Other: ML17181A229, ML20056G180, ML20079R417, ML20094P419, ML20134G924, ML20135D395, ML20151W366, ML20196B705, ML20198Q703, ML20202H368, ML20205R563, ML20206F984, ML20211C466, ML20217E441, ML20217H367, TXX-9402, Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades, TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified, TXX-9906, Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER
|
MONTHYEARML20079R4171993-08-16016 August 1993 Trip Rept of 930718-22 Visit to Omega Point Lab,San Antonio, Tx Re Thermo-Lag Fire Barrier Test Program for Comanche Peak Steam Electric Station,Unit 1 Project stage: Other ML20056G1801993-08-17017 August 1993 Documents 930722 Telcon W/Util Re Thermo-Lag Mfg Specs.Info Did Not Change NRC Previous Conclusions Re Thermo-Lag Fire Barriers or Affect NRC Ongoing Review Activities Project stage: Other ML20059C2831993-12-22022 December 1993 Discusses RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Per 10CFR50.54(f) for Plant.Notifies That Requested Schedule Must Be Submitted within 45 Days from Receipt of Ltr Project stage: RAI TXX-9402, Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades1994-01-28028 January 1994 Responds to 931222 RAI by Informing NRC Last C/A Completing GL 92-08 Is Field Work Installing Thermo-Lag Upgrades Project stage: Other TXX-9415, Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations1994-06-16016 June 1994 Forwards Response to Request for Addl Info Re Thermo-Lag Certification.Rev 2 to ER-ME-082, Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations Project stage: Request ML20072A8331994-08-0808 August 1994 Submits Response to Request for Addl Info Re thermo-lag Cable Functionally Issues.Rev 2 to Calculation Change Notice 071 Encl Project stage: Request TXX-9426, Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues1994-11-0909 November 1994 Forwards Response to Request for Addl Info Re Thermo-Lag Cable Functionality Issues Project stage: Request ML20077A7251994-11-18018 November 1994 Forwards Response to Request for Addl Info Re Ampacity Tests Project stage: Request TXX-9500, Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified1995-02-24024 February 1995 Provides Addl Info Describing Activities That Util Has Performed to Verify Quality of Procured & Installed Thermo- Lag & to Ensure That Thermo-Lag at Plant Properly Qualified Project stage: Other ML20086D9881995-07-0707 July 1995 Informs That Request for Extension to Respond to NRC 950517 RAI on Util 950224 Response to GL 92-08 Re Thermo-Lag Fire Barrier Matl Received & Installed at Facility Discussed W/ Tj Polich & Granted on 950707 Project stage: Request ML17181A2291995-07-28028 July 1995 Discusses from Commonwealth Edison Co & 950627 Affidavit from Transco Products,Inc & Requesting Documents Be Withheld from Public Disclosure Per 10CFR2.790.Documents Will Be Withheld as Requested Project stage: Other ML20087E2701995-08-0808 August 1995 Forwards Response to Request for Addl Info Re Followup to GL 92-08 for Thermo-Lag Fire Barrier Matl Received & Installed at Facility Project stage: Request ML20094P4191995-11-22022 November 1995 Forwards Nucon 06TU935/01, Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples Project stage: Other ML20134P8661996-11-22022 November 1996 Informs That 961024 Response to Open Items Re thermo-lag Cable Functionality Issues Does Not Address Staff Original Concerns.Advises of 961205 Meeting to Reach Final Technical Resolution on Cable Functionality Issues at Plant,Unit 1 Project stage: Meeting ML20134G9241997-02-0404 February 1997 Informs That Util Intends to Submit Addl Info to NRC on or About 970228 Re Response to SE Open Items on Unit 1 for Thermo-Lag Cable Functionality Issues Project stage: Other IR 05000445/19970021997-02-28028 February 1997 Insp Repts 50-445/97-02 & 50-446/97-02 on 970210-14.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Radioactive Waste Effluent Mgt Program,Organization & Mgt Controls,Radioactive Effluent Monitoring for Plant Support Project stage: Request ML20135D3951997-02-28028 February 1997 Provides Response to SE Open Items on CPSES Unit 1 Re Thermo-Lag Cable Functionality Issues Project stage: Other ML20217E4411997-10-0101 October 1997 Discusses Licensee 970228 Revised Response to SE Open Items on Plant,Unit 1 Re thermo-lag Cable Functionality Issues. Requests That Revs to CPSES Engineering Rept ER-ME-067 Be Provided within 30 Days of Receipt of Ltr Project stage: Other ML20198Q7031997-11-0606 November 1997 Submits Response to SE Open Items Re Thermo-Lag Cable Functionality Issue,Per 970916 Telcon W/Nrc & as Stated in Ref 1 of NRC .Rev 5 to ER-ME-067 & Bisco Test Rept 748-105 Encl.Bisco Test Rept Withheld Project stage: Other ML20202H3681998-02-13013 February 1998 Provides follow-up to Licensee Re Thermo-Lag Raceway Testing.Util Has Concluded That It Is Important for Util Not Change Testing Criteria mid-stream. Commitment Made by Util,Listed Project stage: Other ML20217H3671998-04-0101 April 1998 Requests That TU Electric Respond to Staff Comments Re Thermo-Lag Raceway Testing Proposal Concerning Thermo-Lag Fire Barriers at CP Steam Electric Station,Unit 1 to Resolve Issues Prior to Start of Any Fire Endurance Tests Project stage: Other ML20151W3661998-09-0808 September 1998 Informs That Addl Thermo-Lag Testing Currently Scheduled for Last Wk in Oct 1998 at Omega Point Labs,Inc.Detailed Description of Route to Lab Can Be Downloaded or Printed from Internet Project stage: Other ML20196B7051998-11-25025 November 1998 Forwards Preliminary Fire Endurance Test Results,As Part of Action Plan for Closure of Remaining Open Items Associated with CPSES Unit 1 Thermo-Lag Fire Barriers & 980520 Confirmatory Order Project stage: Other TXX-9906, Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER1999-03-0202 March 1999 Forwards Final Fire Endurance Test Rept,Per Closure of Remaining Open Issues Re Thermo-Lag Fire Barriers as Described by Items 1 & 4 in NRC 960522 SER Project stage: Other ML20205R5631999-04-15015 April 1999 Forwards Rev 6 to CPSES Engineering Rept ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Sys. Rept Was Revised to Incorporate Technical Justification for Closure of Open Items 1 & 4 Described in NRC Project stage: Other IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities Project stage: Request ML20206F9841999-04-30030 April 1999 Requests That NRC Return Bisco Tests & Remove Them from Docket Re Thermo-Lag Cable Functionality Issues for CPSES, Unit 1 Project stage: Other ML20206Q0031999-05-14014 May 1999 Forwards Safety Evaluation Accepting Licensee Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Steam Electric Station,Unit 1 Project stage: Approval ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 Project stage: Other 1996-11-22
[Table View] |
Text
,
_N Log # TXX-95291 llllllll' 'llllllll Fi1e # 10010 909.5 E
E Ref. # GL 92-08 4
1UELECTRIC November 22, 1995 Grav Vke President U. S. Nuclear Regulatory Commission Attn: Document Control Room Washington. D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 1 DOCKET N0. 50-445 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOLLOW UP TO GENERIC LETTER 92-08 (TAC NOS. M85536 AND 85537)
REF:
1)
NRC Letter dated May 17. 1995. from Mr. Timothy J. Polich to Mr. C. Lance Terry 2)
TV Electric Letter logged TXX-95136 dated August 8.1995.
from Mr. C. Lance Terry to NRC I
Gentlemen:
Reference 1 requested that Texas Utilities Electric Company (TV Electric) provide additional information regarding Thermo-Lag fire barrier material received and installed at CPSES. In Reference 2. TU Electric responded to that request.
Via Reference 2. TU Electric stated that, it does not believe that there is a technical or regulatory bases for requiring any further chemical sampling to support the acceptability of the Thermo-Lag installed at CPSES Units 1 and 2 as qualified fire barriers. Nonetheless. TV Electric, in response to suggestions from the NRC and to support the industry in its response to this aspect of the qualification of Thermo-Lag, decided to participate in the NEI test program to assess the chemical formulation of Thermo-Lag. In this respect TV Electric provided 10 samples to the Nuclear Energy Institute (NEI) endorsed program to perform the chemical analysis.
280018 h
\\\\
-9511290138-951122 Bos 1002 Glen Rose. Texas 76043 PDR ADOCK 05000445 s R<,._ _.
m.__
PDR _
TXXs95291, Page-2 of 3 J
The NEI program' consisted of Pyrolysis Gas Chromatography (PGC) with Mass Selective Detection (MSD) of 169 samples from the participating utilities to assess organic composition, and Energy Dispersive X-Ray Spectroscopy of 33 samples to assess inorganic. chemical composition. On the basis of these tests, the test 1ab. NUCON.In_ternational. Inc..' concluded that all samples contained the
. constituents. identified by Thermal Science Inc., as essential to fire barrier-performance. NUCON also determined that the composition of the sample population was consistent. A copy of_the summary report has been provided to the NRC by NEI.
The TU Electric samples were consistent with the other utility samples. A copy of the_ summary pages from the NUCON report for TV Electric samples are _ contained in to this letter.
. The NUCON test-results indicate that 8 of the 10 Thermo-Lag samples are consistent.
in terms of chemical composition to other Thermo-Lag samples tested as part of the NEI generic testing program. The remaining 2 samples labeled as "Flexi-Blanket" were not consistent with the other Thermo-Lag [ supplied by other Utilities]
samples. Per discussions with NUCON and review of the NUC0N test report issued for TV Electric, it was concluded that: "Flexi-Blanket" (product name 330-660) is similar in composition and in the same product family. However, proportions of the ingredients used in the "Flexi-Blanket" are different than the Thermo-Lag base material (product name 330-1), the chemical composition of these two samples of
" Flex 1-Blanket material are consistent with the expected values for the product name 330-660 material, The NEI generic testing program did not involve "Flexi-Blanket" samples from other utilities and this accounts for the sample
, inconsistencies identified by the independent laboratory (NUCON).
As stated in Reference 2. TU Electric performed its own tests, under the auspices of its Quality Control program using Infrared Spectroscopy method. Ten samples of Thermo Lag material were analyzed using Fourier Transform Infrared spectroscopy (FTIR). These samples were obtained from various locations of the plant. Based on l
FTIR testing, the samples are the same basic product formulation.
I s-
h TXX-5291 Page 3 of 3 t
If you have any questions regarding the information in the attachment, please i
contact Obaid Bhatty at (817) 897-5839.
i Sincerel,
C, L. Ter OB/ob Attachment c - Mr. L. J. Callan, Region IV Mr. W. D. Johnson, Region IV Mr. K. S. West, NRR Mr. T. J. Polich, NRR Mr. W. H. Rasin, NEl Resident Inspectors
4 1
i i
4 r
i i
1 l
N
h i
i 4
i 1
?
1 1
4 l
1 4
f-ATTACHMENT 1 TO TXX 95291 i
.i a
Summary Pages from NUCON International, Inc. Test Report of Comanche Peak Steam Electric Station's Thermo-Lag. Chemical Samples I
i d
I e
s 1
l l
i i
Y t
4 i
f b
b i
4
..