Letter Sequence Approval |
|---|
|
Results
Other: AECM-84-0107, Requests Addl Delay in Submittal of Inservice Insp Program Until 840801.Justification Provided, AECM-84-0257, Forwards Sample Plan for Selection of Pipe Supports to Be Subj to 10-yr Inservice Insp Plan,Per ASME Boiler & Pressure Vessel Code,Section Xi.Plan Does Not Encompass Snubbers. Review by 840601 Requested, AECM-84-0335, Forwards Requests for Relief from ASME Section XI Code Requirements for Inservice Insp of 11 Items.Requests Submitted in Accordance W/Requirements of 10CFR50.55a(g)(5)(IV), AECM-84-0371, Forwards 10-yr Inservice Insp Plan for Piping,Welds & Supports,Vols I-III, AECM-87-0068, Documents Conversations Re Postulated Complete through-wall Circumferential Fracture of CRD Housing & Normal Makeup Capacity Available at or Near Cold Shutdown.Crd Pump Can Supply Normal Makeup Inventory Due to Failure.Fee Paid, ML20202J455, ML20203J811
|
MONTHYEARAECM-84-0107, Requests Addl Delay in Submittal of Inservice Insp Program Until 840801.Justification Provided1984-03-16016 March 1984 Requests Addl Delay in Submittal of Inservice Insp Program Until 840801.Justification Provided Project stage: Other AECM-84-0257, Forwards Sample Plan for Selection of Pipe Supports to Be Subj to 10-yr Inservice Insp Plan,Per ASME Boiler & Pressure Vessel Code,Section Xi.Plan Does Not Encompass Snubbers. Review by 840601 Requested1984-05-11011 May 1984 Forwards Sample Plan for Selection of Pipe Supports to Be Subj to 10-yr Inservice Insp Plan,Per ASME Boiler & Pressure Vessel Code,Section Xi.Plan Does Not Encompass Snubbers. Review by 840601 Requested Project stage: Other AECM-84-0335, Forwards Requests for Relief from ASME Section XI Code Requirements for Inservice Insp of 11 Items.Requests Submitted in Accordance W/Requirements of 10CFR50.55a(g)(5)(IV)1984-06-29029 June 1984 Forwards Requests for Relief from ASME Section XI Code Requirements for Inservice Insp of 11 Items.Requests Submitted in Accordance W/Requirements of 10CFR50.55a(g)(5)(IV) Project stage: Other AECM-84-0371, Forwards 10-yr Inservice Insp Plan for Piping,Welds & Supports,Vols I-III1984-07-25025 July 1984 Forwards 10-yr Inservice Insp Plan for Piping,Welds & Supports,Vols I-III Project stage: Other AECM-84-0470, Forwards Request for Relief from ASME Section XI Code Requirements for Inservice & Preservice Insp of Pressure Retaining Piping Weld.Expeditious Review Requested1984-09-20020 September 1984 Forwards Request for Relief from ASME Section XI Code Requirements for Inservice & Preservice Insp of Pressure Retaining Piping Weld.Expeditious Review Requested Project stage: Request ML20134K4911985-08-22022 August 1985 Forwards Request for Addl Info Re Proposed Inservice Insp Program & Requests for Relief from Requirements in Section XI of ASME Code Submitted on 840920.Info Needed by 850930 Project stage: RAI AECM-85-0349, Forwards Response to 850822 Request for Addl Info Re 840725 10-yr Inservice Insp Program & 840920 Request for Exemption from Certain ASME Code Section XI Requirements.Program Approval Requested by 8603021985-10-31031 October 1985 Forwards Response to 850822 Request for Addl Info Re 840725 10-yr Inservice Insp Program & 840920 Request for Exemption from Certain ASME Code Section XI Requirements.Program Approval Requested by 860302 Project stage: Request ML20202J4551986-03-28028 March 1986 First Interval Inservice Insp Program,Grand Gulf Nuclear Station, Technical Evaluation Rept Project stage: Other AECM-86-0186, Requests Response to Encl Rev to Justification for Relief Request I-00008 Re ASME Section XI Code Requirements for Inservice Insp of CRD & in-core Housing Welds & Flange Bolting,Per ,By 8608011986-07-14014 July 1986 Requests Response to Encl Rev to Justification for Relief Request I-00008 Re ASME Section XI Code Requirements for Inservice Insp of CRD & in-core Housing Welds & Flange Bolting,Per ,By 860801 Project stage: Request ML20203G4251986-07-22022 July 1986 Forwards Safety Evaluation Re Inservice Insp Program & Requests for Relief from Certain Inservice Insp Requirements & SAIC-86/1626, First Interval Inservice Insp Program, Technical Evaluation Rept.Plan & Requests Acceptable Project stage: Approval ML20203G4361986-07-22022 July 1986 Safety Evaluation Re Inservice Insp Program & Requests for Relief from Certain Inservice Insp Requirements.Inservice Insp Plan Acceptable for Implementation Project stage: Approval AECM-86-0224, Requests NRC Approval of Proposed Change to Inservice Insp Program to Allow Use of Figure Iwb 2500-7(b) from 1983 Edition,Summer 1983 Addenda of ASME Code,Section XI Re Exam Category B-D Weldments.Fee Paid1986-07-23023 July 1986 Requests NRC Approval of Proposed Change to Inservice Insp Program to Allow Use of Figure Iwb 2500-7(b) from 1983 Edition,Summer 1983 Addenda of ASME Code,Section XI Re Exam Category B-D Weldments.Fee Paid Project stage: Request ML20203J8111986-07-30030 July 1986 Notifies That 860723 Request to Use Portion of 1983 ASME Boiler & Pressure Vessel Code,Section XI in Plant Inservice Insp Program Should Be Resubmitted,As Request for Relief from 1977 Edition of Code,By 860816 Project stage: Other AECM-86-0248, Forwards Relief Request I-00013 Seeking NRC Approval for Use of Summer 1983 Addenda of ASME Section Xi,Based on Interpretation of 10CFR50.55(a)(g)(4)(iv), Re Inservice Insp Requirements for Reactor Pressure Vessel Nozzles1986-08-15015 August 1986 Forwards Relief Request I-00013 Seeking NRC Approval for Use of Summer 1983 Addenda of ASME Section Xi,Based on Interpretation of 10CFR50.55(a)(g)(4)(iv), Re Inservice Insp Requirements for Reactor Pressure Vessel Nozzles Project stage: Request AECM-86-0252, Forwards Fee for 860714 Application Revising Relief Request I-00008,per NRC 860804 Request1986-08-20020 August 1986 Forwards Fee for 860714 Application Revising Relief Request I-00008,per NRC 860804 Request Project stage: Request ML20215E7771986-10-0606 October 1986 Safety Evaluation Re Inservice Insp Program & Requests for Relief from Certain Inservice Insp Requirements Project stage: Approval ML20215E7631986-10-0606 October 1986 Forwards Safety Evaluation Supporting Inservice Insp Relief Requests I-00008 & I-00013 Which Request Relief from ASME Code Section XI Requirements for Inservice Control Rod Drive Insp & Approval of 1983 ASME Code Re Inservice Insp Program Project stage: Approval AECM-87-0068, Documents Conversations Re Postulated Complete through-wall Circumferential Fracture of CRD Housing & Normal Makeup Capacity Available at or Near Cold Shutdown.Crd Pump Can Supply Normal Makeup Inventory Due to Failure.Fee Paid1987-07-23023 July 1987 Documents Conversations Re Postulated Complete through-wall Circumferential Fracture of CRD Housing & Normal Makeup Capacity Available at or Near Cold Shutdown.Crd Pump Can Supply Normal Makeup Inventory Due to Failure.Fee Paid Project stage: Other 1986-10-06
[Table View] |
Text
-_
t O
JUL 2 21986 Docket No. 50-416 DISTRIBUTION
. Docket file.
BGrimes NRC PDR JPartlow Local PDR LKintner Mr. Oliver D. Kingsley, Jr.
PD#4 Rdg P0Brien Vice President, Nuclear Operations RBernero ACRS(10)
Mississippi Power & Light Company Young, OELD BTurovlin P.O. Box 23054 EJordan NThompson Jackson, Mississippi 39205 LFMB TBarnhart(4)
Denton/Vollmer OPA
Dear Mr. Kingsley:
Glainas ERossi DCrutchfield ORAS
SUBJECT:
FIRST TEN-YEAR INSERVICE INSPECTION PLAN AND RELIEF REQUESTS Re:
Grand Gulf Nuclear Station (GGNS), Unit 1 By letters dated May 11, June 3, June 29, July 25, and September 20, 1984 and October 31, 1985, the Mississippi Power & Light Company (MP&L) submitted the Inservice Inspection (ISI) Plan and additional information for the first ten-year inspection interval at Grand Gulf Nuclear Station, Unit 1 (July 1, 1985-July 1, 1995).
In these letters MP&L also requested relief from ASME Code requirements for certain items.
l.
The NRC staff has completed its review of your submittals and has concluded the GGNS ISI Plan and relief requests are appropriate except as indicated by the enclosed Safety Evaluation and Technical Evaluation Report.
In reaching i
this conclusion, the staff has determined that the inspection and testing requirements are impractical and, pursuant to 10 CFR 50.55a (g)(6)(1), that the granting of relief, as conditioned in the enclosed safety evaluation, is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest.
In making this deter-mination, the staff has given due consideration to the burden that could result if those requirements were imposed on your facility.
Sincerely, Odginalsigned tw l
Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
(
PD#4/LA PD#4/PM OELD PD#4/D
- MYoung WButler 07/09/86 07/09/86 07/14/86 07/11./86 8608010149 860722 PDR ADOCK 0S000416 G
PDR
e o
e J
/ "
NUCLEAR REGULATORY COMMISSION j
i WASHINGTON, D, C. 20555
$.^.../
JUL 2 21986 Docket No. 50-416 Mr. Oliver D. Kingsley, Jr.
Vice President, Nuclear Operations Mississippi Power & Light Company P.O. Box 23054 i
Jackson, Mississippi 39205 i
Dear Mr. Kingsley:
SUBJECT:
FIRST TEN-YEAR INSERVICE INSPECTION PLAN AND RELIEF REQUESTS i
Re:
GrandGulfNuclearStation(GGNS), Unit 1 I
By letters dated May 11, June 3, June 29, July 25, and September 20, 1984 and October 31, 1985, the Mississippi Power & Light Company (MP*L) submitted the Inservice Inspection (ISI) Plan and additional information for the first ten-year inspection interval at Grand Gulf Nuclear Station, Unit 1 (July 1, 1985-July 1, 1995).
In these letters MP&L also requested relief from ASME Code requirements for certain items.
The NRC staff has completed its review of your submittals and has concluded the GGNS ISI Plan and relief requests are appropriate except as indicated by l
the enclosed Safety Evaluation and Technical Evaluation Report.
In reaching this conclusion, the staff has determined that the inspection and testing i
requirements are impractical and, pursuant to 10 CFR 50.55a (g)(6)(1), that
{
the granting of relief, as conditioned in the enclosed safety evaluation, is authorized by law, will:not endanger life or property or the common defense and security, and is otherwise in the public interest.
In making this deter-mination, the staff has given due consideration to the burden that could result if those requirements were imposed on your facility.
Sincerely, i
4 v Walter. Butler, Director j
BWR Project Directorate No. 4 Division of BWR Licensing
)
Office of Nuclear Reactor Regulation i
Enclosure:
As stated
'cc w/ enclosure:
i See next page i
l I
Mr. Oliver D. Kingsley, Jr.
Mississippi Power & Light Ccmpany Grand Gulf Nuclear Staiten i
cc:
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, Liberman, Cook, Purcell Office of the Governor rnd Reynolds State of Mississippi 1100 17th Street, N.W.
Jackson, Mississippi 39201 Washington, D. C.
20036 l
Attorney General i
Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 i
l Middle South Services, Inc.
i P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 J
P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.
Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 i
Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors
~
U.S. Nuclear Regulatory Commission Port Gibson, Mississippi 39150 Route 2, Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support U.S. Nuclear Regulatory Comission, Mississippi Power & Light Company 101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 i
Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross 4
Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 Mr. C. R. Hutchinson i
GGNS General Manager Mississippi Power & Light Company i
Post Office Box 756 Port Gibson, Mississippi 39150 i
-