, PEACH BOTTOM ATOMIC POWER STATION UNIT 3 INSERVICE INSPECTION
SUMMARY
REPORT FOR THE l
OCTOBER 16,1995 TO NOVEMBER 2,1997 -
PERIODIC INSPECTION l
4 9902060060 990129
~
't-PDR ADOCK 05000278' i
G PDR
- 3 "v"
.a s,
TABLE OF CONTENTS faces Form NIS-1 Owners Report ForInservice inspections 2
1ntroduction i
Section 1 Summary of Examination Legend 1
Summary of in-Service it pection -
Results Prior to and During Unit 3, 11th Refuel Outage 55 Section 2 Summary of Reportable Conditions Observed During in-Service inspection 1
Section 3 Summary of ASME XI Repairs and Replacements 5
Form NIS-2 Owners Report for Repairs or Replacements 6
a.
FOR W NIS-1
- INSERVICE IMS'ECTION REPORT PECO ENERGY COMPANY 965 Chestertxook Blvd.
' Wayne, PA 19087 5691 Date: January 23,1998 Peach Bottom Atomic Power Station - Unit 3 1846 Lay Road Inspection Date:
Delta, Pennsylvania 17314 Octooer 16,1995 to November 2,1997 Commercial Service Date:l December 23,1974 Gross Generating Capability-1159 MWe Pennsylvania State Identincation Number: 8116764 (NB 3904)
Component identl6caten ASME Class 1,2, and 3 Components.
Abstract of Inspections Performed, Conditions Observed, Conective Measure Recommended and Taken are Attached i
Section 1 - Summary of Inservice inspecten Results Secten 2 - Summary of Reportable Conditions Observed Secten 3 - Summary of ASME XI Repairs and Replacements Name ofInspector. James J. Fuhrman Name of Mailing Address of Inspector's Employer.
"The Hartford Steam Boiler Inspecten & Insurance Co.
610 Freedom Business Center Drive
-l Suite 300 King of Prussia, PA 19406 1 certify that the statements made in this report are correct and the examinations and corrective measures
' taken conform to the rules of the ASME Secten XI Code, or Generic Letter 88-01, or other augmented -
s requirements as applicable y
lk5fM PtNO Energy ISI Engineer - Nuclear Maintenance Divison Date 1
1}_
- t.g t
/\\\\
l
FORM NIS 1 INSERVICE INSPECTION REPORT Ebsf2 CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Pennsvivania and employed by Hartford Steam Boiler inspection &
jngurance Company of Hartford. Connecticut have inspected the components described in this owners Data Report dunng the period 10/16/95 to 11/02/97 and state that to the best of my knowledge and belief the Owner has performed examinations and taken corrective measure, described in this Owners Data Report in M
accordance with the requirements of the ASME Code, Section Xic By signing this certificate, neither the inspector nor his employer makes any warranty, expressed or implied, conceming the examinations and corrective measures described in this Owners Data Report. Furthermore, neither the inspector nor his employer shall be liable in any mariner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
iktN,W Date:
9 2k3 A4 swr 3 Commissions GhML National Board, State, ' y,5 Is v%
g (j Ins]pe-tofs Signaalre Province & No.
l
I INTRODUCTION During the period from October 16,1995 through November 02,1997 in-Service inspections were performed at Peach Bottom Atomic Power Station, Unit 3. Unit 3 was shutdown for a scheduled refuel outage during the period from October 03,1997 th gh Novernber 02,1997, The inspections performed during this period were credited towards the third pe '
f the second ten yearinterval
' Examinations completed during this period were performed by PECO Energy Company and General Electric Company in accordance with the requirements of ASME Section XI,1980 Edition with Addenda '
through Winter 1981, and the requirements of 10CFR50.55a(g)(6)(li)(A).
Repairs and replacements of Class 1, 2 & 3 components completed during this period were performed in accordance with the requirements of ASME Section XI,1980 Edition with Addenda through winter 1961, and for primary containment,1992 Edition and Addenda.
in addition to ASME Section XI, other examinations were performed to meet the augmented -
i inspection requirements of the following:
l 1.E.Bulletin 80-13 Cracking in Core Spray Spargers BWRVIP-18 Core Spray intemals inspection and Flaw Evaluation Guidelines
- Generic Letter 8841 NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping-(including Supplement 1)
SIL 462, Supp 3 Cracking in Creviced inconel 600 Access Hole Cover Weldments SIL 588, Rev.1 Top Guide and Core Plate Cracking SIL 474 Steam Dryer Drain ChannelCracking -
SIL 605, Rev.1 Jet Pump Riser Pipe Cracking BWRVIP-27 BWR Standby Liquid Control System Core Plate delta P inspection and Flaw Evaluation Guidelines BWRVIP-41.
Jet Pump Assembly inspection and Flaw Evaluation Guidelines 9
bk
Section 1 1
s
SUMMARY
OF IN-SERVICE INSPECTION RESULTS PRIOR TO AND DURING UNIT 3,11TH REFUEL OUTAGE PEACH BOTTOM ATOMIC POWER STATION '
UNIT 3 OCTOBER 16,1995 TO NOVEMBER 02,1997 6
k s
_+-,-
G U
b
______._.___.m
DATE:
PEACH BOTTCM ATOMIC POWER STATION PAGE:0 REY.SION:
{
INSERVICE INSPECTION
SUMMARY
SECOND INTERVAL. THIRD PERIOD, SECOND OUTAGE (1997)
REACTOR PREBSURE VESSEL 2
3 4
6 NR R g
AsME 5
S OEGE SEC.XI T RcEP
SUMMARY
EXAMINATION AREA CATOY EXAM A E O O O REMAAKS NUMBER IDENTIFICATION REM NO METHOO PROCEDURE T C R M R "CAUDRATIONBLOCK"
SUMMARY
OF EXAMINATION LEGEND 1.
Identification of system.
2.
Cor.ponent identification and description.
3.
ASME Section XI Category and item Number applicable to the component. If there is an augmented requirement to perform an examination, then 'N/A" will appear in this location.
4.
Exam method (NDE) appilcable to the component.
5.
NDE procedure used to perform the examination on the component.
l 6.
Exam Status:
a)
C=
Completed b)
U=
Unscheduled Complete c)
P=
Preservice Complete d)
A=
Augmented Complete e)
E=
Expanded Scope Complete 7.
Examination results broken down into 5 categories described below:
a)
NOREC =
No recordable indications detected b)
RECOR =
Recordable indications detected c)
GEOM =
Geometric indications detected d)
REPOR =
Reportable indications which require corrective action to maintain structural adequacy 8.
Remarks field which contains specific information conceming the component examination or evaluation of examination results.
u.
DATES 01/27/94 PEACH BOTTOM AT;e43C POWER STATION UNIT 3 PAGE:
1 REVISION:
4 INSERVICE INSPECTION SUb91ARY SECOND INTERVAL, THIRD PERIOD, SECOND OUTAGE (97RF)
CLASS 1 CAUEP STATUS COMPONEffrS PEA MOP PPRSSUPE VESSEL NR R
ASME 8 OEGE SEC. XI T RCEP StM4ARY El'VINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDEffr!FICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK'*
PFPAIP WELD f?EF. Tw3. No. ISI-3-PV-011 000050 RPV-RW1 BA 177 0 (TT-P9M-702 VD C
X*-.
EXAMINATION PERFORMED FROM VESSEL ID.
REPAIR WELD IN SHELL COURSE #1 Bl.51 17T-455 tTT-PBM-7 02VO
-.X.
REPAIR AREA IS 13.06* 14NG BY 8.25' HIGH DW, EL 172 9, 34 A2 W.6 0S (TT PBM-702VO
..X.
AND IS 14CATED IN SHELL COURSE R2.
DW, EL 172-9 38 A2 (C01755421
- 6.562-CSCI-39 PEB**
OIPWMPEPEffrI AL WELD $ (PFF r#1 NO. ISI 3.PV-011 000600 RPV.C6 B-A 17T-0 GE-tTT.700 R2 C X..
- EXAMINATION PERFORMED FROM VES$5L ID SHL'CRS NO. 5 TO FLANGE BL 30 177-4 5 S GE tfr.700 R2 X.-.
USING NEW INSPECTION SYS, & SUPPLEMENTS FF, RX CAV 177-6 0 S GE tTT 700 R2 X...
PREVIOUS EXAMS OF THIS WELD FROM RPV FF, RX CAV (TT-70RL GE-tTT-10 0 R2 X...
FLANGE SURFACE. DUE TO PHYSICAL OBSTRUC"rIONS (GUIDE RODS, & REFUEL EQUIPMENT, EXAM LIMITED TO 69.3%
COVERAD*.
7 174213)
"12 Cs $ *
- LANGITUDINAL WFLDS (PEF. DWG. N7. ISI-3-PV-011 000400 RPV-V1A B-A UT-0 GE-tTr.700 R2 C X-..
EXAMINATION PERFORMED FROM VESSEL ID, ON SHL CRS NO. 1 E1.12 17f.4 58 GE UT 700 R2 X=-.
LIMTED TO 70% CODE COVERAGE DUE TO NOZZ 10'5-1/2*-20'0 1/4*
17F 60S GE-(7T.700 R2 X...
N2 C AND JET PUMP DIFFUSER TO VESSEL 10'5-1/2*.20'0 1/48 177-70RL GE-17r-700 R2 X-..
CLEARANCES. (C0174213)
" 6. 5 6 2 -CSCL-3 9-PEB*
- O 000900 RPV V1B B-A 177 0 CE-M-700 R2 C X...
EXAMINATION PERFORNED FROM VESSEL ID, ON SHL CRS NO 1 Bl.12 177 453 GE-17F-700 R2 X-..
LIMITED TO 78% CODE COVERAGE DUE TO 10'5 1/2*.20*0-1/4*
tTT.60S GE-177 700 R2 X.
.. N0ZZLE N2-F AND JET PUMP DIFFUSER TO 10'51/2*-20'01/4*
UT 70RL GE-tTT-100 R2 X-==
VESSEL WALL CLEARANCES. (C0174213)
"6.562 CSCL.39 PEB" 001000 RPV VIC B-A 177 0 GE-tTT-700 R2 C X--.
EXAMINATION PERFORMED FROM VESSEL ID, ON SHL CRS NO. 1 Bl.12 17T-45S GE 177 700 R2 X---
LIMITED TO 78% CODE COVERAGE DUE TO 10*5 1/2*.20*0 1/4' 17T-6 0 S GE-CT.700 R2 X-.-
NO22LE N2-K AND JET PUMP DIFFUSER TO 10'5 1/2*-20'0-1/4*
17T-70RL CE-UT-700 R2 X...
VESSEL WALL CLEARANCES. (C0174213)
" 6. 5 6 2 -CSCL-3 9 - PEB*
- DATE: 01/21/98 PEACH BOTTOM ATOMIC POWER STATION tJNIT 3 PAGE 2
5EVIS]QNe, 4
INSERVICE INSPECTION SUP9%RY SECOND INTERVAL. THIRD PERIOD, SECOND OLTTAGE (97RF)
CLASS 1 CAUET STAIVS COMPONENTS prAtTR PRESftvE VESSEL
.l NR R
]
AsME
^S OEoE i
SEC. XI T RCEP SUP9%RY EXAMINATION AAEA CATQY -
F.XAM A EOO0 REMARKS IfJMBER IDENTIFICAT10h ITEM NO METHOD PROCEDURE T CRMR "CALIBRA' ION BthCK**
IfNGITJDINAL NEI.DS (PEF. tw3. NO. ISI-3-RV 011 001100 RPV V2A BA ITF-0 GE 17f=700 R2 C X-..
EXAMINAT10N PERFORMED FROM VESSEL ID AND ON SHL CRS NO, 2
~
Bl.12 ITF 458 CE.ttf 100 R2
=1*-
CODE COVERAGE NAS ACHIEVED. (C0174213) 90' 0 1/4' to 29' ?'
tTF-608 CE-tTF 100 R2 X..-
20'0 1/4' to 29'1' UT-70RL QE.tTT-100 R2 X...
"6.562 CSCL 3 9 PEB" 001200 R.
-V2B B-A UT 0 GE tTf=700 R2 C X...
EXA'eINATION PERFORMED FROM VESSEL ID AND ON SHL CRS NO. 2 81.1?
17f.4 58 GE.t7f-700 R2
..X.
Cr>E COVERACE WAS ACHIEVED, (C0174213) 20'0 1/4' to 29'7*
ITI.60S CE-tTT.700 R2 X...
20'0-1/4' to 29'7' LTF 70RL CE-UT.700 R2 X
- 6.562.CSCL 39.PEB**
001300 RPV-V2C B-A 17f O GE-17F-700 R2 C X*
. EXAMINATION PERFORMED FROM VESSEL ID AND ON SHL CRS No. 2 Bl.12 17f 458 CE-tTT.700 R2
..X.
/*0DE COVERAGE WAS ACHIEVED. (C0174213) 20'0-1/4" to 29'7' 17f.60s CE-17f 700 R2 X-..
20'O.1/4' to 29'7' 17f.70RL GE-Uf.700 R2
-X.
"6.56*
3CL-39 PEB" 001400 RPV V3A BA Jf-0 CE 17f.700 R2 C X-.*
EXAMINATION PERFORMED FRoti VESSEL ID AND ON SHL CRS No. 3 Bl.12
??f-458 CE-UT.700 R2 X.
- CODE COVERACE WAS ACHIEVED, (C01742131 29' 7* to 39'l-7/16' 17f.608 CE.UT-700 R2 X-29'7* to 39'l 7/16' 17f-70RL GE-tTF.100 R2
- .X.
"6.562.CSCL 3 9.PEB**
001500 RPV-V3B BA (TT 0 CE-17f-700 R2 C X
.. EXAMINATION PERFORMED FROM VESSEL ID AND ON SHL CRS NO. 3 81.12 17f-4 58 CE-tTT-10 0 R2 X...
CODE COVERAGE WAS ACHIEVED. (C0174213) 29'7* to 39'1 7/16*
17f-608 CE-t7f-700 R2 X.-.
29'7' to 39'1 7/16' tTT 70RL GE-UT.700 R2 X...
"6. 562.CSCL-3 9-PEB*
- 001600 RPV.V3C.
B-A ITF-0 CE.tTT-700 R2 C X...
EXAMINATION PERFORMED FROM VESSEL ID.
ON SHL CRS NO. 3 B1.12 17f 45S GE UT.700 R2 X..-
LIMITED TO 77.4% CODE COVERACE DUE TO 29*7* to 39'l 1/16' tTT.60S GE-UT-700 R2 X=
. CORE SPRAY PIPING. (C0174213) 2 9' 7' to 39* 1-7/16' I?f-70RL GE-tTf.700 R2
--X-
- 6. 5 62 CSCL-3 9 PEB"
.4
+=
9
DATE: 01/27/98 PEACH B7TTOM ATOMIC POWER STATION UNIT 3 PAGE:
3 REVISION:
4 INSERVICE INSPEC"f!ON SIM1 ART SECOND INTERVAL, THIRD PERIOD, SECOND OttfAGE 197RF, CIASS 1 CAUEP STATUS COMPONENTS REAC" TSP PRESSUPE VESSEL NA R
ASME 6 0EGE SEC. XI T RCEP SUP91ARY EXAMINATION ARIA CATGY EXAM A EOOO REMARXS NUMBE' 1DEtrf!FICATION
' ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION BLOCX" 1M3ITUMNAL WElf9 (REF. 15WJ. NO. ISI-3-RV-01) 001700 RPV-V4A -
B-A 17f-0 GE-tTf-7 00 R2 C X...
'XAMINATION PERFORMED FRC21 VESSEL ID, ON SHL CRS NO. 4 Bl.12 171-458 GDITf-700 R2
-.X-
.'81TED TO 65.7% CODE COVERAGE DUE TO 39'1 7/16* 48'11-13/
17f-6 08 CE-17f 700 R2
-.X+
4 W ATER SPARGERS, CORE SPRAY PIPING 39'1-7/16*-48'11-13/ -
17f-70RL GE-tTf 700 R2 1.+.
AND NOZT.LE N11.A. (C0174213)
- 6.562-CSCL 39-PEB**
001800 RPV V4B B-A 17f = 0 GE tTf-700 R2 C X..-
EXAMINATION PERFORMED FROM VESSEL ID, ON SHL CRS NO, 4 Bl.12 17f 458 GE-17f 700 R2 X-
- LIMITED TO 65.6% CODE COVERAGE DUE 39'1 7/16*-48'11 W UT-608 CE L7f 700 R2 X---
FEEDWATER SPARGERS AND CORE SPRAT 39'i.7/16*-48'11 13t 17f.70RL GE.UT-700 R2 X...
PIPING. (C0174213)
EXAMINATION PERFORMED FROM VESSEL ID, ON SE CRS NO. 4 81 12 UT 45S GE-17f 700 R2 X---
LIMITED TO 63.9% CODE COVERAGE DUE TO --
39'1 7/16* 48'11 13/
17f.60S GE-17f-700 R2 X---
FEEDWATER SPARJERS AND CORE SPRAT 4
39'l 7/14*-48*11 13/
17f-70RL GE-tTT 700 R2 X---
PIPING. (C0174213)
LIMITED TO 83.8% CODE COVERAGE DOE TO 44'11 13/16* 58'9 7/
tTf 60S GE17f 700 R2 X-
- STEAM DRYER SUPPORT LUG. (C0114213) 48'11-13/16* 58*9-7/
17f
- 70RL GP-UT-700 R2 X
- 6.562-CSCL-39-PEB**
002100 RPV-V5B B-A Uf-0 GE-tTT-700 R2 C X-
- EXAMINATION PERFORMED FROM VESSEL ID AND ON SHL CRS NO. 5 Bl.12 tTf-45S GE 17f-700 R2 X---
CODE COVERAGE WAS ACHIEVED. (C0174213) 48'11-13/16* 58'* 7/
48 11 13/16*-58'9 7/
ITF-70RL GE-17f-700 R2 X---
- 6. 56 2 CSCL-3 9 FEB" 002200 RPV-Y5C B-A 17f-0 GE-17f 700 R2 C '. * - - - - EXAMINATICN PERFORMED FROM VESSEL ID AND ON SHL CRS NO. 5 B1.12 17f 45S GE-17f 700 R2 X+--
CODE COVERAGE NAS ACHIEVED. (C0174213) 48'11-13/16'*58*9 7/
48'11 13/18*-58'9-7/
17f-70RL GE-t7f 700 R2 X--.
" 6. 56 2 -CSCL PEB *
- e
-+
DATE: 01/27/98 PEACH BOTTOM AWMIC POWER STATION UNIT 3 PNE:
4 REVISIONe, 4
INSERVICE INSPECTION SUP94 ART SECOND INTERVAL. THIRD PERIOD, SECOND OUTAGE 197RF)
CLASS 1 CAUEP STAWS COMPONEV9 PEAC" POP POESS*JRE VES$tL NR R
ASME 8 0EOE SEC XI T RCEP
/
SUMMARY
EXAMINATION AREA CATOY EXAM A EOOO RDULRKS NUMBER IDENTIFICATION ITEM NO METNOD PROCEDURE T CRMR " CALIBRATION BLOCE**
NOf2LE-TO.SHELL WELD 9 (FEP. DWG. NO. 1Sf.3-DV.011 003250 N4A B.D 17f.0 ITF.PBM 702VO R0 C X=..
EXAMI*iATION LIMITED TO COMBINED 18.1%,
FEEDWATER N0ZZLE B3.90 UT.455 ITf.PBM.702VO R0 X...
MANUAL PLUS AUTOMATED, CODE COVERACE DUE DW, EL 145 9, 30 A2 17f 60s tTT.PBM 102VO Rd
..X.
TO N0ZZLE N11.A. RPV MIRROR INSULATION DW, EL 10 9 9, 30 A2 B*AKCETS AND N0ZZLE CONFIOURATION.
(C0173349)
" 6. 5 6 2.CSCL. 3 9. PEB" i
003300 N48 B+D L7f.0 UT.PBM 102VO R0 C X...
EXAMINATION LIMITED TO COMBINED 23.3%,
FEEDWATER NOZZLE B3.90 17f-458 tTT.PBM.702VD R0 X...
MANUAL PLUS AITTOMATED, CODE COVERACE DUE DW,' EL 189 9. 90 A2 17f.608 UT.PBM-702VO R0
..X.
TO NO22LE N1.A, RPV MIRROR INSULATION DW, EL 189 9, 90 A2 BRACKETS AND NOZ2LE CONFIGURATION.
[
(C0173366)
" 6. 5 6 2.C3CL 3 9. PEB *
- 003400 N4C B.D LTT.0 17t.PBM.702VD R0 C X...
EXAMINATION LIMITED TO COMBINED 15.3%,
FEEDWATER NOZZLE B3.90
'77 45S 17f.PBM.702VD R0 X...
MANUAL PLUS AUTOMATED CODE COVERACE DUE DW, EL 189 9, 150 A2 17T.603 17T.PBM-702VO R0
..X.
TO NO2ZLE N.11A, RPV MIRROR INSULATION DW. EL 189 9, 150 AZ BRACKETS AND NOZZLE CONFIGURATION.
(C0173372)
- 6.562.CSCL.39.PEB**
003500 N4D.
B-D 17F. 0 17t-PBM-702VO R0 C X
.. EXAMINATION LIMITED TO COMBINED 24.1%,
FEEDWATER N0ZZLE B3.90 17f.4 53 (7t.PBM.702VO R0 X..-
MANUAL PLUS AL7TOMATED, CODE C0VERACE DUE CW, EL 189 9. 210 A2 ITT.60S (TT.PBM-702VO R0
..X.
TO NOZZLE N11.B. RPV MIRROR INSUIATION DW, EL 189 9, 210 A2 BRACKETS AND NO2ZLE CONFIGURATION.
(C0173400)
" 6. 56 2.CSCL. 3 9. PEB "
4 003600 N48 8.D 17f.6 UT.PBM.702VD R0 C X* *. EXAMINATION LIMITED TO COMBINED 11.2%,
FEEDWATER NOZZLE B3.90 UT-458 17F.PBM.702Y0 R0
.*X*
MANUAL PLUS AITTOMATED, CODE COVERACE DUE DW, EL 109 9, 270 AZ 17r.608 UT.PBM-702VD R0
..X.
TO RPV MIRROR INSUIAT!ON BRACKETS AND DW, EL 189 9. 270 A2 NOZZLE CONFIGURATION. (C0173412)
- 6.562.CSCL 39 PEB**
b
CATE 01/31/98 ILACH DOTTOM ATOMIC KMER STAT 10N UNIT 3 FA3ts Pt/!$10Ni 4
2NSERVICE INSI'ECTION SUPMJtY
$t0W IprTEDVAL, TH!P.D itRIC'D, 84COND OWAut (likF)
CLASS 1 LAVEP tTATUS COMIONENTS FE ANOR lttt? tit Vr*ttL NR k ASMt 8 o*OE
$t0. 11 7 RC2P
$t>9%R( t,KAMINATION AREA
- ATQY TRAM A EOOO RtMAkrJ NLMBER IhtNT!r! CAT &DN ITEM NO METHOD PROCEIM E T CRMR ** CAL 1BRATION BLDCF' ref f t_r To-turLI. wrtt's tttF. tv1. No !!!.3.P M EXAMINATION LIMITED TO COMB!NED 19.1%,
003100 N4F D.D ttf. 0 UT.I'B'4 102VD RD C X**
FEETWATFR HottLt
$3.90 UT 448 UT tBM-102VO RO X=.*
MANUAL PLUB AUTOMATED, CODE COVERAGE DVE X.
TO EPV M!kROR INSULATION BRACKET $ AND IW, EL 109 9, 330 At 177 608 tTT FDM 102VO R0
(*,
EL 169 9, 3?0 At Wo!Ett CONT!QURATION. (C011)413)
"4.662.CSCL 3 9.tE9*
EXAMINATION LIMITED 70 33.1% CODE CRD NO2 ELE D3.90 W.458 trr.FhM 300VO R0 E...
COVERAGE DUE TO N01 ELE CONFIGURATION AND IW, EL 194', 149 A3 Iff 60S trt FDM 300VO RO E...
CD ATTAOtMENT LUG. (C0113421)
"$.562 CsCt. 3 9 PE9' 006460 N10 8D UT 0 t*T lDM 300VO R0 C X.**
EXAMINATION LIMITED TO 43.3% CODF COVERAGE DUE.0 ACCESS RESTRICTIONS 5814 Nott.Lt 8L 90 trT-458 trt FAM 300VO R0 X.
(W, FL 13 5, 10 0 At trr.60s trr.t'N4 300VO R0 I..-
CAUSED BY FEkMANENTLY MOUNTED RPV M!kROR tm, EL 136,160 At trt.308 UT l'BM 300VO R0 K=
INSULATION. (C0114012)
" 6. 5 6 3 CSCL.3 9 PEB *
- 1 N0tri t 1N!! tit F AP. f rt?r10N (Prr. tW3 N1 181 3 PV.011 006650 N9.!RS 9D UT.608 LPf PBM 311VO R1 C E..*
EXAMINATION LIMITED TO 92% CODE COVERAGE CRD NOEELE D3,100 trt.105 t't PhM 311VO R1 1...
DUE TO OD ATTACHMENT LUG 8.
USED
(*,
EL 164, 149 A2 ALTERNAft CAL. B14CE $ 70KA!3/FVEUSK!MA8 t*,
EL 146, 149 A2 iC0113431)
"!R. a.SCL. 3 0. rtB *
- INTrgeALLY-NBr0 VFL SUPTS (P r r. tW1 No. If f-103 tV 041 006030 SUPPORT.3(IA)
D.H VT.1 MA3-CG-401 El C 3
.
BY MIRROR YnSULATION, FT EKAM LIMITED To
!% EL 195 4, 90 A8 UPPER 15% OF INTEGRAL ATTAOIMENT AND A tw, Et ul.4 90 At SUFFLEMENTAL VT 1 PERFORMED ON 14NER 24%
OF INTE'JRAL ATTACHMENT. (C01143111311) 00001% SUPPORT.3 F A.B.C VT 3 MAG-CO-401 R.S C 1...
(C0114131)
70.00 t*,
EL 195-4, 90 At J
t'ATB e 01/21/94 FLACH DDTTM ATCN!C POWt'R STAT!DN UNIT 3 FA0!i 6
ktVla!ON f, 4
!N$tkV!CE INSPEC"f!ON St>94ARY StC0tr0 INTERVAL, THIRD ttRIOD, BBCOND Ot?!A05 (l?RF)
CLASS 1 CAVEP STATUS COMPONEFT8 trA~r0R PPtM92 VrsstL MR R
ASME 8 050t Stc. El T RCtP 8tDNARY EEAMINATION AktA CATOY EKAM A EOOO REMAkta NiMPER IDENT!F! CATION litM NO METHOD FROCEDURE T CRMR ** CAL 1 PRAT!DN BLOCK'*
4...................................
M t1RAL!.Y.wnrD YEL f" MR (PfF. bW1. NO. Iff 201 PV 04) 000040 6vPPokT 6(IA) 9N VT 1 94h0-00 407 kl C X*..
DUE To ACCES8!DILITY LIMITATIONS CAUSED STA8 DAR e tal DEO D8.10 PT LP Ft.001
.X*.
$Y MIRROR INSULATION, PT EKAM LIMITED 70 tW, EL 196 4, 226 At Uitta 744 0F INTEGRAL ATTAOD4ENT AND A DN, EL 195 4, 225 At SUPN.t: MENTAL YT 1 FERFORMED Oh LOWER 24%
OF INTEURAL ATTAOO4EN"f. (C0174154) 004065 8UFPORT 4 F A.B.C VT 3 MAG CO 407 RS C 2...
(C0174150)
STAS BAR e 226 tro.
F0.00 IW, EL 195 4, 226 A2 000000 SUFPORT 6 (! Al BK VT 1 MAO rV 407 kl C X*..
DUE TO ACCE8 stb!LITY LIMITATIONS CAUSED STA8 anR e 315 DEO, St.10 PT LP-FE 001 R4
- ... DY MikROR INSULATION, PT EKAM LIMITED TO DW, EL 195-4, 315 AE VPrik 16% OF INTEGRAL ATTAONENT AND A DW, 21 195 4, 315 A2 SUFFLEMENTAL Vt.1 FEkrokMED ON LOWER 26%
OF INTECRAL ATTAOMENT. (C0174519) 000045 5UFPORT 6 F A,5,C Vr. 3 MAG Ctl tot RS C X
.. (C0174159)
STAS BAR e all DEG F0.00 DW, EL 115 4, 315 A2 (RfP-tvL NS m NMfri 004101 STN DYR DRM sHNL Nib N/A VF 1 VT-FDM 202VD R1 A X
.. EKAMINED FER ALQ*07, 08C0 SILT 474, DRAIN OLANNEL WELDS N/A STEAM DRYER DRAIN OLANNEL CRACK!!a3.
(R0644107)
C0terWOL RDD D9fvt Hop 9tN19 (trF. DW1. MS. 181 203 PV-03) 011302 CRD NOUSING DOLTING 9-0 2 VT.1 MA3-CO 407 kl C X**t EKAMINED BOLTIN3 FROM CELLS 06 15, FLANGE DOLTING B7.90 06 47, 10 19, 10 23, 14 15, 22 19, t*,
SUS-PILE RM 22 11, 26 07, 26 11, 24 19, 34 31,
(*, StS F1Lt RM 38 11, 42 07, 42 51, 42-47, 46 15, 50 11, 50 43, 50-47. SEE SEC't!ON No.2 POR REPORTAALE CONDIT!DNS.
4 9
5$f
.._._.___m-__-
DAT8s 01/3./98 PEACH DOTTOM ATOMIC POWER STATION UNIT 3 PA3ts 1
REVI$10Ni 4
1N$tRV!CE INSPE MION St>P%RY
$2COND !!rTERVAL, TN!kD PCR!OD, $tCOND OWAct (9?RF)
C1(18 1 cat *tP STATU$ COMPONENTS ktAN'A PtttFUPE Ytf1LG NR R ASMS 8 o8ot stC. at T kC8P l
swPwRy exAMINAT40N Akta CATor exam A
ooo RcMms prJMBER IDENT!PICATION ITEM NO METHOD PROCEDURE T CRMR **CALiDRATION BibCK+*
Jr7 PtHP too i ferr DW1 NO. Inf.tolatV 14.161 011,04 JP901 ALL COMPONEN1.
D h..
AU314. DWRV!P C8VT 1 EXAM REVEAtcD A 913.10 CsVT*1 VT.PBM 203VO R1
- X.X CRACK 93 Ot3 lbHG IN TittRMAL SLttVE (78) kPV INTERIOR W 458 CE tfT.$16VO R0
.X,X TO R!stR ELBOW NELD, (78) $!Dt. ASWP.
RPV INftRIDR UT 408 Ot UT.616VO Rf
- X*X
!NF0. UT EXAM CONFIRMED CAACh 116.0 Oto LONG. INTERIM DISPOSITION. 'U58 A8 188 PER NCR0 PS #1 03499 001. (C0173493)
JET PtNP NO 1 (Ptr. DWO. NO. 151 201 PV 141 011306 JPeit'bkActARM/VttS 9N2 VT 1 VT.PBM 302VO kl C X ** (C0173693) 813.30 RPV INTERIOR Jt? PtHP NO 2 fRfP. DWG. NO. 191 201 RV-14.151 011300 JP403 ALL CUMPONENTS P.f.1 VT.3 VT.PBM 302VO R1 C X***
AUG.14, DWRVIP C5VT 1 EKAM REVEALED A D13.10 C5VT.1 VT-PbM 302VD R1
.X,X CRACK 93 DEG IDNQ IN THtRMAL SLttVE (TS)
RPV JNTERIOR W.458 GS UT.$16VO R0
.X*X 70 RIsca ELBON Nttb, (TS) 5308, A $UPP.
RPV INTERIOR trf 608 CE UT 516VD R0
.X*X INFO. ITT EXAM CONFIRMED CRACK 115.0 DEG LONG, INTERIM DISPOSITION, 'USE AS.15' PER NCR5 97 02099 001. (C0173693)
Jr? PtHP N3 2 (9tr. DW3. No 151 201 9V 141 011310 JPe0F DRACE ARM /VE8S DN3 VTal VT PBM-302VO R1 C X...
(C0113593) 913.30 RPV INTER!w Jrt PUMP NO 1 (REF. DW3. NO. 191-201 R7-14.151 011313 JP903 ALL COMPONENT 8 9-N 1 Yt.3 v7.P8M 302VD R1 C X*.*
PERFORMED AUG.14, BWRVIP CSVT 1 EKAM ON
+
913.10 C8VT 1 VT PBM 302VO R1 X.*.
THtRMAL SLttVB TO RISER t!a0N wtLD.
RPV INTERIOR (C0113893)
.v.
4, or
-o-
%,-w-
,-,-v-m v.- -,
n.
g
.v--
-+----a e-.--i--=---,-----------,
DAtte 01/31/94 PEACH DOTTON ATWIC POWER STAT!ON UNIT 3 PMt i e
4tV!810N e, 4
INstW3CE INS >tCTION $t>9%RY
$tCOND INTti?AL, THIRD Ptkl00, $ECOND CLftME (97Df)
CLASS 1 CAUtt STATUS CCMPONtNTS DEAftp PRt25*M YttBEL NR R l
MM 8 0808 Stc. XI T RC8P Ct> MARY RKAMINATION AREA CATQY E1AM A B000 DDARES NUMhth 3DENTIP1 CATION tytM NO MRTgop PROCgp(St
? CRMR **CALigAATION 91DCR**
.....................+............................................................................................
. tt PJMP NO 1 (DrP. f4t3. NO. 1E1 101.kV.141 011314 JP603 DAACE ARM / VEAS D.N.3 V't.1 VT. PDM.302VO R1 C 7...
(C01735931 813.30 l
kP, IsrrtRIOR JrT PJMP NO 3 (7tP. tw1. No. 181 201-PV.14.1tl i
t I
011314 JP804 ALL C mPONtNTS D N.1 VT.3 VP.PBM.302VO R1 C X..*
PEPPORMED AUG 14. BWRV!P CSVTal tXAM ON 913.10 CSVT.1 Vt. PDM.303VO R1 X *. THEWMAL SLttV8 to R!stR ELBOW Ne1.D, APV !Irrts!OR (C0173693)
JtT PJMP NO 4 (REP. tW1. No. I g.201.py 141 l
011318 JP904 BRACE ARM /Vt28 DN3 VT 1 YT. PDM.303VO R1 C X...
(C01735tal 913,30 RPV INTER 10A Jtt PJMP NO l fptP. f4f0. NO. IB1 201.RY.14.191 011330 JP905 ALL COMPONENTS 9.N.1 VT.3 VT. PDM.303V0 R1 C X.
THERMAL SLttVE TO R1SER ELBOW Nttb.
RPV INTER 10R (C011369H (ft PtMP NO 6 (PEP. fM3. No. 19 f. 2 01. t v.14 )
011333 JPtol btACE ARM /Ytss 3.N.3 VT 1 YT PBM.303VO El C X...
(C01735 t H 813.30 BPV INTERIOR Jtt PUMP N0 4 (REF. Tw3. NO. Isf.201.RV-14.fll
-011334 JP904 ALL COMPONENTS 9-N 1 YT.)
VT.PBM.303VD R1 C X.. PtRPORMED AUG 14, BWRVIP CSVT.1 EXAM ON R13.10 CSVT.1 VT.P9M 303VD R1 R.. THERMAL $LttVE TO RIStk CLBON WELD.
RPV liritRIOR (C01736tM a
. = -
_ -. - -. _ _ -.. =. _ -.
i DATE: 01/31/90 PEACH Do1"t0M ATOMIC POWEk $7AT!DN LQf!? 3 PA0ts 9
PEVla!DNs 4
!NSERVICE INSPECTION $t99%RY
?
SECOND INTERVAL, TWIRD PERIOD, SECOND OttTAGE (91RP)
CLASS 1 CAUEP STATUS COMPONENTS M ORPttsgivtVrtfg NR R ASME 8 020E Stc. XI T RC$>
sts+tARY EXAMINATIOP' AREA CATOY EXAM A 8000 AD %RES N'JMB ER !!*NTIFICATION ITEM No METHOD l'ROCEDURS T CRMk ** CALIBRATION B14Ct" gET PUMP NS 8 (Pf r. fM NS. 1st teJ RV 14) 011326 Jtt06 BRACE ARM /VEss D.N 3 YT.1 YT.PBM 303V0 R1 C E..*
(C0173693) 913.30 BPV 1NTER10m Jt? MHP NS 7 (PEP. In No. tit 201 PV 14,1tl 011330 JP901 A14 COMPOWEFT$
.. PERPORMED A@le, bWRVIP CSVT*1 EXAM ON 813 10 CSYT.1 VT.I$M 202VO R$
2***
THERMAL SLEEVE 70 SISER EL90W WELD.
kPV INTERIOR (C0173593)
JET MM* No T (PEP. IM NO 191 201 PV 141 011330 JP601 BRACE APM/VESS 9 N.3 YT 1 VT PSM 302VO R1 C X...
1C0173893)
D13.30 Rl'Y INTERIOR JPT KNP NO 8 f9fr. Dw0. NO. ISI 201 PV 14.181 011333 JP800 All COMPONENTS 8 N.1 YT.3 VT.PbM-302VO R1 C *... PERPORMED AUG.14, BWRV!P CSVT.1 EXAM ON 913.10 CSVT-1 VT.PhM 302VO R1 X***
THERMAL SLEEVE TO RISER SSLBOW WELD.
EPV INTERIOR (C0113193)
JPT 1*kP No 9 (RFP. E M MS. IBt.201-9V 14)
/
011334 JP408 bract ARM /YESS 9 N-2 YT.1 Vf P9M 302VD R1 C X*..
(C0173$93) 913.30 RPV INTERIOR Jrf RNP N0 9 (PEP. DWO. NO. 181 201-PV 1 g Q Q11236 Jr#09 A11 COMPONENTS b-N.1 VT.3 YT fBM 302VO R1 C X***
A h 14, DWRV!P CSYT.1 EXAM REVEALED A B13.10 CSVT.1 VT.PBM 302VO R1
- 2 I CRACE 15 DEG 14N3 IN THERMAL SLEEV8 (TS)
EPV INTERIOR tff-458 CS-ttf.516 VD A0
RPV IlrfERIOR trt 608 CE ttT.616VO k0
.X*X 1NPO. Eff EXAM CONPIRMED CBRCK 18.1 DEG 14N3. IFTERIM DISPOSITION, 'USE.AS.!S' PER NCR$ 97 02499 001. (C01736931 s
i a
~,-.-
DATE: 01/37/98 PEACN BOTTOM ATOMIC POWER $ TAT!DN UNIT 3 F#1ts 10 Q tVISION e, 4
IN$tRVICS IN8PECT20N 8'J9%RT SECOND INTERVAL, TN!kD l'tR100. $tCOND OtttAGE (97kP)
CLAS$ 1 CAURP #TATU$ COMPONENTS PtAtTok ppt #9UP2 VM NR R MM
$ 0E05 sec. XI T RC8P Sit? JY RKAMINATION AktA CATUY EXAM A EOOO RD%RKS NUMest IDttrTIPICATION ITEM NO METHOD PROCEIPJRR T CRMR *
- CALIBRATION 914CE *
- Jtt PLNP NO 9 f R P P. fv1. NO. 181 201 PV 141 011336 JP909 DRACE ARM /Vt86 BN3 VT.1 VT.l$ 5 303VD R1 C 2...
(C0173693) 813.30 RPV INTER 30R JET fiMP MO 10 ft.EP 143. No. Iff-201 kV-14.ill 011340 JPelo ALL COMPONENTS 3.N 1 Vf.3 VT.P8M 303VO R1 C I...
AUG 14 BWRVIP CSVT.1 SKAM REVEA1.tD A 313.10 CSVT 1 VT PsM 303VO R1
.X 2 CRACK 15 DSQ 14NG IN THERMAL SLttVE (TS)
RPV INTf'RIOR trt.4 88 08-Vr.3 03VO Rf
.X X TO RISER ELBOW NELD, (TS) SIDE. A SUPP.
PPV'I MERIOR (17 608 ot tFT-203VO 80
.I.X INFO. (TT EZAM CONFIRMED CRACK lt.1 Dt0 LONG. INTERIM DISPOSITION, *USE-AS.!S*
PER NCR0 97 03099 001. (C0173693)
JPT P'JMP NO 10 TREF. tM. NO. 121 201-g 011343 JPelo BRACE ARM /Vt88 9N3 VT-1 VF PBM 303VO R1 C X..-
(C01735931 813.30 kPV InfftRIOR -
gt? PUMP NO 11 (REF. tM. NO. 181 201 RV 14,111 011344 JPfl1 ALL COMPONENTS tN1 VT.)
VT PRM.303VO R1 C. X... PERPORMED A @ lt, BWRVIP CSVT*1 EXAM CN 913.10 CSVT.1 VT.PBM 303VO R1
- .. T E RMAL SLttVE TO RISER ELBOW NELD.
RPV INTEL 10A (C0173593)
JPT rtmp NO 11 (PRP. tw3. No.151 201 PV 141 011344 JP811 bract ARM /VE8S D N.3 VT-1 VT PBM 303VO R1 C X...
(C0173593) 813.30 RPV I MERt0R JET PtNP No 12 (REF. tM. NL 181 203 kv 14.161 011340 JP813 A*.L COMPcettng 8.N 1 YT*3 VT.P9M 302VO R1 C E**.
PERPORMED AUQ 14, BWRVIP CSYT.1 EKAM ON 813.10 CSVT.1 YT PBM 302VD R1 X-.*
THERMAL SLERVE TO RISER ELBOW NELD.
RPV !!rrtRIOR (C017359 H t
t t e;*
DAffs 01/37/98 PEACH $0TTOM ATO C PONtk STATION UNIT 3 FAGre 11 REY!$!ON:
4 INSERVIC5 INSPECTION StH4ARY
$800ND INTERVAL, THIRD PERIOD, $2COND OUTAGE (97RP)
CIA *81 CAUtP $TA'!V3 CCMPONENTS g
- PPr$rUPt YtsrtL NR R Ms 8 0808 Stc. XI T RCEP SU>94ARY EXAMINATION ARIA CAT 07 EXAM A t000 REMARKS NUMbtR IbtNTIFICATION ITEM NO METHOD PR0cttVRE T CRMR *
- CALIBRATION B: Xt**
..............................................................e......
Jtt PJMP No 12 f Ptr. tipi N1 fBf 201 PV 141 031260 JP412 BRACE ARM /VESS B N.2 YT.1 VT.PBM 202VO R1 C 1...
(Cont 3693) 813.20 RPV INTERIOR Jrt PJMP NO 11 (P F F. 191 NO. 181-201 PV 14.1%)
011252 JPf13 alt. COMPONENT 8 9 N.1 VT.)
VT.PbM 202VO R1 C X...
AUG 14, BNRVIP CSVT.1 EKAM REVEALCD A 913.10 CSVT 1 YT.PhM-202VD R1
.X.X SUPP. INFO 1TF EKAM CONF!kMED CRACK 135.$ Dt314NG.1FttRIM CISPOSITION,
'USE.AS-38' PER NCR0 97 02899 001.
(C0173693)
JFT PtNP NO 11 (Ptr. tw1. NO. 181 203 RV 14) 011254 JP813 RILACE AkM/VtSS 5.N 2 VT 1 VT PBM 202VO R1 C X
.. (C0173593) 813.20 RPV INTERIOR JFT PtNP NO 14 (PtF1 t*'1.
NO. 181 203-PV-14.1%1 011254 Jt414 ALL CCHPswttrts BN1 VT.3 VT. PDM-202VO R1 C X***
EUO.14 BNRV!P N YT.1 EXAM REVtALED A
$13.10 C8Vt.1 VT. PDM 202VD R1
-X.X CPACK 120 OtJ 14 JO IN THERMAL SLEEYE RPV INTERIOR W.458 CE-W.516VO R0 X.I (TS) To R!stR ELBON NELD, 178) 8108.
RPV IltTERIOR 1rt 408 Ot W 516VD R0
.X-X SUPPLEMENTAL W EXAM CONFIRMED CRACX 136.$ DEG LONG. INTERIM DISPOSITION,
'U"t-AS.18' PER NCR4 97 02899 003-(C0173593)
Jr? PUMP NO 14 (PFF. tW3. NO. 181 203 RV-141 011250 - JP914 BRACE AWVESS '
B N.2 YT.1 YT*PBM 202Y0 R1 C X.. (C0173593) 913.30 RPV INTERIOR
- a f
s y w m
y v
n r
'--s em-
taAT*
01/27/94 PEACH DOTTOM ATOMIC POWER STAT 10N 11 NIT 3 PAGE:
13 REVISIONf.
4 IN$tRVICE INSPECTION StM4ARY j
SECOND IFTERVA1., THIRD PERIOD, $tCOND Otf!A05 (t?RP)
CLALS 1 CAURP 8 TAWS COMPONENTS P.tA"!Nt PRESSimt VESSEL NR R ASME 8 080t SEC. XI T RCEP 8tM4ARY EKAMINATION ARCA CATGY RKAM A 8000 REMARr.s FJMbER !!)ENTIFICATION 11TM NO METHOD PROCEDURE 7 CRMR
- CA1.1 BRAT 10N 914CR**
Jrf PtNP NO 14 (PEP. N1. WS. 121 201.PV 14.161 011360 JPell A1.L COMPONENTS 9.N.1 VT.)
VT.PBM 302VO R1 C R...
PERPORMED AUG.14, SWRV!P *FVT.1 EKAM ON 813.10 CSVT.1 VT.PBM.302VO R1 X.*.
THEPJtAL SLEEVE TO RISER ELBOW WE1.D.
RPV INTERIOR (C0173$931 JET I"NP No il TREF. MS. NO. iff.201-DV-141 011363 JPell DRAct ARM /Yts8 3.N.3 VT.1 VT.PaM 302VD R1 C X.. (C0173693) 913.30 RPV INTERIOR JET PtNP NO 16 (RPL IWJ. NO. Iff.201 DV 14.1%)
011264 JPf16 ALL COMPONPJf75 D.N.1 VT*3 VT.PBM 302VO R1 C X*.*
PERPORMED AUO-14, BkRVIP CSVT.1 EXAM ON.
913.10 CSVT 1 VT.PSM.202VD R1 X...
THERMAL ELEEVE TO RISER EL&ON 'ft!.D.
kPV INTERIOR (C0173593)
FT PtNP NO 16 (REP. NG. No. ISt.203.PV. 3),
011366 4(#16 BRACs ARM /VESS B.N.3 VT.1 VT.PBM 302V6 R1 C E...
(C0173$93) 913.30
'RPV 1rTERIOR JET MNP NO 11 (RPP. TV1. NO. 181 2 0 3.PV.14.151 011J64 Jf'917 ALL COMPONENTS 9.N.1 VT.3 VT. PDM.302VO R1 C X*.*
PERPORMED AUG.14 'TRVIP CSVT.1 EXAM ON 913.10 CSVf.1 VT.PBM-202VO R1 I...
THERMAL SLttVE TO
RPV INTERIOR (CD1*73bt))
Jr? MNP WO 11 (REP. N3. No. 181 2 0 3. RV.14 )
tillie Jillt BRACE ARM /Ytsa 8.W.3 VT.1 VT.PBM 202VO R1 C I
.. (C0173593) 313.20 RPV 1NTER10R ir.
..=$.
+
....., +
h Y
~
_ _ _. _ ~.,
._____-m
.. _ _ -.. _. _ _. _ _ _ _ _.. _ _. _ _ _ _ _ _ _ _ _ _ _. _. =._ _... _ _ _ _. -. _..
DAT8: 01/27/98 PEACH bOTTce4 ATOMIC POWER STATION UNIT 3 PAGE:
13 DEVISIDWs 4
JNSERVIC8 IN$PECT!DN Supe 4ARY 8tCOND INTERVAL, THIRD PEPIOD, SECOND OUTAct (97RP) i CLASS 1 CAULP $7ATUS COMPONI.NTS PtAcTON PPttstvr YtsstL NR R ASMI S 0802 SEC, 21 T RC3P SUD94ARY EXAMINAT10N AREA CATGY EXAM A 8000 REMERks FJMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMk ** CALIBRATION B1CCX**.
i i
JET f"HP NO 19 (PFr. IV). NO. 1Rf=201 PV 14.ill 8N1 VT.3 VT PBM 303VD R1 C X...
PERPORMED AUG*14, BWRVIP CSVT 1 EXAM ON 011373 JP419 ALL COMPONEFTS B13.10 CSVT.1 VT PBM 303VD R1 X.. THERMAL SLEEVE TO RISER ELA0W WELD.
I RPV INTERIOR (C0173593) i 4
L JPT PtHP NS 19 (PEP. fW)
NO. 1Bf 201 PV 141 011374 JP814 BRACE ADM/VESS BN3 YT*1 VT.PBM 302VO R1 C X
.. (C0173593) 813.30 RPV INTERIOR JET lu4P NO 19 (PtP. two. N$. IRf 201 PV 14.*ti 011376. JPt19 ALL COMPONENTS B-N.1 VT.3 YT FDM-303VO R1 C X...
PERPORMED A @ 14, BWRVIP CSVT 1 EXAM ON 813.10 CSVT.1 YT PBM 303VD R1 X...
THERMAL SLEEVE TO RISER ELBOW WELD.
RPV ! WER10R (C0173693)
JET PtHP NO 19 (PFP. f*1. No 191 201 RV 14) 0113,9 JPt19 BRACE ARM /VESA 8 N.3 VT.1 VT.PBM 303VO R1 C X*..
(C0173593) 813.30 RPV INTERIOR JET PtNP NO 20 f Rtr 1v0. No. f Bf 201-PV 14.11)
+
011300 JP830 ALL COMPONENTS 9N1 VT.3 VT PSM 203VO R1 C X+.*
PERPORMED AUG 14, BWRVIP CSVT.1 EXAM ON B13.10 CSVf 1 VT. PDM *203VO R1 X=..
THERMAL SLEfVE TO RISER ELBOW WELD.
kPV IFTERIOR (C0173593)
Jrf 19tP No 20 (Rtr. tw3. NO. 1Sf-201-9V-14)
.011383 JPf30 BRACE ARM /VESS B N-3 VT 1 VT.PBM 303VD R1 C X.. (C01735938 813.30 RPV INTERIOR s
-~
E I
g
-_,e
~.,,.c-c,-
LAT8: 01/21/98 FEACN DOTTOM ATOMIC POWER STATION UNIT 3 Facts 14 PEV! $ 3 DN s'.
4 INSERY!CE INSPECTION SO4%RY
$ECOND IW!TRVAL, TH!kD PERIOD, SECOND OWAGE (97kF)
CI AS$ 1 CAVEP STATVS COMPONENTS PrA m R ppt w S2 VEastL NR R A8ME 8 020t EEC, XI T RCEP StD9%kY EKAMINATION AREA CATQY EXAM A EOOO REMAkK8 NUMBER IDEFr!FICATION ITWM NO METHOD FROCED"Rt T CRMR ** CALIBRATION $1hCE*e (PEF. twL No. IF! 203 PV 16) 011290 $HkOUD ANNULUJ AAEA b.N.1 VT.3 VT PWM 202VD n1 C X..-
EKAMINATION INCIAJDES TOP $105 CF SHkOUD D13,10 NELDS N.9 AND N 9.
(C01135 93)
RPV INTtk!OS (PEP. tw1. N1 IBI-203-PV.20) 01129% ACCESS HOLT COVERS N/A Yt.1 VT.PBM.202VD R-. A X...
EXAMINED PER ALR3 00, CRCO S!L4 462, 0 6 180 A21M'ffN MANHOLE COVERS N/A VT.3 YT.PBM-202VO R1 X***
SHROUD SUPPORT ACCESS NOLE COVER CRACKS.
RPV INTERIOR (C0173593) 011292 ACTESS "0Lt COVERS B N.1 YT.1 VT.fBM.202VO R1 C X...
(C0173$93) 0 4 180 AE!MLFTN MANHOLE COVERS 813.10 kPV IFTERIOR CORF RPRAY P!PINO (PFP. !W1. NO. ISI. 2 0 ). p gil, 011401 A DNCOMER RPR CLAMP N/A YT.1 VT. PDM.202VO R1 A X...
EXAMINED PER AUG 03, l.E.SULLETIN A DOWNCOMER REPA!R CLAMP N/A 00 13,' CRACKING IN C0kt $ PRAY $PARGER$'
FF !NVES85L.353.5 At USIN3 BWRVIP.19,'CORESPRAY INTERNALS FF,1NVESSEL.362.6 At INSPECTION AND FIAN EVALUATION QUIDELINES*. (C0173693) 011803 8 DNCOMER RPR CLAMP N/A YT.1 Yr-PBM.202VO R1 A E
.- EXAMINED PER ADO.03, IE BULLETIN 9 DOWNCt.NER REPA!R CIAMP N/A 80 13,' CRACK!*3 IN CORE SPRAY $PARGER$'
FF,1NVESSEL,7.$ A3 U$1NG BWRV!P.18,' CORE SPRAY INTERNALS FF,3NVESSEL.1.6 A2 INSPECTION AND FLAN EVALUATION OUIDELINES'. (C0173593) 011003 0 DNCOMER RPR CIAMP N/A YT.1 VT.PBM-202VD R1 A X
.. EXAMINED PER AUG.03, It BLU XTIN C DOWNCCD4ER REPA!R CLAMP N/A 80 13,'CRACKIN3 IN CORE SPRAY SPARGL*RS' FF,1NVESSEL,101.9 A5 USIN3 BWRVIP.18.* CORE SPRAY INTERNALS Fr.!NVESSEL,141.5 A2 INSPECTION AND FIAN EVALUATION OUIDELINES'. (CC113593) 1-g
=ag-
teATE 01/27/98 PEACN BOTt0M ATOMIC POWER STATION UNIT 3 FA0Ee il SEVI$1DNt 4
!NSERV!CE INSFECTION St>91ARY SECOND INTERVAL, TN!RD PERIOD, SECOND OUTAGE (97RF)
CLASS 1 C7UEP STATUS COMFONElftS PEArTOP FPtfr TE YE!!EL N4 R ASME S 0t0t SEC. XI T RCEP SUP9tutY EXAMINATION AREA CATGY EKAM A B000 kEMAR FJ N'JMBER 11iENT1FICAT!DN ITEM NO METHOD PAOCEDURE T CRMR ** CAL 1bpATION BLOCK *
- fN r FPPAY PIFIN1 (Ptf. I'W1. N0 fB Q W PY P )
EKAMINF.D FtR AUG 03, It BULLETIN 011004 ti tiNCOMER RPR CTAMP N/A VT.1 VT.FbM 302VD R1 A K.
D IXWNCOMER REFAIR CLAMP N/A 00 13,' CRACKING IN CORE SFRAY SPARCERS' FF,1NVES&EL,172.& A1 USING BWRVIP.14," CORE SPRAY INTERNALS FF,1NVES$tL,112.f At INSFECTION AND FIAW EVALUATION OUIDELINES'. (C0173593) 011005 HDR TBOX RPR 120 Al N/A EVT.1 YF PbM-202VO R1 A X...
EXAMINED FFR AUG-03, It BULLETIN HEALER TBOX ktFAtk 120 At N/A 40 13,' CRACKING IN CORE SFRAY SFARGERS' FF,1NVESSEL,120 A3 USING BWRVIP.10,' CORE $ FRAY INTERNALS FF,1NVESSEL,120 A1 INSFECTION AND FLAW EVALUATION OU1DELINES*. (C0173693) 011806 HDR TBC2 RPR 240 At N/A EVT.1 YT.FBM 202VD R1 A X...
EXAMINED FER AUG 03, It BULLETIN tiRATER 790X REFAIR 340 A2 N/A 60 13,'CPACKING IN CORE $ FRAY SFARGERS*
FF,1NVESSEL,240 At US!NQ BWRVIP*18,' CORE $ FRAY INTERNALS FF !NVIASEL,240 At INSPFCTION AND FLAW EVALUATION QUIDELINES*. {0017)l93)
EXAMINED PER AUG.01, It BULLETIN 011607 PIA N/A RVT.1 VT. PDM.202Y0 R1 A X..
THRML SLV/ANCT.TBOX WELD N/A
$0 13,' CRACKING IN CORE SFRAY SPARGERS*
240A1 USING BWRVIP.18,'CORZ SFRAY INTERNALS FF,1NVESSEL,240 AS INSPECTION AND FIAW EVALUATION dUIDEL3 yrs'. EXAMINED TOP SIDE ONLY AS WELD IS PARTIALLY N!DDEN.
(C0173593) 011000 PIB N/A IVT.1 VT.FBM-202VO R1 A X*..
EXAMINED PER AUG.03, It BULLETIN THRML SLV/JL*tCT.TBOX WElb N/A 40 13,' CRACKING IN CORE SFRAY SPARGERS' 120A2 tl$ING BWRVIP+18,' CORE SFRAY INTERNALS FF,1NVESSEL,120 A3 INSFECTION AND F1AN EVALUATION QUIDELINES*. EXAMINED TOP SIDE ONLY AS WELD IS PARTIALLY HIDDEN.
(C0173593)
EXAMINED PER AUG 03, It BULLETIN 011809 F2A N/A EVT.1 VT.FBM-202V0 R1 A X.
JUNCT TBX CVR FIATE NElf 240 N/A 80 13,' CRACKING IN CDRE SF9AY SPARGERS' A1 USING BWRY1P.18,
- CORT SP8tAY INTERNALS FF,1NVESSEL.240 A1 INSPECT 10N AND FLAW EVALUATION OUltELINES*. (C01735v3)
+
IQTE. 01/37/98 PEACM BOTTOM ATCMIC PONER STAT!DN UNIT )
PAftt s 16 t,tV1510N e, 4
INSERVICE INSPEC"f!ON Sth04ARY SECOND INTERVAL, TWlkD PERIOD, SECOND WTAGE 197kF)
C1 ASS 1 CAURP STATUS COMPONENTS PLAcTOR lttsstat vttttL NR R ASME S 080t SEC. El T RCEP St>9%RY EXAMINATION AktA CATOY EKAM A EOOO REMARRS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURS T CRMR ** CALIBRATION BLOCE**
...e....................................
l QP.E SPRAY PfPfNO Mir. Dw1. N1 fat 203 PV-071 011010 P2B N/A EYT 1 VT.PBM 202VO R1 A 1..*
EXAMINEb PER AUG 03, it SULLETIN
, ^
).
JUNCT*TBE CVR PLATE NELD 130, N/A
$0 13,8CRACKIN3 IN C0kt SPRAY SPAR 0ERS*
l At USING BNRVIP-10,' CORE & PRAY INTERNALS
- FF,INVES$3L.130 At INSPECTION AND F1AN EVALUATION OU!DELINES*, (C0173593) l l
011011 P3Al W/A tVT.1 VT.PBM 302VO R1 A
.N..
EKAMINED PER AUG 03, It BULLETIN NDR PIPE /JUNCT.Tpt NELD 340 At N/A 40-13,8 CRACKING IN CORE SPRAY SPAROERSS FF,1NVESSEL,340 At USING BWRVIP.18,8 CORE SPRAY IirTERNALS FF INVS,SSEL,340 A2 INSPEC" TION AND FLAN EVAWATION OUIDELINgge, opgggygp ggggg pggygggggy 1 DENT!FIED DURING 3R04, 1985 REFULL OLTTAGE. (C0173593) 011813 P3A3 N/A EYT.1 VT.PEM.202VO R1 A
.X
. EXAMINED PER AUG.03, IE BULLETIN HDR FIPR/JUNCT.11LI NELD 240 At N/A 80*13
- CRACKING IN C0kt SPRAY SPARGERSS FF,1NVES$tL,340 At USING DNRVIP.10,'C0k2 SPRAY INTERNALS FF,1NVtsSEL,340 AS INSPECTION AND F1AN EVALUATION OUIDELINES*, CBSERVAD CRACE PREV 10USLY IDENTIFIED DURING 3R04, 190$ REFUEL QUTAGE. (C0173593) 011413 P381 N/A EYT.1 -
VT.PBM 303VO R1 A I...
E'KAMINED PER AUQ-03, it DULLETIN HDR PIPE /JUNCT.TSX Nttb 130 A2 N/A 40 13,8CRACKIN3 IN CORE SPRAY SPARGER$*
FF *NVES$tL,130 A3 USING BNRVIP.10,' CORE SPRAY INTERNALS M,1NVEsSEL,130 A2 INSPECTION AND FLAN EVA1.UATION GVIDELINESS. (C0173593) 011014 P383 N/A EYT.1 VT.PBM 202VO R1 A X***
EXAMINED PER AUG.03, It DULLETIN HDR PIPE /JUNCT.TBX Wtib 120 A2 N/A 40 13,* CRACKING IN CORE SPRAY SPARGERS*
FF,1NVESSEL,120 At USING BWRVIP.10,
- CORE SPRAY INTERNALB FF.1NVES$tL,120 A1 INSPECTION AND F1AN EVALUATION OUIDELINES*, (C0173593) i
,., l J
m_._
______m
__.mm_.m.___
_m..
. _ ~ _.. _
1 i
Daft 01/31/96 FEACH DOTTCM ATOMIC POWER STATION UNIT 3 FAGC 17 REY!810Na 4
INSERVICE INSPECTION SUP9%RY
/
SECOND INTERVAL. THIRD PERIOD, SECOND OUTAGE 197RF)
CLAS$ 1 CAUEP STAWS COMPONENTS l
PE A*MP PPf $f tT E Vf f f fL NR R f
um 8 ota
' Stc. XI T ACEP St> MARY EXAMINATION AREA CATGY EXAM A $000 REMARKS NUMBER IDENTIFICATION ITEM No METHOD PROCEDURE T CAMR CALIBRATION BLOCK
00Pt $PPAY PIPIN1 (PPP. Pie 1. NS. 181 203 RV 09)
N/A EVT.1 VT PhM.202VO R1 A X.*.
EXAMINED PER AUG.03, it DULLETIN 011916 P4aA
- HDR P3PE/ ELBOW NEtb 353.6 A2' N/A 90 13,' CRACKING IN CORE SPRAY SPARGERS' FF,1WESSEL. 312.S AE US!NQ BWRVIP.18,' CORE SPRAY TirTERNALS FF,1NVESSEL,353.5 A2 INSPECTION AND FLAW EVALUATION QUIDELINEf,'. (C0113893) 011414 P4at N/A EVT 1 VT.PNM.302VO R1 A X
.. EXAMINED PER AUG.03, it DVLLETIN HDR P!PE/ ELBOW WELD 1.$ A3 N/A 40 13,' CRACKING IN C0dt SPRAY SPARGERS' FF,1NVESSEL,7,6 A8 USINQ BWRV1P.14, aCORE SPRAY INTERNALS FF.1NVESEEL.7.5 AE INSPECTION AND FIAW EVALUATION OUIDELINES'. (C0173$93) 011017 PeaC N/A KYT 1 VT FDM-202Y0 R1 A X.'..
EXAMINED PER AUG.03, 15 BULLETIN' HDR P!PE/tLBOW WELD 107.5 A.
N/A 8013,*CRACXING IN CORE SPkAY SPARGERS' FF.!NVt88tL.107.5 A3 USING BWRVIP.18,' CORE SPPAY INTERTALS FF.1NVESSEL,147.5 AE INSPECTION AND FLAN EVALUATION CUIDELINES*. (C0173593) 011014 Pend N/A EVT.1 YT PBM 202VO R1 A X*..
EXAMINED PER AUG-03, it BULLETIN
- HDR PIPE /tLBOW WEIb 113.$ AE N/A 4013.* CRACKING IN CORE SPRAY SPARCERS' FF,1NVESSEL.173,$ A2 USING SWRVIP.19. 'COR$ SPRAY lirTERNALS
- FF.!NVESSEL,173.$ At
. INSPECTION AND F1AW EVALUATION dV1DELINES*. (C0173593) 011819 P4bA N/A EVT.1 VT.PBM 302VO R1 A X.. EXAMINED FER ALU-03, it SU11ETIN El&OW/DWNCMR WELD J35.5 A3 N/A 40 13,' CRACK!NQ IN CORE SPRAY SPARCER$'
FF.!NVESSEL.326.5 AI USING BWRVIP*18.' CORE SPRAY INTERNALS FF.!NVESSEL.3 5.5 A2 INSPECTION AND FIAN EVALUATION CUIDELINES". (C0113593) 011820 P4bt N/A EYT 1 VT PBM 202VD R1 A E*..
EXAMINED PER A @ 03, IE BULLETIN ELA0W/DWNWR With 1.5 A3 N/A
$0-13 'CRACE3NG IN CORE SPkAY SFARGERS*
FF,1NVESSEL.7.8 A3 USING BWRV!P 38,' CORE SPRAY lirTERNALS FF.1NVESSEL.1.6 AE INSPECTION AND FIAY EVALUATION GUIDELINES *. 'C0173$93)
- 5 6
.t
. - =.
..v.,,
...--_.-.,_.,,,c.,
,,m.,--
-~
..,-1
LAfts 01/31/98 PEACH DOTTOM ATOMIC POWER STATION UN!? 3 PAGEs 10 REVISIONr.
4 INSTRVICE INSPECTION StH4ARY SECOND tirtERVAL. TN!RD PERIOD, StCOND OUTAGE (97RF)
C1 ASS 1 CAUEP STAM CCNPONENTS PrA-ton PPtsfi"Pr Yttert NR R AsMt S 050t Stc. R$
? RCEP St99%RY EKAMINAT10N AREA CATOY EXAM A BC00 REMARRS NWmra IDENT!F3 CATION ITEM NO METHOD PROCEDURE 7 CRMR ** CALIBRATION 914CE**
CDP.1 BP9AY P1 PIN 1 fPtr. 1W 1 NO ttf.301 DY.07) 011831 P4hc N/A EVT.1 Y% F9M 303VO R1 A X.. CIAM!htD PER AUQ-03, It DULLETIN ELh0W/DWNCMR WELD 147.$ A2 N/A to.13,* CRACKING IN CORE SPRAY SPARCERS' FF.IWES$tt,147,5 A2 USINQ DWRVIP.10,' CORE SPRAY INTERNALS FF. !WESSLL,107.5 AS INSPECTION AND FLAW EVALUATION OUIDELINES*. (C0173593) 011533 P4 t:D N/A KVT 1 VT.PBM.303VD R1 A X...
EXAMINED PER AUG.03, It DULLETIN ELBOW /DWNCMR WELD 173.$ A2 N/A 40 13,'CRACKINQ IN CORE SPRAY SPARGERS' l
FF,1WESSEL,173.8 A2 USING BWRVIP.18,'CORS SPRAY INTERNALS FF,1WESSEL,173.5 A2 INSPECTION AND FLAN EVALUATION QUIDELINES'. (C0173593) 011833 P4cA N/A EYt.1 VT. PDM.303VO R1 A X...
EXAMINED PER AUQ.03, !$ BULLETIN DWNCMR/ ELBOW WELD 353,5 At N/A 40 13,' CRACKING IN COkt SPRAY SPARGERS*
FF,1NVESSEL.)$3.$ A3 USIN3 BWRV!P.14,' CORE SPRAY !!rfERNALS FF,1NVtsstL,353.$ A8 INSPECTION AND FLAW EVALUATION OUIDELINES". (C01'e 3893) 011934 P4ct N/A EVT.1 VT.PBM 303V0 R1 A I.
CIAMINED PER AUG.03, it.)ULLETIN iMNOIR/ ELBOW NELD 7.5 A3 N/A 00 13 ' CRACKING IN CORE 6 PRAY SPARGERS' FF,1WERSEL,7,$ AE USING SWRVIP 1$,' CORE SPl AY lirTERNALS FF,1WES$tL,7.5 A1 INSPECTION AND FLAN EVALU4 TION OU1DELINESe. (C0173593) 011435 PecC N/A EVT.1 YT.PBM.303VO R1 A X...
EXAMINED PER AUG-03, It DULLETIN DWNCMR/8LBOW WELD 187.5 A2 N/A 60 13,' CRACKING IN CORE SI' RAY SPARGERS' FF,1NVESSEL,107.5 A3 USD43 BWRV!P.14,' CORE SPRAY INTERNALS FF,1NVESSEL,167.5 A3 INSPECTION AND FLAW EVALUATION QUIDELINES". (C0173$93) 011937 P4dA N/A EVT.1 VT.PBM-303VO R1 A R.**
EXAMINED PER AUG.03, It BULLETIN ELDOW/ SHROUD WELD 3$3.5 At N/A
$013.' CRACKING IN CORE SPRAY SPARGERS' FF.INVERSEL.3tl.l AE USING BWRV!P.18,' CORE SPRAY INTERNALS FF.1NVESSEL,353.$ A2 INSPECTION AND FLAW EVALCATION QUIDELINES', (C0173193)
S g
+ +-
e
DATE 01/27/98 PEACW BOTTCH ATOMIC POWED STATION UNIT 3 FACE 19 P.EVISION :
4 INSERVICE INSPECT!DN S'JM.RY e
SECOND !YTERVAL. THIRD PERIOD, SECOND OUTAGE (97kF)
CLASS 1 CAUEP STATUS COMPONENTS PRAT * ?PErs"P.E VEtStL NR R ASME S OEOE SEC, 21 T RCEP S'ANARY EKAMINATION AREA CATGY EXAM A EOOO REMARRS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR * *CALIBR 4710N 914CR'*
OntP SPPAY P! PIN 1 (PPP IW1 N1 1 S f.2 M.PV. 07) 011428 Peda N/A EYT.1 VT.PBM 202v0 R1 A a...
EXAMINED PER AUG.03, IE BULLETIN ELBOW /1HROUD WELD 7.5 AE N/A 60 13,' CRACKING IN CORE SPRAY SPARGERS' FF,1N% sSSEL,1.0 AZ USING DWRV!P.10,' CORE SPRAY INTERNALS FF,1NVESSEL,7.6 A3 INSPEC" TION AND FLAW EVALUATION QUIDELINES'. (C0173593) 011029 P4dC N/A EVP.1 VT PBM-202VD El A X...
EXAMINED PER AUG.03, it BULLETIN ELBOW / SHROUD WELD 107.5 A2 N/A 00 13,' CRACKING IN CORE SPRAY SPARCEPS' FF 1NVESSEL,167.6 A:
USIN3 BWRVIP.18,' CORE SPRAY INTER *1ALS FF,1NVESSEL,107.5 AE INSPECTION AND FIAW EVALUATION OUIDELINES". (C0113593) 011830 P4 dD N/A EVT.1 VT. PDM 20 NO R1 A X...
EXAMINED FER AUG.03, IE BULLETIN ELBOW / SHROUD WELD 172.6 A1 N/A 60 13.' CRACKING IN CORE SPRAY SPAR 0ERS*
FF,1NVESSEL,172.5 AZ USING BWRVIP.10 ' CORE SPRAY INTERNALE FF INVESSEL,172.6 A3 INSPECT 10W AND FLAW EVALUATION GUIDELINES *. (C0173593) 011931 PSA N/A EVT.1 VT.PBM-202VO R1 A K...
EXAMINED PER AUG.03, !E BULLETIN DWNCMR/SLDO-SLV WELD 362.6 AZ N/A to 13,' CRACKING IN CORE SPRAY SPARCERS' FF.1NVESSEL,352.$ At USING DWRVIP.18,' CORE SPRAY INTERNALS FF.INVESSEL,352.$ AE INSPECTION AND FLAW EVALUATION dUIDELINES'. ELAM SCOPE LIMITED TO UPPER 81DE ONLY DUE TO REPAIR CIAMP INTERFERENCE. (C017Jll))
011832 Plu N/A EVT.1 VT.PBM.202VD R1 A X+
. EXAMINED PER Att).03, IE BULLETIN IWNCMR/SISO.5LV WELD 7.5 A2 N/A to.1),' CRACKING IN CORE SPRAY SPAROERS' FF,1NVESSEL.1.6 At USING BWRVIP-10,' CORE SPRAY INTERNALS FF,1NVESSEL,7.5 A3 INSPECTION AND FIAW EVALUATION OU1DELINES*. EXAM SCOPE LIMITED TO UPPER SIDE ONLY DUE TO REPAIR CIAMP INTERTERENCE. (C0173593)
DATE 01/31/98 PEACH DOTTOM ATOMIC POWER STATION Ud!T 3 Pacts 30 REVIStDNI.
4 INSERVICE IN88'EC"T10N 8t>94ARY SECOND INTERVAL, THIRD PERIOD. SECOND OtfrAct (97tF)
CLASS 1 CAUEP STATUS COMPONENTS PEATR PPEFSUPt VEMPL Nk A MM 8 OE08 SEC. 21 T RC8P 8tD91ARY EXAMINATION AREA CATUY EXAM A BC00 REMARKS NUMBER IDENT!FICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION ELOCR**
00Pt FPPM Pf PfMO fffP,.DW1. NO. IRI.201 7V.09) 011033 Plc M/A EVT 1 VT. PDM-303VO k1 A X...
tXAMINED PER AUG.03. It SULLETIN DWNOMR/SLDQ*SLV WELD 187.5 At N/A 0013.* CRACKING IN CORS SPRAY SPARGERS' FF.!NVESSEL.141.5 At USIN3 BWRVIP.10,' CORE SPRAY INTERNAL $
FP.1NVESSEL.181.6 A1 INSPtC"f!ON. AND FLAN EVALUAf tDN OUIDELINES'. EXAM SCOFE LIMITED TO UPPER SIDE ONLY DUE TO REPA!4 CLAMP IFTERFERENCE. (C0173693) 011434 PSD N/A EVT.1 VT.PBM.303VO R1 A h...
EKAMINED PER AUG 03. 1E BULLETIN 1MHCMR/S!bO 8LV NELD 173.5 At N/A 90 13.'CRACE7"'-- IN CORE SPRAY SPARGERS' FF.!NVESSEL.173.$ A2 USIN3 BWRV19-
M-RE SPRAY 1NTERNALS FF.!NVESSEL.172.5 AS INSPECT!ON At f EYLAUATION OU1DELINE8*. E w 3 COPE LIMITED TO UPPER SIDE ONLY t%'E TO REFAIR CLAMP INTERFERENCE.(C0173193) 011838 P6A N/A EVT.1 VT.PBM 302VD R1 A X==.
ERAMINED PER AUG.03. 18 BULLETIN SLDO.8LV/0L1TR 8LV NELD 353.$
N/A 40*13.'CRACEING IN CORS SPRAY $PARGERS' AS.
USING BWRVIP.18.'CORS SPRAY !!rTERNALS FF.1NVESSEL 383.$ A5 INSPECTION AND FLAN EVALUATION QUIDELINES'. (C0173593) 011836 P68 N/A EVT.1 VT.PBM.303VO R1 A X..*
EKAMINED PER AUG.03 18 BULLETIN SLDO SLV/0UTR.SLV NELD 1.8 A8 N/A 8013.* CRACKING IN CORE Sf* RAY (PARGERS*
FF.1NVESSEL.1.8 At USING BWRV!P.18,' CORE $ PRAY INTERNALS FF.INVES$rL.1.5 A3 INSTECTION AND FLAN EVA!EATION CUIDELINES'. (C0173593) 011837 P;C N/A EVT 1 YF. PDM-302VO R1 A X...
EXAMINED PER AUG.03. It SULLETIN SfCO 8LV/0VTR.5LV WELD 101.5 N/A 4013.'CRACKINQ IN CCRE SPRAY SPARGERS' AS.
USINQ DNRVIP 18.' CORE SPRAY !!rTEMALS FF,1NVEsstL.181.5 AA INSPEC"f!ON AND F1AN EVALUATION OU10ELINES'. (C0173593) i T
w
_.--J
%TE : 01/27/95 FEACH D#rTO4 ATOMIC POWER STATION UN!h 3 FA33 21 REY!$!DN:
4 INSLRY1CE IN!PECTION SUWAkT
$tCOND 19t!ThVAL, THIRD TERIOD, SECOND OWAJE (97RF)
CIA 181 CALTP STATUS COMPDNENTS ttA~r09 fttrrp t Vf M rL
- 8 k A MS 5 0808
$3C. El T RC8P StM4ARY EXAMINATION AREA CAT 3Y EXAM A B000 REMARFJ BrJMPER 3DENTIF1D TION ITEM NO METHOD l'ROCEDURE 7 CRMR ** CALIBRATION BLOCE**
CM F FrPAY PIPIN1 (Ptr. DW1 NS. ISI 203.PV.071 EKAMINED ITR AtX3 03, it DULLET!N M/A EVT.1 VT. PDM 202VO 31 A X*
011439 P7A 90 13,'CRACKIN3 !N C0kt SPRAY $1'AROER$'
OUTR.SLV/DWN M NELD 362.5 A2 N/A FF,1NVEESEL,352,5 A2 USING BWRVIP.10,
- CORE $1'kAt INTERNALS FF,2NVE8SEL,352.6 A2 INSitCTION AND FLAN EVALUAT!DN QUIDELINES". t00173593) l 011440 P7b N/A EVT.1 VT.tbM 202VO R1 A X
.. EKAMIfTD FER At10-03, It DULLRTIN 1
j OUTR.SLV/tWNCMR NElb 7.6 At N/A 60 13,'CRACE!NG IN CORE SPRAY SFARGEAS'
(
FF,1NVtssEL,7.5 AE USING BWRVIP.10,'C 23 SPRAY INTERNALS FF,INVE&&EL,7.5 AI INSFECTION AND FLAN FVALUAT!DN QUIDELINES*. (C0173593)
EKAMINED FER AUG 03, it BULLETIN 011041 P7C N/A EVT.1 VT thM 202VO R1 A X.
OVTR 8LV/DWNCMR WR!b 187.5 At N/A
$0 13,' CRACKING IN CORE $ PRAY SFARGER$'
FF. INVE5SEL,167.5 At USING BWRV!P.18,' CORE $ FRAY INTERNALS FF,1NVESGtL,167.5 AE INSPECT 10'l AND FLAN tVALUAT10N OUIDELINES, (C0173593) 011643 Plan N/A EVT.1 VT.PBM*202VO R1 A X...
EXAMINED PER AUG 03, 18 IlULLETIN C01.LAR/8HRD.P!PC WELD 353.6 A2 N/A 90 13,' CRACKING IN CORE SPRAY SPARGERS' FF,1NVESSEL,352.6 A2 USIN3 DWRVIP 14,' CORE SPRAY INTtRNALS FF,1NVEssEL,352.5 A2 INSFECTION AND FIAW EVALUA1 ON dUIDELINES'. (C0173593) 011944 Plat N/A EYT.1 VT rs.4 202VO R1 A X
.. EKAMINED FER AIX)-03, it BULLETIN COLLAR /SHkD.P!PE WELD 7.6 AZ N/A 40 13,' CLACKING IN CORE SPRAY $PARGER$'
FF,1NVESSEL.T.S AZ U$1NG BWRVIP.10,' CORE $$' RAY INTERNALS FF.1NVESSE1.,T.5 AZ INSFRCTION AND FLAN EVALUATION QUILELINES*. (C0173593)
C11845 PsaC N/A EVT 1 YT.FBM 202VO R1 A X
.. EKAMINED PER AUG-03, It BULLETIN COLIAR/SHRD-P!PS NELD 197.5 A2 N/A 60 13,' CRACKING IN COkt SPRAY SPARCERS' FF,1NVESSEL,187.5 At USING $WRV!P.16,' CORE SFRAT lerTERNALS FF,INVESfEL.187,5 A2 INSFtNION AND FIAW EVALUATION OUIDELINE3*. (C0173593) n
TAT 8 s 01/37/98 PEACH DOTTCH ATOMIC POWtk $TATION UNIT 3 FAGts 33 atV!$10N b 4
1NstRVICE INAFECTION 8tM4ARY 8tCOND INTERVAL, THIRD PERIOD, SECOND OLffA02 (9tlLF)
C1 ASS 1 CAUtf STA1VS CVMPOWENT4 gAat09 Ptrastmr Vrtsrt NR R MM 8 0808 SEC. XI T kC2P
$1DNARY $XAMINATION AktA CATQY
$XAM A BC0t ktMARRA IPJMPER IDENTIFICATION ITEM NO METHOD PR0"tDUR$
T C8Mt **CALISRATION bLOCR**
COtt SPP.AY P1FING (PtP, IVI. NS. 181-201 PV 0?t 011444 Pled N/A RVT.1 VT.rDM 303VO R1 A X...
$1AMINED PER At&O3,15 DULLRTIN COLLAk/$HRD.P!Pt Ntta 173.6 A2 N/A
$0 13,'CkAdt!N3 IN CORE SPRAT STARQtR$e FF,1WVES8tL,113.6 At U$1NG BWRVIP.10, eCORE SPRAY INTERNALS FF,1NVEsstL,113.. AI INSPECTION AND F1AN RVALUAT30N OU1DELINt8% (C0173593) 01144T tetA N/A WF.1 VT.PBM.303VO R1 A X...
EXAMINED PER AUG 03,15 DULLETIN COLLAR /SNkD NELD 153.$ A2 N/A 40 13 'CRACt1NG IN CORE SPRAY SPARCERS' FF.INVLsstL,353.6 A2 USIN3 BWRVIP*14 'CORB SPRAY INTERNALS FF,1NVtsSEL,353.6 A3 IN8PECTION AND FIAN EVALUATION OUILtLINgge. (C01135933 011448 F8bt N/A WYT 1 VT.FBM 303Ve R1 A X.. EXAMINED PER At&O3, it BUna.tTIN 00LLAR/8HRD NELD 1.6 At N/A
$0 13,
- CRACKING IN CORE 8FRAf SPARGERS' FF 1NVESSEL,1.6 A8 V81183 DWRV!P.10,* CORE SPRAY INTERNALS FF.3NVt8SEL,1.6 A3
!NSPECTION AND F1AN RVALUATION OUIDELINES', (C0173593) 011949 l'tbc N/A RVT.1 VT.PBM-302VD R1 A X...
t1AMINED FtR AUQ-03, it BULLETIN -
COLIAR/8HRD NELD !$7.6 A3 N/A 00 11,*CRAct'*J IN CORE SPRAY StAROER$'
FF,1NVB58tL,101.6 A2 USING DWRVIP.10,* CORR SPRAY INTERNALS FF.1NVESSEL,101.5 A1 INSPECTION AND FIAM EVALUATION dVIDELINES'. (C0113593) 011450 FebD N/A RYT*1 YT.FBM-303VO R1 A X.*.
EXAMINED PER AUG.03,12 DULLETIN COLLAR /SNRD NELD 113.6 At N/A 6013,' CRACKING IN CORE 8 FRAY SPsJt0ER$'
FF,1NVtsstL,173.9 A3 USIN3 bWRV!P.19,' CORE $ PRAY INTERNALS FF INVES$tL,173,$ A8 INSPEC" TION AND FLAN EVALUATION OUIDELINES'. (C0173593)
Gi'1Bt ROD 0 traRtt ArtwrH (PEP tv1. NO. FBI 201.PV-121 011903 0U108 ROD CAR -
3.N.1 VT 3 VT.PBM-39tV0 R1 C I..-
(CC1735931 913.10 RPV INTERIOR
=~
E k
s
-w
i 14 ATE # 01/87/96 l' TACH 60TTON ATCf41C POWER STAT!DN UNIT 3 FA3ts 33 StV1810N 4
IN$tRVICE INSFtCTION 8t>9%RV
/
l SRCOND INTERVAL, TN!RD PERIOD $tCOND DLffA05 (97kf) r CIA *81 CAutt STATU$ COMP 0NtNTS ptAc* top PRtarupt YtsstL Wk R
- AsMs 0 020t sec. XI T RC3P 81DNARY EEAMINATION ARLA CATQf EKAN A t000 REMARrJ f
NUMBER IDENTIFICATION ITEM NO Mt1 HOD PROCEffURE T CRMR * *CALibkAT10N 914CF.*
- Outbt pod 100 ttGT:Et At t > t P. tw1 N' lif.201 PV 121 011904 00105 300 140AE NN1 VT.3 YT. PDM 303VP Al C 2..*
IC017359M
- ' D13.10 prV INTERIDR PttDWAtta stARote to At <> t r. tw1. NS. 1st 203 pV 111 011914 FW AFAR 0ER 30AE B.N 1 VT.3 YT.I'BM.303VO R1 C X**.
(C0173693) i D13,10
)
RPV INTER 1 3 I
t rttDwAtta stAnns to Ar (str. twl. NO. 181 201 PV-111 011919 FW $PARGER 90AE D.N 1 VT*3 YT.rBM 303VO R1 C
- 3
- (C0173693)
B13.10 RPV INTERIOR Fttr9fATER frAport lle At (Ptr. tw3. N0. 181 201 DV 111 011933 FW SPAhott 180A3 3N1 YT.3 VT PBM 303VO R1 C E**.
(C0173593) 813.10 RPV INTERIOR-rttDWATER WPARott 210 A2 (Pfr 19e1 No. 181 2 03 RV 111 011934 FW SPAROER 310A3 8N1 VT.3 VT.PBM-202VD R1 C E..-
(C0173$93)
RPV INTERIOR l
1 FttDNAttP. f PAPGER 270 A2 (Rtr. tw1. te.1sf 201 RV-111 011930 FW $PARGER 370A2 9N1 Vf.)
YT.FBM 303VD R1 C X*=.
(C0173$93) 913.10 RPV INTERIOR 9
$Y w
L. s i
F'F
'r-g
+
7-
.T--17
-Wv='""T'w"F-i=WwN'J'Tww'e t
rrrvy'-
v'N w-4n'rm+Ym*F-w"'W'N'T-'P=rw
'W v'
wmW-
-y'wi'vrr w-mWwvy-Www
-g'-"'-r-'-'-Pw-v-N*--'-
w
__m.___..-
m
_-_~_m batts. 01/21/98 PLACH DOTTOM ATOMIC PONER STAT!ON (JNIT 3 PA0t 24 ktVIS10N a+,
4 1NKERVICS INSPEC"P!ON $UPPERY
- ECOND INTERVAL, THIRD Ptk!DD, SECOND OUTAct (97RP)
CIACS 1 CAURP STATUS COMPONENTS PtA*"f0P ppt 99UPE YtstPL Nk k A8Mt 8 '808 Ctc. El T RCEP 8t29%RY E1 AMINATION ARRA CATQY EKAM A EO00 REMAkts WJMatR IDENTIFICAT!DN ITEM NO METHOD PROCEDURE T CRMR ** CAL!bRATION 91bCE**
FttivArtp EPApart 130 At fttP tW1 N1 18t d 61 PV 111 011934 PN SPARGER 330A8 6 N.1 YT 3 VT PBM 202VO R1 C X...
(C0173693) 913.10 DPV 1NTER102 TOP OUfDE (P f r. [9f1. N1 1Bf 203 DV 101 011938 TCP COR5 OUIDE 8N1 YT.3 VT.PBM 202VO R1 C X=..
EKAMINATION PERPORMED ON TOP $!DR ONLY,
$13.10 CONS! STENT N!11 SNRVJP 26,' CORE PLATR RPV INTERIOR INSPECTION AND FLAN 8%AlnATION RPC INTERIOR GUIDELINE' AND AUG.10. (C0173193)
TOP Ottf bt (ktF L A. NO. N"WF1 011941 ALIONER P!N 180 Dec N/A VT.3 VT.PbM 203VO R1 A I...
EXAMINED PER AtX3 10, OECO $108 Sea,' TOP AL10NER FIN N/A CUIDE AND C0kt FIATE CRACKIN08 USING RPV INTJRIOR BWRVIP 24,'TCP OUIDE INSPEC" TION AND PLAN RPV 1NTERIOR EVALUATION OU1DELINE'. (C0113693) 011942 ALIONER FIN 210 btQ.
M/A YT 3 VT PDM-202VO R1 A I-..
EXAMINED IER AUG 10, 08C0 SIL4 las,'1tP AL10NER PIN N/A CU1DR AND CORS PLATE CRACKING
- USING RPY IrrtRIOR BWRVIP 24,' TOP QUIDS INSPECT 30N AND FLAN RPV !WTERIOR EVALUATION QUIDELINE'. (C0173893)
Ft'RVt1L F AM HStPFR 10 At (PFP. Dwl No ISt 201 PV 19) 011945 8URYL SAM HLDR 30At DN1 YT.3 Yr PBM 202VO R1 C X.*.
~011990 RifRVL SAM N1bR 120A2 BN1 YT.3 Vf-PBM 202VD R1 C I*..
(C0173593) 913.10 Ps. IrrtRIOR i b a.
,.r-_-
n.-.
-w.
,.,s---.
-.. ~ -.... ~....
. - - - - ~ - - -... - - - _ _. - -
... -.... ~ -... -
~ - -.
teft s 01/31/99 PEAC3t DOTTCH ATOMIC t0NER STATION UNIT 3 PA3ts 36 FEV1830Ne 4
1NSERVIC8 INSFCCf!ON $U>HARY SECOND INTERVAL, THIRD l'rRIOD, SECOND OUTAGE (97RF)
CLA88 1 CAutP $7ATV3 COMPONENTS k1A M OR PitfftDr YtsttL NR k MM 8 0805 stC. El T RC8P St#*.VY EXAMINAT!ON AREA CATOY EKAM A B000 REMARKS NUMBER IDENTIFICATION ITEM NO METICD l'ROCEt4S E T CRMR ** CALIBRATION 91bCE**
ELMT1L SAM HOLfTR 100 Af (P f'F. f4f1. NS. fft.201 pV.171 011953 SURVL SAM H1bR 300A2 B+N.1 VT.)
VT thM*303V0 R1 C 2...
IC01735931 913.10 kPY INTERICR JPEP. fWO. NO. 1Bf 201 RY 211 013006 CORS PIAT8/SUP DOLT 8 tN3
-YT.1 Vf.PBM 303VO R1 C X...
EKAMINED 10 CF 34 80L18 (1 THRU 6, 23 814.33 TH30 36, 30 THRU 34). PERFORMED VT.1 IN LIEU OF VT 3 PER QUIDANCE OF BWRV!P 35,' CORE P1 ATE IN$FECTION ANr FIAW EVALUATION QUIDELINt* AND AIX3-10.
(Cf 13593)
Ottr tW1. NO. ISl-201 DV-241 01301$ OR1r1CED FUEL SUP t N+3 VT 3 VT*P8M 303VO R1 C X.
. ERAMINATIONS FERFORMED AT CORS B13.33 lbCATIONSW 10 33, 06 37, 14 19 AND 33 33. (C017359 H t
i
!.h 6
-+=--ev F
4 l:
tAtti 01/31/98 PEACH DOTTOM ATOMIC POWER STATIM UNIT 3 PA3ts 35 PtV1880N o, 4
IN$tRVICE INSPECf10N St>9%RY i
$ECCND INTERVAL. TW!kD Pth!DD, $tCOND OVfA3R (97RP)
CLASS 1 CAUtt STATUS COMPONENTS-MAIN ffEAM NA R MM S 0808 Stc. XI T kCtP SID9%kY EKAMINATION AAtA.
CAT 0f EXAM A B000 ptMARKs N!Deth IDENTIFICATION ITEM NO METNOD PROCEDURE -
T CRM& " CALIBRATION BLOCE**
...s....................................................................................................
1/XP D (Pfr. tw1 NO, 09N 01 Mf 101 1 bl 051400 HD3(IA)
B81 Mr MT.Pt.001 83 C X...
(C0114233)
INTEGRAL ATTActMENT B10.10 1% EL 156 6. 3ll At 067000 1.D.7/DSA 3J Kf MT.Pt.001 R2 C X*..
Lff $XAMINATION PERPORMED PROM (TPSTREAM 4 1N. DRANOt CONN 99.31 UT.4 58 UT.PBM 106VO DO X=.*
(P!PE) 81D8 ONLY DUE TO PIPS 70 BRANCH DN. EL 15'J.0, 385 A2 CONNECTION CONP10VRAT10N. (C0174364) 069900 HD)(!Al B81 MT Nr.PE.001 R3 C X=..
(C0114 2 31)
INftGRAL ATTAO(MENT D10.10 DW, EL 166 4. 333 At 040100 1.D 1/DSQ 9.J Mt Mt Pt 001 R3 C X...
trf EXAM 1HATION PERPORMED FROM UPSTREAM l.!N BRANOR CONN
$9.31 trf 4$8 UT PDM 106VD R0 X...
(PIPE) SIDE ONLY DUE TO BRANCH CONNECTION DW, EL 156 0, 333 A2 CONF 10URATION. (C0174304) 041100 HD4(IA1 D81 Mf wf.PE 001 R3 C Xe (C0174336)
INTEGRAL Al"fAOlMtFT D10.10 DN. EL 156 0 let A3 061600 1 D 9LU 8J-MT Kf.PE 001 R2 C 3. +. : tiSED ALTERNATE CAL $1DCE WITH NOTCHta #
10N3 SEAM UPSM 99,13 trt.455 trt.PBM-106VO RO X...
LIM 36 1.013.C3.
iC0114315)
IMt. EL 154 4.10% A5
- 26.N X 1.06 3 8. PED" 061600 1.D 9 8-J Fr wf.Pt.001 R2 C E...
EXAMINATIONS LIMITED BETWttN 20.l* TO PIPS 70 ttJ60W D9.11 UT 458 trf PBM 104VO RO X
63.l* DUE TO Prox 1MITY OF Pitt.
DW, EL 156 9. 10$ A3 SUPPORTAND ACHitVtD 45.1% CODE COVERACE.
DW, EL 116 8 lll A3 REFERENCE RELIEP REQUEST 8 RR 05. USED Al. TERNATE CAL BLOCK NITH NOTCHES 8 LIM 34 1.013.CS.
(C0114315)
- 26.CS E 1.06.*J0.Pt9'*
4
'w-+
+
l l
t; ATE : 01/87/90 FLACH DOTTOM ATOMIC POWER STATION UNIT )
FACE:
27 REY!8 ION:
4 IN$LRVICE IN$f 20"f!ON 5'St%RY
$1COND INTERVAL, 'In!*D FERIOD, $tCOND 07tAGE (97&T)
CLASS 1 CAUEP U ATUS COMPONENTS l
5t.!N 6 TEAM NR k
um 8 0808 Stc. 11 RCEP St>9%RY EKAMINATION AktA CAT 0Y EKAM A EOOO REMARKS N'JM3itR 20twf!FICATION ITEM NO METHOD PROCEDUER T CRMR ** CALIBRATION blDCK
1/er D (PFF. f'W1. NO. DPN 01 Pt 101 1 fl 061700 1.D 9LD1 D.J MT Mf Ft.001 k2 C X
.. USED ALTERNATE CAL BibCK N!TH NOTCHES #
1DNG SEAM DNr.M EL 1R 89.12 UT.458 (ft.I'BM 106Y0 $0 X
1C0114315)
EM, Et,156 0, 105 A2
- 26 CS X 1.06 28 PED'*
USED ALTERNATE CAL BLOCK NITH NOTOtES 9 Of1800 1 D 9Ltc DJ MT MT Ft.001 R2 C X*
LONQ CLAM !*6M EL OR D9.13 17f.4 58 (ff.FDM*106YO R0 X...
LIM 26 1.011.C5.
(C0174316)
IN, EL 156 0, les A3
- 26.CS X.1.06 20*ItD**
EKAMINATION LIMITED TO 71 CODE COVERAGE 043600 GD1(IA)
INTEORAL A1"TAODtENT 910.10 DUE TO INACCESSIBILITY CAUSED BY FUPPORT EL 134 1,tw 18) At DES!QN, REFERENCE RE11tF REQUESTS RR.06, tL 138 1,DN 16) A2 (C0174231)
~
SAFETY & PFLIFF 9ffEFS!Ds) (PFF. f*1, N1 DI1N 01 MI-301 1 D1 061300 1-DSA-1 DJ MT NT PE 001 R2 C X...
tTt EKAMINATION FERFORMED FROM DOWNbTREAM BRANCH CONN TO FIFR 99.11 LFr 458 LFf. PDM-106VO R$
X
.. (P1PE) $!DE ONLY DUE 70 BRANCH t*, EL 156 4. 245 A1 CONNECTION CONFIGURAT!ON. (C0114268)
6 CS 160. 718 6A PEB**
046500 1.Ds3 1 m.J MT wf.I't 001 R2 C X..
UT EKAMINATION PERFORMED FROM DOWNSTREAM BRANCH CONN TO P!Pt 99.11 Vf-455 t?f.FDM.106VO R0 X
.- (FIFE) SIDE ONLY DUE TO BRANCH (W, EL 1$0 4, 230 AX CONNECTION CONFIGURATION. (C0114300)
- 6.CS.160. 718 6A. FED'*
066400 1.DSB 2 F#
D-0 2 YT 1 MA3-CO-401 R5 C X...
(C01143531 FIAttJB DCLTING B1.$0 DW, EL 158 4, 205 A2 067100 1 dst 3r8 B02 YT 1 MAG C0+401 RS C X..
(C0114390)
FLAP 838 BOLTING B7.50 LW. EL 158 4, 213 A2
_______m_
m_______.________________m_
T 1
i 1478s 01/31/94 ttACM DOTTOM ATOMIC Powth $7AT10N tlN!? 3
- JAQg, gg ktVISIONL, 4
INSERVICS 1NSPECT10N 8thMARY j
SECOND INTERVAL, THIRD PtA10D, 8tcoND OLftA02 (9 tar) i CIA 881 CAUtr STATUS COMKWCFis MIN BTf.AM Nk k l
A8Mt 8 080t SEC. XI T RC5P
+
8tMSAT EXAMINATION AktA CATGY EXAM A B000 REMAkKS
[
NUMDER ILEFT!PICAT10N ITEM NO METHOD PROCCDUP.E T CRMk **tALibRATION 4thCKee CArrTY a irLitr Rf 8E9f fbt1 f PrF. fv1. NO. f5hN 01 MI.101 1g 047300 1.D8F.3FB D.0 3 VTai MAO-CO-401 kl C E.*.
1C0174393) i r!.ANQt WOLT!N3 97.50 DW, EL 168 44 330 At i
e 1
4 4
q 4
+
=
4 8
l i
DAfts 01/31/90 FF.ACH DOTTOM W,ts41 POWER 47AT10N UNIT 3 FAQts 39 88V1810N 4
1N$tkV!CE INSPECT!DN $UMKARY
/
$8CDND IlfttkVAL, THIRD PERIOD, SECOND OUTAGE (91kF)
CIA 881 CAVEP STATUS COMPONtiff8 MAIN RfC19E.u ff0N NA A AsMr 8 0t0t
$$C. Et i AC3P
- st#944Y TEAMINATION Akt.A CATOY 8xAM-A 2000 ktMARKs FJMBER 2 DENT!FICAT10N ITEM NO METHOD PROCEDURS T CAMR **CAbibRATION $!4CKe*
f9tP. fW1. NS. PC! 01 M1 101 1 g 108407 A& 35/C0iPRB) 3-0 3 V"f.1 MA3 CO*407 R$ C X..*
IC0193617)
CLEANotff DOLT!NG
$1.60 EL 132 4, 330 AE i
t+1sNIApar ther A (ktr tv1. M J cs.02.Mf-301 1-Al r
B03 VT 1 MAG C3 407 RS C X...
(C0173636)
CLEANOLT DOLTING B7.50
[*,
EL 134-0, 310 AE
!RtP. t971 N0. Pfs 02-MI 301-1 Bl 138346 BD 36/C0(FRB)
B03 VT-1 MAG-CG 407 RS C N.
. (C0173533)
CLEANOUT DOLTING B7.60 DN, EL 136 8, 130 A2 l
r l --
,e 4
e
-L--,---m---
--r.-
-mi--,--r..---r.,,,.
.w--,
,w-
-vc-e.-
e m, - -
w-
.--er-swy.
+--v--,-
--,r--
=wm-w-r--,-ry,-,
._.-.-m_.-.._.---m
. _. ~ _ _.
.-.. _ _... - -.. _ _ - _ - ~ ~ -. - ~. - - -
t)Att s $1/21/94 Pt.ACH DOTTOM ATOMIC PowtR STATION UNIT 3 PAGEs 30 ptVis!ONs, 4
, IN$tRVICE INSPECTION st49%RY
$$COND INTtkVAL, TM!RD PERIOD, SECOND OUTA38 (9?kF)
CLASS 1 CAVtr STATUS COMPONttff8 PLAfrC4 DRAIN NA R ACME 8 080t SEC, El T kC8P
$UP94ARY EXAMINATION AktA CATQY EXAM A EOOO REMARKS IfVMBER IDENTIFICATION ITEM N3 METHOD PROCEDt12 7 C 8t M R ** CAL 1 BRAT 10N 814CE**
2 IN?H h7Pf0M 12AD bpA!N (MP. DW1._ N9. t o 04 pf 301 2)
Stellt 4 kD 1A BJ tt 1.P rt 001 94 C X.. (C0194474) titt $ND TO M1PPOLET D9.40 IW, EL 140 0, 9 A2 (PRP. tW1. NO. t<'N-04 Mf 301 21 130333 PH 46 F.A.D.C VT.3 MAO-CO 407 RS C X*.*
EXAMINATION REVEAltD IMPROPER COLD laAD SPRINO HANGER F0.00 VT 4 MAO CO 407 R$
.X**
stTTING. RtWORKED PER NO# C0174474(08)
(W. EL 160 0, O A5 AND RE tXAMINED SAT. (C0114414) 2 INN BfTTCW 1andi DPAIN f9tP. DW1. NO. tG 04 Mf :01 2) 188335 4+RD 1A DJ PT LP PE 001 94 C X
.. (01744?4) 2130N TD PIPE BND 99.40 t*,
EL 160 0, 5 A5 138360 FN 97 F A.B.C VT 3 MAO CO 407 RS C X.. (C0114414)
SPRING HANGER FO.00 VT 4 MAO CO 407 kl Ia
[W, EL 189 9, 5 At (DEP
- MO. NO. DON 04 MI-301-21 138385 4DOf-8110 F.A.B.C VT-3 MAO CO-407 Al C X**.
(C0174414)
R101D RESTRAINT F0.00 DW, EL 159 9, 5 At i
s
-P+p--
,~-
DATES 01/31/98 PEACH bOTTCM ATOMIC POWER STATION UNIT 3 PActe 31 REY!$3 DN s 4
IN$tRVICE INSPE0"f!ON StWARY SECOND INTERVAL. THIRD PEk!OD. SECOND Ott! AGE (97RP)
CLASS 1 CAURP $TATUS COMPONPFTS RA"tDe ftt!st92 VFstPL NR R MM 8 0E05 SEC. 21 7 RCEP i
i
$1HiARY EXAMINAT!DN AREA C GY EXAM A EOOO $LEMARF8 N'MER IDENTIFICAT!ON ITEM NO METHOD PROCEDURE T CRMR **CALIBkATION BLOCR**
p f' P. !W1. NS. 1BI 1 PV t4) 130405 4 kl0 1 BP PT LP.PE 001 R4 C X *. EXAMINED PER AUG-15, $TAND9T L10UID N10 NO2 TO SP END 6L20 CONTROL N0ZZLE.TO SAFE END NELD.
DN, tL 135 0, 180 AE (C0174012) 190883 4 N13A 1 9P PT LP PE+001 94 C X
.. EXAMINED PER AUG 16 RPV INSTRUMENT N13A NOS '!O COUP Bl.20 1.0EELE SAFE END TO PIPE NE!ES, te, EL 196 0, 40 A2 (C0174114) 130816 4 Ni2A-3 DJ PT LP PE 001 R 4 t' X*
EXAMINED l'ER AUQ-16. RPV INSTRUMENT COUP TO P18'E 99.40 N0ZELE SAFE END TO P!PE NELDS, DN, EL 196 0, 40 A2 (C0114114) 138542 4 N128 1 B.P PT LP.PE 001 R4 C E...
EXAMINED PER AUG-16 RPV INSTRUMENT N129 A02 70 COUP B5.30 ND*2LE SAFE END TO PIPE WILDS.
DN. EL 194 0, 32% AE (C0174113) lattel 4 N139 3 9J PT LP PE.001 94 C E
.. EXAMINED PER ADO 16, RPV INSTRUMENT CVUP TO PI.
99.40 NOEELE SAFE LND '!C P!PE NELDS,
!*. EL 196 325 A1 (C0174119) p h
1
-~
-w-.
- - - ~ ~. -
DAfti 01/31/98 PEACH >ff70M ATOMIC POWER STATION UNIT 3 PA03 13 PJY!$10N D 4
IN&tRVICS INSPEMION $UP9%RY ttCOND INTEkVAL, TH!kD PERIOD, SECOND OtffAGS (974P)
CLAS$ 1 CAUTP STATUS COMPONENTS Pit!*.ATER NR k MM S 0808 8tc. It t RCtP SU>tuRY EXAM!NRT!DN AREA CATGT LXAM A t000 P.tMAkKS N' Metr IDENTIFICATION ITEM WO METHOD PROCEDURE T CRHR
- CA!.1& RATION 914Cgee 1
J MAIN 1.f ME 1/XP A (PfF 191. NO. bfW.08 Mt 10_1 g 130300 4.A 9 8J Kt KT PE 001 R2 C X....
tff EXAMINAT10N PERPORMED PROM VPSTREAM j
PIPE 70 PENT P!PE
$$,11 (ff.468 t.7.PBM 104VO R0 X *.. - (PIPtl SIDE ONLY ttft TO PIPS 70 ODMEIV, BL 144 6 PENETRATION COMPIQURATION. (C0113611)
- 24-CS.100 3.631 3A Pt9'*
MAIN 1TNE IMP B (PFP. fM1. NS. DfW 06 MI.101 2 D) 137000 690 9J WF HT.PR 001 R3 C I.
. 117 EXAMINATION PERPORMED PROM UPSTREAM P!Pt TO PENT 99.11 (17 468 (ff-PBM*106V0 R0 X...
(P!Pfl SIDE ONLY DUE TO PIPE TO 08M81V RM. EL let al f ENElltAT10N CONPIOURATION. (C0173655)
- 140100 SDDNL+ H20 (I A) 9.K 1 - MT Fr PR-001 P2 C 3=..
(C0173629)
INTEGRAL ATTAC3NENT Bf).10 DW, BL 110 + 0. 110 AI 140400 6 98 3 9.J Mr MT.PE 001 R2 C
- USED ALTERNATE CAL BLOCE N'TH NOTCHES #
PIPE TO Ela0W 99.11 (ff.458
- trt.PBM 106VO R0 LIM 12.043-CS.
(C0113412)'
DW, EL 146 0, 370 AZ
- 12.CS-100. 043 3.PEB**
i I
gi
= * *.
l
IATE: 01/27/98 PEACH BOTTOM ATCMIC POWER ETAT 10N UNIT 3 PAGE:
33 REVISION:
4 INSERVICE INSPECTION S'JNARY SECOND INTERYAL, THIRD PERIOD, SECOND CRTIAGE (97RF)
CIASS 1 CAUEP STATUS COMPONENTS RESID'J71 HEAT P%
a NR R ASG S 0EOE CEC. XI T RCEP SUb94ARY f.XAMINAT1DN AREA CATOY EXAM A EOOO TEMARES NtNDER IDE!:TIFICATION ITEM N3 METHOD PROCEDUPE T CRMR *
- CALIBRATION 914CK*
- UT EXAMINATION PERFORMED FROM DOWNSTREAM (PENrt1 TAT 10N) SIDE ONLY DUE TO VALVE VALVE TO PENETRATION 49.11 ITT 4 58 IfT PBM 106VD R0 X-NTVR,EL 139-0,110 A2 ITf-60RL 17f PDH 106VO R0 X---
CONFIGURATION. (C0173648)
- 24 SS-80 1.218 54.PEB.**
OW t9FF. fv1. NO. MA 10 Mf 306-13) 160900 10DCN M153 F.A.B,C VT 3 MA'J CO-407 R5 C X.*-
(C0173692)
SPRING HANr.ER FO.00 VT 4 MAO-CG-4 07 ES X
CW, EL 139 0, 17 AE 161630 N 12 F A.B.C VT-3 MAG-CO-4 07 R5 C X***
(C0173640)
ANCHOR F0.00 N!?R.EL 139-0, 4 3 AZ e
b 5
m DATE: 01/27/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:
34 REVISIONr.
4 INSERVICE INSPECTION
SUMMARY
SECOND IFTERVAL. THIRD PERIOD, SECOND OUTAGE (97RP)
CLASS 1 CAUEP STATJS COMPONENTS PPX TCP NAtra ctEAN UP NR A
ASME S OEGE SEC. X!
T p92P i
EUMMARY EXAMINATION AREA CATQT EXAM A EOOO SPWJtKS trJMiiER IDENTIP! CATION ITEM NO METHOD PROCEDURE 7 CRMR *
- CALIBRATION BM)CE*
- IN f*FF DW1 No. PE 12 -M1 3 02 - 2 )
162360 12-1 1C N/A UT 6 0RL PDI-UT-8 RB A X=-.
EXAMINED PER AUG-01, 43C GL 48-01 PIPE TO VALVE N/A IFTERC8tANULAR STRESS CORROSION CRACEING.
OBMs!V EL 158-6 (C0175609)
- 09-08-47'*
CW.M (PEP tw3. Nn. DCA 12-M1-101-1) 165450 12 0-38 B.J PT LP-PE-001 R4 C X..-
W EKAMINAT*0N PERFORMED P90M DOWNSTREAM PENTTRATION TO PIPE 99.11 07-453 W-PBM-106VO R0 X-.-
(PIPEI SIDE ONLY DUE TO PENETRATION IVC, tL 178 1, 60 A3 CONFIGURATION. (C0175752)
- 6.SS 80. 432 50.PEB**
165460 12-0-39 T-J PT LP-PE 001 R4 C I
-- W EXAMINATION PERPPRMED PROM UPSTREAM PIPE TO VALVE B9.11 W-455 W-PBM 106VO R0 X
-- (PIPE) SIDE ONLY DUE TO PIPE TO-VALVE IVC.EL 178-1, 60 A2 CONFIGURATION. (C0175752)
- 6-S&.80.432-50 PEB**
,Lfi two NO. DF 12-MT-301-6) 165532 12 13-4 N/A UT.0 (TT.PBM-106VO R0 A X
.. EXAMINED PER AUG.01, NRC GL 88 01, PIPE TO ELBOW N/A UT-4SS PDI.tfr 2 RB X..-
INTERGRANULAR STRESS CORROSION CRACKING.
REGEN RM. EL 175 0 (C0175763)
E*4-SS-80 337-65A-PEB**
165568 12-13-12 N/A UT-458 PDI.UT-2 RB A X*.-
EXAMINED PER AUG 01, NRC GL 88-01.
PIPE TV ELBON N/A INTERGRANULAR STRESS CORROSION CRACKING.
RECEN RM, EL 175 0 (C0175763)
- 4-SS-80. 337-65A-PEB**
t> ATE : 01/27/98 PEACH BOTTCM ATOMIC POWER STATION UNIT 3 PAG 3 35 REVIS!ON:
4 INSERVICE INSPEC* TION SUPNARY SECOND INTERVAL, THIRD PER30D, SECOND Cl?TAGE 1978F)
CIASS 1 CAUEP STATUS COMPONENTS PEATP MPt 18iOLATICH COOLIN1 NR R
ASME S 0EOE SEC. XI T RCEP St)t4ARY EXAMINATION ARTA CATUY EKAM A EOOO REMARKA NtMBER ! DENT!r1 CATION ITEM NO METHOD PROCEDtME T CRMR **CALJBRATION BIN K8*
(Ptr Dw1. NS. DDN 11-MI-301 1) 165584 % 3 13 21(PRD)
B.0 2 VT.1 MAO.CG.407 RS C X...
(CC173716) r VALVE BCLTING B7.T0 OBMS!V, EL 152 7 M4 Dwo. NO. DDN 11 MI-301 1) 165400 13 1 6 BJ MT PrT.PE.001 R2 C X...
UT EXAMINATION PERPORMED FROM UPSTREAM P!PE TO TEE B9.11 ITT.4 58 ITT.PBM.106VO RO X...
(PIPE) SIDE CNLY DUE TO PIPE.TO. TEE OBMS!V, EL 153 7 CONFIGURATION. (C01.3716)
- 6.C3 120. 562-51.PEB**
I 4
6
DATE: 01/37/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:
36 RSVISION:
4 INSERVICE INSPEC"TICN SUF94ARY EECOND INTERVAL, THIRD PERIOD, SECOND M ACE (97RF) s CLASS 1 CAUEP STATUS C h a wa8 cnPr EPPM NR R
ASME S OEGE SEC. XI T RCEF SU>91 ART EKAJ4INATION AREA CATGY EXAM A EOOO REMARKS NUMBER !DENTIFICATION ITEM NO METHOD PROCEDURE T CRMR **CALEBRATION BLOCK'*
LOOP A (PFF. DWO. NO. IUf-14
UT EXAMIMTION PERFCRMED FROM UPSTREAM PENT PIPE TO PENT 99.11 UT-458 UT-PBM 106VD R0 X
-- (PIPE) SIDE CNLY DUE TO PIPE TO N!VR, EL 143 6 UT-60RL UT-PBM 106VD RG I..
PENETRATICN CONFIGURATION. (C0173730)
- 12 SS-80. 687-12.PCB**
Lont B (PEF. EC. NO. f("N 14 MI. 3 0 3 - 4
- M 167530 14DCN R74t!A)R B E.1 PT LPIPE.001 R4 C I..
(C0173731)
INTEGRAL ATTAC104 EFT B10.10 DW EL 145 10, 100 A2
.149550 14 A.33LUt BJ PT LP.PE.001 R4 C X...
USED A.TERNA"'E CAL BLOCK WITH NOTCHES 8 14NG SEAM UPSM EL IR 89.12 UT-459 UT.PBM.106V0 R0 X-
. LIM-12.688-SS.
(C0173786)
. DW, EL ICO.4. 110 A2
- 12-SS.80. 687 12.PEB**
+ 169555' 14.A 33LUO B.J PT LP-PE-001 R4 C X-..
USED ALTERNATE CAL BLOCK WITH NOTCHES 8 14NQ SEAM UPEM EL OR 89.12 UT.458 UT PBM-106VD R0 X---
LIM-12. 688.SS.
(C0173786)
DW, EL 160-4, 120 AZ
- 12.SS-80.687 12 PEB**
169860 14 A 33 B.J PT LP-PE-001 R4 C I
.- USED ALTERNATE CAL BLOCK WITH NOTCHES 8 ELBOW TO PIPE 89.11 UT-458 UT PBM-106VO R0 X..-
5.IM-12.688-SS.
(C0173736)
DW, EL 160 4, 120 A2
- 12-SS 80.687 12-PEB**
169$65 14 A-33LD B-J PT LP PE.001 R4 C X.
- USED ALTERNATE CAL BI4CK WITH NOTCHES 8 14NG EEAM Dh3M 89.12 UT.458 UT PBM-104VD R0 X-.-
LIM-12.688-SS.
(C0173786)
DW, EL 140-4. 120 A2
- 12-SS-a0 687-12-PEB**
LOOP A fREF. tw1. NO. DcN 14 -MT-301-4 M 170101 14 B-502 B-J PT LP-PE 001 R4 C X.--
UT EXA? NATION NAS PERFORMED FROM VALVE TO PIPE 89.11 UT.45S UT.PBM-106VO RO X.--
DOWNSTREAM (PIPE) SIDE ONLY DUE TO DW. EL 143 6 UT 60RL UT-P9M-106VO R3 I.--
VALVE-TO-PIPE CCNFIGURATION. USED DW, EL 143-6 ALTERNATE CAL BLOCK WITH NOTCEES 8 LIM-12. 688 SS.
(C0173812)
- 12.SS 80. 687-12-PEB**
b 6
l l
l I> ATE: 01/37/96 PEACH BCTTCM ATOMIC POWER STATION UNIT 3 PAOEs 37 REV!510Ns 4
INSERVICE INSPECTION CUP 94ARY SECOND IFTERVAL, TMIRD PERIOD, SECOND OUTAGE ( 978LF)
CLASS 1 CAUEP STATUS CChPONENTS HICH P9ESSUPE NOU.NT INJEOTQ NR R
ASME S 0EGE SEC. XI T RCEP SIMMART EXAMINATION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENT!FICATION ITEM NO METHOD PROCEDURE T CRMR ***ALIbEATION BLOCK" Off? (9FF I473 NO, den 23 MI-303 4) 174000 23 0 9 B.J Mr MT PE 001 R2 C
.X
. RECORDABLE LINEAR INDICATION WAS REMOVED ELBOW TO PIPE B9.11 ITT-4 5 S ITT PBM 106VD R0 X-.
BY REWORK AND RE-EXAMINED SAT. USED DW, EL 151-11, al AE ALTERNATE CAL B14CK l'ITH NUTOE10 DW, FL 151 11, 95 A2 LIM 10. 593-CS R.
(C0173907)
"10.CS 4 0. 5 9 3 7 A-PE9" 174300 23DBN-H51(IA) 8.K 1 MT NT PE.001 R2 C X..
. USED ALTEMATE CAL B14CK WITH NOTCHES 9
?rrEGRAL ATTAC104 EFT 210.10 LIM 10. 593-CS R.
(C0173909) t*,
EL 151 11, 85 AE 174400 23DBN-H51 F A,B.C YT-3 MAG " 07 RS C X.-.
USED ALTERNATIVE CAL BLACK WITH NOTCHES SPRING HANGER FO 00 VT 4 MAO CO. 01 R5 X--.
6 LIM-10. 59).CS-R.
(C0173909)
DW, EL 147 0, 60 A2 175060 N-11 F-A,B C VT 3 MAG-CG 407 R5 C X...
USED ALTERNATIVE CAL li!4CK WITH NOTCHES ANOlOR F0.00 9 LIM-10. 593.CS-R.
(C0173910)
N!VR, EL 139 0 175100 23-0 18 B.J MT Mr.PE 001 R2 C X...
ITT EXAMINATION PERFORMED FROM DOWNSTitEAM FENT TO PIPE 89.11 (Tf-45S L7-PBM-106VO R0 X...
(PIPE) SIDE ONLY DUE TO PEhTTRATION TO NIVR, EL 139 0 PIPE CONFIGURATION USED ALTERhATE CAL NIVR, EL 139-0 B'14CK WITH NOTCHES 8 LIM-10. 593.CS R.
(C0173910)
"10 CS-80. 593 7A-PEB" 175300 23 0-19 B-J Mr Mf-PE 001 R2 C X.-
- USED ALTERNATE CAL BI4CK WITH NOTCHES S PIPE TO ELBOW B9.11 UT 45S LTr PBM-106VD R0 X. - - LIM-10.593 CS R.
(C0173910)
NIVR, EL 139 0
- *10.CS.8 0. 5 93 -7A PEB"
DATE: 01/27/98 PEACM DOfrom ATOMIC POWER STATION UNIT J PAGE:
30
%IV1810Ns.
4 INSERVICE INSPECTION SUlt%RY CECOND INTERVAL, THIRD PERIOD, $ECOND OVTAOE (STAF)
CLASS 1 CAUEP STATUS COMPONDffS
$YFTEM PPr$9'4r TEsg NR R
. 8 OEGB SEC. El 7 RCEP SUPNARY EXAMINATION AREA CA7UT EXAM A EOOO REMARFS NtDGER IDENTIFICATION.
ITEM NO METHOD PROCEDURE T CRMR "CALIBeATION BLOCE**
DFV; PIPfW71 PtMPS! VA @
178550 CIMS 3 (AAXAGE 3-P
-VT-2 87-0-040-575 3 C
.E..
INITIA*. EXAM REVEALET MINOR 1.EAKAGE ILT PRESSURE RETAINING BOUNDARY 815.50' CEAL AREAS OF SEVERAL CLMPONENT DW, ALL ELEVS & AES
^
LOf%TIONS, AFTER MINOR CORRECTIVE MAINT,
!*. ALL ELEVS & AZS ALL LOCATIONS NERE EXAMINED SAT NOTEi DURING 7tET, MINIMLN TEST l'RESSURE
]
IDENTIFIED IN ST NAS NOT MAINTAINED, SEE
)
PEP 10007544.
l l
4 e
e e
y
l LATE: 01/27/98 PEACH DOTTOM ATOMIC POWER STATIC 21 UNIT 3 PACE:
39 BEVIS!"Ns 4
INS.3tV!CE INSPECJtON Siht4ARY SECOND IlrTERVAL. THIRD FER100, SECOND OLTTAGE (97kF)
CIABS 2 CAUEP STATUS COMPONENTS Drsfr81AL HEAT fI m E NR R
ASME S OEOE SEC. El T RCEP stM%RY EXAMIN7. TION AREA CATGY EXAM A EOOO REMARKS NUMBER IDENTIFICATION ITEM NO METHOD PROCEDURE T CRMR *
- CALIBRATION BIMX'
....~...........................................................................................................
UCAD SPPAY
'P TP. 2W7. NO. Ofi 10-M1 305 13_B1 203400 10 2n36-6 C-F Fr MAO.-CO 403
$4 C E...
N01762 94 ',
E110W TO P2 PE C5.11 NIVR, EL 161-4 203600 100B HISTA F-A,9,C YT-3 MAO-CO-407 R5 C X-..
(C0176294)
RIGID RCSTRA13rr F0.00 NIVE, EL 161-4 204250 10 2HS6 19 CF KT MT PS 001 R2 C X...
(C0176446)
P!PE TO ELBOW C5.11 IVC, EL 178 0 204450 10 2nS6 20 C-F Kf MT PE.001 R2 C X..-
(C0176446)
ELBOW TO P!PE C5.11 IVC, EL 178.J 204650 N 17 F.A.B,C VT-3 MAG-CG-407 R$ C X...
(C0176446)
ANCHOR F0.00 IVC, EL 178-0 FUltL POOL COOIMrf LOOP A (REF. THO. NO. CB 10-Hf-305-12 A) 208900 10GB H133 F-A,B.C VT-3 MAO.CO-407 R5 C
- X..
LOCX Nt?T FOUND 1MSE AND LOAD SETTING SPRING MANGER F0,00 VT-4 MAG-CG-407 R$
.X.-
FOUND OUT OF RANCE. REWORK PER AR$
TC SEG 1*, EL 126-9 A1104466. (C0176543) 4 TCPUS-IN-LOOP A (REF. DwO. NO. 09-10 Mt.304-10-A) 210800 10GB H47 F A,B,0 VT 3 MAG CG-407 R5 C X-.-
(C0176536)
SPRING ltAP.CER F0.00 VT-4 MAG-CG-407 R$
I..-
TC-SEG 12. EL 113 4 a
l 5
DATS: 01/27/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:
40 F,RVISION ts 4
INSERV3CE INSPECT 10N SUD94ARY SECOND INTERVAL, THIRD PERIOD. SECOND OltrAGE (97RF)
CLASS 2 CAUEP STATUS COMPorTENTS PESIICAL HEAT PDCVAL NR R j
AsME S o0 SEC. 21 f RC8P SUhtWtY EXAMINATION AktA CATOY EXAM
.A EO30 REMARES NUMRER IDENr!FICATION ITEM NO METHOD PROCEDURE T CRM$ ** CALIBRATION 814CE**
. TORUS IN tMP A (REF tw3. N'3. CB 10 MI-104 10-Al 810900 10 373A14-5 CP MT MAO CO-ee3 R6 C X...
(C0116636)
PIFS TO ELBOW-CS.11 TC SEO 13, Et, '113 4 812000 - 10a2TIA16 12 C-F NT MAO-CO 403 R6 C E
- (C0176531)
P!PR TO VALVE C5.11 TC Sto 13f SL 122 4 l
812006 10GA 843 1 F-A.8,C VT.3 MAO-CG 407 R5 C I...
(C0176531)
HYDRAULIC ENUBBER FO.00 TC Sto 12. EL 122 4 212004 1008 843 2 F.A.B.C Nr NT PE 001 R2 C X...
(C0176531)
HYDRAULIC SNUBBER FO.00 TC SEO 12 EL 122 4
- TORUS-IN I&P A (REP. tW1. NO. CB-10-MI-104-11-A) 812022 1008.H89 P-A.B.C Vr 3 MAO-CO 407 RS C X...
'C0176520)
SPRING HANGER FO.00 vt-4 MAG-CO-407 R5 X.
TC SEO 12. EL 122-4 312023' 10 2TIA18 16BC CP MT MAO-CO 403 R6 C X...
(C0176520)
BRANCH CONNECTION C5.31 TC-SEO 12. EL 132 4 SHttrDOW*t COOL SUCT LOOP D TREF. DWG. NO. HD-10-M!-301.-D) 221800 10 2SCSD20+8' C.F NT MAO CG-443 94 C E*.-
EXAMINATION LIMITED TO 95% CODE VALVE TO PIPE C5.11 COVERAGE DU3 TO INSUFFICIENT CLEARANCE D RHR RM, EL 107 11 BETWEEN PIPE AND WALL.
(C0176337) t i
+
-.O
l DATE: 01/21/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 FAGE:
41 REY!$10N 4
INSERVICE INSFECTION SU>f4ARY e
SECOND INTERVAL, ThfRD PERIOD, SECOND OtrTAGE (97RF)
CLASS 2 CAUEP STATUS CfNPONENTS Pf81 DUAL PF.AT pew? VAL MR R
ASME S OEOE SEC, K2 T RCEP St> NARY EKAMINAT10N AREA CATGY EXAM A EOOO REMARKS N'JMBER ltENTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION B14CE**
SM?ftewN NL FTT IMP D (PEF. CWO. 79. HB-10-MI 101-2 D)
(C0176337) 222000 10HB 81011A1 C-C Mr MAO-CG-403 R6 C 1 INTEGRAL ATTACHMErf C3. 2 0 D kl!R RM, EL 106 6 DISOIAPGE tIOP B (Pff. DWO. NO. CB-10 M1+307-3-B) 226200 10 2DB20-11 C-F MT MAG-Co-403 R6 C X---
(C0176303)
RLBOW To P2PE C5.11 B BHH RM, EL 97-0 NEAT EXStAN1FP Ot?f-IIOP D (REF. DW1. N9 09 10-MT-302-4-D) 234406 10GB-H5 0 (IA)
C-C Mt MAG-CG-403 R6 C X---
(C0176380)
IlrfEGRAL ATTACHMENT C3,20 D RHR RM, EL 112 0 237100 10-2KD020-8 C-F MT MAG-CG 403 R6 C X
-- (C0176390)
VALVE To ELBOW C5.11 D RHR RM, EL 101-11 COFTAtNMVf $PPAY IN 1DOP A (#EF, DWO. NO, OB 10-MI-303-1-A) e 243300 10GB H85 F.A.B,C VT 3 MAG-CO-407 R5 C X-..
(C0176543)
SPRING HANGER FO.00 VT-4 MAG-C04 07 R5 X.
TC.EEG 13, EL 123-6 INJECTION LOOP A (PEF. DWG. NC. DUN-10-MI-303-6-A) 247900 10DDN-H9 2 (I A)
C.C Mi MAG.CG-403 R6 C X---
(C0176543)
INTEGRAL ATTACHMENT C3.20 SIVR, EL 137 0 INJEC"ffCN LOOP B (REF. DWG. NO. "DN-10-Mt-303-9-B) 249300 10DDN H66A(IA)
C-C Mr MAG-CG-403 R6 C X- -- (C0176289)
INTEGRAL ATTAONEttf C3.20 NIVR, EL 137-2 t
i DATE: '41/27/94-PEACH BOTTOM ATOMIC power STAT 10N UNIT 3 FACE: ~
42
$EVISIONs 4
. INSERY!CE INSFECTION 5'JP9%RY SECOND INTERVAL, THIRD FERIOD, SECOND QUTAGE (97kF)
CLASS 2 CAUEP STATVS COMPONENTS pts! DUAL HEAT REMOYAL NR R ASME S 0EGE SEC. E!
T 4CEP
SUMMARY
EXAMINATION AREA.
CATGY EXAM.
A EOOO REMARKS N1.NBER IDElff!PICATION ITEM NO METHOD PROCEDURE T CPMR " CAL 1 BRAT 10N BLOCK" INJEC*rf0N 1AOP B f p tF. DM. No. B & 10 MI.303-9 9) 249500 10 21824 9 CF PT MAG.CO.402 R4 C E...
CODE ACCEPTABLE SPOT INDICATIONS EL90W TO VALW C5.21 UT-0 UT PB.002V9 R1
-X..
RECORDED THAT DID NOT INTERFERE WITH NIVR, EL 137 2 UT.455 UT.PB.002V9 R1 X.
ANGL3 BEAM EXAMS. (C01 99)
NIVR. EL 131 2 UT 408 UT.PB 002V9 R1
.*X=
"24 CS.100 1.531 2A.PEB**
SHi m *N COOLING FJt*rION (PEP. PM. M. HR 10 MI 304 14) 851900 10..'SCS20 2 C-F MT-MAG.CO 403 R6 C X-..
(C011633tl TEs' TO VALVE C5.11 NIVR, EL 139 0 252100 10HB.H41(IA)
C.C KT MA3.CO.4 03 R6 C X=*.
(C0176338)
INTRORAL ATTACHMENT C3.20 NIVR, EL 136 1
+.
=
4 6
x I
DATBi 01/27/94 FEACH SCfrTOM ATOMIC POWER STATION UNIT 3 PAGE:
4}
REV!81CW 4
INSEPV!CE INSPECTION SUP94ARY SECOND INTERVAL, THIRD PERIOD, SECOND OUTA3E (97RF)
CLASS 2 CAUEP STATUS COMPCNENTS gmIN FTTM NR R ASME S 0EOE SEC. El T RCEP
SUMMARY
EXAM!hATION AREA CATOY EXAM A EOOO ltEMARx3 NUMBER IDENTIFICATION ITEM NO MFTHOD PROCEDURE T CRMR **CALIBRATICN BLOCE**
MAINLINE t/CP D (PFF. Owl NO PB-01 MI-301-2 D) 260640 1DB S36A F n,B,C VT-3 MAO-CG-407 R5 C X-..
(C0174145)
HYDRAULIC SNUBEER Fw.00 FW HTR MR2, EL 153-9 269450 lbd 842A F-A.B.C VT-3 MA3 CO-407 R5 C X...
(C0144154)
MECHANICAL SNUBBER F0,00 FW HTR MEE, EL 153 3 270120 1 206-22BC-1 CF MT NT-PE-001 R2 C X...
(C0174157)
PIPE TO CAP C5.11 M SEP AREA, EL 152 4 19' BYPASS LIM IZCP A fRFF. PWG, NO. PB MT - 12 2 4 - B )
270700 1 2MSA10 3 CF MT MT-PE-001 R2 C X...
USED ALTERNATE CAL BLOC'. WITH NOTCHES #
PIPE TO ELBOW C5.21 t7f.0 UT.PBM-106VO RO X.. LIM 18.938-CS.
(C0174182)
M SEP AREA, EL 157 9 ITT-4bs UT PBM 106VO R0
.X.
- 14-CS-80.750-15.PEB**
19' BYP4SS-LINE LOOP B (PEF-t*t3. NO. OB-01-MI-322 5-Al 271540 7D0-812 F-A.B.C VT 3 MAG-CG-407 R5 C X...
(C01741821 HYORAULIC SNUB 0ER FO.00 M SEP AREA. EL 155-5 I
g b
- t. ATE 01/27/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 FAGE:
44 P,EVISION s.
4 INSERVICE INSPECTION St>tOJIY SECOND INTbs7AL. THIRD PERIOD. SECOND CUTAGE (97RF)
CLASS 2 CAUEP STATUS COMPONENTS SCRAM DisCHAPCE VO11HE NR R ASME S 0EOE SEC. XX 7 RCEP SU>e4ARY EXAM *MION AREA CATUY El%M A EOOO RIMARKs NUMBER IDE)rTIFICATION ITEM NO METHOD
- PROCEDURE T CRMR ** CALIBRATION 814CK**
NORTH (PEF. tw1, No. CS-01 MI-3 01 1-M 875100 829 F-A,B,C VT-3 MAG-CQ.401 R$ C X***
(A1055464)
Rt01D RISTRAINT FO.00 00, EL 14 9 2 (DEP. tw1. NO. CS-01-MI-301 1-Al 311105 308 H310 F A.8,C VT 3 MAG-CO-407 al C X...
(A1055464)
R101D RESTRAINT F0.00 E g (REP t#3.' 570. CS-01 Mf-3 01-1.M 875400. S24 P-A.8,C VT 3 MAO-CG-4 07 R5 C X--.
(A1055464)
RIGID RESTRAllff F0.00 -
D0. EL 149-2 i
'375460 30E H345 F-A.B.C Vra3 MAG-CO-407 RS C X...
(A1055464)
. RIGID RESTL'.25 F0.00 NORTH (REF. * *'t NO. CS - 0 3 -MI. 3 01 M 873500 825 F.A.B.C VT 3 MAG-CO-407 RS C X---
(A1055464)
R101D REJTRAINT F0.00 DC. EL 149 2 (REF. DWO. NO. CS-0 3 MT -'3 01 M 37Q530 30E HJ55 F-A.B,C VT-3 MAG-CG.407.
R5 C X++-
(A1055464)
RIGID RESTRAINT FO.00 4
,..c.
.4 x
m_._.._
DATE 01/27/98 PEACH DCTTOM ATOMIC POWER STATION UNIT 3 PAGE:
45 ptV1810Ns 4
INSERVICE INSPEC'flON SUP94ARY e
SECOtID lif7ERVAL, THIRD PERIOD, SECOND TrAGE (97RF)
A. ASS 3 CAUEP STATUS COMPONn?S CnPt SPPAY NR R
ASME S 0EGE SEC, XI T RCEP SUP94ARY EXAMINATION AREA CATOY EXAM A EOOO REMARKS NUMBER 10ENTIFICATION ITEM NO METHOD P90CEL*9.E T CRMR ** CALIBRATION BLOCK **
TDPUS BU" TION IMP B (PEF. IW1 N1 HB-14 Mf-301-1-P1 297619 14HB H9 F.A.B.C VT.J MAJ-CG-4 07 R',
C X*
- (C0176220)
STRING HANGD.
TC-3t3 1, EL 94 6 fREF. DW1. No H9 14 Mt 301 1-PL 291750 14HF S4 0 F A,B.C VT-3 MAO-( 3-4 07 R5 C X-..
(C0176220)
RICID RESTRAINT F0.00 TOPUS SUCff0N IM P D (PEF. DW'3. NO. H9-14 MI-301 1 D)
(C0176220) 302950 14HB-H6 F-A,B.C VT-3 MAG-CG-407 R5 C X-SPRING HANGER F0.00 Vf 4 MAG-CG-407 R5 X---
D CS RM, EL 94 6 (C0176336) 303100 14 2TSD16 15 CF Mr MAG-CG-403 R6 C X-a PIPE TO PUMP C5,11 D CS RM, EL 94-6 DTSTAPOE IMP B (PEF. DWG. NO. CD 14-Mt.302-2-B) 304550 14GB H30 T-),B.C VT-3 MAG-CG 407 R5 C X.
- (C0176220)
SPRING H/NGER F0.00 VT-4 MAG CO.407 R$
X-.-
B CS RM, EL 94 6 DISCHAPGE IMP C (PEF. DW1. Nn CP-14-MI-302-2-C) 305200 14 2DC12-1 CF Mr MAG-CG-403 R6 C X-
. (C0176245)
PUMP TO PIPE C5.11 C CS RM, EL 94 6 DISCHAPGE I M P BED (PEF. DWG. FO. CB-14-MI-302-2-B) 307150 14GB-R33 F-A,0,C VT-3 MAG CG-4 07 R5 C X-..
(C01762201 SPRING HANGER F0 '*
VT-4 MAG-CG-407 R$
X- --
w-4
l l
l DATsi 01/27/94~
PEACM 901 TOM ATOMIC POWER STATION UNIT 3 PAGE:
46 R,EVISIONay 4
2NSERVICE INSPECT!ON SUPNARY
$ECOND INTERVAL, THIRD PERIOD, SECOND QUTAGE (9?EP)
CLASE 2 CAUEP ETA 1VS COMPONENTS SpPE SPPAJ 5
NR R AsME 8 0EOE SEC. XI T RCEP SU> NARY EXAMINAT10tf AREA CATOY EXAM A EOOO RDIARKS N'JORR IDEMIPtCATION ITEM NO METHOD PROCEDURE 7 CRMR **CALIBAATION BLOCK **
g1901APGE th0P A&C (DEP. Ow3. 10. CB 14 Mf 303-3*A)
MAG-CO 402 R4 C X-..
(C0176245) 311975 1408 N58(IA) s INTEGRAL ATTACHMEFT C3.20 81VR, EL 134 0 312300 14 2DAC12 29 C-P PT MAO CG-402 R4 C X...
(C0176267)
ELB048 TO P!PE C5.21 W-0 W-PS-002V9 R1 X---
S!VR, EL 141 0 VT-458 W-PB4002V9 R1
.*X.
81VR, EL 142 0 UT 608 17t-PB-002V9 R1
-X-
- 12-SS 40.687-12 PEB**
DIS W ARGE 100P ELD (REF. NG. NO. GB 14-MI-303-3-B) 313050 14MO H59A F-A.8,C VT-3 MAG-CO 401 55 C X-.-
(C0116220)
SPRING MANGER-FO.00 VT 4 MAG CO-401 R$
X.-
NIVR. EL 139-4 m
e 9
t I
CATE 01/27/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:
47 FEY!8 ION:
4 INSER"!CE INSPECT 3ON
SUMMARY
SECOND INTERVAL, THIRD PERIOD, SECOND CWAGE (97RFI CLASS 2 CAUEP STATUS COMPONEWS Hf'JH PPFtSUpt COOLANT INJFC"tf fH NR R
ASP 2 8 0 EOF SEC. XI T RCEP 81JmARY EXAMINATION AAEA CATOY EXAM A EOOO RIMARES NiNBER IDEWIFICATION ITEM NO METHOD FROCEDURE T CRMR ** CALIBRATION BLOCE**
T6909 FtKTION (9EF. r*G. No. Mfi 23 MI-301-1) 317750 23HB H11 F-A,B,C VT-3 MAG-CG-407 R5 C X
-- (A1055523)
SPRING HANGER FO 00 W-4 MAG-CG-407 25 X---
TC.SEG 13. EL $4 6 DISCHAPOE fpTP two. Nn DDN-23-MI-M2-21 323250 23 DON s23A F-A.B.C VT 3 MAG-CG 401 R5 C X
.. (A1055523)
RIGID RESTRAINT FO 00 TC SEO 33, EL 109 0 DISOT W,E (REF. DWG. NO. DDN-23-MI-302-31 323725 23DDN H14 F-A.B.C W3 MAG-CG-407 R5 C X---
(A1055523)
SFRING 1 ANGER F0,00 W-4 MAG.CG-407 R$
X--
TC SPU 11. EL 126-8 Ot?T (REF. DW1 NO. tBN 23 MT-103 61 325630 23 DEN H57 F-A.B.C VT 3 MAG-CG-407 RS C X
-- (A1055533)
SPRING HANGER F0,00 VT-4 MAG-CG-407 R$
X-.-
TC-SEG 2. EL 128-0 3:5125 23DBN 51 F.A.B.C VT-3 MAG-CG-407 R5 C X--
(A1055523)
NYDSAULIC SNUBBER F0.00 TC-SEQ 1. EL 128-0 325950 23DBN H45 F-A,B.C VT 3 MAG-CG-407 R$ C X---
(A1035523)
SPRING HANGER F0.00 VT-4 MAO CG-407 R5 X.-.
TC SEG 15, EL 126-0 HIGH P9FSS COOL INJEC*ICN (PEF. DW3 NO. DDN-23-MI-302-3) 329300 23-2HPCIID-4 C-F MT MAG-CG-403 R6 C X---
EXAMINATION FERFORNED FROM UPSTREAM PIPE TO FLANGE C5.21 W-0 W-PBM-106VO R0 X---
(PIPE) SIDE CNLY DUE TO FLANGE TC-SEG 9. EL 126 4 UT-455 UT-PBM-106VO RO X---
CONFIGURATION. USED ALTERNATE CAL BI4CE
,TC-SEG 9, EL 126-4 NITH NOTCHES # LIM-10.693-CS R.
I (C0176111)
DAtt - 01/27/94.
PEACH BOTTN ATOMIC PONER STATION UNIT 3 PAGE:
44 ptVlaldNo, 4
INSERVICE INSPECTION SiblMARY sac 0No 2NTtRvAr., mRo PsR200,- s:CoNo ovrAQs ;97kri CLASS 2 CAL'EP TTAWS COPWONENTS Mt% T'Sjd%LK gMEj', }fMECTIDt!
NR R AsME 8 0tGE Stc. XI T RCtP stjksuRY E14MINAT10N AREA CATGY EXAM A EOOO REMARKS NUMBEA IDENTIFICATION '
ITEM No METHOD
. PROCEDURE T CRMR ** CALIBRATION SthCR**
HIGH PR?S9 ML YNJtt*f f0M TREF. fWL No. Dt'N 2 3 - MI 3 P 2 - 31 339450 3)DDN.H33 F-A,8,C VT.3 MAG.CQ.407 R5 C X...
(A1055523) i EPRING MANotR' F0.00 VT 4 MAO.CG-401 R5 I...
6
- .t "i
l
l PEACH BOTTM ATOMIC POWER STAT!DN UNIT 3 PAGE:
49 DATES 01/27/98 REVISIONI 4
INSERVICE INSPECTION St.294ARY SECOND INTERVAL, THIRD PERIOD, SECOND OUTAGE (97RF)
CLASS 2 CAURP STATUS COMPONENTS BYt' TEM FUN 710NAL TEM NR R
AmME S OEOE SEC. K!
T RCEP Sts14ARY EXAMINATION AREA CATGY EKAM A EOOO REMAkK3 trJM!iER IDENTIFICATION ITEM NO METHOD PROCEDURE T C R M P.
- CALIBRATION BLOCK **
PPF$$ VESS PIPIWL VIV9. Pr$
- - TEST REQUIREMENT SATISFIED WITH HYDRO 400000 SBLC SYSTEM C-H VT 2 ST 0 011-412-3 C K-PRESSURE RETAINING COMPONENTS TEST.
400100 BCIC SYSTEM C-H VT 2 ST-0 013-411 3 C 1--
TEST REQUIREMENT SATISFIED WITH HYM0 PRESSURE RETA.tN!NO COMPONENTS TEST.
400200 RHR SYSTEM C-H VT 2 ST 0-010+411 3 C X- - - PRESSURE TEST CCMPLETED ON LOOP A 6 SHLN COOLING SUCTION PIPING. PARTIAL PRESSURE RETAINING COMPONENTS ST 0 010-414-3 X-TEST COMPLETED ON th0P-B WITH THE EXCLUSION OF TORUS ROOM PIPING. TEST REQUIREMENT SATISFIED WITH HYDRO TEST.
400300 CORF SPRAY SYSTEM CH VT 2 ST 0-014 411-3 C X-
- - TEST REQUIREMENT SATISFIED WITH HYDRO PRESSURE RETAINING COMP 0NENTS ST-0-014-414 3 X- - - TEST.
400400 SCRAM D18 VOL SYSTEM C-H VT-2 ST C-003-435 3 C X-
. - PARTIAL PRESSURE TEST COMPLETED WITH THE EXCLUSION OF NORTH CRD AREA. TEST PRESSURE RETAINING COMPCNENTS REQUI! AENT SATISTIED WITH HYDRO TEST.
DATas 01/27/94 PEACH D0!"f0M ATOMIC POWER STATION UNIT 3 PAGEi 50 SEVISIONw 4
INSE*V!CE INSPECTION SUPO4ARY SECOND INTE*. VAL, THIRD PERIOD, SECOND OUTAGE (97%P)
CIACS 2 CADEP STAWS COMPONENTS SYFTEM HYDROSTATIC TEft NR R ASME S OEOE SEC. El T RCBP Suh94ARY EXAMINATION AREA CAMT EEAM A EOOO RDUJtKS NUMBER IDDrTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION 914CE**
PPEfB VE39.PIPIN1 YLYS.Pr9 401000 SaLC SYSTEM C-H VT 3
$7 0-011-612 3 C 1..-
PRESSURE RETAINING COMPONEFTS 401100 RCIC SYSTEM C-H VT 2 87 0 013 611 3 C X...
PRESSURE SETAINING COMPONENTS 401300 RHR' SYSTEM C-H iPT-2 ST-0-010 611 3 C X...
PRESSURE TEST COMPLETED ON *40P.A &
PRESSURS RETA!N!NO COMPONDrTS ST-0-010-614 3 SHUTDOWN COOLING SUCTION PIPING. PARTIAL TEST COMPLRTED ON 140P-8 N!TH EXCLSION OF TORUS ROOM PIPINO, 401300 CORK SPRAT SYSTEM CH VT-2 8T.0 014-631 3 C I PRESSURE RETAINING COMPONENTS S7 0 014 614 3 1
401600 - SCRAM D!S VOL SYSTEM C-H VT 2 8T.0-003-635 3 C-X.--
PARTIAL PRES $URE TEST COMPLR*"ED NITH PRESSURE RETA!NING COMPONENTS EXCLUSION OF NORTH CRD AREA.
401700 MAIN STRAM SYSTEM C.H YT 2 ST 0 001 635 3 C X...
PRESSURE RETAIN!R3 COMPONENTS
l DATE: 01/27/93 FEACH BOTTOM ATCM3C POWER STATIDN UNIT 3 PAGE 51 REV1810N 4
INSERVICE INSFECTION Sd>94ARY SECOND INTERVAL, THIRD PERIOD $$COND ". % E (97EP)
CLASS 3 CAUEF STATUS COMPONDf!S PIGH IPFf f"Pt EFPVitR W ATEP NR R
ASME S OEGE SEC. XI T RC8F SUF94ARY EKAMINATION AREA CATGT EXAM A EOOO REMARK 3 N'JMhKR 3DENTIFICAT10N 17TM NO METHOD PROCEDURE T CRMR ** CALIBRATION BLOCK'*
(PFF. tw'L NO. CB 32 MI 301 3)
(C0173910) 641100 3308-813 F A,B.C VT 3 MAG-CG-407 R5 C X*..
EtGID EESTRAttrr F0.00 U/3PT6AT, EL 110 4 641150 32G8 S13(!A)
D.B VT 3 MAG-CG-407 R5 C X-..
(NONE)
!NTEGRAL A?TAclD4ENT D2.30 U/3PThAT, EL 110 4 641300 32GB-514 F-A.B.C VT.3 MAG-CG-407 R5 C X*.
. (NONE)
RIGID RESTRAINT F0.00 U/3PT6AT. Et. 110-4 641250 32GB 814 (! A)
D-B VT-3 MAG.CG.407 R5 C X-
- (MEMO)
INTEGRAL ATTACHMENT D2.30 U/3PT&AT. EL 110 4 (PEP Tw1. No, GB.32-MI-301-5-?)
644300 3208 852 F-A,B,C YF.)
MAG.CG-401 R5 C X+..
(C0173910)
RIGID RESTRAINT F0.00 TC.SEO 14 EL 127 6 644350 32GB-S$4 F.A.B.C VT.3 MAG-CG-407 R5 C X
.- (C0173910)
R!GID RESTRAINT F0.00 TC.SEG 14, EL 127 6 (RFF. TwG. NO. 09-32-MI-301-6-A) 644750 32MO-H54 F-A,B,C VT
- MAG-CO.407 R5 C X
.. (C0173910)
SPRING HANGER F0.00 V T-4 MAG-CG-407 R$
X..
C RMR RM, EL 106 5 t
?
DAtti 01/27/98 8'EACH BOTTOM ATOMIC POWER STATION UNIT 3 FACE:
$2 REY!SION,
4 INSERVICE INSPECTION S N Y J
$ECOND IFTERVAL. THIRD PERIOD, EECOND OLTTAGE 197RFI CLASS 3 CAUEP JTATV$ COMPONENTS HI9f FPEW?PE f tp**
4 NATER NR R
ACME 5 OEOE SEC. XI T RCEP SL994ARY EXAMINATION ADEA CA70Y EXAM A EOOO REMARKS FJMBER IDKYTIFICATION ITEM NO METHOD PROCEDURE T CRMR ** CALIBRATION D14CK+*
(REF. fW). NS. CD _12 MI 301-4-A) 644050 3239 866 F-A.8,C VT 3 MA3 CO-407 R$ C E---
(C0173910)
RIGID RESTRA!FT FO.00 C RilR RM. EL 106-5 (PFF. fM. M1 08-3 2 *2 '01 6 B) 645000 3202 H23 P A.B.C VT 3 MAO CG 407 RS C I.-
- (C0176504)
SPRING HANGER FO.00 VT 4 MAG CG-407 R5 X...
D RHR RM. EL 111-0 645050 3208-H23 (I A)
D-8 YT-3 MAG.CG-407 R5 C X.-
. (C0176504)
!FTEGRAL ATTAODENT D2.40 D RHR RM. EL 111 0
?
641500 32G8 857 F.A.D.C VT 3 MA3 CO-407 RS C X.-.
(C0173910)
R10!D RESTRAINT E0.00 B Raul RM. EL 111-0 e
J
DATR* 01/27/94 FEAO( BOTTOM ATCMIC POWER STATION UNIT 3
%E 53 REV!baJNs 4
INS!.RVICE INSFECTION StM4ARY SECOND INTERVAL, THIRD FERIOD, SECOND O W AGE (97RF)
CLASS 3 CAUEF STATUS COMPONEtrrs prrp' JEW Bf 9VICE WATTR NR R AtiMit 5 0EOE SEC. XI T RCEF st)t4ARY EKAMINATION AREA C% TOY EXAM A EOOO REMApr3 N'JMBER 3DENTIFICATION ITEM NO METHOD FROCEDURE T CRMR ** CALIBRATION B14CE**
(p rr. Dw3. No HBC 11-MI-101 11 547347 33HB 8153 F A,B,C VT.3 MAG-CG-407 R5 C K..-
(NONE)
R10!D RESTRAINT FO.00
!arr. Ow1 No. HB-33-Mf-101 5) 6$1200 33HB-S73 F A,B,C VT 3 MAG-CO-407 R5 C X...
(C01763991 R10!D REETRA!W F0.00 RBCCW RM, EL 128-0 (C0176399) 651250 33HB-873(IA)
D-B VT.3 MAG-CO 407 R5 C K.
INTEGRAL ATTACHMENT D2,20 RBCCW RM, EL 128 0 651300 33HB 574 F-A,B.C VT.3 MAG-CG-407 R5 C X
.. (C0176282)
RIGID R".STRAINT F0.00 RBCCW RM, EL 128 0 651450 33HB.S76 F-A,B.C VT.3 MAG-CG-407 R5 C X-..
(C0115202)
RIG!D RESTRAINT F0.00 RBCCW RM, EL 124-0 s
651500 33HB-S77 F-A,B,C VT 3 MAG-CG 407 R5 C X.-.
(C0176274)
RIGID RESTRAttr!
F0,00 RBCCW RM, EL 128 0 (DEF. CWG. NO. RSC-33-MI.102-24) 653150 33HB-H33 F-A,B,C VT-3 MAQ.CO-407 R5 C X...
(A1055537)
RIGID RESTRAINT P0.00 TC-SEG 14, EL 115 6 P.
IATE s. 01lJ1/98 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 PAGE:
54 REVISim a.
4 INSERVICE INSF".'*0N SUD91ARY SECOND INTERVAL, THIRD PERIOD, SECOND Ot,TfAGE (97kF) l CIA 58 3 CAUEP STATUS COMPONENTS I
fMR'3ENCY KrPVICE WATER i
l NR R
ASME S OEGE SEC El T RCEP StM4 ART EXAMINATION AREA CA19Y EEAM A EOOO REMARES WUMBER IDENTIFICATION ITEM NO METHOD FROCEDURE T CRMR ** CALIBRATION BLOCE" (Mr. Dw)
NO. HBC-11 M1 101-15) 453300 31HB 853 F-A.B.C VT.3 MAG CG.407 R5 C I...
(A1055537)
RIGID RESTRAINT 1
F0.00 TC SEO 14. EL 115 6 653310 33 6.H1 F.A B.C VT 3 MAG s9 407 RS C X.. (A1055537)
R101D RESTRAINT F0.00 TC SEQ 15. EL 115 6 653230 33 6.H3 F.A,0.C VT 3 MAG-CG 407 RS C E
.. (A1055537)
RIGID RESTRAINT F0.00 TC.SEO 15, EL 115 6 653350 33HB 855 F.A,3,C YT.3 MAG.CO 407 R5 C X...
(A1055537)
R!GID RESTRA!NT F0.00 TC.SEO 15. EL 114 6 (R EF. DWG. NO. HB-13 M7 101 2) 653355 33HB H1 F-A,B.C VT 3 MAG-CO 407 RS C I...
(NONE)
RIGID RESTRAINT F0.00 i
(PEF. tw3. NO. HBC-11-Mf 102-19)
-653360 33HB H153 F.A,B,C VT MAG CO.407 R5 C X
.. (A1055537)
RIGID RESTRAINT F0.00 TC.SEO 11. EL 115 2 (REF. TW1. NO. ItBC-11 -Mf -102 2 0) 653410 33HB H189 F A,B,C VT.3 MAG.CO 407 R5 C X..-
(A1055537)
R1010 RESTRAINT F0.00 TC SEG 07. EL 115 3 e
DATE: 01/37/94 FEACH DCTTOM ATOMIC FONFR STATION tJNIT 3 FAGE:
56 SEVtst0N:
4 2NSERVICE INSFECTION SIM4ARY SECOND INTERVAL THIRD PERIOD, SECOND OWAGE (97RF)
CLAS$ 3 CAUEF STATUS COMPONEFIS EMEPGFNN SFFVit"E NATER NR R
'ASME 8 0EoE
&EC, XI T RCEF f*M4ARY EXAMINATION AREA CATQY EXAM A EOOO REMARKS NUleER. IDENTIFICATION ITEM NO METHOD FROCEDURE 7 CRMR ** CALIBRATION BLOCE'*
!PFF. tw3, tn. HDc.11 M1 101 141' 4
653460.33HB-840 F. A,9, C VT.)
MAG.CO-407 RS C E...
(A1055537)
RIQ1D RESTRAIKT.
F0.00 7C.8E0 03, EL 115 0 653465 33H8. set F.A.D,C VT.3 IMO.CO 401-R5 C X...
(A1055537)
R101D REST 9 Aller F0.00 TC.SEO 03, EL 115 0 653 10 33HB. SIS-F.A.B.C VT.3 MAG.CG.407 R5 C X...
(A1055537)
RIG!D RESTRAINT F0.00
- TC. SEQ 03. EL 115 0 653475 33HB.S$7
- F.A.A.C VT.3 MAG-CO 407 RS C X... - (A1055537)~
~
RIGID RESTRAINT F0.00 TC.850 03, EL 115 0 653480 33HB.891 F.A,8,C VT 3 MA3.CG 407 RS C X...
(A1055537)
R10!D RESTRAINT FO.00 TC-850 02, EL 115 0 453485 33HB.893 F.A.B.C VT.3 MAG.CO 407 RS C X-..
(A1055537)
R10!D RESTRAINT F0.00 TC.EEG 03 EL 115 0 i
>t 9
I e
Section 2
~
=,
SUMMARY
OF REPORTABLE CONDITIONS OBSERVED DURING IN SERVICE INSPECTION A
PEACH BOTTOM ATOMIC POWER STATION
- UNIT 3 OCTOBER 16,1995 TO NOVEMBER 02,1997 4
9 4
a
S:ction 2 Peg 31 of 1
SUMMARY
OF REPORTABLE CONDITIONS OCSERVED As a result of examinations performed prior to and during the Unit 3,11th Refuel Outage, numerous conditions were reported. Subsequent examinations and/or evaluations determined most conditions to be either insignificant or geometric in nature. However, several reportable conditions were l
recorded and are summarized below.
Jet Pumos 1/ 2. 9/10.13/14 Riser Piping Welds On JP 1/2 riser thennal sleeve to elbow weld, cracking was reported in approximately 115.0 degrees of the weld length. On JP 9/10 riser thermal sleeve to elbow weld, cracking was reported in approximately 18.1 degrees of the weld length. On.lP 13/14 riser thermal sleeve to elbow weld, cracking was reported in approximately 135.5 degrees of the weld length. Details of these reportable indications can be found in GE Inspection Services Final Report for PB 3R11 Inservice Inspections. An engineering evaluation was performed and concluded the subject weids can support continued operation within restrictions of the analysis until repaired at the appropr: ate time. Reference NCR
- 97-02899,001.
19 Flances CRD Flange Bolting During the exchange of 19 Control Rod Drives bearing surface damage was found on 23 of 152 bolts examined. All damaged bolts were replaced with newly inspected bolts. Reference AcGon Request #
A0971266.
S:ction 3..
SUMMARY
OF ASME REPAIRS AND REPLACEMENTS COMPLETED q
FOR PEACH BOTTOM ATOMIC POWER STATION i
UNIT 3-
^
OCTOBER 16,1995 TO November 02,1997.'
4 4
'h 1
i 9
4 y'* -
.t
.-m c
l SECTION S Page 1 of 5
SUMMARY
OF ASME SECTION XI REPAIRS AND REPLACEMENTS System 01: Main Steam System LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96-093 R0648056 RV-3-02-071 D installed new safety relief valve 96-112 R0471776 SS C-3 Installed new snubber 96-113 R0471980 1-GG-S-18 Installed new snubber 96 115 R0471985 1 -GG-S-33 Installed new snubber 96-116 R0471986 1 -GG-S-34 Installed new snubber 96-117 R0471989 1-GG-S 55 Installed new snubber 96-118 R0471992 1 -GG-S-63 Installed new snubber 96-122 R0545174 SS-3-D Installed new snubber 97-001 R0471987 1-GG-S-51 Installed new snubber 97 004 R0468455 SS-A-1 Installed new snubber 97-006 R0468457 1-GG S-15 Installed new snubber 97-008 R0508461 7-DB-S-10 Installed new pipe clamp bushing for snubber 97-011*
C0174284 MO-3-D1 H-3323 Installed new valve 97-016 R0508168 SS-C-6 Installed new snubber 97-035 R0647938 RV-3-02-071 A Installed new safety relief valve 97-036 R0648060 RV-3-02-071 G Installed new safety relief valve 97-037 R0718351 RV-3-02-071 C Installed new safety relief valve 97-038 R0647937 RV-3-02-070B Installed new safety valve 97 041 R0648062 RV-3-02-071 H Installed new safety relief valve 97-056 C0178494 1-GG-S-203-A installed new snubber 97-058 C0178496 1-GG-S-109-B installed new snubber System 02: Reactor and Recirculation LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 97-018*
C0171932 HV-3-02A-92B/93B installed new valves97-029' C0175969 HV-3-02A-c2A/93A Installed new valves97-046 C0178081 HV-3-02-15 & 16 Installed new bonnets on valves
SECTION 3 Page 2 of 5 Syste.m 03: Control Rod Drive LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96-128 R0650525 CRD's 06-15, 06-47,10-19, Exchanged CRD's with rebuilt 14-15,50-47,22-19, CRD's 51,26-07,26-11, 26-59,34-31,42-51, 38 11,42-07,42-47, 46-35, 50 11,50-43, 10-23 96-129 R0650725 CRD-3-03-3624 Replaced flange tube serial
- S/N 3624 with S/N# A9269 -
l 97-067 C0178584 CRD-3-03-0627 Replaced ring flange on CRD System 04: Reactor Pressure Vessel and Internals LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 97-068 C0178566 N-6B Nozzle Machined tiew surface in N-6B nozzle flange l
97-069 C0178556 4DBN-1" Pipe Weld restoration of pipe wall on 4DBN-1" Pipe l
System 06: Feedwater System LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 95-116 C0166839 CHK-3-06-968 Installed Tecm inc. leak repair bonnet studs 021 C0175003 CHK-3-06-96B Welded in new seal plate 97-051-C0178449 CHK-3-06-28A Weided in new seal plate System 07: Primary Containment LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 97-042 R0056972 N-200A Replaced 0-rings on suppression chamber access hatch 1
SECTION 3 Page 3 of 5 System 10: Res dual Heat Removal System 4
LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 94 139 C0153698 PB 310-3AE024 Seal weld ;.oating head 94 195 C0158535 PB 310-3BE024 Seal weld floating head 94 190 C0158538 PB-310-3CE024 Seal weld floating head
- 94 197 C0158539 PB-310-3DE024 Seal weld floaHng head i
95 109 R0509851 RV 3-10-1818 Installed new valve 95 110 R0508232 RV-3-10-181D installed new vale 95 112 R0508230 RV 310-181 A Installed rebuilt valve 95-113 R0508231,
RV 310181C Installed rebuilt valve Mod #
)
P00350 C0176250 3AS769 Installed new strainer Mod #
P00350 C0176251 3BS769 Installed new strainer Mod #
I P00350 C017625 3CS769 Installed new strainer Mod #
P00350 C0176253 3DS769 Installed new strainer System 13: Reactor Core Isolation Cooling LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96-110 R0471767 13-HB S-23 Installed new snubber 97-022 C0175200 N/A Installed RCIC discharge piping extension in the Torus97-039' C0175779 CHK-3-13C-38 Replaced BCV pump check valve 97-040 C0176649 LS-3-13-07 4 Replaced RCIC steam supply drain pot level switch t
4
SECTION 3 Page 4 of 5 System 14: Core Spray System LOG #
'/!ORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96 119 R0472002 14 DCN S 24 Instat;ed new snubber 95 030' R0508234 RV-314-0208 Replaced valve 95-031*
R0508233 RV 314-020A Replaced valve Mod #
P00350.
C0170254 3AS763 Installed new s;ralner Mod #
- P00350 C0176255 3BS763 Installed new strainer Mod #
P00350 C0176256' 3CS763 Installed new strainer Mod #
P00350 C0176257 3DS763 Installed r.ew strainer Systern 23: High Pressure Coolant Injection LOG #.
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96-092 C0172396 Hanger Supports Installed supports 3-23-DBN-H630,H631,SS1,SS2,S53, S54, S55, H58, H44 and H59 96 120 R0472034 23 DDN S 33 Installed new snubber 97-023 C0175313 N/A Installed HPCI discharge piping extension in the Torus97-028 C0175525 23 DBN H40 Replaced riser clamp bolts on support 97-047' C0177842 RO-3 23-072 Relocate RO from downstream to upstream side of HPCI gland seal condenser in accordance with GE SIL-129
. 48 9
a m
SECTION 3 Pcg2 5 of 5 System 32: High Pressure Service Water LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 95-085*
C0163547 PB 3-32-MISC.
Welded new flanges for installation of 18" dia pipe 95-085 C0163547 HV 3 32-33428 Installed new drain connection to 18" die HPSW pipe 95-115 R0508237 RV 3 32-180C Installed new valve 96-070 R0508236 Ru3-32180B Installed new valve SG-072-R0508235 3-32 i80A Installed new valve 97-030*
C0176136 Q-37898 Welded flanges,14" dia pipe downstream of R0 37898 97-033 C0176350 32GB S58. H43 Installed shims for HPSW rigid restraint System 65A:
Hydraulic Snubbers LOG #
WORK ORDER #
COMPONENT ID DESCRIPTION OF WORK 96-112 R0471776 PB-3-65A-SS-C-3 Installed new main steam pressurized reservoir snubber
- Specification M 733, Relief Request #RR-14, for use of Code Case N 4161 was implemented during these repairs / replacements, E
Specification M-679 R:v. 3 of; Art Repair & Replacement Program PBAPS Units 2 & 3.
LGS Unes 1 & 2 Attachment E Page iof 2 FORM Nis 2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASMC Code Section XI 1 Owner PEQQ_LntI2Y1QTPRSY Dete Ngygg.igt2LIR97 Narne 23Q1MametSttetLfhlladtgba. PA 19101 Sheet 1
of 2
Address 2 Plant Pgadt.Bgitom Atomic Power staiton Unit 3
Name 1M01pyReet. Delta PA17314 P. QEg.JSPL 409291 i
Address Repalt Or9antration P.O No., Job No. etc.
3 Work Performed by 11ont.ef81Wrkster Type Coda Symbol Stamp N/A Name Authortration No,
_.N/A P.O B.cGSgLggggtttdM221Q2;r00 Empiration Date N'A Address i
1
- 4. Identification of System RHR Sucilon StraiQgra une No.
System 10
- 5. (a) Applicable Construction Code ALMElftilon lit 19EEdition.
No
- Addenda, NL, Code Case (b) Applicable Editior) of Section XI Utilized for Repairs or Replacements 1pfL thru,1PW2,_ Addenda N-516-1 Code Case 6 Identification of Components Repaired or Replaced and Replacement Componente
- Repaired, ASME Code Name of Name of Manufacturer National Other Year Built Replaced, or Stamped (Yes Component Manufacturer Serial No.
Board No identifkation Replacement or No) 3AS763 U S. Tool and St N-2919 9719-01 1997 Replacement Yes Stiffener onhf 5 t..c NPT 3AS769 U S. Tool and
$2 N 2919 9719-02 1997 Replacement Yes Stiffener only De inc NPT 3BS769 U.S. Tool and 61 N 2919 971943 1997 Replacement Yes Stiffener only Die, Ine NPT 3BS765 U.S. Tool and
$2 N-2919 9719-04 1997 Replacement Yes Stiffener ontv Die, Inc NPT 3CS769 UA Tool and
$1 N 2919 9719-05 1997 Replacement Yes Stiffener only Die, Inc NPT 3CS769 U S. Tool and
$2 N-2919 97 t 9-06 1997 Replacement Yes Stiffener only Die inc NPT 3 DST 69 O S. Tool and St N 2919 9719-07 1997 Replacement Yes Stiffener only D6e. Inc NPT 3DS769 U S. Tool and S2 N 2919 9719-08 1997 Replacement Yes Shffener only De, Inc l
NPT 7.
De*cription of Work __StdfenertWildtile.Een!!n219aaRirgMunafort of Suction Strainer Rectartment 8 Testa conducted. Hydrostatic 0 Pneumatic 0 Nominal OpertW Pressure O Other s Pressure N'A osi Test Temp.
N'A
- F.
yl. land 3 Der 1992 Section Xi NOTE: tupplemental sheets ln form of lists, sketches, or drawings may be used, prr Aded (1) site 81/2 in. x 11 in., (2) Informa-tion in items 1 through 6 on this repori ls included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form (12/82)
This Form (E000301 may be obtuned Nun the Order Dept, ASME,345 E 47th St., New York, N.Y.10017 4
Specteatm M499,Cet 3 DQAFT Qepair & Replacement Program PBAPS Unas 2 & 3, LG8 UnAsi A 2 Attachment E Pap 9 of 2 1
FORM Nis 2 (SACK) 9.
Remarks _Jded6Ge00n P00350 to realze and replace the suctum stralDatt.ansociated with the Core Sprattudatedga!EseL BtfDEYalayalem.AWGilpa.huttAss.G9tdeDge with PEC0 Ener2(1$9EEDRIDtulL!D&QtJQ.lttlMIDht lg NRC IE Bulletin 96 03.
M9.t99tEampiugitgured.
Apphceble Manufacturer's Date Reports to be attachen -
a d
n i
f CERTIFICATE OF COMPLIANCE We certify that the statements erade in the report are correct and this teolacement conforms to the rules of the l
ASME Code,Section XI.
repair or repiscoment Type Code Symbol Stomp NA cert (cate of Authortration No M
Expiration Date NA WWJ2621c?rdm dnl
.t. u Daie Son.d "Dwner pr"swXers DAignee, f aie
[
{
CERTilICATE OF INSERVICE INSPECT 10N 1, the undersigned, holding a valid commission isoled by the Natlonal Board of Boiler and Pressure Vessel inspectors and the State 1
or Province of Pennavtvania and emp oyed by H.S.B f & l. Comoany of Hartford. CT have irlopected the components described
- In thJs Ownere Report durmg the period W:i l %7 to
% 01 M M
- and state that to the best of my knowledge and behef, the Owneihas performed examinatione and taken cor'rectivb rnesoures described in this Owners Report in encordance with the requirements of the ASME Code, Sect 6on XI, By algnan0 tNs certificate neither the inspector nor No employer inakes any worrenty, expressed or Implied, concoming the c exam 6netions and corrective enessures described it tNe Owners Report. Furthermore, nettlar the Inspects nor Ns employer shall be Rab6e in any rnanner for any personal injury W property damage or a was of any kind arising from or connected with tNs in g
j t/s$s WW Commissions PA 21831. N. A. S & !$.
NR,f}92
>M inspectors Signature National Board, State, Province, and Endorsements uMq M 19.93 ta (1252) t
- - ~
t e
e.,-
O
-.#,-~%.,_w e
o--__,m,,,m,m,,,,,,,.
m
,... ~..,
r,
Specificat6on M-679, Rw 3 DRMT 0: pair & kplaccrr.:nt Program PBAPS Units 2 & 3, LGS Urvts 1 & 2 Attachment E FORM NIS.2 OWNER'S REPORT FOR REF AIRS OR REPLACEMENTS
+
As Requped by limrrovisions of the ASME Code Section XI
- 1. Owner PECO Ent!2LC2fDranJ Date N rtsbef.26.1927 2
Name 230. Maitl$htLI.bllR2t!DhiLfA 10101 Sheet 2
of 2
Addross
- 2. Plant Peach Bottom Atomic Power Stytign Unit.
3 Name 16311ty2 pad.DeRa. PA 17314 P. O t{gjl1[LMjC91 Address Repow Orgenitshon P.O. No, Job No. etc.
3 Work Performed by.Jli20tmmebater Type Code Symbol Stamp ftA Name Authortrotson No _
trA P O. BogQQ lgston. MA 022100$00 Expketion Date N/A Addiess 4 Ident(ication of System Core Sgtv Suetion Stilntre Lht h Sntem 14
$ (a) Apphcat4e Construction Code.
ASME Secten til 1000_Eddion.
No Addenda.
tfA Code Case (b) ApplicLble Eddion of Section XI Utiltred for Repairs or Replacements 192L thru.1922_ Addenda.
It110-L, Code Case
- 6. Identification of Components Repared or Replaced and Replacrment Components Repaired.
ASME Code Name of Name of Manufacturer Natenal Other Year Built Replaced, or Stamped (Yes Component Llanufacturer Serial No.
Board No.
IdentW6 cation Replacement or No) 3AS763 U S. Tool and S1 N 2919 9719-09 1997 Replacement Yes Stiffener only Dee, Inc NPT 30S763 U.S Tooland
$1 N 2919 9719 10 1997 Replacement Yes ltfrfeneronY De.Inc NPT 3BS763 U S Tooland S2 N 2919 9719-11 1997 Replacement Yes Stiffener only Die inc NPT 3CS763 U S. Tool and
$1 N-2919 9719 12 1997 Replacement Yes Stiffener only De, Inc NPT 30S763 U S. Tool and St N 2919 9719 13 1997 Replacemeat Yes Stiffener only Die, Inc NPT 30S763 U.S; Tool and S2 N 2919 9719-14 1997 Replacement Yes Stiffener only Die. tne,
NPT 7.
Description of Work Stiffeners Wet 2tittipstina Torus Rana Girdelf12.D19.flaittlon Strainer RWeemed 8 Tests conducted Hydrostatic D Pneumatic 0 Nominal Operating Pressure 0 Other W Pressure N'A esi Test Temp N'A
'F.
VT 1 and 3 eer 1992 Section XI NOTE: Suppk.aental sheets in form of lists, sketches, or drawings may be used, provided (1) size 81/2 6n. x 11 in., (2) Informa-tion in tems 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
(12/82)
This Forrn (E00030) may be obtained from the Order Dept., ASME,345 E 47th St., New York, N.Y.10017 FORM Nis-2 (BACK)
~.
-._....____._._____.m h
Specificatxin M 479, Cht,3 OWT Qepolt & Qeplacement Progra:n PBAPS Unite 2 & 3.
l LGS Unna 1 & 2 i
Attachment E l
Page 2 of 2 e
l l
9.
Romerke,,JendifsatWif0030.lelaeus_atullasiast.lbtaalkittattatutanamisted with the cors_SararmulRenkian! Hast RetDDytLarele!!LSWlMulDet in Ewese wth PECO Enernv's commRmgDillD9de in felDQDbL10.tiRC IE Bulletin 96 03.
lio190tAlamMDalteuted Applicable Manufacturers Data Reports to be attached i
t y.
h CERTIFICATE OF COMPLlANCE
[
t We certify that the statsments inade in the report are correct and (Ns reolacement conforms to the rules of the f
z ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NA f
Certificate of Aut Irahon o NA Expiration Date NA 3 4.$ r % cvi 6.s.& v-)
y
[
u L 2E Date,
l Al
. 19 %
Sfgned LW x2 so
-/%ner oM5wn6fs D6sgnee, Tk4 j
f CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commiss6on issued by the National Board of Boller and Pressure Vesselinspectors and the State or Province of Nana.ura and employed by H.B B t.& l Comanny of Hartford. CT have inspectgthe componente described in thls Owner's Report durmg the per6od ib: il 9 7 to I6i11i-d and state that to the best of my knowledge and t* lief, the Owner'hai performed examinations and taken correbtive measures described in tNo Owners Report in accordance with the requirements of the ASME Code,Section XI, By signin0 this certif6cate neither the inspector nor his employer makes any warranty, expressed or implied, concerNng the -
(
examinations and corrective measures described in thle Owners Report. Furthermore, nedher the inspector nor his employer shall be lieble in any manner for any persoF al injury or property damage or a loss of any kind arising from or connected wth this inspection
~
Lt Commiss6ons PA 21631. N. A. S & 19.
Na 7602
~ Inspector's Sgnature National Board, State, Province, and Endorsements DateWWI
'M 19 N (12/82) -
s l
8 4
4
- =
e t
-r+
,,,,,..-4
,,,me.--
-,..,v'-ww.w.,,w.
-r,-,
m.~
.w.-,,,,
v
,r,
Arm N 2 FORM N 2 CERTIFICATE HCLLER'S CATA REPORT FOR ICENTICAL NUCLEAR PARTS AND APPURTINCES' As Recuired by the Provisions of :ne ASME Code, Section til Not to Escoed one Cay's Preducten P;.1 of _2,,,,
- 00 3raddeek e m.ue Pi A.sh.:r;
- 1. w.n.n.mu,
,,n
,, 1. !.
ee1 ;
!ie.
-. v ", m. --. e-s e
== eu==== ein c,wn y
- . u.nu,,,,,,,,,,, AEB C:r.=us ti:n Engineering Nu:le a.r Operati:ns 000 Oa/ Mi 1 Pcad P.C.g 3e, k,e BcE*,
Windsce,cf06095
- s. t.o.a.n.e,,
Pe ach Be ttem Atem1: Pewer Stati:n *.548 Laf 7:ad Oelta, PA 1 n4 v
~
- 4.,,. $WTO ve. M.18 6
- b!N~
0
! y!- '- a ys-N/A 1997 e
- s. Ashes ca... s
- m. civ n 1: 1990 Yditie-
$1e Addenda MO _
N/A
==
cc.
e.r m -
C.nn. s civ. onevi 9 es an im e
N/A em
- 7. n.,,,,,,
C:mpenents are stiffeners for existia.e rine etrders in the suppression pool er torus. Overall responsibility for design retained
- r SWE0 under N-Certift: ate of Authorizati n, #N-2562.
- e. N.m. v an e nn.: M/A um e a e==,==
un.
9/s tw e m a n.: Mn L nsin ev.r.: i,e a in.:
9n
- 9. Wh.n seensakse Carvessee Messers Case Resorts we semenme for.ean aan et pue sneerg Part er Aspurtenanse Det er Appurten#=ue I*""'"""*'
I""*' ""'"**'
We Nissemana Crear n Nurneum Oeuer a
t1i 9719-1 til f
tm 9,19-4 1
tm i
(31 9719-3 l
tm l
141 'tili-4 l
ion i
(5) eili-i 1
151
)
tel f ili-o 1
Im I
(7) 9719-i 1
rn I
lIm am ' isAr e 1
i 19e iiir y
)
, si (10 9iir Av tion I
(111_ i e ir A A stil l
t1m viir A.
11 :3
(
(13 y 41* AJ (1 33 l
(1 41
- 17 64 ties l
(1 81
- iAP-13 l
11 5) t (1m 744F 40
{
(13 ""
{
(17) i i 1** A 4 (1 71 l
gt c t1m W # 13-44p lim i
ff,. M * (\\
titi
{
(18
}
/
'[
Qs tio
}
t:ct I
l
[
/\\'
(til (218
\\j /M
(::1 1:2 l
\\AY~
'C
(:31 l
(:31 l
\\AtM-yv C} [
tiel I
(2 41 l
(251 j
1:51 i
i
- 10. Deemen p N/A p., tenis.
N/A
- s.
N,e, t g,,
ur, N/3 et isene. F flim }.eemsel
- * ^
WW.,uegmen et ye eeMut af Imam, dassWuuk W WW <hs,98 t.53 $PWU4 gad ll\\ 95 4 $ i $ I I $e (I) iFWermE.eR WI 85EFWG $ WL I g 3 943 hSS AGEMP4 S WWWERG
- Wn West E39 e.un grams e anauessus gg gw mesmer af gruse e measume a go gas er go twab 9
o f ---(e
..Page
~
e...
v
/
Form N 1 4
FORM N.2 (Pack. P;. 2 of L) enwnome ne.r s. we..
9719-1 9719-18 vi,,,,, n CENTIFICATICN CF CESIGh 3.,,,,
% g Nichclas C. P.apagnani M
23 d -E
,4 gg,,,,
n,,,,,
0 gn mente eemn.s w Alexande r J kenis P.t sim.
PA m.o. n.. P!-0 3 3 5 3 9 -!
l CUtTIFIC ATICN CF COMPUANCE we e wty thee v. eies.m== mm a one meet we een=e ne mar vue nn,
Appurtences seanwms to em nm of emn.vuc3.n et vw asw cone. s.enen in, civ n t.
Nrr em ot 4
,i,v.een,se, N-2919 r,,,,,
Jana 2, 1998 ce. 9/22/97 u.,,. U.S. Teci & Cie. Inc.
Q \\( N,
.t ns
~,
W CEMTIFICAi1CN CF INSPECTICN t ye une=mened. hassbis e vand 1
- esans by v Neo nal some of seier ew me we ve a basarses and ww sames er Pimmue et e.--..f i v s-i n ew.new,.e ty Allendale Mutual Insurana s e--...r r*.--- - u.msmi
- n e-e. A lsn) se.N m oc, 9.A h
m.m a.e e amme -
_ a e ericame ammer en y.a*'
. ans emmen mas a sw beet,, my _ _ _ ;,w es e, yu Carvanaes Meaner has famntamme visse pegs er moununarmee m : - c-_
w1n A&ndE Cade. Sassar*
IX. Dimenwi 1. Laun part asons has been auenormed for simumme en the essa ensene aseve.
By esensie ese omreenaus russier wie incesseur nor he omosever snamme any werveney, empremmed or irredsed, omnamment wie enamoment W m thee Oste magert Pushornasse, riusther Tie ineseses, nor tes emessver ehed be Sasse m aruy fnerener for any perusnef Innsy er preserif daneses et lose of any bhid wieres frorn er _
_ sWe Wus kuumergerb
^ w Coes _ 9/72/97 f'ynse B-
- [M'3 j-
..n d:37 q.
Q S
/
hECTf9.$
d ofM Page
~~
- ~ ~~ ~ ~ -
.-a a
-a a
.sm
--, - ~ -
a
+
-a I
90 g
- ^
y N_
- ~
e I
k
,*i~
.1 4
f 4
_6
.g
+
w