Rev 1 to WPS-E308/83670, Downcomer Bracing - Nuclear Power Plant
ML20203E580
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/19/1979
From:
CBI NUCLEAR CO.
To:
Shared Package
ML20203E435 List:
References
WPS-E308-83670, NUDOCS 9802270084
Download: ML20203E580 (3)


Text

.,

C), '

d IDEldTIFI',

N jg w

l WF.LDING PROCEDURE SPECIFICATION WPS - E308/83670

+

l w

PnODuCT DOWNCOMER BRACING - NUCLEAR POWER PLANT go,E NO.

}

OF 3

No'R CuSiOr.iE n COMMONUEALTH EDIS01 CM DATE 10/10/3 nY

(' '

WOR < THIS DOCUMENT WITH GEN.WE LD PROCEDURE SPLC, GWPS-SMAW REFF DENCF PHOCEDURE QUAllFICATION HECORD CPECIFIC CONTnACT NO.

POSlflON THICKNE SS R ANGE POSITION THICKNE SS R ANCE 2525 V, H, OD 3/16" to 1 1/2" V,H,0,0 3/16" - 3/8" SPECif IC CONTR ACT WPS HEOulnEMENTS DASEMETAL-This welding procedure specification ASME SA 240 Type 304 (P-8, GP-1) complies with the ASME Code Section welded together.

S m er 1977.

This procedure is to be used for any a

welding with E308* electrode on the

<Qi base material listed.

d rlLLEH f/ETAL-Asus SnnCu:iCATioN NO.

SFA 5.4 LIMITATIONS:

p..

ASME CUMiHCATION:

E308*

'^#**'

^

ne inm pss Wenh M mms k 7,iSr.Ecac.'NO.

F-5 the base material listed shall not

(

exceed 350'F maximum.

h

  • E309 ray be substituted for E303.

No post weld heat treatment is ELECTn.CA CnAnACTEHisuCS-required.

CunnENT:

DC PULARITY.

Electrode PosiLive No prcheat is required except as an aid oTnEm (Reverse Polarity) for removing moisture or unless the u AC>a NG " AT r ni A L-ambient temperature falls below 32#F.

When the ambient temperature falls below None Required 32 F, the plate shall be preheated warn to the hand within 3" of the point of Nane Required g

Gas -suiu. DING BACKLP CONTRACT f 34 78 CofaPOsmcN Mone More DATE

/d-/4 79 min. r tce. a A rt Required Required INITIALS r85/

CUSTO?/EH APPHOVAL- 06CO h LC 5 70'//

RELEASED BY

(

M //-M.97 CNQA SERVICES P otSTIMLO'NG SI ll I'hA HEG COnP REG cn ENWt{tNGR hh C

O QA IIY DATE a

C_.y. 2 JSV CMR LRS RF PREPARED JEB 5-5-78 hg

.}

CHECKED TJL 10-10-79 AUTnOnizEo RES 10.19-79 a

wuoo Imuc or n ncv nog s 1

9802270004 980220 l

PDR ADOCK 05000373 P

PDR

g IDE N TI F ICATION

,l mr. -

WEl&JN_G_PROCEDU R E SPECIFIC ATION WPs - E308/83670 nEN-2 or 3

rnooucT C0WilCOMER BRAC!flG - flVCLEAR POWER PLANT

.f custou[n C0tG10tlWEAl.TH EDISON "f* '[g*R DATE 10/10/79 SPECIFiG REQ 1st.7EMENTS (CONT)

SPECIFIC REQUIREMENTS (CONT) s Use only stainless steel brushes on this material.

Vertical passes may be deposited uphill or downhill, f.-

(

r; f

I

' /,,',k I

,W WL.100 (PAGE 2 OF 2) ilt.V f 40V 76

N

)

M Q{ '

, D (w l

iocutirication WPS-E308/83670

,.m WELOING PROCEDURE SPECIFICATION

,,'J L c Pacc so.

3 or 3

00WNCOMER BRAClhG - NUCLEAR POWER. PLANT n ov. so.

1 racover C0!'J10tiWEALTH EDIS0I' ev CMR o^Tc 10/10/79

custout, GENERAL WELDING TECHNIQUE t

Optetion Desde Wold E l.c t e od e Current Volty Travel B.O.H.

O e.c rip tio n Ley.s Proc.

Sis e i T w ee (empel (Voltel flPM)

Sec/12" T

54-32 Stringer As SMA 3/32"O E308-15 60-100 23 26 Beads

  • Reg'd I/8"D 60-100 23-26 90-55 100 60 5/32"O 100-145 23-26 90-47 3/16"O 130-230 24-27 x

4 3/32"C E303-16 60-100 19-22 80-49 108-55 1/8"D 70-110 23-26 105-57 5/32"E 110-170 24-26 92-50 3/16"E 160-240 24-27

  • Vertical Uph ill welcs and overhead welds may be deposited usin[ a weave technique.

l JOINT DETAll-See contrae: drawings for opp;icsble joint details and dirnensions.

VERTICAL HORIZ0l;TAL OVERHEAD & DOWN

^

I I

l l

4 a

C..

~.

(wWh 0.u.

s we t oo

.tC

.c,e