_ _ _ __ _ - _ _ - _ _ _ _ _ _ _ _ - _ _
_ _ _ _ _ _ _ _ - _ _
_ _ _ _ _ _ _
-
r
i
-.
s
+
.
December 4. 1997
!
' '
Florida Power Corporation
Crystal River Energy Complex
Mr._Roy.A., Anderson (SA2A)
'
Sr. VP Nuclear Operations
ATTN: LMgr.. Nuclear _ Licensing
15760 West Power Line Street.
F
Crystal River. FL 34428-6708
i
SUBJECT:
NOTICE OF VIOLATION AND NRC. INSPECTION H PORT NO. 50-302/97-14-
Dear Mr. Anderson:
An NRC inspection was conducted October 6 - 10. and October 20 - 24, 1997, at
,
.
your Crystal River facility.- This was a Safety System Functional Inspection
,
(SSFI) of the makeup and purification system and decay heat removal system.
The enclosed report presents the results of that inspection.
,
Overall, the operational performance capability of the mdeup and purification
system and the decay heat removal system was assessed as adequate with some
.
-exceptions. - The-exceptions were discussed in th'. exit meetings and some
.
'
involved submittal of several requests for assistance to the NRC Office of
,
-Nuclear Reactor Regulation for disposition.
The SSFI team noted that-
'
significant work involving plant modification and revision of documentation
(procedures'and calculations) wn ongoing during the inspection period.
This-
,
work limited the SSFI team's capability to evaluate the.aperational. readiness
i-
of the two focus systems fully. ~ The SSFI team identified several conditions.
'
in which ongoing corrective-actions for past problems did not allow for
,
' assessment-of readiness to_ resume operations. Each of these items ~was-
'
. identified in this report and linked to an open NRC' issue or a new NRC issue
4
was -identified. -In addition dua to the recent changes in the corrective
4-
action program, the team was unable to evaluate the effectiveness in this
-
-
area,
.
i
Based on the results'of the inspection, the NRC has determined that violations
j
of NRC requirements occurred.
Violations were identified-for failure to take
e
adequate corrective actions in the areas of stem protectors for valve
actuators and drawing deficiencies, failure to test makeup valves adequately,
an inadequate procedure for calibration of reduced inventory operation level
!
instrumentation, failure.to evaluate the effects of out-of-tolerance test
equipment, failure to follow foreign material exclusion procedure
requirements, failure to install overload relays properly, and failure to take
!
adequate corrective actions for past design _ weaknesses. Although the number
of violations identified indicated additional need for management attention in
_
-
i
assuring regulatory requirements were met, the NRC considered these issues
l
were isolated instances of i gulatory non-compliance.
~
9712120034 971204
N
I,[! lll, lll,l !!!!
I
"
fi
.
-
-
tw
-
_ - _ - _ _ _ _ _ _ _
,
,
3
2
In accordance hith 10 CFR 2.790 of the NRC's " Rules of Practice " a copy of-
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Original signed by
Johns P. Jaudon
Johns P. Jaudon. Director
Division of Reactor Safety
Docket No.:
50-302
License No..
.
.
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
John P. Cowan, Vice President
Attorney General
'
Nuclear Production-(NA2E)
Department- of Legal Affairs
,
Florida Power Corporation
The Capitol
Crystal River Energy Complex _
Tallahassee, FL 32304
15760 West Power Line Street
Crystal River. FL 34428-6708
Bill Passetti
Office of Radiation Control
C. C. Pardee. Director
De)artment of Health and
Nuclear Plant Operations (NA2C)
Rehabilitative Services
Florida Power Corporation
1317 Winewood Boulevard
Crystal River Energy Complex
Tallahassee, FL 32399-0700
15760 West Power Line Street
Crystal River. FL 34428-6708
Joe M',ers. Director
Division of Emergency Preparedness
Robert E. Grazio. Director
Department of Community Affairs
Nuclear Regulatory Affairs (SA2A)
2740 Centerview Drive
,
Florida Power Corporation
Tallahassee FL 32399-2100
Crystal River Energy Complex
15760 West Power Line Street
Chairman
Crystal River. FL 34428-6708
Board of County Commissioners
Citrus County
James S. Baumstark. Director
110 N. Apopka Avenue
Quality Programs (SA2C)
Inverness. FL 34450-4245
Florida Power Corporation
Crystal River Energy Complex
Robert B. Borsum
s
15760 West Power Line Street
Framatome Technologies
Crystal River. FL 34428-6708
1700 Rockvi~lle Pike. Suite 525
Rockville. MD 20852-1631
R. Alexander Glenn
Corporate Counsel
Florida Power Corporation
MAC - ASA
P. O. Box 14042
St. Petersburg FL 33733-4042
_ - -_
. . . . .
.
. . .
.
.
..
.
FPC'
3
Distribution w/encls:
K. Landis. Ril
L. Raghavan, NRR
R Schin RII
P. Steiner, RIl
PUBLIC
NRC Resident inspector
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
Crystal River, FL 34428
.
l;
orries
o;; +os
o;; +os
o;; nos
o;; nos
o;; mos
ot t +oo
7
.
gh
s1GNATURE
. . , ,
NAME'
BHo11and rd
R ch n
, err y
RMoore v
HChr1 stensen ;
annon
DATE
11/ N/ 97
11/Si/ 9?
li_ti 7 r 97
!! /M /17
(1 h / 97
11 / 8 8 / 97
com
(its)
no
(Trs) no
/rtf
no
.ts
(80)
{ts)
no
no
'
.
d
0-
//
erritt
o;; +oo
,,
o;;. cop
~=
..
W
' !'
p
slasuuRt
,
/
.td
,qdry
l
NAMi
L *ner
' KLar
'tensen
t
Init
f2/,9 / 97
thf h / 97
11 / 2 4 / 97
11/N8 / 97
11 /
/ 97
11 /
/ 97
m v?
6ts) no
/4s ) no
(ffD
80
FEdj NO
YES
NO
VEs
NO
UfficiAL RtLUnu Uur'1
M ute i W t: 5 : Mio \\te sRrivi-14. iF i
m
, . . . .
,
--