON 02/25/85C
. M10192 B-24 VENTING AND PURGING CONTAINMENTS HNILE AT FULL PON 10/25/80C f
M08412 5-25 BWR FEEDWATER N0ZZLE CRACKING 06/09/83C j - M10949 B-27 REVIEN RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 10/01/80C M11017 B-29 BWR FEEDHATER PUMP TRIP 11/30/78C M11786 B-40 PIPE SUPPORT BASE PLATES 01/23/81C M11116 B-41 FIRE PROTECTION - FINAL TECN SPECS (INCLUDES SER S 07/29/82C 1
N06043 D-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 09/26/78C M11705 B-42 TMI FOLLON UP - ALL PLANTS 07/10/81C i
j M12421 B-44 LESSONS LEARNED IMPLEMENTATION 05/02/80C i
i M30544 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 6
L S$0N LEA DI LE NTA ON 04/1 /8 C I' M30547 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30508 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C
]
M30549 B-44, LESSONS LEARNED IMPLEMENTATION 04/18/80C l
'M30550 B LdSSONS LEARNED IMPLEMENTATION 04/18/80C i
M30551 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C i
}
M30552 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C i
M30553 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C 1
t
4 R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.8 270 FACILITY IMPLEMENTATION 03/31/86 ij MILLSTONE 1 (CONTINUATION)
)
I LIC ACT LICENSEE I TAC NO.
MPA 9 TITLE COMPLETE STATUS JL41E
]
M30554 3-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C f M30555 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C l M12918 B-45 NASN 1400 EVENT V, ' PRIMARY COOLANT SYSTEM PRESSUR 02/25/81C M42079 B-46 ANALYSIS OF TURBINE DISC CRACKS 05/15/80C 1
M12698 B-47 ECCS; CLAD SHELLING AND RUPTURE 07/30/80C i M12762 3-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 04/19/83C i M10704 B-56 CONTROL RODS FAILURE TO INSERT. BNR 06/15/81C l M42210 B-58 SDV CAPABILITY 01/09/81C j M47431 3-58 SDV CAPABILITY 04/21/83C M42913 3-59 MASONRY HALL DESIGN 04/30/86 l M42523 3-60 ENVIRONMENTAL QUALIFICATION 07/30/85C M42684 B-61 LOSS OF NON CLASS IE I8C POWER 07/28/82C M42755 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 07/24/81C M43925 B-63 INTERIM PROCEDURES FOR SNORT TERM BLACKOUT 08/27/81C M43721
.B-65 SAFETY CONCERNS ASSOCIATED WITN PIPE BREAKS IN BNR 11/12/82C M46615 B-70 FATIGUE TRANSIENT. LIMIT TS 05/25/82C M51684 B-72 NUREG 0737 TECM SPECS (GENERIC LETTER 82-16) 03/19/84C l M52773 3-76 ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION 8 04/05/85C M52854 B-77
, ITEM 2.1 - EQUIPMENT CLASSIFICATION 8 VENDOR INTER j 'M52935 3-78 ITIMS 3.1.1 8 3.1.2 -POST MAINTENANCE TEST PROCEDU 09/03/85C i
M53016 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CNANGES TO 09/03/85C j
M54545 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-12/15/85 M55602 B-84 INSPECTIONS OF BNR STAINLESS STEEL PIPING ACCORDIN 12/16/84C 4 :
1 1
3-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE 110.8 271 FACILITY IMPLEMENTATION 03/31/86 MILLSTONE 1 (CONTINUATION)
LIC ACT LICENSEE TAC NO.
MPA 9 TITLE COMPLETE STATUS RAIE M53606 B-85 SALEM ATHS 1.2 DATA CAPABILITY 02/15/86 M53689 B-86 SALEM ATHS 2.2 S-R COMPONENTS MS3772 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 02/28/86C M53855 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 09/03/85C M54082 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FEATURES 02/03/86C M53999 B-93 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES M08281 C-02 BNR-RECIRC. PUMP TRIP (ATHS) 08/20/79C M08C50 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 07/19/84C M10910 C-11 RPS POWER SUPPLY 06/14/34C M52244 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLDHUP OF MPA 06/28/85C M07941 D-01 GE MARK I CONTAINMENT EVALUATION - LONG TERM 09/12/84C M10069 D-11 FISSION GAS RELEASE 10/13/78C M12290 D-15 NIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/19/81C M43050 D-17 DEFINITION OF OPERABLE 05/23/84C M55876 D-19 DIESEL GENERATOR RELIABILITY TECN SPECS (GL 84-15) 09/06/85C M56741 D-20 MARK I DRYMELL VACUUM BREAKERS - LICENSEE RESPONSE 04/31/86 M44033 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 02/22/82C M44103 F-02 I. A.1. 3 SNIFT MANNING 06/30/83C M44174 F-03 I.,A.2.1 UPGRADING OF RO AND SRO TRAINING 01/07/83C M44245 F-04 I.b.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC 03/26/85C M44315 F-05 I.C.1.2/3.5 PROCEDURES GENEPATION PACKAGES (NUREG 06/15/86 M47228 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/08/82C M47300 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/08/82C
R-1208731-OO1 REGULATORY INF0RMATION TRACKINO SYSTEM PAGE NO.8 272 FACILITY IMPLEMENTATION 03/31/86 MILLSTONE 1 (CONTINUATION) l LIC ACT LICENSEE TAC NO.
MPA 9 TITLE COMPLETE STATUS DAIE M51176 F-08 I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEN PROGRA 07/10/87 M51256 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 10/12/86
?
M44384 F-10 II.B.1 RCS HIGH POINT VENTS 06/27/83C i
M47951 F-11 II.B.2 PLANT SHIELDING 06/07/83C M44453 F-12 II.B.3 POST ACCIDENT SAMPLING 07/19/84C M44524 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 01/07/83C l
M44594 F-14 II.D.1 RV AND SV TRAINING 03/14/83C M44792 F-18 II.E.4.1 DEDICATED NYDROGEN PENETRATION 08/12/81C M44863 F-19 II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 02/25/85C M44934 F-20 II.F.1.1 NOBLE GAS MONITOR 11/23/81C I
M45005 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/23/81C i
M45076 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 84/15/82C 1
f M47612 F-23 II. F.1. 4 CONTAINMENT PRESSURE INSTRUMENT 03/14/83C M47683 F-24 II.F.1.5 CONTAINMENT NATER LEVEL INSTRUMENT 03/14/83C M47754 F-25 II.F.1.6 CONTAINMENT NYDROGEN MONITOR 06/24/85C M45147 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEGUATE 03/26/85C
- M57657 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CNALLE 05/00/85C 1
M45356 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/08/82C M46530~
F-43,II.K.3.13 NPCI AND RCIC INITIATION LEVELS 04/14/82C 1
M46531 F-44 If.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 09/15/81C M4L533 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVE 10/18/84C M45642 F-47 II.K.3.17 ECCS OUTAGES 08/10/83C M46534' F-48 II.K.3.18 ADS ACTUATION 03/14/83C i
i l
R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.8 273 FACILITY IMPLEMENTATION 03/31/86 MILLSTONE 1 (CONTINUATION)
LIC ACT LICENSEE TAC NO.
MPA 0 TITLE COMPLETE STATUS DAIE M46535 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 07/23/81C M46536 F-50 II.K.3.21 RESTART OF CSS AND LPCI 03/08/83C M48834 F-53 II.K.3.25 PDHER ON PUMP SEALS 11/18/82C M46538 F-54 II.K.3.27 CDMMON REFERENCE LEVEL 12/11/81C l M48280 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS 11/29/84C M46539 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSERS 09/15/81C M45839 F II.K.3.30 SB LOCA METHODS 12/19/83C M48178 F-58 II.K.3.31 CDNPLIANCE WITH 10 CFR 50.46 12/19/83C M46540 F-59 II.K.3.44 ANTICIPATED TRANSIENTS HITH SINGLE FAIL 12/18/81C i M46541 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 03/20/84C M45958 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 11/12/86 M46029 F-64 III.A.1.2 OPERATIONAL SUPPORT CENIER 02/10/87 j
M46101 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 02/10/87 M46173 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C M46245 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/13/83C M46317 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 02/10/87 M46388 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 07/07/81C M46457 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 04/16/82C M56138 F-71
,I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLDHUP TO 07/10/87
i
! R-1208731-001 REGULAT0RY INFGRMATION TRACKING SYSTEM PAGE.40. 8 268 l
FAC1LITY IMPLEMENTATION 04/14/86 l
l FACILITY: MILLSTONE 1
!. PLANT LOCATION: 5 MI SN OF NEN LONDON, CONN LICENSED POWER: 2011 MNT PROJECT MANAGER: J. SHEA DOCKET NUMBER: 850-00245 DESIGN POWER:
0660 MNE BRANCH CHIEF C. GRIMES ARCN/ ENGINEER: EBASCO NSSS VENDOR:
GE LIC. ASSISTANT:
P. ANDERSON IE INSPECTOR:
T. SHEDLOSKY t
TAC NO.
MPA 0 TITLE y
MO6626 A-01 MILLSTONE UNIT NO. 1 INSERVICE INSPECTION PROGRAM M44033 F-01 MILLSTONE 1 - NUREG-0737 I. A.1.1 STA LONG TERM REQUIREMENTS j N08294 A-01 MILLSTONE 1-10 CFR 50.55S(G)-INSERVICE INSPECTION-GENERIC STING - GENERIC M07941 D-01 MILLSTONE 1 - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION 1 MSS 115 A-02 MILLSTONE 1 - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN
! M44103 F-02 MILLSTONE 1 - NUREG-0737 I. A.1.3.1, SHIFT MANNING OVERTIME LIMITS
! N08281 C-02 MILLSTONE 1 - ATHS RECIRCULATION PUMP TRIP
- M44174 F-53 MILLSTONE 1 - NUREG-0737 I.A.2.1.4, UPGRADING OF RO AND SRO TRAINING M44245 F-04 MILLSTONE 1 - NUREG-0737 I.C.1.2.A, INADEGUATE CORE COOLING GUIDELINES M10137 A-04 MILLSTONE 1 - CONTAINMENT LEAK TESTING - APPENDIX J (GENERIC) f M44315 F-05 MILLSTONE 1 - PROCEDURES GENERATION PACKAGE REVIEN (NUREG 0737 SUPP/1)
I j N08221 D-05 MILLSTONE 1 - STRESS CORROSION CRACKING - BNR RCSPB - GENERIC N07919 A-05 MILLSTONE 1 - MARK I CONTAINMENT SHORT TERM PROGRAM IMPLEMENTATION i
j - M46665 B-05 MILLSTONE 1 - IMPLEMENTATION OF NUREG-0313, REV.1 i N08197 B-06 MILLSTONE 1 - BNR SAFETY / RELIEF VALVE SURVEILLANCE - GENERIC a
M47228 F-86
, MILLSTONE 1 - FEEDBACK OF OPERATING EXPERIENCE CAP I.C.5)
"M47300 F-07 ~ MfLLSTONE 1 - CORRECT PERFORMANCE OF OPERATING ACTIVITIES (API.C.6) 3 l M08178
.A-07 MILLSTONE 1 - FRACTURE TOUGHNESS REQUIREMENTS - APPENDIX G - GENERIC M51176 F-08 MILLSTONE 1 - I.D 1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN F-08 l M51256 F-89 HILLSTONE 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM 1-i i
i
,H i
I a
l R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEN PAGE NO.s 269 FACILITY IMPLEMENTATION 04/14/86 MILLSTONE 1 (CONTINUATION) i l
) TAC NO.
MPA 0 TITLE M11367 A-09 MILLSTONE 1-REACTOR VESSEL BELTLINE MATERIAL SURVEILLANCE M44384 F-10 MILLSTONE 1 - NUREG-0737 II.B.1, RCS HIGH POINT VENTS M10412 A-10 MILLSTONE 1 - CONTINGENCY PLAN REVIEN N00060 C-10 MILLSTONE 1 -CONTROL OF HEAVY LOADS DVER SPENT FUEL POOL (NUREG 0612)
M10910 C-11 MILLSTONE 1 - RPS POWER SUPPLY
. M19408 A-11 MILLSTONE 1 - GUARD TRAINING PLAN REVIEN M10069 D-11 MILLSTONE 1 - ENHANCED FISSION PRODUCT RELEASE FOR HIGH BURNUP LHR FUEL M47951 F-11 MILLSTONE 1 - PLANT SHIELDING MODIFICATIONS (II.B.2.2)
M10110 A-12 MILLSTONE 1 - VITAL AREA ANALYSIS 1 M40453 F-12 MILLSTONE 1 - NUREG-0737 II.B.3.2, POST ACCIDENT SAMPLING MODIFICATIONS j M4ss24 F-13 MILLSTONE 1 - NUREG-0737 II.B.4.1, TRAINING FOR MITIGATING CORE M44593 F-14 MILLSTONE 1 - RV AND SV TESTING
! M12290 D-15 MILLSTONE 1 - HELB AND CONSEQUENTIAL SYSTEM FAILURE MILLSTONE 1 j M52204 C-15 MILLSTONE 1 - CONTROL OF HEAVY LOADS - PHASE II (FDLLONUP OF MPASC-10)
M12136 3-16 MILLSTONE 1, EMERGENCY PLAN REVIEN M12137 B-16 MILLSTONE 1 - EMERGENCY PLAN REVIEN M51106 A-17 MILLSTONE 1 - INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDENT (RG 1.97)
}
i l M43050 D-17 MILLSTONE 1 - TECHNICAL SPECIFICATIONS DEFINING OPERABILITY FOR SAFETY SYSTEMS l N08417 B-17 f1LLSTONE 1 - TS SURVEILLANCE HYDRAULIC SNUBBERS
!"M44792 F-18 MIILSTONE 1 - NUREG-0737 II.E.4.1.2, DEDICATED NYDROGEN PENETRATIONS i
M55722 A-18 MILLSTONE 1 - TECH. SPECS. AFFECTED BY 50.72 AND 50.73 (GL 83-43)
M55876 D-19 MILLSTONE 1 - DIESEL GENERATOR RELIABILITY TECH. SPECS.
(GL 84-15) lj M44863 F-19 MILLSTONE 1 - NUREG-0737 II.E.4.2, CONTAINMENT ISOLATION DEPENBnBILITY
?.
I~
l
O R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.
270 FACILITY IMPLEMENTATION 04/14/86 MILLSTONE 1 (CONTINUATION)
TAC NO.
MPA 8 TITLE M59113 A-20 MILLSTONE 1 - 10CFR50.62 OPERATING REACTOR REVIENS M;6741 D-10 MILLSTONE 1 - VACUUM BREAKERS M44934 F-20 MILLSTONE 1 - NUREG-0737 II.F.1.1, NOBLE GAS MONITOR M1028.
B-20 MILLSTONE 1 - CONTAINMENT LEAKAGE DUE TO SEAT DETERIORATION M10348 B-21 MILLSTONE 1 - LOSS OF 125-V BUS VOLTAGE HITH LOSS OF ANNUNCIATOR SYSTEM M45005 F-21 MILLSTONE 1 - NUREG-0737 II.F.1.2, IODINE /
PARTICULATE SAMPLING M45076 F-22 MILLSTONE 1 - NUREG-0737 II.F.1.3, CONTAINMENT HIGH RANGE MONITOR N08415 B-22 MILLSTONE 1 - TS SURVEILLANCE FOR MECHANICAL SNUBBERS M10033 B-23 MILLSTONE 1 - POTENTIAL EQUIPMENT FAILURES ASSOCIATED HITH GRID VOLTAGE M47612 F-23 MILLSTONE 1 - NUREG 0737 ITEM II F1.4 CONTAINMENT PRESSURE INSTRUMENT M47683 F-24 MILLSTONE 1 - NUREG 0737 ITEM II F1.5 CONTAINMENT HATER LEVEL MONITOR
'M42612 3-24 MILLSTONE 1 - LONG TERM REVIEN CONTAINMENT PURGE AND VENT (B-24)
M10192 B-24 MILLSTONE 1 - CONTAINMENT PURGE M08412 B-25 MILLSTONE 1 - BNR FEEDWATER S CONTROL R0D DRIVE N0ZZLE CRACKING M47754 F-25 MILLSTONE 1 - NUREG 0737 ITEM II F1.6 CONTAINMENT HYDROGEN MONITOR M45147 F-26 MILLSTONE 1 - NUREG-0737 II.F.2.3, INADEQUATE CORE COOLING INSTRUMENTATION M10949 B-27 MILLSTONE 1 - BWR OFF GAS SYSTEMS H2 IGNITIONS M11017 B-29 BWR FEEDHATER PUMPS TRIP M45356 F-38 MILLSTONE 1 - NUREG-0737 II.K.3.3, REPORT ON RV/SV FAILURES
'M57657 F-38 MILLSTONE 1 - REPORTING SAFETY AND RELIEF VALVE FAILURES - II.K.3.3(F-38)
)
M11786 B-40 MILLSTONE 1 - FOLLOW UP DN BULLETINS 79-07,04 AND 02 ADL PIPE M11116 B-41 MILLSTONE 1 - FIRE PROTECTION SER SUPPLEMENT M06043 B-41 MILLSTONE 1 - FIRE PROTECTION (SRP-9.51) b
H R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.
271 FACILITY IMPLEMENTATION 04/14/86 MILLSTONE 1 (CONTINUATION)
TAC NO.
MPA O TITLE M11705 B-42 MILLSTONE 1 - THREE MILE ISLAND FDLOWUP HORK M46530 F-43 MILLSTONE 1 - NUREG-0737, II.K.3.13, HPCI
& RCIC M46531 F-44 MILLSTONE 1 - NUREG-0737, II.K.3.14, ISOLA 0F ISOLATION CONDENSERS ON HIGH RADIATION M30544 B-44 MILLSTONE 1-2.1.5 A,C DEDICATED H2 CONTROL PENETRATIONS & RECOMBINER PROCEDURE M30545 B-44 MILLSTONE 1-2.2.2 A,B,C CONTROL ROOM ACCESS, TSC, OPERATIONAL SUPPORT CENTER M30546 B-44 MILLSTONE 1-2.2.1 A,B,C SHIFT SUPER. RESP.,
STA, TURNOVER PROCEDURES M30547 B-44 MILLSTONE 1-2.1.8.C IMPROVED IODINE INST.
M30548 B-44 MILLSTONE 1-2.1.8.3 HIGH RANGE RADIATION MONITORS I
M30549 B-44 MILLSTONE 1-2.1.8.A POST ACCIDENT SAMPLING M30550 3-44 MILLSTONE 1-2.1.6.B SHIELDING REVIEW M30551 3-44 MILLSTONE 1-2.1.6.A SYSTEMS INTEGRITY FOR HIGH RADI0 ACTIVITY
! M30552 B-44 MILLSTONE 1-2.1.4 DIVERSE CONTAINMENT ISOLATION M30553 B-44 MILLSTONE 1-2.1.3.B INST. FOR CORE COOLING M30554 3-44 MILLSTONE 1-2.1.3. A DIRECT INDICATION OF VALVE POSITION M30555 B-44 MILLSTONE 1-2.1.2 RELIEF 8 SAFETY VALVE TESTING M12421 3-44 MILLSTONE 1 - LESSONS LEARNED IMPLEMENTATION M12918 B-45 MILLSTONE 1 - PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES M46553 F-46 MILLSTONE 1 - NUREG-0737, II.K.3.16, CHALLENGES AND FAILURES OF RELIEF VALVES M42079 B-46 FILLSTONE 1 - ANALYSIS OF TURBINE DISCS IN G.E. TURBINES "M45642 F-47 MILLSTONE 1 - NUREG-0737 II.K.3.17, ECC SYSTEM OUTAGES l M12698 B-47 MILLSTONE 1-ECCS CLAD SHELLING & RUPTURE M46534 F-48 MILLSTONE 1 - NUREG-0737, II.K.3.18, ADS ACTUATION STUDY M12762 B-48 MILLSTONE 1 - ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEMS VOLTAGES
'~
~
q 4
) 18 i
i R-1208731-901 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE No.: 272 I
FACILITY IMPLEMENTATION 04/14/86 MILLSTONE 1 (CONTINUATION) i J-TAC No. MPA 0 TITLE M4~e535 F-49 MILLSTONE 1 - NUREG-0737,II.K.3.19.
INTERLOCK RECIRC PUMP MODIFICATION t
M46536 F-50 MILLSTONE 1 - NUREG-0737 II.K.3.21, RESTART OF CSS AND LPCI I
M48834 F-53 MILLSTONE 1, NUREG-0737 ITEM II K.3.25 PONER TO PUMP SEALS j
M46538 F-54 MILLSTONE 1 - NUREG-0737, II.K 3.27, COMMON REFERENCE LEVEL Mai280 F-55 MILLSTONE 1 - NUREG 0737 II.K.3.28, VERIFY GUALIFICATION OF ACCUMULATORS ON ADS VALVES l
M46539 F-56 MILLSTONE 1 - NUREG-0737, II.K.3.29, PERFORMANCE OF ISOLATION CONDENSERS M19704 3-56 MILLSTONE 1 - CONTROL ROD FAILURE TO INSERT M45839 F-57 MILLSTONE 1 - NUREG-0737 II.K.3.30, SB LOCA OUTLINE
{
M47431 B-58 MILLSTONE 1 - SORAM DISCNARGE VOL.-DIVERSE INST. EXCEPTION l
M48178 F-58 MILLSTONE 1 -NUREG 0737 II.K.3.31 COMPLIANCE HITN 10 CFR 50.46 M42210 B-58 MILLSTONE 1 - BNR SCRAM DISCNARGE VOLUME CAPABILITY j
M46500 F-59 MILLSTONE 1 - NUREG-0737, II.K.3.44, TRANSIENTS WITN SINGLE FAILURES
(
i M42913 3-59 MILLSTONE 1 - MASONRY NALL DESIGN. RESPONSE TO IE BULLETIN 80-11 J
j M42523 3-60 MILLSTONE 1 - ENVIRONMENTAL GUALIFICATIONS OF SAFETY RELATED ELECTRICAL EQUIPMENT (80-CLI-21)
M46541 F-60 MILLSTONE 1 - NUREG-0737, II.K.3.45, MANUAL DEPRESSURIZATION M42684 3-61 MILLSTONE 1 - IE BULLETIN 79-27, LOSS OF NON CLASS IE INST & CONTR. PONER. REV. & EVAL. RESPONSES
.M42755 B-62 MILLSTONE 1 - ESF RESET CONTROL DESIGN DEFICIENCY - ISE BULLETIN 80-06 4
M43925 3-63 MILLSTONE UNIT 1 - STATION BLACK 0UT PROCEDURES S TRAINING 1
}
M45958' F-63, MILLSTONE 1 - NUREG-0737 III. A.1.2, TECHNICAL SUPPORT CENTER l "M46029 F-64 MII.LSTONE 1 - NUREG-0737 III.A.1.2, OPERATIONAL SUPPORT CENTER M46101 F-65 MILLSTONE 1 - NUREG-0737 III.A.1.2, EMERGENCY OPERATIONS FACILITY M43721 3-65 MILLSTONE 1 - SAFETY CONCERNS ASSOCIATED WITN PIPE BREAKS IN THE BNR SCRAM SYSTEM i
-M46173 F-66 MILLSTONE 1 - III. A.2 NUCLEAR DATA LINK DATA
- is l
l R-1208731-001 REOULAT0RY INF0RMATION TRACKING SY$ TEM PAGE NO.
273 i
FACILITY IMPLEMENTATION 04/14/86 1
) MILLSTONE 1 (CONTINUATION)
. TAC NO.
MPA 9 TITLE M46245 F-67 MILLSTONE 1 - III. A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 4 M46317 F-68 MILLSTONE 1 - NUREG-0737 III.A.2.2, METEOROLOGICAL DATA UPGRADE IJ M46388 F-69 MILLSTONE 1 - NUREG-0737 III.D.3.3, INPLANT RADIATION MONITORING I
! M46615 B-70 MILLSTONE 1 - MONITORING OF FATIGUE TRANSIENT LIMITS FOR THE REACTOR COOLANT SYSTEM M46457 F-70 MILLSTONE 1 - NUREG-0737 III.D.3.4, CONTROL ROOM NABITABILITY
! M56138 F-71 MILLSTONE 1 - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN SUf91ARY REPORT - F-71 1
1 M51684 3-72 MILLSTONE 1 NUREG 0737 TECN SPECS
{ M52773 B-76 MILLSTONE 1 - ITEM 1.1 - POST TRIP REVIEN PROGRAM DESCRIPTION AND PROCEDURES M52854 3-77 MILLSTONE 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52935 B-78 MILLSTONE 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONE i
M53016 3-79 MILLSTONE 1-ITEM 3.1.3 -POST-MAINTENANCE TESTING-CNANGES TO TECN SPECS-RTS COMPONENTS l
? M54545 3-83 MILLSTONE 1 - TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36, 83-37 FOR NUREG-0737 t
j M55602 B-84 MILLSTONE 1 - INSPECTION OF BNR STAINLESS STEEL PIPING ACCORDING TO GENERIC LETTER 84-11
] M53606 B-85 MILLSTONE 1 - ITEM 1.2 - FDST TRIP REVIEN-DATA AND INFORMATION CAPABILITY M53689 B-86 MILLSTONE 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS j
j M53772 B-87 MILLSTONE 1-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONEN
, M53855 B-88 MILLSTONE 1 - ITEM 3.2.3 - POST-MAINTENANCE TESTING
-CNANGES TO TECN. SPEC. - ALL SR COMPONENTS i M54082 B-92 MILLSTONE 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES j M53999 B-93
, MILLSTONE 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES 8 TEST INTERVALS l=
e 4
I E
1 i