ML20199J821

From kanterella
Jump to navigation Jump to search
Informs That ISIs Were Completed on Unit 3 During 971003-1102,eleventh Refuel Outage IAW PECO Energy Company Second ten-year Interval ISI Program. W/ Summary Rept for 951016-971102 Periodic Insp & Summary of ASME Repair..
ML20199J821
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/29/1998
From: Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199J826 List:
References
NUDOCS 9802060043
Download: ML20199J821 (2)


Text

, _ _ __ - _ _ _ _ _ - _ - _ - _ _ _ - - _ - - - - - - - - -

' Thomas N.Mitehon Vr2 Presdent F% ch Donam Atene ibwer Stn.on PECO NUCLEAR nco ne.c-v

  • 1848 lay nood
  • / A Unit of PECO Energy Delta, PA 17314-0032 717 456 4000 Fax 717 456 4243 January 29,1998 l

Docket Nos.: 50 278 l U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mall Station P1 137 Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station Unit 3 - Inservice Inspection Gentlemen:

l In accordance with the PECO Energy Company Second Ten Year Interval Inservice Inspection Program, inservice inspections (ISIS) were completed on Unit 3 during the October 03,1997 through November 02,1997, eleventh refuel outhge.

Enclosed are the " Summary Report for the October 16,1995 to November 02,1997 Periodic inspection" (NIS-1) and the " Summary of ASME Repair and Replacement Completed," This submittalls required per paragraph IWA-6230 of the ASME Code Section XI, " Rules for Inservice inspection of Nuclear Power Plant Components."

Sincerely, Thomas N. Mitchell Vice President, Peach Bottom Atomic Power Station TNM/ MEW /MJM/ARP/RES/TCH:tjb Enclosures cc: N. J. Sproul, Public Service Electric & Gas (w/o enclosures)

R. R. Janati, Commonwealth of Pennsylvania (w/o enclosures)

R.1. McLean, State of Maryland (w/o enclosures)

H. J. Miller, Administrator, Region !, USNRC A. C. IA",urtray, USNRC Senior Resident inspector, PBAPS T. M. Messick, Atlantic Electric (w/o enclosures)

A. F. Kirby Ill, Delmarva Power (w/o enclosures)

A. Schlaffino, Hartford steam Boller Chief Boiler Inspector, Commonwealth of Pennsylvania

,,I OvulC2 - @Ql l CCN 98-14005 9002060043 980U.9 ..

PDR Ellfilu.

  • i ln. .g<i<yi ADOCK 050C3278. *
  • G Pih*t u

bcc: E. W. Callan SMB4 5, PBAPS (w/o enclosures)

J. G. Hufnagel - 62A 1, Chesterbrook (w/o enclosures)

, Commitment Coordinator 62A 1, Chesterbrook (w/o enclosures)

Correspondence Control Program 61B-3, Chest 6(brook (w/o enclosures)

E. J. Cullen S231, Philadelphia (w/o enclosures)

V. M. Nilekani 638-3, Chesterbrook Licensing Library 62A 1. Chesterbrook M. E. Wamer SMB3-2A, PBAPS (w/o enclosures)

PB Nuclear Records SMB13. PBAPS (w/o enclosures)

G. D. Edwards A4-1S, PBAPS (w/o enclosures)

D. M. Smith 51 A 11, Chesterbrook (w/o enclosures)

T. C. Hinkle (original enclosures)

R, E. Simpson SMB3-6, PBAPS

.A.R.Piha . SMB3-6, PBAPS J. J. Fuhrman SMB3-6, PBAPS G.J.Lengyel A4 SS, PBAPS (w/o enclosures)

C

_A