Text
- - _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _
(
l ATTACHMENT 1 Summary of Required Changes to Appendix V,
" Pump and Valve Testing Program Plan' 9106270258 910625 PDR ADOCK 05000461 P
g =,.
1 k
ATTACHMENT 1 i
8"==ary of Chances to Accendix V 4
Appendix V,'" Pump and Valve Testing Program", was revised due to 1
the following:
Relief Request 2032 provides an alternate testing method for
~
relatively fast acting air-operated valves (with an average stroke time of one_of six seconds).
ASME Section XI, IWV-3417(a) requires trending the stroke time test results for these valves and increasing the testing frequency to monthly for a 50% increase from the previous stroke time.
This relief request required that the-test frequency for air-operated valves be increased to once per month if the valve exhibits an increase in stroke time of more than 100%
from the last test.
j.
This alternate testing method will eliminate the potential for operator stopwatch errors due to operator response time and stopwatch errors.
This testing method will also be helpful to alert the operator to actual valve-degradation, such as air leaks, which cause the stroke time to increase with each successive stroke time test.
Relief Request 2013 was revised to delete-those valves which are no longer part of the ISI Pump and Valve Testing Program-or those valves which-are air-operated and are now addressed by Relief Request 2032.
Deleted valves 1E12-F073A, 1E12-F073B, 1E12-F074A, 1E12-F074B, 1E12-F103A, 1E12-F103B, 1E12-F104A, 1E12-F104B.
These valves have been deleted from Appendix V due to the installation of blind couplings in the lines of the Steam Condensing mode of operation as per Plant Modification RHF-015.
This portion of the RHR System is tagged out, pending implementation of a plant modification to permanently disable this mode.
Section I,' Introduction,_of Appendix V was revised to include a paragraph describing the responsibilities of Illinois Power. personnel in control of the program plan to ensure ISI requirements are met and the plan is revised to remain current.
This section also allows implementation of changes to this plan, prior to program plan revision, if approved by personnel responsible for implementation of ISI requirements.
M2217/M93/1
n-s.
Section III, : Valve Testing, was revised to. incorporate the -
methodology to be used in determining the~ limiting stroke time value for air operated valves.. This section identifies
- that, air operated valves with full: stroke time less than-or aque.1 to five seconds will be given a limiting stroke time equal to 10 seconds if Tech. Spec., Design, and USAR commitments'are met, i-f.
p I
1:
i M2217/M93/2
4 ATTACHMENT 2 Appendix V
" Pump and Valve Testing Program Plan" Revision 9
i Revision 9 May 15, 1991 APPENDIX V PUMP AND VALVE TESTING PROGRAM PIJsN Submitted By:
Ohja6
[/ ).
/ludA A
h S
Approved:
/,8##4#,)
./ #16 ANII Concurrence:
f ~
a 6
M5546/M136
APPENDIX V PUMP AND VALVE TESTING PROGRAM PLAN RECORD OF REVISION SHEET Rgvision/Date Affected Paces 0/
12/26/85 Initial Issue as CPS 1887.00 1/
03/18/86 Complete Revision 2/
07/06/87 Complete Revision 3/
08/24/87 Complete Revision 4/
03/01/88 Complete Revision 5/
05/31/88 Complete Revision 6/
08/17/88 Revised Table II-p' age 87 7/
05/26/89 Complete Revision 8/
08/31/90 Revised Table II - pages 33 and 53 and Key to Table II 9/
05/15/91 Complete Revision b
M5546/M136
9 8
9 9
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN (REVISION 9) l 6
s M5546/M136
i I.
INTRODUCTIQ1{
This program plan describes how safety-related pumps and valves will be tested to satisfy the requirements of the ASME Boiler and Pressure Vessel Code Section XI, Rules for the Inse rvice Inspection of Nuclear Power Plant Components, 1980 Edition, Winter 1981 Addenda and any additional requiremants as listed below.
The requirements of this edition.tnd addenda will be used during the first 10-year inspection interval or until a later edition is selected to be used.
Later editions must be endorsed in 10CER50.55a or approved by the appropriate enforcement and regulatory agencies prior to their use.
The requirements of this program plan include the relief requests as documented in Appendix III of the ISI Manual.
Revision to this program plan will be controlled by Illinois Power.
Plant Modifications / Field Alterations which could affect this plan will be reviewed by personnel responsible for implementation of ISI requirements to ensure that changes are identified and the plan is revised to remain current.
These identified changes to the plan may be implemented prior to revising the plan if approved by personnel responsible for implementation of ISI requirements.
The following documents have been reviewed and incorporated into the ISI Manual as necessary:
1)
NRC Letter dated September 22, 1987, which attached "NRR's Position on When Technical Specification LCO Action Statement Clock Begins When IST Surveillance Results Are in the Action Range."
2)
IE Information Notice 86-50 " Inadequate Testing to Detect Failures of Safety-Related Pneumatic Components or Systems."
Illinois Power Review letter Y-86498 dated November 18, 1987.
3)
IE Information Notice " Check Valve Inservice Testing Program Deficiencies" Illinois Power review letter Y-90126 dated December 6, 1988.
4)
NRC Generic Letter 89-04 " Guidance on Developing Acceptable Inservice Testing Programs" Illinois Power review letter Y-91415 dated May 11, 1989.
II.
PUMP TESTING A.
Scope l
The requirements of this program plan shall be applied to safety-related pumps which are required to perform a specific function in shutting down the reactor or in M5546/M136 1
I mitigating the consequences of an accident and are provided with an emergency power source.
The pumps which are included in this plan are identified in Table I of this plan.
B.
Frecuency of Testina Inservice tests of pumps shall be performed every 3 months during normal plant operations.
This frequency shall be maintained during extended cold shutdowns and refueling outages whenever possible.
If this frequency cannot be maintained during these shutdown periods, the pumpgs) shall be tested t'ithin 1 week of the plant being returned to normal opereting conditions.
C.
Inservice Test Reauirements The following test parameters shall be observed or measured during inservice testing of pumps.
1.
Speed (Variable speed pumps only).
2.
Inlet pressure (measured prior to pump startup and during testing).
3.
Differential pressure.
4.
Flow rate.
5.
Vibration amplitude.
6.
Proper lubrication level for those pumps not lubricated by the fluid being pumped or having grease lubricated bearings.
D.
Baseline Values 1.
Pump testing baseline reference values have been established for all pumps included in this program.
If additional sets of reference values are needed, they shall be established in accordance with IWP-3112.
2.
After a pump has been replaced, a new set or sets of reference values shall be determined from the results of the first inservice test run af ter the pump is put into service.
3.
When a reference value or set of values have been affected by repair or routine servicing of the pump, a new reference value or set of values shall be determined or the previous value reconfirmed by an inservice test run prior to returning the pump to normal service.
Deviations between the M5546/M136 2
l j
=
previous and new set of reference values shall be identified, and verification that the new values represent acceptable pump operation shall be placed in the test records.
E.
Test Procedures The procedures utilized for inservice testing shall include the following requirements.
1.
Each pump shall be run at least 5 minutes under conditions as stable as the asse ited system r
permits.
At the end of this tir-, at least one measurement or observation of each of the quantities shall be made and recorded.
2.
The test flow path to be used shall be identified.
3.
Instruments which measure the various test quantities shall be identified by instrument number for permanent instruments or type and location if test gauges are to be used.
4.
Reference values and limits for the quantities to be measured shall be provided in the procedure.
5.
The resistance of the system shall be varied until either the measured differential pressure or the measured flow rate equals the corresponding reference value with a tolerance of 2 percent.
The test quantities shall then be measured of observed and recorded.
F.
Analysis of Results/ Corrective Action 1.
The test results analysis shall consist of a comparison of the measured test quantities and the ranges defined in IWP-3210 as modified by Relief Request 3006.
2.
When test quantities fall within the alert range identified, the testing frequency shall be doubled until the cause of the deviation is determined and
=
the condition corrected.
3.
When test quantities fall within the required action range, the pump shall be declared inoperable and not returned to service until the cause of the deviation is determined and the condition corrected.
4.
When a test shows deviation greater than allowed, the instruments involved may be recalibrated and the test rerun.
M5546/M136 3
5.
After the cause of deviations to test quantities has been determined, the condition shall be corrected by either repairing or replacing the pump or by performing an analysis to demonstrate that the condition does not impair pump operability and to ensure that the pump will perform its function.
A new set of reference values shall be established after such an analysis.
G.
Inservira Test Records 1.
Summary Listino The Supervisor-ISI shall maintain a log of the pumps in this program and the current status of the program.
2.
Pumo Records Manufacturers' pump records shall be maintained in the IP Records Center.
3.
Record of Tests The pump tes' record shall include the following information:
a.
Date of test.
b.
Measured and observed quantities, c.
Instruments used.
d.
Comparisons with allowable ranges of test values.
c.
Analysis of any deviations in test quantities.
(-
f.
Corrective action requirements.
g.
Signatures of personnel conducting the test and analyzing the results.
H.
Inst ruments 1.
Accuracy l
Instrument accuracy shall be within the following limits:
a.
Pressure -
2% of full scale.
l MSS 46/M136 4
1
4 b.
Differential pressure - i 2% of full scale.
c.
Flow rate - 1 2% of full scale.
d.
Speed - i %2 of full scale.
e.
Vibration amplitude - t 5% of full scale.
f.
Temperature - i 5% of full scale.
2.
Rance The full scale range of cach instrument shall not exceed 3 times the reference value of the parameter being measured.
3.
Calibration Instruments shall be calibrated in accordance vith schedules and procedures established for each instrument.
III.-VALVE TESTING A.
Scope The requirements of this program plan apply to certain safety-related valves (and their actuating and position indicating systems) which are required to perform a specific function in shutting down the reactor to a cold shutdown condition or in mitigating the consequences of an accident.
The following valves are exempt from the requirements of this plan:
1.
Valves used for operating conveniences (such as manual vent, drain, instrument, and test valves).
2.
Valves used for system control (such as pressure regulating valves).
L 3.
Valves used only for maintenance, l
4.
External control and protection systems responsible for sensing plant conditions and i
providing signals for valve operation.
l The valves which are to be tested under this plan and their ASME Category are listed in Table II.
B.
Frecuency of Testinc 1.
Seat leakage tests shall be performed at least once every 2 years.
1 M5546/M136 5
2.
Valve exercising and stroke timi..9 unali be performed every 3 months unless such testing is not practical during normal plant operations.
Those instances where this frequency is not practical shall be identified.
3.
Relief valve setpoints shall be verified in accordance with a schedule that provides for all applicable relief valves to be tested every 5 years.
4.
At least 20% of the charges in explosively actuated valves shall be removed, fired, and replaced every 2 years with charges from a fresh batch.
A sample charge from the fresh batch shall have been tested satisfactorily.
Charges shall not be older than 10 years.
l 5.
Valves with remote position indication shall be observed at least once every 2 years to verify that valve indication is accurately indicated.
6.
When systems are declared inoperable or not required to operate for extended periods, the exercising and stroke timing schedule need not be followed; however, within 30 days' prior to returning the system to operable status, the valves shall be tested as applicable and the test frequency resumed.
7.
Illinois Power Company will perform testing during cold shutdowns as follows:
a.
Testing shall commence no later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after cold shutdown is reached, and continue until complete or the plant is ready to return to power.
b.
Completion of all valve testing is not a prerequisite to return to power.
c.
Any tasting not completed during one cold shutdown yill be performed during any subsequent cold shutdowns starting from the last test performed at the previous cold shutdown.
d.
For planned cold shutdowns, where ample time is available for testing all of the valves identified which require the cold shutdown test frequency, all will be tested although testing may not begin within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, i
(
M5546/M136 6
L w
?
4 9
1 C.
Inservice Test Recuirements The following table identifies the types of tests required for each valve.
VALVE SEAT LEAKAGE STROKE TIME EXERCISE
'lPECI AL CATEGORY WNCTION TEST TEST TEST TEST A
Active Yes Yes Yes No A
Passive Yes No No No B
Active No Yes Yes No
-B Passive No No No No C Relief Active No No No Yes Valves Passive No No No No C Check Active No No Yes No Valves Passive No No No No D
Active No No No Yes D
Passive No No No No D.
E.aseline Values 1.
Preservice baseline values have been established for valves included in this progam.
-2.
When a valve or its control system his been replaced, repaired, or has undergone laintenance that could affect perfccmance and priar to the time it is returned to service, it shall be tested to demonstrate that the affected perf)rmance parameters-are within acceptable limits.
The results of these tests shall be used during subsequent insenice testing as appropriate.
Rcfer to Relief Request No. 2021 for post maintenance testing following packing adjustment.
i E.
Test Procedures Test procedures utilized for inservice testing shall include the following requirements:
1.
Eggt Leakace Tests a.
Valve seat leakage tests shall be made with H5546/M136 7
the pressure differential in the same direction as when the valve is performing its function unless on the following exceptions is taken:
1)
Globe valves may De tested with pressure under the seat.
11)
Butterfly valves may be tested in either direction if their seat constructiors is designed for sealing against pressure from both sides.
iii) Gate valves with 2-piece disks may be tested by pressurizing betwoon the seats.
iv)
Valves (except check valves) may be tested in either direction if the functional differential pressure is 15 psi or less.
v)
Types of valves in which service pressure tends to diminish overall leakage may be tested at lower than service differential pressure.
In such cases, the observed leakage (l ) shall t
be adjusted.
This adjustment shall be made by utilizing the following formula:
pf If=lt Pt it = observed leakage if = functional Icakage Pt = test pressure Pr = functional pressure b.
Seat leakage shall be measured by one of the methods described in IWV-3424 or other equivalent method.
c.
Seat-leakage rates shall oe evaluated for acceptability by comparing the test results with previous test results and the maximum permissible leakage rate.
M5546/M136
_ ~
2.
Yalve Exercisina a.
Valves shall be exercised to the position required to fulfill their function.
b.
Valve disk movement shall be determined by observing an indicator that signals the required change of disk position, or observing indirect evidence (changes in system pressure, flow rate, level, or temperature) which reflect stem or disk position.
c.
Check valves which are normally open and are required to prevent reverse flow shall be tested in a manner that proves the disk travels to the seat promptly on the cessation or reversal of flow.
d.
Check valves which are normally shut and whose function is to open on reversal of pressure differential shall be tested by proving that the disk moves away from the seat when the closing pressure is removed and flow through the valve is initiated, or when a mechanical force is applied to the disk.
e.
Valves with fail-safe actuators shall be tested by observing the operation of the valvea upon loss of actuator powcr.
3.
Valve Stroke Timina a.
Stroke time shall be that time interval from initiation of the actuating signal to the desired position indication, b.
The stroke time of valves shall be rounded up to the nearest second.
c.
For all valves except those that are air operated, the limiting value of full stroke l
time for valves shall be determined using the l
most conservative of the following val,ues:
l 1)
Design Specification-2)
Technical Specification 3)
USAR commitments 4)
For valves with full stroke time less than or equal to 10 seconds the Max.
l Allowable Stroke Time = Initial Base Line Time x 2 5)
For valves with full stroke times greater than 10 seconds the Max.
M5546/M136 9
I' Allowable Stroke Time = Initial Base Line Time x 1.5 d.
For air operated valves, the limiting value shall be determined using the most conservative of the following values:
1)
Design Specifications 2)
Technical Specification 3)
USAR commitments 4)
For valves with full stroke time less than or equal to 5 seconds the Max.
Allowable Stroke Time = 10 seconds (10 seconds was determined by review of all air operated valves with initial stroke times less than 5 seconds.
These initial stroke times varied from 0.98 seconds to 4.93 seconds).
5)
For valves with full stroke times greater than 5 seconds and less than or equal to 10 seconds the Max. Allowable Stroke Time = Initial Baseline Time x 2..
6)
For valves with full stroke times greater than 10 seconds the Max.
Allowable stroke Time a Initial Baseline Time x 1.5.
4.
Relief Valve Testina Relief valve set points shall be tested in accordance with ASME PTC 25.3-1976 5.
Fail-Safe Valves (Loss of Power Testina)
Valves with fail-safe actuators shall be tested by observing the operation of the valves upon loss of actuator power.
6.
P3sition Indication Verification Valves with remote position indicators shall be observed to verify that valve operation is accurately indicated.
Position indication testing shall be satisfied with an operator at the valve, to verify actual valve movement in the proper direction against remote indication.
F.
Apalvsis of Results/ Corrective Action 1.
Seat Leakaac Tests If the leakage rate exceeds the maximum perr.issible rate the valve shall be repaired or
- replaced, i
M5546/M136 10
d 2.
Exercisina and Stroke Time a.
If a valve fails to exhibit the required change of stem or disk position or exccods its specified limiting value of full stroko time, the valve shall be considered inoperable.
l b.
When corrective action is required as a result of testa performed during cold shutdown periods, the condition must be corrected prior to starting the plant up.
c.
The test frequency for power operated _ valves shall be increased to once por month if:
1)
For valves with stroke times greater than 10 seconds, tho valvo exhibits an increase in stroke time of more than 25%
from the last test.
11)
For valvos with stroke times of 10 seconds or less, the valvo exhibits an increase in stroke timo of more than 50%
from the last test.
3.
Relief Valve Testina A relief valve failing to function properly during testing shall be repaired or replaced.
4.
Explosive Valve Testina If a charge fails to fire, all charges with the same batch number shall be removed, destroyed, and replaced with charges from a fresh batch from which a sample charge shall have been tested satisfactorily.
G.
Inservice-Terl_ Records 1.
Summary Listina The Supervisor-ISI shall maintain a log of the valves in this program and the current status of the program.
2.
Preservice Tests Preservice test results and manufacturers' functional test results shall be maintained in the IP Records Center.
3.
Test Results l
M5546/M136 11
The test results records shall include the following:
Component Identification Number Test Required / Performed Test Method Measured Quantities Acceptance criteria' Dated signature of the individual responsible for the test.
O M5546/M136 12
4 JLLINDIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE l--PUMPS Page 1 EIN EQUIPMENT KAME TYPE OF TEST FREQUENCY Rill (F REQUEST OvC00PA Control Room HVAC Chllled Water Pttp A Pwp 3 Month 3001,3006 DVC08PB Control Room HVAC Chltled Water Pwp 8 Ptrp 3 Month 3001,3006 1C41 C001A Stardsy Liquid Control (SLC) Pwp A Ptep 3 Month 3001,3003,3005,3006 1C41 C0018 Standby Liquid Control ($LC) Pwp 8 Ptro 3 Month 307,3003,3005,3006 10001PA Diesel Oil f ransfer Pwp A Pup 3 Month 3001,3002 10001P8 blesel Oil f ransf er Ptrp 8 Purp 3 Month 3001,3002 10001PC Diesel Oil Transfer Ptro C Pttp 3 Month 3001,3002 1E12-C002A Residual Heat Removal (RhR) Pwp A Pwp 3 Month 3001,3006 1E12 C0028 Residual Heat Removal (RHR) Pwp 8 Puv 3 Month 3001,3006 1E12 C002C Residual heat Removal (RNR) Pw p C Purp 3 Month 3001,3006 1E12-C003 Rua Water Leg Purp Pwp 3 Month 3001,3006 1E21-C001 Lrw Pressure Core Spray (LPCS) Puy Pwp 3 Month 3001,3006 1E21-C002 LPCS and RHR Loop A Water Leg Pwp Pam 3 Month 3001,3006 1E22 C001 High Pressure Core Spray (HPCS) Ptro Pwp 3 Month 3001,3006 1E22-C003 HPCS Water Leg tw p Ptry 3 Month 3001,3006 1E51 C001 Reactor Core Isolation Cooling (RCIC) Ptrp Puv 3 Month 3006 1E51 C003 RCIC Water Leg Pw p Puy 3 Month 3001,3006 1FCO2PA fuel Pool cooling and Clean-Up Pump A Ptry 3 Month 3001,3006 1FCO2PB Fuel Pool Cooling and Clean Up Pttp 8 Ptrp 3 Month 3001,3006 15x01PA Shutdown service Water Ptro A Pam 3 *onth 3001,3006 1sx01PB Shutdown Service Water h 9 8 Ptro 3 Month 3001,3006 1Sx01PC Shutdown Service Water Ptry C Ptro 3 Month 3001,3006
P ILLINOIS PWER COMPANY CLINTON PWER STATIO.V PUMP AND VALVE TESTING PROGRAM PIAN KEY TO TABLE II -- VALVES t
VALVE TYPEr COLD SHUTDOWN JUSTIFICATION:
B
- Butterfly Valve Reference 1: Revision 2 submittal; Letter U-600968 C
- Check Valve dated June 30, 1987 entitled "Clinton l
CV.
Control Valve Power Station Inservice Testing Program".
EFC - Excess Flow Check Valve Reference 2: Revision 3 submittal: Letter U-601006 EX
- Explosive Valve dated August 20, 1987 entitled "Clinton t
G
- Gate Valve Power Station Inservice Testing Program".
l GL
- Globe Valve Reference 3: Revision 4 submittal: Letter U-601141
[
NC
- Non-Slam Check Valve dated March 8, 1988 entitled "Clinton
(
P
- Flug Valve Poirer Station Inservice Testing Program".
R
- Relief Valve Reference 4: Revision 5 submittal: Letter U-601194, SR
- Safety Relief Valve dated May 27, 1988, entitled "Clinton Power VR
- Vacuum Relief Valve Station Inservice Testing Program".
MFC -- Manual Plow Control valve Reference 5: Technical Specification: Table 3.6.4-1 Note G CSC - Discharge Stop Check Valve Reference 6: Revision 8 submittal: Letter U-601736, dated DIA - Diaphram Valve September 27, 1990, entitled "Clinton Power
{
2WAY - Two Way Valve Station Pump and Valve Testing Program Plan *.
VALVE ACTUATOR:
l AO
- Air Operated
{
HO
- Hydraulic Operated l
M
- Manually Operated MO
- Motor Operated f
- Solenoid Operated SC
- Self Contained NORMAL POSITION / TEST POSITION:
I O
- Open C
- Closed
(
.. Locked Open LC
- Iocked Closed i
I
,1 b
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 1 EQUIPMENT CAtE-ACTU-POSIT!ON P&ID/SMEET; REQUIRED TESTS RELIEF COLD SHUTO(Mi hUMBER TYFE Si2E CLASS GORY ATOR normal test coordinates (Additionet Tests Setisfied)
FREcuCNCY REcuEST JUST!FICATION OMC009 G
4 2
A MO O
C M05-1042/4;E-5 Stroke Time (Ezercise) 3 Month Leak Rete 2 Year 2011 Position Indicetion 18 Month OMC310 G
4 2
A MO 0
C M05-1042/4;D-5 Stroke Time (Emercise) 3 Month teak Rate 2 Year 2011 Position Indication 18 Month ORA 026 CV 1
2 A
AO O
C M05-1065/7;D-8 Stroke sine (Emercise, Loss of Power) 3 Month 2032 l
Leek Rete 2 Year 2011 Position Indication 18 Month ORA 027 cv 1
2 A
A0 0
c M05-1065/7;D-7 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Leak Rete 2 Year 2011 Position Indicetion 18 konth ORAC2S CV 1
2 A
AO O
C M05-1065/7;D-6 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Leek Rete Refueiing 2027,2011 Positten Indication 2 Year ORA 029 CV 1
2 A
A0 0
C Mc5-1065/7;D-5 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Leek Rete Refueling 2027,2011 Position Indication 2 Year OvC010A cv 2
3 8
A0 0
0 MC5-1102/5;A-7 Stroke Time (Emercise, Loss of Power) 3 Month 2032 OvC0108 cv 2
3 8
A0 0
0 M05-1102/6;A-7 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ovC017A C
2 3
C C
0 M05-1102/5;F-7 Esercise 3 Month OvC01TB C
2 3
C C
0 M05-1102/6;F-7 Esercise 3 Month DVC020A C
2 3
a C
C M05-1102/5;F-7 Exercise 3 Month OvCO20s C
2 3
8 C
C MC5-1102/6;F-7 Esercise 3 Month l
OvC022A cv 1.5 3
8 A0 C
0 M05-1102/5;F-7 Stroke Time (Emerc'se, Less of Power) 3 Month 2032 Y
e
o ILLINOIS F0VER COMPANY CLINTON FCVER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 2 EQUIPMENT CATE-ACTU-POSITIOef PEID/SMEET; REQUIRED TESTS RELIEF COLD SMJTDOWN NUNSER TYPE SIZE CLASS GORY ATOR normal test coordinates (Adiltional Tests Settsfied)
FREQUENCY REQUEST JUSilFICAf!Ott OvC0228 CV 1.5 3
8 A0 C
0 M05-1102/6;F-7 Strote Time (Exercise, Loss of Power) 3 Mnnth 2032 l
ovC025A R
1.3x2 3
C C
0 M05-1102/5;E-6 Bench 5 Year ovCO258 R
1.5x2 3
C C
0 M05-1102/6;E-6 Bench 5 Year 1821-F001 GL 2
1 A-P*
M0 C
C M05-1071/2;D-4 Leak Rate 2 Year 2011 Position Indication 2 Year 1821-F002 GL 2
1 A-P*
Mo C
C M05-1071/2;E-4 Leak Rote 2 Year 2011 Position Indication 2 Yeer 1821-F010A NC 18 1
A/C 0
C,0 M05-1004;C-7 Exercise (0 pen)
Cold Shutdown Ref 3 Leek Rate (Exercise Closed) 2 Year 2011 1821-F0108 NC 18 1
A/C 0
C,0 MOS-1004;A-7 Exercise (Ope:c)
Cold Shutdown Ref 3 Leak Rate (Esercise Closed) 2 Year 2011 1821-F016 G
3 1
M0 O
C M05-1002/1;8-1 Stroke Time (Emercise) 3 Month Leek Rete 2 Year 2011 Position Indication 18 Month 1821-F019 3
3 1
A MO O
C M05-1002/1:8-1 Stroke Time (Emercise) 3 Month Leek Rete 2 Year 2011 Position Indication 18 Month 1821-F022A GL 24 1
A A0 0
C M05-1002/1;C-2 Stroke Time (Emercise, Loss of Power)
Cold shutdown 2021 Ref 1 Partiet Exercise 3 Month Leak Rate 18 Month 2011 Position Indication 18 Month 1821-F0228 GL 24 1
A A0 0
C M05-1002/1;F-2 Strche Time (Emercise, Loss of Power) cold shutdown 2021 Ref 1 Partiet Emercise 3 Month Leak Rate 18 Month 2011 Position 1rdication 18 Month 1821-F022C GL 24 1
A A0 0
C M05-1002/1;A-2 Stroke Time (Esercise, Loss of Power)
Cold shutdown 2021 Ref 1 Portlet Esercise 3 Mcnth Leak Rete 18 wonth 2011 Position Indicatico 18 Month
- Passive vetve
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 3 EQUIPMENT CA1E-ACTU-POSITION P&lD/ SHEET; REQUIRED TESTS REllEF COLD SMUTDom NUMBER TYPE SIZE CLASS GORT ATOR - normal test coordinates (Adfitional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1821-F022D CL 24 1
A A0 0
C M05-1002/1;D-2 Stroke Time (Emercise, Loss of Power)
Cold Shutdown 2021
' Ref 1 Partiet Esercise 3 Month Leak Rate 18 Month 2011 Position Indicotton 18 Month 1821-F0244 C
0.5 3
C 0
C M10-1002/5 Exercise Ltd Shutdown Ref 1 1821-F024a C
0.5 3
C 0
C M10-1002/5 Esercise Cold Shutdown Ref 1 1821-F024C C
0.5 3
C 0
C M10-1002/5 Esercise Cold shutdom Ref 1 1821-F0240 C
0.5 3
C 0
C M10-1002/5 Esercise Cold Shutdown Ref 1 1821-F028A GL 24 1
A A0 0
C M05-1002/2;C-5 Stroke Time (Exercise, Loss of Power)
Cold Shutdown 2021 Ref 1 Partist Esercise 3 Month Leat Rete 18 Month 2011 Position Indication 18 Month 1821-F0288 CL 24 1
A A0 0
C M05-1002/2;F-5 Stroke Time (Emercise, Loss of Power)
Cold Shutdown 2021 Ref 1 Portf at Esercise 3 Month 15 Month 2011 Leek Rate Position Indication 18 Month 1821-F028C GL 24 1
A A0 0
C N05-1CO2/2;3-5 Stroke Time (Emercise, Loss of Power)
Cold Shutdown 2021 Ref 1 Partial Exercise 3 Month 18 Month 2011 Leak Rate Position Indication 18 Month 1821-F0280 ct 24 1
A A0 0
C M05-1002/2;E-5 Stroke Time (Emercise, Loss of Power)
Cold shutdown 2021 Ref 1 Partist Esercise 3 Month Leek Rate 18 Month 2011 Position Indication 18 Month 1821-F029A C
0.5 3
C 0
C M10-1002/5 Esercise Cold Shutdom Ref 1 1821-F029s C
0.5 3
C 0
C M10-1002/5 Enercise Cold Shutdown ref 1 I
~
ILLINOIS POWER COMPANY CLINTON FOWER STATION FUMP AND VALVE TESTING FROGRAM FIAN TABLE II--VALVES Page 4 EQUIPMENT lCATE-ACTU-POSITION P&lD/ SHEET; REQUIRED TESTS RELIEF COLD 54UTDOWN NL**SE R TYPE SIZE CLASE CORY ATOR normat test coordinates
( Adiltionel Tests Satisfied)
TREQUENCY REQUEST NSilflCATION 1821-F029C j C 0.5 3
C 0
C M10-1002/5 Exercise Cold shutdown ref 1 1821-F0290 C
0.5 3
C 0
C M10-1002/5 Exercise Cold shutdown Ref 1 Cold Shutdown Ref 3 1821-7032A NC 20 1
A/C AO O
C,0 M05-1004;C-6 Exercise (0 pen)
Leek Rote (Emer Closed, Loss of Power) 2 Year 2011 Position Indication 18 Month 1821-F0328 NC 20 1
A/C A0 0
C,0 M05-1004;A-6 Exercise (open)
Cold shutdown aef 3 Leek Refe(Emer Closed, Loss of Power) 2 feer 2011 Position Indication 18 Month 1821-F0 %
C 0.5 3
C C
C M10-9002/2 Exercise Cold shutdown ref 1 1821-70.M C
0.5 3
C C
C M10-9002/2 Exercise Cold shutdown ref 1 1821-F036G C
0.5 3
C C
C M10-9002/2 Exercise Cold shutdown Ref 1 1821 F036.s C
0.5 3
C C
C M10-9002/2 Exercise Cold shutdown ref 1 f
1821-F036L C
0.5 3
C C
C M10-9002/2 Eseretse Cold shutdown nef 1 lM10-9002/2 Esercise Cold shutdown Ref 1 1821-F036M C
0.5 3
C C
C 1821-F036N C
0.5 3
C C
C M10-9002/2 Exercise Cold shutdown ref 1 1821-F036P C
0.5 3
C C
C M10-9002/2
'sercise Cold shutdows Ref 1 1821-F036a C
0.5 3
C C
C M10-9002/2 Esercise Cold shutdown aef 1 iB21 ~037A vt 10 3
C C
O.C M05-1002/1;C-6 Enercise Cold shutdown Ref 1 1321-F0375 vt 1G 3
C C
0,C M05-1002/1;E-6 Esercise Cold shutdawn Ref 1 1821-F037C va 10 3
C C
0,C M05-1002/1;A-7 Esercise Cotd shutdown Ref 1 1821-F037D va to 3
C C
0,C M05-1002/1;D-7 Enercise Cold shutekwi aef 1
ILLINOIS POWER COMPANY CLINTON F0WER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 5 RELIEF COLD $NUTDOWN EQUIPMENT CATE-ACTU-POSlf!ON PEID/ihEET; REQUIRED TESTS NUMBER TYPE SIZE CLASS CORT ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1821-F037E VR 10 3
C C
0,C M05-1002/1;E-4 Exercise Cold shutdom Ref 1 1821-F037F VR 10 3
C C
0,C M05-1002/1;A-5 Esercise Cold shutdtun Ref 1 1821-F037G VR 10 3
C C
0,C M05-1G02/1;A-4 Exercise Cold shutdown Ref 1 l
1821-F037H VR to 3
C C
0,C M05-1002/1;C-5 Enercise Cold shutdown Ref 1 1821-F037J VR 10 3
C C
0,C N05-1002/1;E-7 Emercise Cold shutdown Ref 1 1821-F0371t VR 10 3
C C.
0,C N05-1002/1;A-5 Ezeccise Cold shutdown Ref 1 1521-F037L vt 10 3
C C
0,C M05-1002/1:0-6 Exercise Cold shutdown Ref 1 1821-F037M vt 10 3
C C
0.C M05-1002/1;E-3 Exercise Cold shutdown Ref 1 1821-F037N VR 10 3
C C
0,C M05-1002/1;E-5 Exercise Cold shutdown Ref 1 1821-F037P VR 10 3
C C
0,C M05-1002/1;A-6 Esercise Cold shutdown Ref 1 1821-F037R VR 10 3
C C
0,C
- 05-1002/1;D-5 Emercise Cold shut 3)wn Ref 1 Cold shutdown Ref 1 1821-F0375 VR 10 3
C C
0,C N05-1002/1;A-3 Esercise 1821-F0398 C
0.5 3
A/C C
0,C M10-9002/1 Leak Rate (Emercise) cold shutdown 2029,2011 Ref 1 1821-F039C C
0.5 3
A/C C
0,C M10-9002/1 Leek Rate (Esercise)
Co;d shutdown 2029,2011 Ref 1 1821-F0390 C
0.5 3
A/C C
0,C M10-9002/1 teek Rate (Emercise)
Cold shutdown 2029,2011 Ref 1 i
1821-F039E C
0.5 3
A/C C
0,C M10-9002/1 Leak Rate (Emeref se) cold shutdown 2029,2011 Ref 1 1821-F039H C
0.5 3
A/C C
0,C M10-9002/1 Leet Rete (Emercise)
Ccid shutdom 2029,2011 Ref 1 1821-F03W C
0.5 3
A/C C
0,C M10-9002/1 teet Rate (Exercise)
Cold shutdown 2029,2011 Ref 1 1821-F0395 C
0.5 3
A/C C
0,C M10-9002/1 Leet Rate (Exercise)
Cold shutdown 2029,2011 Ref 1
t 1
ILLINOIS POVER CottPANY CLINTON POWER STATION PUMP AND VALVE TESTING IROGRAM PIAN TABLE II--VALVES Page 6 e
EGUlrMENT CATE-ACTU-POSITION P&lD/SMEET; REQUIRED TESTS RELIEF COLD SMUTDOWN NUMBER TYPE SIZE CLASS CORY ATOR normal test coordinates (Additional Tests Settsfied)
FREQUENCY REQUEST JUSTIFICATION 1821-F041A SR 8x10 1
C A0 C
0 M05-1002/1;C-6 Position Indication 2 Year sench 5 Yeer 1821-F0415 SR 8x10 1
E/C A0 C
0 M05-1002/1;F-7 Stroke Time (Emercise, Loss of Power)
Refueling 2012.2021 Position Indication 2 Year Bench 5 Year 1821-F041C SR 8x10 1
s/C Au C
0 M05-1002/1;B-8 Strone Time (Emercise, Lose of Power)
Refueting 2012,2021 Position Indication 2 Year sench 5 Yeer 1
1821-F0410 SR 8x10 1 - d/C A0 C
0 M05 1002/1;D-8 Stroke Time (Emercise, Loss of Power)
Refueling 2012,2021 Position Indication 2 Yeer Bench 5 Year li 1821-F041F SR 8x10 1
B/C A0 C
0 M05-1002/1;F-5 Stroke Time (Emercise, Loss of Power) sefueling 2012,2021 Position Indication 2 Year Bench 5 Yeer 1821-F0d G SR 8x10 1
C Ao C
0 M05 1002/1;B-6 Position Indication 2 Year I
sench 5 Year 1821-F04*L SR 8xt0 1
C A0 C
0 M05-10G2/1;B-4 Position Indication 2 Year Bench 5 Year 1821-F047A SR 8x10 1
B/C Ao C
M05-1002/1;C-6 Stroke Time (Esercise, Loss of Power)
Refueling 2012,2021 s
Position Irsfication 2 Year Rench 5 Yeer 1821-F047B SR 8x10 1
C A0 C
405-1002/1;F-8 Position Irdication 2 Year eench 5 Yeer 1821-F047C SR 8x10 1
e/C A0 C
M05 1002/1;8-5 Stroke Time (Ezerefoe, Loss of Power)
Refueling 2012,2021 t
Position Indication 2 Yeer sah 5 Year 1821-F047D SR 8x10 1
C AO C
0 M05-1002/1:0-7 Positicn Indication 2 Year L
tench 5 Year I
--A
ILLINOIS FWER COMPANY CLINTON FWER STATION FUMP AND VALVE TESTING FROGRAM FU.N TABLE II--VALVES Page 7 EQUIPMENT CAtE-ACTU-POSITION P&tD/Sf*EET; REQUIRED TESTS RELIEF COLD $NUTDCUM NUMBER TYPE SIZE CLASS GORY ATOR normet test coordinates (Additional Tests Satisfied)
FRET 2JEwCY REQUEST JUSTIFICATION 1821-F047F SR 8:10 1
C A0 C
0 M05-1002/1;F-4 Position Indication 2 Year sench 5 Year 1821-F0518 SR Szio 1
C Ao C
0 M05-1002/1;F-6 Position Indication 2 Year w.ech 5 teor 1821-F051C St Sato 1
C Ao C
0 M05-1002/1;t-T Posit M Indication 2 Yeer Bench 5 Yeer 1821-F051D SR 8:10 1
C A0 C
0 M05-1002/1;D-6 Position Irdication 2 Yeer Bench 5 Year l
1821-F051G SR 8x10 1
B/C AO C
O M05-1002/1;B-4 Stroke Time (Emercise, less of Power)
Refueling 2012.2021 Position Indication 2 Year sench 5 Yeer 1821-F065A G
20 2
A MO O
C M05-1004;C-5 Stroke Time (Emercise)
Cold Shutdown 2021 nef 1 teak Rete 2 Year 2011 Position Indication 2 Year 1821-F0658 G
20 2
A mo O
C N05-1004;A-5 Stroke Time (Ezercise)
Cold Shutdown 2021 Ref 1 Leek mate 2 Year 2011 Position Indication 2 Yeer 1821-F067A CL 1.5 1
A mc 0
C m05-1002/2;C-6 Stroke Time (Emercise) 3 month teek Rate 18 month 2011 Position Indication 18 Month 1821-F0673 Gt 1.5 1
A MO O
C M05-1002/2;E-6 Stroke flee (Ezercise) 3 month Leek Rate 18 month 2011 Position Indication 18.v th 1821-F067C GL 1.5 1
A MO O
C M05-1002/2;A-6 Stroke flee (Esercise) 3 month Leek Rate 18 month 2011 Position Indication 18 month 1821-F067D GL 1.5 1
A PO O
C
- 05-1002/2;D-6 Strote Time (Emercise) 3 month teek Rate 18 month 2011 Position Indication 18 month m_.
ILLINOIS FOVER COMPANY CLINTON FCVER STATION
~
FUMP AhD VALVE TESTING FROGRAM FLAN TABLE II--VALVES Page 8 EQUIPMENT CATE-ACTU-POSifl04 F110/StiEET; REQUIRED TESfs RELIEF COLD SNTDCb4 WUMBER TYFE SIZE CLASS GORY ATOR normal ! test coordinates (Additional fests Satisfied)
FREQUENC#
REQUEST JUSitFICATION I
1821-F078A VR 10 3
C C
0,C N05-1002/1;C-6 Esercise Cold Shut h Ref 1 i
1821-50788 Vft 10 3
C C
0,C MOS-1002/1;E-6 Exercise Cold Shutdw Ref 1 1821-F078C vt 10 3
C C
0,C N05-1902/1;A-7 Exercise Cold shutdm Ref 1 1821-F078D VR 10 3
C C
0,C MOS-1002/1;D-7 Esercise Cold shutdw Ref 1 1821-F078E VR 10 3
C C
0,C M05-1002/1;E-4 Exercise Cold Shutdcw?
Ref 1 1821-FC78F VR 10 3
C C
0,C N05-1002/1;A-5 Enercise Cold 5%tdm Ref 1 1821-F078G VR 10 3
C C
0,C M05-1002/1;A-4 Esercise Cold shutd w tef 1 1821-7078N VR to 3
C C
0,C M05-1002/1;c-5 Exercise Cold shutdown Ref 1 1821-F078J VR to 3
C C
0,C N05-1002/1;E-T Exercise Cold shutdcnn aef 1 1821-F078K VR 10 3
C C
0,C M05-1002/1;A-5 Esercise Cold shutd w Wef 1 1821-F078L VM 10 3
C C
0,C M05-1002/1;D-6 E sercise Cold Shutdm Ref 1 1821-F078M vt 10 3
C C
0,C M05-1002/1;E-3 Emercise Cold shutd m aef 1 1821-F0784 VR 10 3
C C
0,C N05-1002/1;E-5 Esercise Cold $butdc.n sef 1 1821-F078P VR to 3
C C I 0,C m05-1002/1;A-6 Esercisc Cold Shutdown ref 1 1521-F078R Vk 10 3
C C
0,C m05-1002/1:0-5 Esercise Cold shutckmn Ref 1 1821-F0785 VR 10 3
C C
0,C M05-1002/1;A-3 Esercise Cold shuta w Ref 1 1821-F3794 VR 2
3 C
C 0
M05-1002/1;F-7 Esercise Cold shutdows Def 1 1921-F3799 Vt 2
3 C
C 0
M05-1002/1;F-6 Emercise Cold Shutdoint Ref 1 1821-r3 MC VR 2
3 C
C 0
M05-1002/1;F-5 Esercise Cold shutdown 8ef 1 1
i j
i L
i ILLINOIS POVER COMPANY CLINTON POWER STATION l
l' PUNP AND VALVE TESTING PROGRAM PIAN l-TABLE II--VALVES Page.9 1
EQu!PMENT k'
CATE-ACTU-Postitom P&tD/StiEET; REQutaED TESTS RELIEF COLD $880TDOWu NUMBER TTFE SIZE' CLASS CORY ATOR norine t test coordinates (Additional Tests Settsfled)
FREQUENCY-REQUEST JusttFICAfl0N 1821-F3790 VR 2
3 C
C 0
M05-1002/1;F-4 Exercise Cold Shutdows Ref 1 1821-F379E vt 2
3 C
C 0
M05-1002/1;F-3 Exercise Cold Shutdows Ref 1 1821-F379F VR 2
3 C
C 0
M05-1002/1;E-7 Emercise Cold shutdows Ref 1 1821-'F379G VR 2
3 C
C 0
M05-1002/1;E-6 Emercise Cold Shutdown Ref 1 1821-F379M VR 2
3 C
C 0
M05-1002/1;E-5 Exercise Cold Shutdows Ref 1 1821-F379J VR 2
3 C
C 0
M05-1002/1;C-6 Emercise Cold Shutdown Ref 1 1821-F379t:
vt 2
3 C
C 0
M05-1002/1;C-5 Exercise Cold shutdswi Ref 1 1821-F379L VR 2
3 C
C 0
M05-1002/1;t-7 Emercise Cold shutdows Ref 1 1821-F379st va 2
3 C
C 0
M05-1002/1;e-6 Emercise Cold shutdows Ref 1 1821-F3794 VR 2
3 C
C 0
M05-1002/1;s-5 Emercise Cold shutdows Ref 1 1821-F379P VR 2
3 C
C 0
M05-1002/1;s-5 Emercise Cold Shutdows Ref 1 isti-F3790 VR 2
3 C
C 0
M05-1002/1;a-4 Exercise Cold shutdows Ref 1 1821-F379R ve 2
3 C
C 0
M05-1002/1;s-3 Emercise Cold shutdows Ref 1 1821-F433A C
0.5 3
C 0
C M10-1004/8 Exercise Cold Shutdows Bef 1 1821-F4338 C
0.5 3
C 0
C M10-1004/8 Emercise Cold Shutdows Ref 1 1833-F013A C
0.75
.2 A-P*
C C
M05-1072/1;A-5 Led Rete Refueting 2027,2011 1833-F0138 C
0.75 2
A-P*
C C
M05-1072/2;A-4 Leek Bete Refueting 2027,2011 1833-F017A C
0.M 2
A-P*
C C
M05-1072/1; A-6 Leek Rete Refuellns 2027,2011 1s33-F017B C
0.75 2
A-P*
C C
M05-1072/2;A-3 Liek Rete Refuetins 2027,2011
- Passive velve s
I ILLINOIS PWER CO?tPAVY CLINTON FWER STATION l
PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 10 EQUlFMENT CATE-ACTU-POSITICN P&lD/SHEETT REQUIRED TESTS RELIEF COLD SMUTDOWN I
NUMBER TYPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests Setieffed)
FREQUENCY REQUEST JUST1FICATION f
l 1833-F019 CV 0.75 2
A A0 0
C M05-1072/1;E-5 Stroke Time (Emercise, Loss of Power) 3 Month 2032 Position Indication 2 Year Leek Rete Refueling 2027,2011 1833-F020 CV 0.75 2
A A0 0
C M05-1072/1;E-8 Stroke Tine (Emercise,-Loss of Power) 3 m mth 2032 Position Indication 2 Year Leak Rete Refueling 2027,2011 1
~
10%/120 days 2024 1C11-114 **
C 0.75 0
C C
0 CLN-001 Exercise IC11-115 "
C 0.5 0
A/C 0
C Cin-001 Leek Rete (Emercise) eefueting 2023,2011 1C11-126 "
01A 1
0 8
A0 C
0 CLN-001 Stroke Time (Emercise, Loss of Power) 10%/120 days 2024 1Cf1-127 **
DIA 0.75 0
B A0 C
0 CLN-001 Strc4e Time (Emercise, Loss of Power) 10%/120 deys 2024 1C11-138 **
C 0.5 0
C 0
C CLN-001 Esercise 3 Month 2025 1C11-139 **
DIA 0.75 0
8 50 C
0 CtN-001 Stroke Time (Emercise, Loss of Power) 1ct/120 days 2024 1C11-F010 GL 1
2 8
A0 0
C CLN-001 Stroke Time (Emercise, Loss of Power) 3 Month 2032 f
Position IMication 2 Year 1C11-F011 GL 2
2 8
A0 0
C CLN-001 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Position Indication 2 Year 1C11-F083 GL 2
2 A
MO O
C M05-1078/1;E-1 Stroke Time (Emercise)
Cold Shutdown 2027
- ef 1 Leak Rete 2 Year 2011 Position IMication 2 Yeer 1C11-F122 C
2 2
A/C 0
C M05-1078/1;C-7 Leek Rate (Emercise)
Refueting 2002,2011 1C11-F180 GL 1
2 B
A0 0
C CLN-001 Stroke Time (Emercise, Loss of Power) 3 Month Position trufication 2 Year 1C11-t181 GL 2
2 s
A0 0
C CLN-001 Stroke Time (Emercise, Loss of Power) 3 Month l
I'osition Indication 2 Year f
" Ypical (145 of each)
1 ILLINOIS POWER COMPANY CLINTON POVER STATION PUMP AND VALVE TESTING FROGRAM PLAN TABLE II--VALVES Fage 11 RELIEF COLD SNUTD0uu EQUIPMENT CATE-ACTU-POSITION P&lD/ SHEET; REQUIRED TEsfS NUMBER TYPE
$12E CLASS GORY ATOR normal test coordinates
( Adfitional Tests Satisfied)
FREQUENCY REQUEST JUSTtFICATION 1C41-F001A CL 3
2 8
M0 C
0 M05-1077;C-6 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1C41-F0018 CL 3
2 8
M0 C
0 M05-1077;E-6 Stroke Time (Emercise) 3 Month Position Indicaticn 2 Year 1C41-F0044 Ex 1.5 1
D C
0 M05-1077;C-3 Emplosive Alt Refueling 1C41-F0f" 8 EX 1.5 1
D C
0 M05-1077;D-3 Emplosive Att Refueling 1C41 F006 NC 3 -
1 A/C C
0,C M05-1077;D-2 Exercise (0 pen)
Cold Shutdown 2030 Ref 3 Leak Rate (Exercise Closed)
Refueting 2027,2011 l
1.5m2 2
C C
0 h05-1077;C-4 Sench 5 Year 1C41-F0299 R
1.5 x2 2
C C
0 M05-1077;E-4 sench 5 Year 1
1C41-F033A NC 1.5 2
C C
0,C M05-1077;C-4 Exercise (open) 3 Month Esercise (Futt Stroke)
Cold shutdown Ref 3 1C41-F0338 NC 1.5 2
C C
0,C M05-1077;D-4 Emercise (open) 3 Month Enercise (Futt Stroke)
Cold shut e Ref 3 1C41-F336 C
4 1
A/C C
0,C M05-1077;E-1 Exercise (open)
Refueling 2028 Leak Rete (Emercise Closed)
Refueling 2027,2011 1CC049 G
10 2
A MO O
C M05-1032/3;C 8 Stroke Time (Emercise)
Cold shut e un 2021 Ref 1 Leak Rate 2 Year 2011 Position Indication 18 Month 1CC050 G
6 2
A MO O
C M05-1032/3;C-7 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 teak Rete 2 Year 2011 Position Indic* tion 18 Month 1CC053 G
6 2
A MO O
C M05-1032/3;C-3 Stroke Time (Exercise)
Cold shutdown 2021 Ref 1 Leek Rete 2 Year 2011 Posittore Indication 18 Month
i
~
i ILLINDIS PWER COMPANY CLINTON PWER STATION PUMP AND VALVE TESTING PROGFAM PIAN TABLE II--VALVES l
Page 12 l
EQUIPMENT CATE-ACTU-POSITION P&lD/ SHEET:
PEcutRED TESTS RELIEF COLD SHUTDOWN NLHBE R TYPE SIZE CLASS GORY ATOR normeL test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1CC054 G
10 2
A MO O
C M05-1032/3;C-1 Stroke Time (Exercise)
Cetd Shutdown 2021 Ref 1 Leak Rete 2 Year 2011 Position Indication 18 Month TCC057 G
S 2
s MO O
C M05-1032/3;D-8 Stroke Tine (Exercise).
Cold shutdown 2021 Ref 1 Position Indication 2 Year 1CCC60 C
8 2
A M0 O
C M05-1032/3;c-2 Stroke Time (Exercise)
Cold shutdown 2021 Ref 1 Leak Rete 2 Year 2011 Position Irdication 18 Month l
1CC071 G
4 2
A Mo C
C M05-1032/3;E-2 Stroke Time (Exercise)
Cold shutduwn 2021 Ret 1 Leek Rate 2 Year 2011 Position Indication 18 Month 1CC072 G
4 2
A Mo C
C M05-1032/3;E-1 Stroke Time (Exercise)
Cold shutdown 2021 Ref 1 Leek Rete 2 Year 2011 Position Indication 18 Month ICc073 G
4 2
A Mo C
C n05-1032/3;F-1 Stroke Time (Emercise) cold shutdown 2021 Ref 1 j
Leak Rete 2 Year 2011 Position Indication 18 Month l
1CC074 G
4 2
A M0 C
C N05-1032/3;F-2 Stroke Time (Exercise)
Cold Shutdown 2021 Ref 1 Leak Rate 2 Year 2011 Position Indication 18 Month 1CC0754 8
14 3
8 M0 O
C N05-1032/2;E-3 Stroke Time (Exercise) 3 Month Position f rufication 2 Year 1CC075s a
14 3
s MO O
C M05-1032/2:C-3 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1CC076A a
14 3
8 M0 O
C M05-1032/2;D-2 Stroke Time (Exercise) 3 Month Position Indication 2 Yeer 1CC0768 s
14 3
s M0 O
C M05-1032/2;C-2 Stroke Time (Exercise) 3 Month Position Indication 2 Year
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING FROGRAM FI>.N TABLE II--VALVES Fage 13 RELIEF COLD SMUTDOW EQUIPMENT CATE-ACTU-POSITION P11D/ SHEET; REQUIRE 0 TESTS IiUMBER TYPE SIZE CLASS GORY ATOR normal test coordinates (Adfltionet fests Settsfled)
FREQUENCY REQUEST JU$f!FICATION 1CC127 G
8 2
A MO O
C M05-1032/3;D-8 Stroke Time (Emercise)
Cold Shutdoest 2021 Ref 1 Leet Rete 2 Year 2011 Position IMication 18 Month TCC125 G
8 2
8 MO o
C M05-1032/3;c-2 Stroke Time (Emercise).
Cold Shutdown 2021 Ref 1 Position Indication 2 Year 5 Year 1CC280A R
0.75x1 3
C M0 C
0 M05-1032/2 sench 1CC2808 R
0.75m1 3
C M0 C
o M05-1032/2 sench 5 Year 1CM002A EFC 0.75 2
A/C o
C M05-1034/1;S-7 Esercise Cold Shutdoist Ref 2 Position Indication 2 Year 2 Year 2011 Leek !!ste 1CM002B EFC 0.75 2
A/C 0
C M05-1034/1;A-7 Exercise Cold Shutdown Ref 4 Position Indication 2 Year Leek Rate 2 Year 2011 1CM003A EFC 0.75 2
A/C 0
C M05-1034/1:8-4 Esercise Cold Shutdown Ref 2 Position Indication 2 Year 2 Year 2011 Leek Rete 1CM0038 EFC 0.75 2
A/C o
C M05-1034/1;B-7 Exercise Cold Shutdown sef 2 Position Indication 2 Year Leek Rete 2 Year 2011 1CM011 G
0.75 2
A SO O
C M05-1034/2;C-7 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Leek Rete 2 Year 2011 Position trufication 18 Month 1Cwo12 G
0.75 2
A 50 0
C M05-1034/2;C-6 Stroke Time (Ezercise, Loes of Power) 3 Month 2013 2 Year 2011 Leak Rete Position Indication 18 Month 1CM022 G
0.75 2
A SO C
C M05-1034/2;D-3 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Leek Rete 2 Year 2011 Position trufication 18 Month V
_____.mx
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 14 EQUIPMENT CATE-ACTU-POStTION P&tD/$ MEET; REQUIRED TESTS RELIEF COLD SMUTDOWW NUMBER TYPE
$!ZE CLASS GORY ATCR normat test coordinates (Additlenet Tests satisfied)
FREQUENCY REQUES7 JUSTIFICATION 1CM023 G
0.75 2
A so C
C M05-1034/2;D-3 stro6e Time (Exercise, Loss of Power) 3 Month 2013 i
Leak Rete 2 Yest 2011 Position Indication 18 Month 1CM025 G
0.75 2
A 50 C
C M05 1034/2;C-3 Stroke Time (Ezercise, Loss of Power) 3 Month 2013 Leek Rete 2 Year 2011 Position Indication 18 Month l-1 CMC 26 G
0.75 2
A
$0 C
C M05-1034/2;C-3 Stroke time (Exercise, Loss of Power) 3 Month 2013 Leek Rete 2 Year 2011 Position Indication 18 Month ICM047 G
0.75 2
A so O
C M05-1034/2;0-6 Stroke Time (Exercise Loss of Power) 3 Month 2013 Leet Rate 2 Year 2011 Position Indication 18 Month 1CM048 G
0.75 2
A SO O
C M05-1034/2;D-7 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Leek Rete 2 Yeer 2011 Position Indication 18 Month 1CM051 EFC 0.75 2
A/C 0
C M05-1034/2;C-6 Exercice Cold shutdown Ref 2 Position Indication 2 Year Leek P,te 2 Year 2011 1CM053 EFC 0.75 2
A/C C
C M05-1034/3;C-5 esercise Cold shutdown Ref 2 Position Indication 2 Year Leak Rate 2 Year 2011 1CM066 EFC 0.75 2
A/C 0
C M05-1071/1;F-3 Emercise Cold Shutdown Ref 2 Position trufication 2 Yeer Leek Rate 2 Year 2011 1CM067 EFC 0.75 2
A/C 0
C M05-1071/1;E-6 Exercise Cold Shutdown Ref 2 Position Indication 2 Year Leek Rate 2 Year 2011 1CYD16 G
6 2
A MO O
C M05-1012/6;c-6 Stroke Time (Emercise) 3 Month Leek Rete 2 Year 2011 Positicrt Indication 18 Month
~
ILLINOIS FWER COMPANY CLINTON PWER STATION 1
FUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 15 EQUIPMENT CATE-ACTU-POSITION Pf.tD/SMEET; REQUIRED TESTS RELIEF C9LD SMUTDOWN NUMBER TYPE SIZE CLASS GORY ATOR normat test coordinates (Adif tfonet Tests Satisf fed)
FREQUEhCY REQUEST JUSTIFICATION 1CYD1T G
6 2
A Mo o
C M05-1012/6;C-6 Stroke five (Ezercise) 3 Month l
Leek Rate 2 Year 2011 Position Indication 18 month 1CYO20 G
3 2
A M3 0
C M05-1012/6;D-3 Stroke Time (Emercise).
3 Month Position Indication 2 Year Leak Rate Refueling 2027,2011 l
1CYO21 G
3 2
A Mo o
C M05-1012/6;D-2 Stroke Time (Ezercise) 3 Month Position Indication 2 Year Leak Rate Refueting 2027,2011 1DG006A R
3.75x1 3
C C
0 M05-1035/1;E-6 Bench 5 Year 1DC0068 R
0.75x1 3
C C
0 M05-1035/1;D-6 Bench 5 Year 1DG006C R
- 0.75x1 3
C C
0 M05-1033/2;E-6 sench 5 Yeer i
5 Year 1DG0060 R
0.75x1 3
C C
0 M05-1035/2;0-6 sench 1DG006E R
0.75x1 0
C C
0 M05-1035/3;E-6 8ench 5 Year 10G006F R
0.75x1 0
C C
0 M05-1035/3;D-6 sench 5 feer 10G008A DIA 1.5 0
8
$0 C
0 M05-1035/1;E-3 Stroke Time (Emercise) -Att Procedure 3 Month Stroke Time (Emercise) 3 Month 2026 10G0088 DIA 1.5 0
8 S0 C
0 M05-1035/1;C-3 Stroke Time (Emercise) 3 Month 2026 Stroke Time (Emercise) - Alt Procedure 3 Month 10G008C ora 1.5 0
8 50 C
0 M05-1035/1;F-3 Stroke Time (Exercise) 3 Month 2026 Stroke Tise (Exercise) -Alt Proced;re 3 Month 13G0080 DIA 1.5 0
9 S0 C
0 M05-1035/1;B-3 Stroke Time (Exercise) 3 Month 2026 Stroke Time (Emercise) -Att Proced;re 3 Month 10G008E DIA 1.5 0
8 50 C
0 M05-1035/2;E-3 Stroke Time (Emercise) 3 Month 2026 Stroke Time (Exercise) -Att Proced;re 3 Month o
ELLINOIS PWER COMPANY CLINTON PWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 16 POSITION P110/SPEET; REQUIRED TESTS
- ELIEF COLD SMt/TDOWW EQUIPMENT
'CATE-fACTU-WUMBER TYPE SIZE CLASS GORTj; ATOR normat test coordinates (Additional Tests Settsfied)
FREQUE NCY REQUEST JUSTIFICATIC*
1DG008F DIA 1.5 0
s 50 C
O M05-1035/2;C-3 Stroke Time (Esercise) 3 Month 2026 Stroke Time (Exercise) -Alt Procedure 3 Month 1DG008G DIA 1.5 0
9 50 C
0 M05-1035/2;F-3 Stroke Time (Exercise) 3 month 2026 Stroke Time (Exercise)-Att ProcedJre 3 Month 1DC008N CIA 1.5 0
5 50 C
0 M05-1035/2;s-3 Stroke Time (Emercise) -Att ProcedJre 3 month Stroke fire (Exercise) 3 month 2026 1DGOO8J DIA 1.5 0
8 SO C
0 M05-1035/3;E-3 Stroke fisie (Emercise) 3 Month 2026 Stroke Time (Exercise) -Att ProcedJre 3 Month 10G008C DIA 1.5 0
8 SO C
0 M05-1035/3;D-3 Stroke Time (Ezercise) 3 month 2026 Stroke Time (Emercise) -Att Procedure 3 month 1DG163 C
1 0
A/C C
C M05-1035/1;E-7 Leak este (Emercise) -Alt ProcedJre 3 Month Leak Rate (Emercise) 3 month 2029,2011 10G169 C
1 O
A/C C
C M05-1035/1;C-7 Leak este (Ezercise) -Att ProcedJre 3 Month Lesk Rate (Emercise) 3 month 2029,2011 1DG170 C
1 O
A/C C
C M05-1035/2;E-7 Leek Este (Emercise) - Att Procedure 3 Month Leak tote (Emercise) 3 Month 2029,2011 1DG171 C
1 0
A/C C
C M05-1035/2;C-7 Leek mate (Esercise) 3 MJnth 2029,2011 Leek Este (Emercise) -Alt Procedure 3 Month 10G172 C
1 O
A/C C
C M05-1035/3;E-7 Leak date (Emercise) 3 Month 2029,2011 Lest Rete (Emercise) - Alt ProcedJre 3 Month 1DG173 C
1 O
A/C C
C M05-1035/3;C-7 Leek Rate (Emercise) 3 month 2029,2011 Leek Rate (Emercise) -Att procedure 3 Mcnth 1Do001A C
1.5 3
C C
o MOS-1036/1;s-1 Exercise 3 Month 1000018 C
1.5 3
C C
0 M05-1036/1;8-5 Exercise 3 Month
ILLINDIS PWER COMPANY CLINTON PWER STATION J
PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 17 RELIEF COLD SMUTDOWW j
EQL;1PMENT CATE-ACTU-POSITION P&lD/ SHEET; PEGJfRED TESTS NUMBER TYPE
$!ZE CLASS GORY ATOR normet test coordinates (Additional Tests Setlefied)
FREQUENCY REQUEST JUSTIFICAft0N i
100001C C
1.5 3
C C
0 M05-1036/2;s-3 Exercise 3 Month 100005A R
0.75x1 3
C C
0 M05-1036/1;C-1 sench 5 Year 5 Year 1000058 R
0.75 m1 3
C C
0 M05-1036/f;C-5 sench 100005C R
0.75x1 3
C C
0 M05-1036/2;C-3 sench 5 Yeet 1E12-F003A CL 14 2
8 MO O
O M05-1075/4;C-2 Stroke Time (Emercise) 3 Month Position Indication 2 Year 1E12-F003B CL 14 2
8 MO O
O M05-1075/4;C-7 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1E12-F004A G
20 2
A MO O
0,C M05-1075/1;A-4 Stroke Time (Emercise) 3 Month 18 Month 2011 Leak Rete Position Indication 2 Year 1E12-F004B C
20 2
A MO O
0,C M05-1075/2;A-6 Stroke Time (Emercise) 3 Month 18 Month 2011 Leak Rate Position Indication 2 Year 18 Month 2011 1E12-F005 R
1.5m2 2
A/C C
0,C M05-1075/1;8-5 Leak Rate sench 5 Year 1E12-F006A G
16 2
s MO C
C M05-1C75/1; A-5 Stroke Time (Emercise) 3 Month Position Indication 2 Year 1E12-F0068 G
16 2
8 MO C
C M05-1075/2;A-6 Stroke Time (Ezercise) 3 Month Position trufication 2 Year 1E12-F008 G
18 1
A MO C
C M05-1075/1;s-4 Strote Time (Emercise)
Cold shutdown 2021 Ref 1 18 Month 2011 Leek Rete Position Indication 18 Month 1E12-F009 C
18 1
A Mo C
C M05-1075/1;s-2 Stroke Time (Emercise)
Cold Shutdown 2021 Ref
- 18 Month 2011 Leak Rate Position Indication 18 Month i
b ILLINOIS PWER COMPAVY CLINTON FWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 18 EOUIPMENT CATE-ACTU-POSlYION PEID/SMEET; BEQUIRED TESTS RELIEF COLD SMUTDOWN NUMEER ftPE SIZE CL ASS CORY ATOR normal test coordinates
( Ackff tf onal Tests satisfied)
FREQUENCY REQUEST JUsitFICAt104 1E12-7011A CL 4
2 A
M0 C
C M05-1075/4;D-4 Stroke Time (Emercise) 3 Month Leak Rate 18 Month 2011 Position trdication 18 Month 1E12-F011s CL 4
2 A
No C
C M05 1075/2;C-3 Stroke Time (Exercise).
3 Month Leak Rate 18 Month 2011 Position Indication 18 Month 1E12-F014A G
18 3
3 M0 C
0 M05-1052/1;D-2 Stroke ilme (Emercise) 3 Month Position Indication 2 Yeer TE12-F0148 G
18 3
s No C
0 M05-1052/2;D-2 Stroke flee (Emercise) 3 Month Position indication 2 Year 1E12-F017A R
1.5x2 2
A/C C
0,C M05-1075/1;B-6 Leak rate 18 Month 2011 Bench 5 Year 1E12-F0178 a
1.5m2 2
A/C C
0,C M05-1075/2;s-6 Leak este 18 Month 2011 Seech 5 Year 1E12-F019 C
4 1
C C
0 MCS-1075/3;C-5 Esercise Cold Shutdwn pef 1 1E12-F021 GL 14 2
A MO C
C M05-1075/3:D-3 Stroke flee (Emercise) 3 Month Leak Rate 18 Month 2011
)
Position Indication 18 Month j
1E12-F023 GL 4
1 A
M0 C
0,C M05-1075/2;C-5 Stroke Time (Emercise)
Cotd shutdown 2021
- ef 1 Leak Rote 18 Month 2011 Position Indication 18 Month 1E12-F024A G
14 2
A MO C
0,C M05-1075/1;C-7 Stroke Time (Emercise) 3 Month Leak Rate 15 Month 2011 Position Indication 18 Month 1E12-FC248 G
14 2
A Mo C
0,C M05-1C75/2;C-2 Stroke Time (Enercise) 3 Month Leek Rate 11 Month 2011 Position Indication 18 Month w
ILLINDIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Fage 19 ECUlFMENT CATE-ACTU-POSITION P11D/ SHEET; REQUIRED TESTS RELIEF COLD $ WTDOWN NUMBER TYPE
$1ZE CLASS CORY ATOR rorsel test coordinates (Additionet Tests satisfied)
FREQUENCY REQUEST JUSilFICATION 1E12-F025A R
1x1.5 2
A/C C
0,C M05-1075/1;D-4 Leak Rete 2 Year 2011 sench 5 Year 1E12-F0258 R
1x1.5 2
A/C C
0,C M05-1075/2;E-5 Leak Rate 2 Year 2011 sench 5 teor TE12-F025C R
1x1.5 2
A/C C
0,C M05-1075/3;F-3 Leak Rete 18 Month 2011 sench 5 Year I
4 2
s Mo C
C M05-1075/4;E-3 Stroke Time (Enercise) 3 Month Position Indication 2 Year f
4 2
s Mo C
C
- 05-1075/4;E-6 stroke Time (Emercise) 3 Month j
Position Irdication 2 Year l
L 1E12-F027A G
12 2
A MO O
0,C M05-1075/1;0-4 Stroke Time (Exercine) 3 Month Leek Rate 2 Year 2011 Position Indication 2 Year I
12 2
A Mo o
o,C M05-1075/2:0-5 stroke flee (Emercise) 3 Month Leek Rete 2 Yeer 2011 Position Indication 2 Year 1E12-F02tA G
10 2
A Mo C
0,C M05-1075/1;F-3 stroke Time (Emercise) 3 Month Leek Rate 2 Year 2011 Position Indication 2 Year 1E12-F02Se G
10 2
A MO C
0,C N05-1075/2;F-6 Stroke ilme (Emercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year 1E12-F030 R
1x1.5 2
A-P*
C C
M05-1075/2;s-3 Leek sete 18 month 2011 1E12-F031A NC 14 2
C C
0 kO5-1075/1:5-8 Exercise 3 Mocch 1E12-F031s pC 14 2
C C
0 M05-1075/2;s-1 Exercise 3 Month
- Possive vetve
g J
l
(
ILLINDIS F0WER COMPANY CLINTON F0WER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 20 EQUIPMENT CATE-ACTU-POSITIOM P&lC/SMEEf; REQUIRED TESTS REL!EF COLD SMJTDcuW NtPBER TYPE
$1IE CLASS CORY ATOR normal test coordinates (Additional Tests $atisfied)
FREQUENCY REGUEST JUSTIFICATION 1E12-F031C NC 14 2
C C
0 M05-1075/3;D-1 Exercise 3 M mth 1E12-F036 R
4m6 2
A/C C
0,C M05-1075/4;E-5 Leak Rate 18 Month 2011 sench 5 Year 1E12-F037A GL 10 2
A Mo C
C N05-1075/1;F-2 stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Pcsition Indication 18 Month 1E12-7037B GL 10 2
A Mo C
C M05-1075/1;F-7 Stroke Time (Emercise) 3 Month Leak Rete 2 Year 2011 Position trdication 18 Month 1E12-F040 GL 3
2 s
Mo C
C N05-1075/2;E-1 Position Indicatlon 2 Year Stroke Tine (Enercise) 3 Month 1E12-F041A NC 12 1
A/C A0 C
0,C M05-1075/1:0-2 Exercise Refueling 2014 Partial Exercise Cold shutdown Ref 1 l
Lest Rate 18 Month Eu11 Position Indication 2 Year 1E12-F041B NC 12 1
A/C Ao C
0,C M05-1075/2;D-7 Exercise Refuelins 2014 Partlet Exercise Cold Shutdown Ref 1 Leek Rate 18 Month 2011 Position Indicatim 2 Year 1E12-F041C NC 12 1
A/C A0 C
0,C M05-1075/3;E-T Exercise Refueling 2014 Parttal Esercise Cold shutdown Wei 1 Leak Rate 18 Month 2011 Position Indication 2 Year 1E12-F042A G
12 1
A MO C
0,C M05-1075/1;D-3 stroke time (Ezercise)
Cold shutdown 2021 Ref 1 Leek Rate 18 Month 2011 Position Indication 2 Year 1E12-7042s G
12 1
A M0 C
0,C M05-1075/2;D-6 Stroke Time (Emercise)
Cold shutdown 2021 Ref 1 Leak Rete 18 Month 2011 Position Indicetion 2 Year
ILLINDIS PCWER COMPANY CLINTON POWER STATION PUNP AND VALVE TESTING PROGRAM PLAN l
TABLE II--VALVES Page 21 Ecu!PMEN!
CATE-ACTU-POSITION PAfD/SMLET; REJJ1 RED TESTS RELIEF CDLD SMUTDOW i
NUMBER TYPE SIZE CLASS CORY ATOR normal.
test coordinates (Ackfittor*at Tests satisfied)
FREGJENCY EfQUEST JUSTIFICATION 1E14-F042C
.G 12 1
A Mc C
0,C M05-1[75sr 95 Stroke Time (Exercise)
Cold shutdown 2021 Ref 1 Leak Rate 18 Month 2011 Position Irdication 2 Year 1E12-F046A C
4 2
C 0
0 M05-1075/1;B-7 Exercise 3 Month i
4 2
C 0
0 M05-1075/2;s-2 Exercise 3 Month 1E12-F046C C
4 2
C 0
0 M05-1075/3;B-2 Exercise 3 Month 1E12-F 04' c
14 2
e M0 O
O M05-1073/4;C-2 StrrAe Time (Exercise) 3 Month Position Irdication 2 Year 1E12-F047B G
14 2
B M0 O
O M05-1073/4;c-8 Stroke Time (Exercise) 3 Month Position Irdication 2 Yeer 1E12-F048A CL 14 2
8 M0 O
0,C M35-1075/1;C-8 Stroke Time (Exercise) 3 Month Position Irdication 2 Year 1E12-F0488 CL 14 2
s M0 O
0,C M05-1075/2;C-1 Stroke Time (Exercise) 3 Month Positie 1rdication 2 Year 1E12-F049 G
3 2
A MO C
C M05-1075/2;E-1 Leak Rate 18 Month 2011 Position Irdication 2 Year Stroke Time (Exercise) 3 Month 1E12-F050A WC 10 2
A/C C
0,C MOS-1075/1;D-5 Exetcise (0 pen)
Cold Shutdown Ref 3 Lenk tate (Exercise Closed) 18 Month 2011,2030 1E12-F0509 NC 10 2
A/C C
0,C M05-1075/2;E-5 Ereccise (open)
Cold shutdown Ref 3 Leek pate (Emercise Closed) 18 Month 2011,2030 1E12-F051A G
6 2
A Ao C
C M05-1075/4;F-2 Stroke Time (Exercise) 3 Month Leak este 18 Month 2011 1E12-F051s G
6 2
A Ao C
C M')S-1075/4;F-6 Stroke Time (Exercise) 3 Month Lesk este 18 Month 2011
-u
l ILLINOIS POWER COMPANY I
CLINTON POWER STATIGk
~
PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES 2
Page 22 EQUIPMENT CATE-A."TU-POSilloN PRID/ SHEET; REQUIRED TLSTS RELIEF COLD SMUTDOWM m,at u TYPE SIZE CLASS CORY ATO normat test coordinates (Additional Tests satisfied)
FREQUENCY REGUEST JUST!FICATION 1E12-F052A GL 8
2 8
Mo C
C M05-1C75/4;E-4 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1E12 F0528 GL 8
2 s
M0 C
C M05-1075/4;E-6 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1E12-F053A GL 10 2
A MO C
0,C M05-1075/1;D-6 Stroke Time (Exercise)
Cold shutdown 2021
- >f 1
Lesk Rete 18 Month 2011 Position Indication 18 Month 1E12-7053B GL 10 2
A M0 C
0,C M05-1075/2;E-4 Stroke Time (E7ercise)
Cold shutdown 2021 Ref 1 Leak Rate 18 Month 2011 Position Indication 18 Month 1E12-7054A C
4 2
C C
o M05-1075/4;0-3 Exercise 3 Month 1E12-F0548 C
4 2
C C
0 M05-1075/4;D-6 Exercise 3 Month 1E12-FC55A R
8x12 2
A/C C
0,C M05-1075/4;C-2 Leak Rete 18 Month 2011 Bench 5 Tear 1E12-F0558 R
8x12 2
A/C C
0,C M05-1075/4;C-7 Leek Rate 18 Month 2011 Bench 5 Year l
0.75 2
B So C
C M05-1075/ ;a-4 Stroke Time (Exercise, Loss cf Power) 3 Month 2013 4
Position Indication 2 Year 1E12-F0609 G
0.75 2
8
$0 C
C M05-1075/4;B-5 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Position Indication 2 Year 1E12-F064A G
4 2
A M0 O
0,C M05-1075/1;8-8 Stroke Time (Exercise) 3 Month Leak Rate 18 Month 2011 P%ltion Indication 2 Year 1F12-70648 C
4 2
A MO O
0,C N05-1075/2;8-1 Stroke Time (Erercise) 3 Month Leak Rate 18 Month 2011 Positicn irtfication 2 Year
._g g
ILLINOTS PWER COMPANY CLINTON PWER STA~IOM PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 23 EQUlFPENT CATE-ACTU-POSIfloN F&lD/ SHEET; REQUIRED TESTS RELIEF COLD SMUTDOWN NUMBER TTFE SIZE CLASS GORY ATOR normet test coordinates (Additionet Tests Satisfied)
FREQUENCY
- EQUEST
- JSilFICAT10N 1E12-F064C G
4 2
A MO O
0,C M05-1075/3;8-1 Stroke Time (Exercise) 3 Month Leek Rete 18 Month 2011 Positicn Indication 2 Year 1E12-FCd5A G
4 2
8 A0 C
C M05-1075/4;D-3 Stroke fire (Emercise).
3 Month 1E12-F0658 G
4 2
8 A0 C
C N05-1075/4;D 6 Stroke Time (Exercise) 3 Month 1E12-F068A G
18 3
8 MO C
0 M05-1052/1;c-1 Stroke 78== fr : else.
3 Month Pos f I'
.nolc' I'c' 2 Year St he Tim tex,Ise) 1 Month 1E12-F0688 G
18 3
8 Mo C
0 M05-1052/2;C-1 7. df - Irdi-4 ton fear 1E12-F0754 G
0.75 2
s 50 C
C M05-1075/4;8-4 Stree ime 4Estrc
't, Los M pawer?
3 P ith 2013 Position I.v?lcation 2 iear iE12-F0758 G
0.75 2
8 SO C
C M05-1075/4;8-5 Stroke Time (Eme cese, Leas of Nar) 3 Month 2013 Position Indication 2 Year 1E12-F084A C
2.5 2
C 0
0 M05-1075/1;8-7 Esercise 3 Month 1E12-F0848 C
2.5 2
C 0
0 M05-1075/2:8-2 Esercise 3 Month 1E12-F084C C
2.5 2
C 0
0 M05-1075/3;E-2 Esercise 3 Month l
2 C
0 0,C M35-1075/1;8-8 Exercise (Open) 3 Month Exercise (Closed)
Att Refueling 2008 j
2 C
0 0,C P05-1075/2;8 1 Esercise (open) 3 Month l
Esercise (Closed)
Alt Refueting 2008 TE12-F085C GSC 2
2 C
0 0,C M05-1075/3;E-1 Esercise (Open) 3 Month Esercise (Closed)
Att Refueling 2008 1E12-F087A G
6 2
A Mo C
C M05-1075/4;E-3 Stroke Time (Exercise) 3 Month teak Rate 18 Month 2011 i
ILLIN01: PWER COMPANY CLINTON PWER STATION FUMP AND VALVE TEGTING PROGRAM PIAN TABLE II--VALVES Page 24 EQUIPMENT CATE-ACTU-POSITION P&fD/SMEFT; REQU RED TESTS RELIEF COLD SMUTDOWN NtM9ER ffPE SIZE CLASS GORY ATOR ncrmall test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1E12-F0878 G
6 2
A Mo C
C M05-1075/4;E-7 Stroke time (Exercise) 3 Month Leak Rate 18 Month 2011
}
1E12 F094 G
4 3
8 MO C
0,C M05-1075/4;E-7 Stroke Time (Exercise) 3 Month i
Position Indication 2 Year 1E12-F095 2WAY ').75 3
8 So 0
C M05-1015/4;E 7 Exercise (Loss of Poiner) 3 Month 2007 1E12-F096 G
4 2
8 M0 C
0,C M05-1075/4;E-7 Stroke Time (Exercise) 3 Month Post:fon indication 2 Year 1E12-F003 C
4 2
C C
0 M05-1075/4;0-7 Exercise 3 Month 1E12 F101 R
1x1.5 - 2 A/C C
0,C N05-1075/3;C-5 Leak Rate 18 Month 2011 Bench 5 Year 1E12-F105 G
20 2
A Mo 0
0,C M05-1075/3;8-5 Stroke time (Exercise) 3 Month Lesk Rate 18 Month 2011 Position Indication 2 Year 1E12-r475 C
1 2
A/C C
0,C M05-1075/1:8-2 Leck Rate (Exercise Closed)
Refueling 2011,2018 Esercise (open)
Refueling 2018 1E21-f001 G
20 2
A MO O
0,C M05-1073;8-4 Stroke Tise (Exercise) 3 Month Leak Rate 18 Month 2011 Position Indication 2 Year IE21-F003 NC 12 2
C C
o M05-1073;E-6 Esercise 3 Month 1E21-F005 C
to 1
A Mo C
0,C M05-1073;E-4 Stroke Time (Emercise)
Cold Shutdme 2021 Ref 1 Leak Rate 18 Month 2011 Position Indication 2 Year 1E21 F006 NC 10 1
A/C A0 C
0,C M05-1073;E-2 Exercise Refueting 2014 Partial Exercise Cold Shutdown Ref 1 l
Leak Rate 18 Month 2011 Position Indication 2 Year j
.A__
.~
m ILLINOIS POVER COMPANY-CLINTON POWER STATION ^
PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES l
Page 25 EQUIPMENT CATE-ACTU-POSITION P&f0/SMEET; REQUIRED TESTS RELIEF COLD SMUTDOWN
-WOMEER TYPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests satisfied)
FREQUENCY REQUEST-JU$flFICATION 1E21-F011 G
4.
2 A
MO O
0,C M05-1073;D-6 Stroke Time (Exet.ise) l Leek Rete 3 Month 18 Month 2011 l-Position Indication :
2 Year i
- TE21-F012 Gt, 10 2
A Mo -
C.
C M05-1073;0-5 Stre,ke Time (Exercise).
3 Month Lest Rate 18 Month 2011 i
' Posittors Indication 18 Month.
I 1E21-F018 R
1.5x2 2
A/C
'C 0,C M05-1073;E-5 teat Kete 18 Month 2011 sench 5 Year 1E21-F031 R
1.5x1 2
A/C-C:
0,C M05-1073;C-8 test Rete 18 Month 2011 l
tmcn 5 Year 1E21-F033 C
2.5 2
C 0
0 M05-1073;f-6 Exercise 3 Month 4
y l
2 C
0 0,C M05-1073;0-6 exercise (open) 3 Month i
Esercise (closed)
Att Refueting 2006 1E21-F3'03 NC 1G
,2 C
.C:
0 M05 1073;L-5 Exercise 3 Month 4
1E22 F001 G
16 2-8 MO
.0 C
M05-1074;A Stroke Time (Emercise) 3 Month Sositfor andication 2 Year-4 1E22-F002 C
16 2
C 0-
.O N05-1074;A-5 Exercise 3 Mon'.h
}
Exercise - Att Method 3 Month 1E22-F004 G
10 1
A Mo C
0,C M05-1074;E-7 Stroke ilme (Emercise)
Cold Shutdown 2021 Ref 1 Leak Rate 18 Month 2011 Pot,ition Indication 2 Year i
1E22-7005 NC 10 1
A/C Ao C
0,C M05-1074;E Exercise Refueling 2014 9
Partiet Exercise Cold Shutdown '
Ref 1 Leat Rate.
18 Month 2011 4
Position Indication 2 Year 1E22-F006 GSC 2
2 C
M.
0 0,C M05-1074;0-4 Exercise (0 pen) 3 Month Exercise (Closed)
Refueling-2006 i -
4 4
1 i
a
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 26 EJUWENT CATE-ACTU-POSITION PalD/ SHEET; CEQUIRED TESTS RELIEF COLD Sm;TDOWN M.NBER TYPE SI2E CLASS CORY ATOR normat test coordinates (Additional Tests satisfied)
FREQUENCY REQUEST JUSTIFICATION 1E2?-F007 C
2.5 2
C 0
0 M05-1074;D-4 Exercise 3 Month it 2-F010 CL 10 2
8 Mo C
C M05-1074;D-6 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1E22-F011 GL 10 2
8 M0 C
C M05-1074;D-5 Stroke Time (Exercise) 3 Month Positf ore Indication 2 Year 1E22-F012 G
4 2
A Mo C
0,C N05-1074;D-3 Stroke Time (Exercise) 3 Month teak Rate 18 Month 2011 Position Indication 2 Year 1E22-F014 x
1x0.75 2
A/C C
0,C M05-1074;C-5 Leak Rate 18 Month 2011 Bench 5 Year 1E22-F015 G
20 2
A M0 C
0,C M05-1074;8-7 Stroke Time (Exercise) 3 Month Leak Rate 13 Month 2011 Position Indication 2 Year 1E22-F01b c
20 2
C C
0 M05-1074;8-6 Exercise 3 Month Esercise - Att Method 3 Month 1E22-F023 CL 10 2
A MO C
C M05-1074;D-6 Stroke Time (Exercise) 3 Month Leak Rate 18 Month 2011 Position Indication 18 Month 1E22-F024 kC 14 2
C C
0 M05-1074;E-3 Exercise 3 Month 1222-F035 R
1x0.75 2
A/C C
0,C M05-1074;E-3 Leak Rate 18 Month 2011 Bench 5 Year 1E22-F039 a
1n0.75 2
A/C C
0,C M05-1074;C-6 Leak Rate 18 Month 2011 Bench 5 Year 1E22-F330 EFC 0.75 2
A/C 0
C M10-1074/3 Exercise Cold shutdown Ref 2 Position Indication 2 Year Leak Rate 2 Year 2011
9 ILLINOIS POWER COMPANY CLINTON PDGIER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 27 I
ECUIPME N T CATE-ACTO-POSITION PRID/SMEET; REQUIRED TESTS RELIEF COLD SMUTDOWN WJMBER TYPE
$12E CLASS GORY ATCR noreaal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST NST!FICATION 1E22 F332 EFC 0.75 2
A/C o
C M10-1074/3 Exercise Cold Shutdown Sef 4 Position IMication 2 Year Leak Rate 2 Year 2011 1E31-F014 t.
1 2
A SO O
C M05-1041/4;E-8 Stroke Time (Exercise, Loss of Pcaser) 3 Month 2013 Position Ind! cation 2 Year Leak Rate Refueting 2027,2011 i
l 1E31-F015 G
1 2
A SO O
C M05-1041/4;E-7 Strcke Time (Exercise, Loss of Power) 3 Month 2013 Position IMication 2 Year Leak Rate Refueling 2027,2011 1E31-F017 G
1 2
A So o
C M05-1041/4;C-7 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Position Indication 2 Year Leak Rate Refueling 2027,20f t 1131-F018 G
1 2
A SO O
C M05-1G41/4;C-8 Stroke Time (Enercise, Loss of Po-er) 3 month 2013 Position Indicatiors 2 Year Leek Rate Refueling 2027,T 11 1E32-F001A CL 1.5 1
A Mo C
0,C M05-1070;C-7 Stroke Time (Emercise)
Cold Shutdown 2021 sef 1 Leak Rate 18 month 2011 Position IMication 2 Year 1E32-F001E GL 1.5 1
A M0 C
0,C M05-1070;E-7 Streke Time (Emercise)
Cold Shutdown 2021 Ref 1 teak Rate 18 Menth 2011 Position Indication 2 Year l'32-F001J a
1.5 1
A M0 C
0,C M05-1070;B-7 Stroke Time (Exercise)
Cold Shutdown 2021 Ref 1 Leak Rate 18 Month 2011 Position Indication 2 Year 1E32-F001m ct 1.5 1
A M0 C
0,C M05-1070;0-7 Stroke Time (Enercise)
Cold shutdown 2021 Ref 1 teek Rate 18 Month 2011 Position Indication 2 Year 1E32-F002A ct 1.5 2
8 M0 C
0,C M05-1070;C-7 Stroke Time (Enercise)
Cold Shut h 2021 Ref 1 Position IMication 2 Year o
i
?
l ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 28 EQU!PMENT CATE-ACTU-POSITION PalD/ SHEET; REcuteED TESTS WUMBER ffPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY PEQUEST JUSTIFICATION RELIEF COLD $NUIDOW 1E32-F002E CL 1.5 2
a Mo C
0,C M05-1070;E-7 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year l
1E32-F002J CL 1.5 2
5 M0 C
0,C M05-1070;B-7 Stroke Time (Emercise)
Cold shutdown 2021 Ref 1 Position Indication 2 Year 1E32-F002W CL 1.5 2
s MG C
0,C N05-1070;D-7 Stroke Time (Emercise)
Cold Shutdown 2021 sef 1 Position Indication 2 Year 1132-F003A GL 1.5 2
8 Mo C
0,C M05-1070;C-7 Stroke Time (Emercise)
Ccid Shutdown 2021 Ref 1 Position Indication 2 Yeer 1E32-F003E CL 1.5 2
5 MO C
0,C M05-1070;E-7 Stroke Time (Emercise)
Cold shutdown 2021 sef 1 Position Indication 2 Year 1E32 F003J CL 1.5 2
8 MO c
0,C M05-1070;A-7 Stroke Time (Emercise)
Cold shutdown 2021 Ref 1 Position Indication 2 Yeer 1r32-7003w GL 1.5 2
8 Mc C
0,C M05-1070;D-7 Stroke line (Emercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year 1E32-F006 G
2.5 2
8 M0 C
0,C M05-1070;C-4 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year 1E32-7007 G
2.5 2
a MO C
0,C M05-1070;C-3 Streke ilme (Emercise)
Cold Shutdcwn 2021 te* 1 Position Indication 2 Year 1E32-F008 C
2.5 2
e M0 C
0,C M05-1070;A 4 Stroke Time (Emercise)
Cold Shutdown 2021 eef 1 Pesition Indication 2 Yeer 1E32-F009 C
2.5 2
8 M0 C
0,C M05-1070; A-3 Stroke Time (Emercise)
Cold Shutdown 2021 pef 1 i
Position Indication 2 Year 1E32-FO M C
0.75 2
C C
0,C M05-1070;E-4 Emercise (open) cold Shutdown Ref 1 Emercise (closed) 3 Month 1E32-F011 C
0 75 2
C C
0,C M05-1070;e-2 Emercise (open)
Cold Shutdown Ref 1 Emercise (Closed) 3 Month
+
- -.. - - ~ ~ -
l ILLINOIS PWER COMPANY l
CLINTON PWER STATION I
PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 29 ECUIPMENT CATE-ACTU-POSITION PilD/ SHEET; REQUIRED TESTS RELI*F COLD StIUTDOW kir8E R TYPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests $stisfle:f)
FREQUEhCY REQUEST JU$ilFICAfl0N 1E32-F315A C
0.75 2
C C
0,C M05-1070;A-4 Exercise (open)
Cold shutdown Ref 1 Exercise (Closed) 3 Month 1E32 F3158 C
0.75 2
C C
0,C M05 *070;A-4 Exercise (0 pen)
Cold Shutdown Ref 1 Exercise (Closed) 3 Month 1E32-7315C C
0.75 2
C C
0,C M05-1070;A-4 Exercise (Open)
Cold shutdovi Ref 1 Exercise (Closed) 3 Month 1E32-F3150 C
0.15 2
C C
0,C M05-1070;A-4 Exercise (open) cold shutdown Ref 1 Exercise (Closed) 3 M mth l
4 2
s MO o
C M05-1079/2;D-3 stroke Time (Exercise) 3 Month Position Indication 2 1' ear l
1E51-F004 CV 1
2 s
A0 0
C M05-1079/1;s-1 stroke Time (Exercise, Loss of Power) 3 Month 2032 l
Position Indication 2 Yeer 1E51-F005~
CV 1
2 s
Ao C
C M05-1079/1;B-2 stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Position Indication 2 Year 1E51-F010 c
6 2
s MO O
C M05-1079/2;A-6
$troke fine (Exercise) 3 Month Position Indication 2 Year 1E51-F011 C
6 2
C C
0 M05-1079/2;A-4 Exercise 3 Month 1E51-F013 G
6 1
A MO C
0,C M05-1079/2;F-6 Stroke Time (Exercise)
Cold Shutdown 2021 Ref 1 Leak Rate 18 Mar.th 2011 Position Indication
? Year 1E51-F018 R
2x3 2
C C
0 M05-1079/2;C-5 sench a Year 1E51-F019 CL 2
2 A
MO C
0,C M05-1079/2;D-6 Stroke Tise (Exercise) 3 Month Leak Rate 18 Month 2011 Position Indication 2 Year 1E51-F021 C - 2.5 2
C C
C M05-1079/2;D-5 Exercise 3 Month t
p
+
c.-
5 i
ILLINDIS POWER COMPANY
.CLINTON POWER STATION.
PUMP AND VALVE TESTING PROGRAM PLAN-TABLE II--VALVES, 3
Page 30 IQUIPMENT CATE-ACTU-POSITION
' PilD/ SHEET; REQUIRED TESTS RELIEF COLD SMUTDOWN NUMBER TYPE SIZE CLASS GORT ATOR normal test coordinates
.(Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1E51-F022 cl.
4 2
s MO C-C P05-1079/2;E-5 Stroke Time (Exercise) 3 Month Position Indication 2 Year
.I I
1E51-F025 CV 1
2 8
A0 0
C M05-1079/1;D-5 Stroke Time (Exercise, Loss of Power) 3 Month 2032 Position Indication 2 Year
+
.I
,l
{
1E51-F026 CV 1
2 8
AO.
O C
M05-1079/1;0 5 Stroke Time'< Exercise, Loss of Power) 3 Month.
2032-Position Indication 2 Year 4
6 2
C C-0 M05-1079/2;s-4' Exercise 3 Month-s i
6 2
A MO C
0,C M05-1079/2;C-6 Stroke Time (Exercise) 3 Month-4 Leek Rate 18 Month 2011 Position Indication 18 Month 4
4 1E51-F040 C
12 2
A/C
.C 0,C M05 1079/1;C-4 Exercise (Open) 3 Month 2030 Leak Rate (Exercise Closed) 18 Month 2011 1E51-F045 ct 4
2
-S M0 C
'0,C M05-1079/1;D-4 Stroke lea (Exercise) 3 Month Position Indic.! ion 2 Year 1E51-F046 GL 2
2 B
MO C
0 M05-1079/2;C-3 Stroke Time (Exercise)
'3 Month Position Indication 2 Year 1E51-F059 G
4 2
s M0 C
C M05-1079/2;E-5 Stroke Time (Exercise) 3 Month l
Position Indication 2 Year l
.C 2.5 2
C 0
0 M05-1079/2;B-4 Exercise 3 Month 1E51-r062 C
2 2
C 0
0 M05-1079/2;s-4 Exercise 3 Month 1E51-F063 G
8 1
A MO O
C M05-1079/1;E-8 Stroke Time (Exercise).
3 Month Leak Rate.
2 Year 2011 Position Indication 18 Month l
8 1
A MO O
C M05-1079/1;E-5 Stroke Time (Exercise) 3 Month Leak Rete 2 Year 2011 I
Position Indication 18 Month f
i I
Y y
1 Lt
,h
4 ILLINDIS POWER COMPANY CLINTON POWER STATION l
l PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 31 EQUIPMENT CATE-ACTU-
' POSITION P&lD/ SHEET;.
REQUIRED TESTS REitEFL COLD SMUTDOWN NUMBER TYPE
$12E CLASS CORY ATOR normal test coordinates (Additional Tests Satisfied) -
FREQUENCY REQUEST JUSTlFICAfl04 1E51-F065 kC 4-1 C.
.C 0
M05-1079/2;E-6 Exercise Cold Shutdown Ref 1 1E51-F066 NC 4-1 A/C A^,s C
0,C M05-1079/2;F-8 Exercise (0 pen)..
Cold Shutdown Ref 4 Leak Rate (Exercise closed) 18 Month 2011 1E51-F068 G
12 2
.t IC 0 l C.
M05-1079/?;C-5 Stroke Time (Exercise) 3 Month Leak Rate 18 Month 2011 Position Indication 2 Year 1E51-F076 CL.
1 1
A No C
C M05-1079/1;E-8 Stroke Time (Exerciae) 3 month 3
Leak Rate 2 Year 2011 Position Indication 18 Month i
1E51-F077 GL 1.5 2
A-M0 O
.C M05-1079/1;C-5 Stroke Time ( D ercise) 3 month Leak Rate 2 Year-.
2011 Position Indication 18 Month 1
l 1E51-F073 G
3 2
A MO O
.C M35-1079/1;c-6 Stroke Time (Ezercise) 3 Month Leak Rate 2 Year 2011 Position Indication
'8 Month i
1E51 F079 VR 2
2 C'
C 0
M05-1079/1;C-6 Exercise 3 Month
?
1E51-F031 VR 2
2 --
C' C
0 M05-1079/1;C-6 Exercise 3 Month 1E51-F090 R
0.75x1 2'
A/C C
0,C M05-1079/2;E-5 Leek Rate 18 Montn 2011 Bench 5 Year 1E51 F095 1
1 2
8 M0 C
0,C M05-1079/1;D-4 Stroke Time (Erercise)
' wth
'l Position Indication s Year 1E51-F377A EFC 0.75 2
A/C 0
C M10-1079/2 Exercise Cold shutdown Ref 2 Position Indication 2 Tear i
Leak Rate 2 tear 2011 j
-4 4
1E51-F377B EFC 0.75 2
A/C 0
C.
M10-1079/2 Exercise Cold Shutdown ReF 4 Positico Indication 2 Year' Leak Rate 2 Tear 2011-r i
?
9 ie
.m..
....m
.o 1
l ILLINOIS POWER CO!!PANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 32 EQUIPMENT CATE-ACTU-POSli10N P8tD/ SHEET; REQUIRED TESTS RELIEF COLD SNtJfDOWN NUMBER ifPE SIZE CLASS CORY ATOR normet test coordinates (AcMitional Tests satisfied)
FREQUENCY REQUEST JUSTIFICATION 1FC004A cv 8
3 a
A0 0
0 M05-1037/3;E-5 Stroke Time (Exercise, Loss of Power) 3 Month Position Indication 2 Yeer 1FC0048 cv 8
3 8
A0 0
0 M05-1037/3;A 5 Stroke Time (Exercise, Loss of Power) 3 Month Position Indication 2 Year 1FC007 G
10 2
A Mo o
C M05-1037/1;B-2 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2C*1 Position Indication 18 Month 1FC008 G
10 2
A MO O
C M05-1037/1;8-1 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Irdication 18 Month 1FC011A e
14 3
8 MO O
0,C M05-1037/3;E-7 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1FC0118 8
14 3
a MO O
0,C M05-1037/3;A-7 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1FC013A WC 14 3
C 0
0,C M05-1037/3;E-7 Exercise Open 3 Month Exercise Close 3 Month 1FC0139 NC 14 3
C 0
0,C M05-1037/3;A 7 Exercise Open 3 Month Exercise Close 3 Month 1FC015A a
14 3
e MO O
o M05-1037/3;E-2 Stroke ilme (Exercise) 3 Month Position Indication 2 Year 1FC0f58 a
14 3
s MO O
o M05-1037/3;A-2 Stroke Time (Enercise) 3 Month Position Indicatico 2 Year 1FC0164 8
8 3
8 MO O
C M05-1037/3;D-6 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1FC0168 8
8 3
8 MO O
C M05-1037/3;C-6 Stroke ilme (Eme vise) 3 Month r
Position Indication 2 Year a
.l
.w t
^
ILLINOIS PCUER COMPANY CLINTON POVER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 33 EQUIPMENT CATE-ACTU-POSITION P&lD/SMEET; REQUIRED TESTS RELIEF COLD SMUTDOW U SER TYPE SIZE CLASS CORY ATOR norest test coordinates (Additionet Teste Satisfied)
FREQUENCY REQUEST JUSTIFICATICM 1FC017 8
8 3
s Ao o
C M05-1037/3;C-6 Strcte Time (Emercise, Loss of Power) 3 Month Position Irdication 2 Year l
CC23 8
8 3
s Ac 0
C M05-1037/3;C-3 Stroke Time (Emercise, Loss of Power) 3 Month 2032 Position trdication 2 Year TFC024A 8
8 3
8 MO O
C M05-1037/3;E-2 Stroke Time (Exercise) 3 Month Positi m Indication 2 Year IFC0248 8
8 3
s n3 0
C M05-1037/3;C-2 Stroke Time (Emercise) 3 month Position Indication 2 Year 1FCO26A 8
14 3
a Mo o
o,C M05-1037/3;E-2 Stroke Time (Emercise) 3 Month Position Indication 2 year 1/Cn26a a
14 3
s Mo o
o,C M05-1037/3;8-2 Stroke Time (Emercise) 3 Month Position Indication 2 Year 1FC036 G
S 2
A MO O
C M05-1037/1;E-1 Stroke Time (Esercise) 3 Meth Lenk este 2 Year 2011 Position Irdication 18 Month l
1FC037 G
8 2
A MO O
C N05-1037/1;E-2 Stro6e ?8,e (Emercise) 3 Month l
Lesk Ri e 2 Year 2011 Position trdication 18 Month 1FC091 R
Am6 3
C C
o M05-1037/3;E-1 Bench 5 Year 18P050 G
6 2
A MO O
C M05-1039/9;D-3 Stroke Time (Exercise) 3 M mth Leak note 2 Year 2011 Position Indication 18 Month 1FP051 G
10 2
A MC O
C M05-1039/9;C-7 Stroke Time (Ezercise) 3 Month test sete 2 Year 2011 Position Indication 18 Month 1FPC52 G
10 2
A Mo o
C M05-1039/9;C-6 Stro6e Time (Esercise) 3 Month Leek fate 2 Year 2011 Position Indication 18 mmth
r ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 34 EQUIPMENT CATE-ACTU-POSITION P&lD/SMEET; REJulREC T2STS RELIEF COLD SHUTDouw NUM9ER TYPE SIZE CLASS GORY ATOR normat test coordinates (Additional Tests satisfied)
FREQUENCY REQUEST JUST!FICATION 1FP053 G
10 2
A MO O
C M05-1039/9;C-4 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1FP054 G
10 2
A MO O
C.
M05-1039/9;c-2 Stroke Time (Exercise)-
3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1FP078 G
4 2
A MO O
C M05-1039/9;D-5 Stroke Time (Ezercise) 3 Month Position indication 2 Year Leak Rate Refueling 2027,2011 1FP079 G
4 2
A Mo o
C N05-1039/9;D-6 Stroke Time (Ezercise) 3 Month Position Indication 2 Year Leak Rate Refueling 2027,2011 1FP092 G
6 2
A MO O
C M05-1039/9;D-3 Stroke Time (Ezercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1G33-F001 G
6
-1 A
MO O
C P05-1076/4;8-8 Stroke Time (Exercise)
Refueling 2017,2021 teak Rate 2 Year 2011 Position Indication 18 Month 1G33-F004 G
6 1
A MO O
C M05-1076/4;B-5 Stroke Time (Exercise)
Refueling 2017,2021 Leak Pete 2 Year 2011 Position Indication 18 Month 1G33-F028 G
4 2
A Mo C
C M05-1076/4;E-8 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1G33-F034 G
4 2
A M0 C
C M05-1076/4;E-7 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1G33-F039 G
4 2
A Mo o
C M05-1076/4;D-7 Stroke Time (Exercise)
Refue;ing 2017,2021 Leak Rate 2 Year 2011 Position Indication 18 Month
ILLINOIS PWER COMPANY CLINTON PW ER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 35 ECUIPMENT CATE-ACTU-POSITION P&I0/ SHEET; REQUIRED TESTS RELIEF COLD SHUTD M NUMBER TYPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests satisfied)
FREQUENCY REQUEST JUSTIFICATION 1G33-F040 G
4 2
A Mo o
C M05-1076/4;0-8 Stroke Time (Exercise)
Refueting 2017,2021 Leak Rate 2 Year 2011 Position Indication 18 Month 1G33-F051 sc 4
2 C
O C
M05-1076/4;D-6 Exercise Att Refueling 2008 1G33-F052A NC 4
2 C
0 C
M05-1076/4;0-5 Exercise Att Refueling 2008 1C33-F0528 NC 4
2 C
0 C
M05-1076/4;0-5 Exercise Att Refueling 2008 1G33-F053 G
4 2
A MO 0
C M05-1076/4;C-8 Stroke Time (Exercise)
Refueling 2017,2021 Leak Rate 2 Year 2011 Position Indication 18 Month 1G33 F054 G
4 2
A MO O
C M05-1076/4;C-7 Stroke Time (Exercise)
Refueling 2017,2021 Leak Rate 2 Year 2011 Position Indication 18 Month 1Mc001 8
2 2
A Mo C
0,C N05-1063;D-3 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1HC004 2
2 A
Mo C
0,C a05-1063;C-3 Stroke Time (Exercise) 3 Month Leak Rate 2 year 2011 Position Indication 18 Month 1MC005 8
2 2
A No C
0,C N05-1063;E-3 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 18 Month 1HG008 8
2 2
A M0 C
0,C M05-1063;E-3 Stroke Time (Exercise) 3 Month Lesk Rate 2 Year 2011 Position Indication 18 Month 1MG009A C
6 2
A M0 C
0,C M05-1063;E-4 Stroke Time (Exercise) 3 Month Position Indication 2 Year Leak Rate Refueling 20?T,2011
.t- -
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 36 RELIEF COLD SMU7DOWN EQu!PMENT CATE-ACTU-POSITION P&lD/ SHEET; REcutRED TESTS WUMSER TYPE SIZE CLASE GORY ATOR normal test coordinates (Ackficionet fests Set tsfled)
FREQUENCY REQUEST
- JSTIFICAf!OM 1HG0099 G
6 2
A Mo C
0,C M05-1063;E-6 Stroke Time (Exercise) 3 Ponth Position Indicetion 2 Yese Leak Rate Refueting 2027,2011 1HG010A VR 10 2
A/C C
0,C M05-1063;C-4 Exercise (Actuator) 3 Month Position Indication 2 Year Enercise (Set Point)
Cold shutdown Ref 3 teak ante Refueling 2027,2011 1HG0108 va 10 2
A/C C
0,C M05-1063;c-7 Esercise (Actuator) 3 Month Position Indication 2 Year Esercise (Set Point)
Cold Shutdown ref 3 defueling 2027,2011 Leak ante 1hC010C vm to 2
A/C C
0,C MOS-1063;B-4 Exercise (Actuator) 3 Month Position Indication 2 Year Refueling 2027,2011 Leak sete i
Exercise (Set Point)
Cold Shutdown Ref 3 thG0100 VR 10 2
A/C C
0,C M05-1063;8-7 Exercise (Actuator) 3 Month Position Indication 2 Year l
Leak Rate Refueling 2027,2011 Exercise (Set Point)
Cold Shutdown Ref 3 1
1H0011A VR 10 2
A/C C
0,C MUS-1063;C-4 Exercise (Actuator) 3 Month Position Indication 2 Year Exercise (Set Point)
Cold Shutdown Ref 3 Leek Rate gefueling 2027,2011 iwG0118 vt 10 2
A/C C
0,C M05 1063;C-6 Exercise (Actuater) 3 Month Position Irufication 2 Year Esercise (Set Point)
Cold Shutdown Ref 3 Refueling 2027,2011 Lesk note twG011C VR 10 2
A/C C
0,C M05-1063;s-4 Exerciss (Actuator) 3 Month Position Indication 2 Year Exercise (Set Point)
Cold Shutdown Ref 3 Leek Rate nefueling 2027,2011 I
a
l i.
ILLINOIS POVER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 37 EQUIPMENT CATE-ACTU-POSITION P&lD/ SHEET; REQUIRED TESf5 RELIEF COLD SMJTDOWs NUMBER TYPE SIZE CLASS CORY ATOR normal test coordinates (Additional fests tatisfied)
FREQUENCY REQUEST JUSTIFICATION 1H00110 VR 10 2
A/C C
0,C M05-1063;8-6 Esercise (Actuator) 3 Month Position Indication 2 Year Leak Rate Refueling 2027,2011 Exercise (Set Point)
Cold shutdown Ref 3 IIA 005 cv 3
2 A
A0 0
C M05-1040/5;D-2 Stroke Time (Esercise, Loss of Power)
Cold Shutdown 2021 Ref 1 Leak Rate 2 Year 2011 Positicvi Indication 18 Month 1!A006 cv 3
2 A
AO O
C M05-1040/5;0-3 Stroke Time (Erercise, Less of Power)
Cold Shutdown 2021 Ref 1 2 Year 2011 Leak Rate Position Indication 18 Month 1!A007 CV 3
2 A
A0 0
C M05-1040/5;D-3 Stroke time (Emercise, Loss of Power)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year Refueling 2027,2011 Leak Rate ffA003 CV 3
2 A
A0 0
C M05-1040 5;D-3 Stroke fire (Emercise, Lose of Power)
Cold shutdown 2021 Ref 1 Position Indication 2 Veer Leak Rate Refueting 2027,2011 11A012A CL 1
2 A
MO O
0,C M05-1040/7;D-2 Stroke Time (Emercise) 3 Month 2 Year 2011 Leak Rate Position Indication 2 fear t!A0128 GL 1
2 A
MO O
C M05-1040/7;C-3 Stroke time (Emercise) 3 Month 2 Year 2011 Leak Rate Position Indication 18 Month IIA 013A CL 1
2 A
MO O
0,C M05-1040/7;D 7 Stroke Time (Ezercise) 3 Month teak Rate 2 fear 2011 Position Indication 2 Year
!!A0138 ct 1
2 A
M0 O
C M';5-1040/7;C-6 Stroke Time (Exerclae) 3 Month Leak Rate 2 Year 2011 Position !rdication 18 Month
e ILLINDIS POWER Coff?ANY CLINTON PC'IER STATION l
1 PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 38 RELIEF COLD SHUTDOWN EOJIPMENT CATE-ACTU-POSITION P&fD/SNEET; REcu! RED TESTS WOM8ER TYPE SIZE CLASS CORY ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION
!!A042A C
1 2
A/C 0
C,0 M05-1040/7;D-6 Exercise Cold shutckwn Ref 1 Leak Rate 2 Year 2011 ftA0428 C
1 2
A/C 0
C,0 M05-1040/7;D 4 Exercise Cold Shutdown Ref 1 Leak Rate 2 Year 2011 11A128A R
1.5x3 D
C C
0 M05-1040/7;E-7 8ench 5 Year 11A1289 R
1.5m3 0
C C
0 M05-1040/7;E-2 Bench 5 Year 11A175 C
0.5 2
A/C 0
C M05-1040/5;E-3 Leak Rate (Exercise) 2 Year 2011,2022 iPS004 G
0.75 2
A So C
C M05-1045/12;E-6 Stroke Time (Exercise, Loss of Power) 3 Match 2013 Leek Rate 2 Year 2011 Position Indication 18 Month IPS005 G
0.75 2
A So C
C M05-1045/12;E-6 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication is Month 19$009 G
0.75 2
A So C
C M05-1045/12;E-6 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1PS010 G
0.75 2
A So C
C M05-1045/12;E-5 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 19S016 G
0.5 2
A So C
C M05-1045/12;E-5 Stroke Time (Exercise, Loss of Power) 3 Month 2013 2 Year 2011 Leak Rate Position Indication 18 Month 1PS017 G
0.5 2
A SO C
C M05-1045/12;E-5 Stroke ilme (Emercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1P5022 G
0.5 2
A So C
C M05-1045/12;E-4 Stroke Time (Ezercise, Loss of Power) 3 Month 2013 l
l Leak Rate 2 Year 2011 Position Indication 18 Month d
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES.
Page 39 EQUIPMENT CATE-ACTU-Posti!0N PE!D/ SHEET; REQUIRED TESTS RELIEF COLD SHUTDOWN NUMBER TYPE SIZE CLASS CORY ATOR normal test coordinates (Ack$ltional Tests satisfied)
FREQUENCY REQUEST JUSTIFICATION 1PS023 G
0.5 2
A So C
C M05-1045/12;E-4 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year.
2011 Position Indication 18 Month 1PS031 G
0.75 2
A 50 C
C M05-1045/12;E-2 Stroke Time (Exercise, Loss of Power) 3 Month 2013 l
Leak Rate 2 Year 2011 i
Position Indication 18 Month 1PS032 G
0.75 2
A So C
C M05-1045/12;E-2 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month i
l 1PS034 G
0.75 2
A So C
C M05-1045/12;F-1 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leek Rate 2 Year 2011 Position Indication 18 Month 1PS035 G
0.75 2
A 50 C
C M05-1045/12;E-1 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1PS037 G
0.75 2
A 50 C
C M05-1045/12;E-8 Stroke Time (Exercise, Loss of Power) 3 Month 2013 teak Rate 2 Year 2011 Position Indication 18 Month 1PS033 G
0.75 2
A 50 C
C.
M05-1045/12;E-8 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1PSO43A G
0.75 2
8 50 C
C M05-1045/12;F-2 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Position Indication 2 Year IPSO 438 G
0.75 2
8 So C
C M05-1045/12;F-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Position Indication 2 Year 1PSO44A G
0.75 2
B So C
C M05-1045/12;E-2 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Position Indication 2 Year l
l
.. -.s
ILLINOIS POVER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING FROGRAM PLAN TABLE II--VALVES Page 40 EQUIPMENT CATE-ACTU-PostilON P&lD/ SHEET; RECulRED TESTS RELI'T COLD SHUTDOWN NUM8ER TYPE SIZE CLASS GORY ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1950449 G
0.75 2
8 So C
C M05-1045/12;E-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Position Indication 2 Year 1PSO47 G
0.75 2
A SO C
C M05-1045/12;F-7 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leek Rate 2 Year 2011 Position Indication 18 Month 1PSO48 G
0.75 2
A So C
C M05-1045/12;E-7 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1P5055 G
0.5 2
A So C
C M05-1045/12;C-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position IMication 18 Month 1PS056 G
0.5 2
A SO C
C N05-1045/12;C-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 1PS069 G
0.5 2
A SO C
C N05-1045/12;8-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Positf on trufication 18 Month 1PS070 G
0.5 2
A
$0 C
C N05-1045/12;8-3 Stroke Time (Exercise, Loss of Power) 3 Month 2013 Leak Rate 2 Year 2011 Position Indication 18 Month 5 Year 1RA016A R
1x1.5 3
C C
0 M05-1065/S;C-7 Sench 1RA0168 a
1x1.5 3
C C
D M05-1065/8;C-3 sench 5 year l
1RE019 CV 3
2 A
A0 0
C M05-1046/4;A-7 Stroke flee (Exercise, Loss of Power) 3 Month 2032 Positten Indication 2 Year Leak Rate Refueling 2027,2011 1RE020 cv 3
2 A
A0 0
C M05-1046/3;A-4 Stroke time (Exercise, Loss of Power) 3 Month 2032 l
Position Indication 2 Year Leak Rate Refueting 2027,2011 l
\\
ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 41 EQUIPMENT CATE-ACTU-POSITION P&lD/ SHEET; REQUIRED TESTS RELIEF COLD SHUTDOWN kUMBER TYPE SIZE CLASS GORY ATOR normat test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUST!FICATION 1RE021 CV 3
2 A
A0 0
C M05-1046/3;s-5 Stroke Time (Exercise, Loss of Power) 3 Month 2032 l
Leak Rate 2 Year 2011 Position Indication 18 Month 1RE022 CV 3
2 A
A0 0
C M05-1046/3;8-6 Stroke Time (Exucise,. Loss of Power) 3 Month 2032 l
Leak Rate 2 Year 2011 Position Indication 18 Month l
1R7019 CV 3
2 A
A0 0
C M05-1047/3;8 2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 Position Indication 2 Year Leak Rate Refueling 2027,2011 1RF020 CV 3
2 A
A0 0
C M05-1047/3;s-3 Stroke Time (Exercise, Lass of Power) 3 Month 2032 l
Position Indication 2 Year Leak Rate Refa ling 2027,2011 l
1Rr021 CV 3
2 A
A0 0
C M05-1047/3;B-6 Stroke Time (Exercise, Loss of Power) 3 Month 2032 Leak Rate 2 Year 2011 Position Indication 18 Month l
1RF022 CV 3
2 A
A0 0
C M05-1047/3;B-7 Strone Time (Exercise, Lose of Power) 3 Month
?032 Leak Rate 2 Yesr 2011 Position Indication 18 Month l
1SA029 cv 3
2 A
40 0
C M05-1048/6;D-2 Stroke Time (Emercise, Loss of Power) 3 Month Leak Rate 2 Year
.-2011 Position Indication 18 Month 1SA030 CV 3
2 A
A0 0
C M05-1048/6;0-3 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
Leak Rate 2 Year 2011 Position Indication 18 Month 1SA031 CV 3
2 A
A0 0
C M05-1048/6;D-4 Stroke Time (Exercise, Loss of Power) 3 Month 2032
)
Position Indication 2 Year Leak Rate Refueling 2027,2011 1SA032 CV 3
2 A
A0 0
C M05-1048/6;D 5 Stroke Time (Exercise, Loss of Power) 3 Month Position Indication 2 Year Leak Rate Refueling 2027,2011 4
ILLINOIS POVER COMPANY
~
CLINTON POWER STATION 4
PUMP AND VALVE TESTING PROCRAM PIAN TABLE II--VALVES Page 42 Ecu!PrikT CATE-ACTU-P05 titeet P&lD/SMEET; RE0b! RED TESTS RELIEF COLD SHUTDOWN WESER TYPE
$17E CLASS CCRY Afo#
normal test coordinates (Additional Tests satisfied)
FREQUENCY REQUEST Jttsf tFICATI0tt ISFt01 G
10 2
A Mo C
C M05-1060;E-5 Stroke Time (Exercise) 3 Month Leak este 2 Year 2011 Position Indication 18 Month 1SF002 G
10 2
A to C
C M05-1060;E-5 Stroke Tiw (Esercise) 3 Month Leak tote 2 Year 2011 Position IMication 18 Month 1SF004 G
12 2
A M0 C
C M05-1060;C-5 Stroke Time (Emercise) 3 Month teak aste 18 Month 2011 Position Irdication 18 Month 1SM001A 8
24 2
B M0 C
0 M05-10G;D-5 Stroke Time (Emercise) 3 konth Position Indication 2 Year 1SM0018 8
24 2
8 Mo C
0 M05-1069;D-4 Stroke Time (Emercise) 3 Month Position Indication 2 Year 15w002A 8
24 2
s Mo C
0 M05-1069;D-5 Strote Time (Ereccise) 3 Month Position f reicatfors 2 Year 15*0028 B
24 2
a Mo C
0 M05 1069;D-4 Stroke ilme (Eurcise) 3 Month Position trdication 2 Year lM05-1069;D-5 15m003A a
0.751 2
C C
0 Bench 5 Year ISM 0038 a
0.75x1 2
C C
0 MG5-1069;D-4 Bench 5 Year 157008 EFC 0.75 2
A/C 0
C M05-1069;A-3 Exercise Cold shutdown aef 4 PC,sition Indication 2 Year Leak Rate 2 Year 2011 1S*009 EFC 0.75 2
A/C 0
C M05-1069;C-3 Esercise Cold shutcbwn ref 2 Position Indication 2 Year Leak tate 2 Year 2011 1SM010 EFC 0.75 2
A/C 0
C M05-1069;C-3 Exercise Cold shutdown ref 2 Position Irdication 2 Year teak mate 2 Year 2011
"l ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGFJLM FLAN
~
TABLE II--VALVES Page 43 EQUIPMENT CAtE-ACTU-PostTIC4 P&lD/ SHEET; REQUIRED TESTS PELIEF COLD SHUTDOW4 NUM9ER TYPE
$12E Ct. ASS CORY ATOR normal jtest coordinates (Adff tfonal Tests satisfied)
FrioufMCY REQUEST JUSTIFICATION 1SM011 EFC 0.75 2
A/C 0
C M05-1069;B-4 Esercise Cold shut &>wn Ref 4 Position Indication 2 Year Leak Rate 2 Year 2011 1SX001A NC 30 3
C C
0
.105-1052/1;D-7 Exercise 3 Month 1sx0013 NC 30 3
C C
0 M05-1052/2;D-T Exercise 3 Month ISx001C NC 10 3
C C
o M05-1052/3;D-7 Exercise 3 Mar.th 1Sx003A B
30 3
S MO
'O O
M05-1052/1;0-6 Stroke Time (Emercise)
,th Position Irdication 2. ear ISx0038 8
30 3
8 MO O
O M05-1052/2;0-6 Stroke Time (Ezercise) 3 Month Position Irdication 2 Tear 1Sx003C a
to 3
s MO O
O M05-1052/3;D 6 Stroke Tise (Esercise) 3 Month Position Indication 2 Year 1sx004A 8
30 3
S MO O
O M05-1052/1;0-5 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1Sx0048 8
30 3
8 MO O
O M05-1052/2;D-5 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1Sx004C 8
10 3
9 MO O
O M05-1052/3;0-5 Stroke Time (Emercise) 3 Month Position Indication 2 Year 15x006C B
S 3
8 M0 C
0 M05-1052/3;0-2 stroke Time (Emercise) 3 Month Position Indication 2 Year 1Sx0084 8
20 3
8 MO C
0 M05-1052/1;E-6 Stroke Time (Emercise) 3 Mcnth Position Irdication 2 Year 1Sx0088 e
20 3
8 M0 C
0 M05-1052/2;E-6 Stroke Time (Emercise) 3 Month Position Indication 2 Year
.s; 9
ILLINOIS PW ER COMPANY CLINTON PWER STAT 10N.
PUMP AND VALVE TESTING PROGRAM PIAN -
i TABLE II--VALVES Page 44' EQUIPMENT CATE-ACTU-POSITION
.P&lD/ SHEET; REQUIRED TESTS RELIEF COLD SHUTDOWN 4
NUMBER TYFE SIZE CLASS CORY ATOR normal test coordinates (Additional Tests Satisfied)-
FREQUENCY REQUEST JUSTIFICATION 1
1Sx008C 8
8-3 8
M0 C
0 M05-1052/3;D-6 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1SX010A CV 2 '
3 8
A0 C
0 M05-1052/1;E-3 Stroke Time (Exercise, Loss of Power) 3 Month 2032 i
1Sx0108 CV
'2 3
'8 A0 C
0 M05 1052/2;E-3 Stroke Time (Exercise, Loss of Power) 3 Month 2032 j
1Sx010C CV 1.5 3
8 A0 C
0 M05-1052/3;E-4 Stroke time (Exercise, Loss of Power) 3 Month
?032 1Sx011A 8
16 3
8 Mc C
C M05-1052/1;D-3 Stroke Time (Exercise) 3 Month Position Irdication 2 Year i
+
j 1Sx0118 8
16 3
8 M0 C
C M05-1052/2;E-3 f.troke Time (Esercise) 3 Month Position trdication 2 Year 1Sx012A 8
14 3
8 M0 C
0 M05-1052/1;C-3 Stroke Time (Exercise)
Cold Shutdown 2021 Ref 1 i
Position Irufication 2 Year 15x0128 8
14 3
8 M0 C
0 M05-1052/2;C-3 Stroke Time (Exerciee)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year i
1SX014A 8
20 3
8 M0 O
'C M05-1052/1;F-3 Stroke Time (Exercise 3 Month Position Indication 2 Year 1Sx0148 8
20 3
8 MO O
C M05-1052/2;F-3 Stroke Time (Exercise) 3 Month g
Position Indication 2 Year i
1Sx014C 8
8 3
8 MO O
C M05-1052/3;E-4 Strcke Time (Exercise) 3 Month i
Position Indication 2 Year ISx016A C
2.5 3
8
- C C
0,C N05-1052/1;C-3 Stroke Time (Exercise)
Refueling 2004,2021 j
Position Indication 2 Year b
i 1Sx016a G
2.5 3
8 MO C
0,C M05-1052/2;D-3 Stroke Time (Exercise)
Refuelin8 2004,2021 Position Indication 2 Year a
iSx020A 8
12 3
8 MO O
C M05-1052/1;c-4 Stroke Time (Exercise) 3 Month I
Position Indication 2 Year y
)
e a
G
~
c s
:--- -- a-
-.,s-
-.----.u-m
ILLINOIS POWER COMPANY f
CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 45 EQUIPMENT CATE-ACTu-POSITION P&lD/ SHEET; REQUIRED TESTS RELIEF COLD SHUTDOWN NUMBER TYPE SIZE CLASS CORY ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1Sx0208 8
12 3
8 MO O
C M05-1052/2:C-4 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1Sx023A CV 2
3 8
.A0 C
0 M05-1052/1;C 2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx0238 CV 2
3 8
Ao C
0 M05-1052/2;C-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ISx027A cv 2 -
'3 S
A0 C
0 M05-1052/4;D-6 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ISx0278 cv 2.5 3
a Ao C
0 M05-1052/4;D-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx027C cv 2.5 3
8 A0 C
0 M05-1052/4;c-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx029A cv 1.5 3
8 A0 C
0 M05-1052/4;0-6 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1SX0299 CV 1.5 3
8 A0 C
0 M05-1052/6;D-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx029C CV 1.5 3
s Ao C
0 M05-1052/4;B 2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx033 cv 2
3 e
A0 C
0 M05-1052/4;C-6 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ISx037 cv 1.5 3
s A0 C
0 M05-1052/4;a-6 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ISx041A cv 2
3 s
Ao C
0 M05-1052/3;c-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 1Sx041B Cv 2
3 e
A0 C
0 M05-1052/3;B-2 Stroke Time (Exercise, Loss of Power) 3 Month 2032 ISx062A 8
14 3
8 M0 C
0 M05-1052/1;B-4 Stroke Time (Exercise) cold shutdown 2021 Ref 1 Position Indication 2 Year 1Sx0628 8
14 3
8 Mo C
0 M05-1052/2;8-4 Stroke Time (Exercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year 1Sx063A 8
8 3
8 Mo C
0 M05-1052/1;C-2 Stroke Time (Exercise) 3 Month Position Irdication 2 Year 1Sx063B 8
8 3
8 M0 C
0 M05-1052/2;C-2 Stroke Time (Exercise) 3 Month Position Indication 2 Year
I ILLINOIS POWER COMPANY CLINTON P0(JER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVE 5 Page 46 EQUIPMENT CATE-ACTU-POSil!ON P&lD/ SHEET; REQUIRED TESIS RELIEF COLD SHUTDOWN NUMSER TYPE SI2E CLASS CORY ATOR normal test coordinates (Ackfitional Tests Satisfied)
FREQUENCY REQUEST JUSTIFICATION 1sx0714 G
3 3
B MO C
C M05-1052/5;F-7 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year 1sx0718 G
3 3
8 MO C
C N05-1052/5;F-3 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year ISx073A G
3 3
8 M0 C
0,C M05-1052/5;F-6 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year 1sx0738 G
3 3
8 Mo C
0,C M05-1052/5;F-2 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year 1sx074A.
G 3
3 8
MO C
C M05-1052/5;E-7 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year 15x0748 G
3 3
8 MO C
C M05-1052/5;E-3 Stroke Time (Exercise)
Refuelin2 2009,2021 Position Indication 2 Year 1sx0764 G
3 3
a Mo C
0,C M05-1052/5;D-7 Stroke Time (Exercise)
Refueting 2009,2021 Position Indication 2 Year 1sx0769 G
3 3
8 M0 C
0,C M05-1052/5;D-3 Stroke Time (Exercise)
Refueling 2009,2021 Position Indication 2 Year isx082A G
3 3
s MO o
C M05-1052/1;D-1 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1sx0328 G
3 3
8 MO O
C M05-1052/2;D-1 Stroke Time (Exercise) 3 Month Position Indication 2 Year 1sx088A G
3 2
A MO O
C M05-1052/5;C-8 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year 1sx0885 C
3 2
A Mo o
C M05-1052/5;C-4 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year a
.e
.9 ILLINOIS POVER COMPANY-CLINTON POWER' STATION
~
j
- PUMP AND VALVE TESTING' PROGRAM PIAN :
[
TABLE'II--VALVES Page 47_
i -
EQUIPMENT CATE-ACTU-POSITION P&lD/ SHEET;
.. REQUIRED TESIS RELIEF COLD SMJTDOWW I NUMBER TYPE SIZE CLASS CORY:
ATOR normat test; coordinates :
(Additional Tests satisfied)
FREQUENCf ~
REQUEST JUSilFICATION 1Sx089A G
3 2
'A M0' O
C M05-1052/5;C-7 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Irwfication 2 tear 1Sx0898 C
3 2
A M0 O
C M05-1052/5;C-3 Stroke Time (Exerciae).
3 Month Leak Rate 2 Year 2011 i-Position Indication 2 Year 1Sx096A G
3 2
A MO O
C M05-1052/5;C-5 Stroke Time (Exercise) 3 Month Leak Rate-2 Year 2011 Position Indication-2 Year-1 1Sx0968 G
3 2
A MO.
O C
M05-1052/5;C-2 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year ISx097A G
3 2
A
.MO O
C M05-1052/5;C-5 Stroke Time (Exercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year 1Sx0973 G
3 - '2
-A MO O
C M05-1052/5;C 1 Stroke Time (Esercise) 3 Month Leak Rate 2 Year 2011 Position Indication 2 Year i
1SX1054 G
3 3
S MO C
C M05-1052/5;D-7 Stroke Time (Eserclae)
Refueting 2009,2021 3
j Position Indication 2 Year 1
i
?
1511058 G
3 3
s-Mo C
C M05-1052/5:0-3 Stroke Time (Exercise)
Refueling 2009,2021 1,
Positioit Indicatico 2 Year.
. y 1Sx107A G
3-3 3
MO C
0,C M05-1052/5;D-T Stroke Time (Exercise)
Refueting 2009,2021 i
Pcsition Indication 2 Yeer L
1Sx107s G
3 3
a
'm C
0,C M05-1052/5;D-3 Stroke Time (Emercise)
Refueling 2009.2021 Position Indication 2 Year l
ISx149 R
0.75x1 3
C C
0 M05-1052/4;C-5 sench 5 Year 1
I i
M ILLINOIS POWER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PLAN TABLE II--VALVES Page 48 E00lPMENT CATE-ACTU-Postil0N P&lD/ SHEET; REQUIRED TESTS RELIEF COLD SHUTDOW NUMBER TYPE SIZE class CORY ATOR normal test coordinates (Adif tf onal fests satisfied)
FREOGNCY REQUEST JttsTIFICAYlON 1sx150 R
0.75x1 3
C C
0 M05-1052/4;8-6 Bench 5 Year 1sx151A R
0.75x1 3
C C
0 M05-1052/4;E-5 Bench 5 Year l
1sx1518 R
0.75x1 3
C C
0 M05-1052/4;E 2 Bench 5 Year 1sx151C R
0.75 x1 3
C C
0 M05-1052/4;C 2 sench 5 Year 1sx152A R
0.75x1 3
C C
0 M05-1052/1;c-3 Bench 5 Year 1sx1528 R
0.75x1 3
C C
0 M05-1052/2;c-2 Bench 5 Year 1sx153A R
0.75x1 3
C C
0 M05-1052/1 8-6 Bench 5 Year 1sx1538 R
0.75x1 3
C C
0 M05-10?2/2;8-6 8ench 5 Year 5 Year 1sx154A R
0.75 x1 3
C C
0 M05-1052/4;E-5 Bench x1548 R
0.75x1 3
C C
0 M05-1052/4;E-2 Sench 5 Year tsx154C R
0.75x1 3
C C
0 M05-1052/3;c-2 8ench 5 Year 1sx155A A
0.75x1 3
C C
0 M05 1052/1;E-4 Sench 5 Year 5 Year 1sx155B R
0.75x1 3
C C
0 M05-1052/2;F-3 Bench isx155C a
0.75 x1_. ' 3 C
C 0
M05-1052/3;D-4 Bench 5 Year 1sx156A R
0.75x1 3
C C
0 M05-1052/3;c-2 8ench 5 Year 1sx1568 R
- 0. 75 x1 3
C C
0 M05-1052/3;8 2 8ench 5 Year 1sx157A R
0.75x1 3
C C
0 M05-1052/5;c-6 Bench 5 Year 1sx1578 P
0.75xt 3
C C
0 M05-1052/5;c-2 8ench 5 Year 1511694 a
0.75x1 3
C C
0 M05-1052/1;c-3 8ench 5 Year
s ILLINOTS P0G'ER CorsPANY CLINTON POVER STATION PUMP AND VALVE TESTING FROGRAM FLAN TABLE II--VALVES l
Page 49 l
I EQUIPMENT CATE-ACTU-POslTION PilD/sMEET; REQUIRED TEsis RELIEF COLD SMUTDCus NUMSER TYPE stIE class CORY ATOR normal test coordinates (Adfitional Tests settsfied)
FREQUENCY REQUEST JUsTIFICAfl04
)
1sx1699 R
0.75x1 3
C C
9 M05-1052/2;C-3 Genr.h 5 'eer sx169C R
0.75x1 3
C C
0 M05-1052/3;D-2 sench 5 Yeer 1st170A R
0.75s1 3
C C
0 M05-1052/1;s-3 sen:h 5 Yeer I
1sx170s R
0.75a1 3
C C
0 M05-1052/2;s-3 sench 5 Year 1sx1734 G
10 3
s Mo C
0,C M05-;052/t;D-2 strete Time (Emercise) 3 Month Position Indication 2 Year 1sx1738 G
10 3
s MO C
0,C M05-1052/2;D-2 stroke Time (Cuercise:
3 Month Position truficstion 2 Year 1sx181A cv 2.5 3
s A0 C
0 M05-1052/1;F-1 stroke Time (Ezercise, toss of Power) 3 Month 2032 1sx181s CV 2.5 3
8 Ao C
o M05-1052/2;F-1 stroke Time (Emercise, toss of Power) 3 M et5 2032 1sx185A CV 2.5 3
s Ao C
o M05-1052/1;E-1 strcte Time (Esercise, Loss of Power) 3 Month 2032 1sx185s CV 2.5 3
s A0 C
0 M05-1052/2;E-1 ! Stroke Time (Emercise, Loss of Power) 3 Month 2032 1sx189 CV :2.5 3
s ao C
o M05-1052/2;s-4 strete Time (Emercise, less of Power) 3 e th 2032 1sx193A CV 1.5 3
5 A0 C
0 MC5-1052/1;s-7 strote Time (Emercise, Loss of Power) 3 Month 2032 ISX1938 CV 1.5 3
s 40 C
o M05-1052/2;s-4 strone time (Esercise, Loss of Power) 3 Month 2032 1sx197 cv 2
3 8
A0 C
O M05-1052/1;e-4 stroke Time (Emercise, Loss of Power) 3 Month 2032 1sx2004 R
0.75m1 3
C C
0 M05-1052/1;F-1 sench 5 Yeer 1sx2008 R
0.75n1 3
C C
o M05-1052/2;F-1 sench 5 Yeer 1sx201A R
0.75x1 3
C C
0 M05-1052/f;E-1 semh 5 Yeer 1sx201s_
a 0.75x1 3
C C
0 M05-1052/2;E-1 sench 5 Yesc
ILLINOIS POWER COMPAVY CLINTON F0WER STATION PUhF AND VALVE TESTING FROGRAM PIAN TABLE II--VALVES Fage 50 EQU!PMENT CATE-AC7U-POSITION P&lD/SMEET; REcultED TESTS RELIEF COLD SitJT00W4 NUMBER TYPE SIZE CLASS GORY ATOR normai test coordinates (Adfitional Tests Setisfied)
FREQUENCY EEOUCST JUSTIFICATION ISX202A R
0.75x1 3
C C
0 M05-1052/2; A-7 sench 5 Yese 1Sx2028 A
0.75x1 3
C C
0 M05-1052/2;C-4 sench 5 tear 1 x?03 R
0.75x1 3
C C
0 M05-tOS2/2:s-4 sench 5 Year 1Sx204 4
0.75x1 3
C C
0 M05-1052/1;s-5 Bench 5 Year 1Sx207 a
0.75x1 3
C C
0 M05-1052/2;e-2 sench 5 Yeer 1Sx20SA R
4x6 3
C C
0 M05-1052/1;D-1 sench 5 Year 5 Year 1Sx2088 a
4x6 3
C C
0 M05-1052/2;D-1 Bench 1St209 CV 1.5 3
s Ao C
0 M05-1052/2;A-1 Stroke Time (Exercise, Less of Power) 3 Month 2032
' 3x294 R
0.75x1 3
C C
0 M05-1052/1;D-7 sench 5 veer tyc0568 EFC 0.75 2
A/C 0
C M10-1105/4 Exercise Cold shutdown Sef 2 Position Indication 2 Year Leek mate 2 Year 2011 ivc 0578 EFC 0.75 2
A/C 0
C M10-1105/10 Exercise Cold Shutdown ref 2 Position Indication 2 Year Leak Rate 2 Yeer 2011 IvP004A G
10 2
A MO O
C M05-1109/2;D-3 Stroke flee (Ezercise) 3 Month Lesk Rete 2 Year 2011 P3sition Indication 18 Month 3 a nth IvP0048 G
10 2
A MO O
C M05-It09/3;D-3 Stroke Time (Emercise) o Leek Wate 2 Year 2011 Position Indication 18 Month IVP005A G
10 2
A MO O
C M05-1109/2;D-2 Stroke Time (Exercise) 3 Month Lenk Rete 2 Yeer 2011 Position Indication 18 Month l
h
e w
ILLINOIS POVER CO?!PANY CLINTON PCWER STATION PUMP AND VALVE TESTING FROGRAM PIAN TABLE II--VALVES Page 51 EQUIPMENT CATE-ACTU-POSITION PE!D/SMEET; REQUIRED TESTS RELIEF COLD SMUTDOWN NUMBER TYPE SIZE.
CLASS Cosy ATOR nornet test coordinates (Ad35tional Tests Settsfied)
FREQUENCY REQUEST JUSTiftCATION 1VP0058 G
to 2
A MO O
C M05-1109/3;D-2 Stroke Time (Emerciee) 3 Month teak Rete 2 Year 2011 Positiort itMicettort 18 Month IVP014A G
10 2
A MO O
C M05-1109/2;E-3 Stroke Time (Exercise).
3 Month teak Rete 2 Veer 2011 Position Indication 18 Month 1VP0148 G
10 2
A MO O
C Md5-1109/3;E-3 Strche Time (Emercise) 3 Month teek Rete 2 Yeer 2011 Position indication 18 Month IVP015A G
10 2
A MO O
C M05-1109/2;E-2 Stroke Time (Emercise) 3 Month Leak Rete 2 Yeer 2011 Position Indication 18 Month TVP0158 G
10 2
A MO O
C M05-1109/3;E-2 Stroke Time (Esererse) 3 month teak Rate 2 Yeer 2011 Position Indicatia,
18 Month 1VP023A R
0.75x1 2
A/C C
0,C M05-1109/2;D 3 teak Retc 2 Year 2011 tench 5 Yeer IVP0238 a
0.75x1 2
A/C C
0,C M05-tiO9/3;D-3 Leek Rete 2 Year 2011 sench 5 Year 1VP027A R
0.75x1 2
A/C C
0.C M05-1109/2;F-3 Leek Rete 2 Year 2011 Bench 5 Yeer tvP0278 R
0.75x1 2
A/C C
0,C M05-1109/3;F-3 teak Rete 2 Year 2011 Gench 5 Year IVQ001A B
24 2
A-P*
A0 C
C M05-1110/2;C-8 teak Rete Refueting 2027,2011 Position Indication 2 Yeer 1Vo0018 e
24 2
A-P*
AO C
C M05-1110/2;C-7 teak Rete Refueling 2027,2011 Position Indication 2 Year
- Possive velve s
ILLINOIS POWER COMPAVY CLINTON POWER STATION PUMP AND VALVE TESTING PROGRAM PIAN TABLE II--VALVES Page 52 l
EQUIPMENT CATE-ACTU-POSIfl0W P&lD/SMEET; REQUlpED TESTS RELIEF COLD Spa)TDOWN NUMBER TYPE SIZE CLASS GORT ATOR normal test coordinates (Additional Tests Satisfied)
FREQUENCY REQUEST JUST!FICATION tvo002 s
24 2
A C
C M05-1110/2;C-6 Position todication 2 Year Stroke Time (Encrcise, Loss of Power) 3 Month teak Bate refueling 2027,2011 tvo003 5
36 2
A A0 C
C M05-1110/2:C-5 Leak Rate refueling 2027,2011 Position Indication 2 Year Stroke flina (Emercise, Loss of Power) 3 Month 2032 tv0004A P
36 2
A Ao C
C M05-1110/2;D-4 Strcke Time (Emercise, Loss of Power)
Cold Shutdown 2032 Ref 6 Leak Rate 2 Year 2011 Position Indication 18 Month l
Ivo0043 5
36 2
A A0 C
C M05-1110/2;D-5 Position Indication 18 Month Leak Rate 2 Year 2011 l
stroke Time (Ezercise, Loss of Power)
Cold Shutdown 2032 Ref 6 Ivc 005 a
10 2
A Ao C
C M05-1110/2;D-6 Position Indication 2 Yeer Leak Rate Refueting 2027,2011 l
Stroke Time (Ezercise, Loss of Power) 3 Month 2032 Ivo006A GL 4
2 A
Mo C
C Mc5-1110/2;C-4 Position Indication 18 Month Lesk Rete 2 Year 2011
(
Stroke Time (Emercise)
Cold Shutdown Ref 5 Ivc 0068 GL 4
2 A
Mo C
C N05-1110/2;C-4 Leak Rate 2 Year 2011 Position Indication 18 Mcnth Stroke Time (Emercise)
Cold shutdown Ref 5 l
1VR001A 8
36 2
A A0 C
C M05-1111/1;E-2 stroke Tine (Emercise, Loss cf Power) cold shutdown 2032 Ref 6 Leek Rate 2 Year 2011 Position Indication 18 Month Iva0018 3
36 2
A Ao C
C M05-1111/1;E-1 Position trufication 18 m mth l
Stroke Time (Emercise, Loss of Power)
Cold shutdown 2032 Ref 6 Leak Rate 2 Tese 2011 IVR002A CL 4
2 A
M0 C
C M05-1111/1;E-2 Stroke Time (Emercise)
Cold shutdown ref 5 teak Rate 2 Year 2011 Position trafication 18 Month
ILLINOIS PW ER COMPANY CLINTON POWER STATION PUMP AND VALVE TESTING PROCPJOf PLAN TABLE II--VALVES Page 53 EQUIPMENT CATE-ACTU-POslil0W P&lD/SMEETT REQUIRED TEsf5 REllEF COLD SNUTDouu F#9ER TYPE SIZE CLASS CORY ATOR normal test coordinates (Additional Tests Settsfied)
FREQUENCY REOLTST JUSTIFICATION i
Iva0028 GL 4
2 A
M0 C
C M05-1111/1;E-1 Leek Rete 2 Yeer 2011 Position indication 18 ponth Stroke Time (Emercise)
Cold Shutdown Ref 5 tvR006A 8
12 2
A A0 0
C N05-1111/5;E-3 Leek Rate 2 Year 2011 Position Indication 18 Month Stroke Tlee (Emercise, Loss of Power) 3 month 2032 tvR0068 8
12 2
A0 0
C N05-1111/5;E-2 Stroke Time (Emercise, Less of Power) 3 month 2032 Position Indication 18 month Leek Rete 2 Yeer 2011 tvR007A 8
12 2
A A0 0
C M05-1111/5;8-7 Position Indication 18 month Leek Rete 2 Yeer 2011 Stroke Time (Emercise, Loss of Power) 3 Month 2032 l
tvR0078 8
12 2
A A0 0
C M05-1111/5;8-7 Position Indication 18 month Stroke Time (Emercise, Loss of Power) 3 Month 2032 Leak Rate 2 Yeer 2011 Cold Shutdown Ref 2 1vs016A EFC 0.75 2
A/C 0
C M10-1111/5 E
se
,y,,,
Leak Rate 2 Teer 20M 1VR0168 EFC 0.75 2
A/C 0
C h.J-1111/5 Leek Re*?
2 Year 2011 Position Indication 2 Year l
Enercise Cold shutdown Ref 2 1kR018A EFC 0.75 2
A/C 0
C M10-1111/5 Leek Rete 2 Yeer 2011 Esercise Cold Shutdown Ref 2 Position Indication 2 Yeee tvR0158 EFC 0.75 2
A/C 0
C M10-1151/5 Leak Rete 2 Yeer 2011 Emercise Cold shutchwn Ref 2 Position Indication 2 Year Ivt035 2wAY 0.75 2
A SO O
C M10-1111/19 Leek Rate 2 Year 2011 Position Indication 18 month Stroke Time (Esercise, Loss of Power) 3 month 2013
i l
i ILLINOIS P W ER COMPAhT CLINTON PW ER STATION 1
l PUMP AND VALVE TESTING PROGRAM PIAN i
TABLE II--VALVES l
Page 54 l
l EQUIPMENT
{
NUM9ER TYPE CATE-ACTU-POSifl0M P&tD/ SHEET; REQUIRED TESTS RELIEF COLD SMUTDOWN SI2E CLASS CORY ATOR norset test coordinates (Additionet Tests Settsfied)
FREQUEMCY REQUEST JUSTIFICATION 1vR036 2WAY 0.75 2
A SO O
C M10-1111/19 Position Indication I
18 Month Leek Rete 2 Year 2011 4
l Stroke Time (Emercise, Loss of Power) 3 Month 2013 l
1 Iva040 2WAY 0.75 2
A SO O
C M10-1111(19 Leek Rete 2.Teer 2011 Position Indication 18 Month Stroke flee (Emerefoe, Loes of Power) 3 Month 2013 IvR041 2WAY 0.75 2
A SO O
C M10-1111/19 Stroke Time (Emercise, Loss of Power) 3 Month 2013 Position Indication 18 Month Leek Rete 2 Yeer 2011 1W0001A G
6 2
A MO O
C M05-1117/19;E-5 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 Leek Rete 2 Yeer 2011 Position Indication 18 Monti:
1W00018 G
G 2
A MO O
C M05-1117/19;E-6 Stroke flee (Emercise) cold Shutdown 2021 Ref 1 Position Indication 18 Month Leak Rete 2 Year 2011 1W0002A G
6 2
A MO O
C M05-1117/19;F-5 Position I M icatit )
18 Month Leek Rete 2 Year 2011 Stroke Time (Emercise)
Cold Shutdown 2021 Ret 1 1WOOO2B C
6 2
A MO O
C M05-1117/19;F-6 Leek Rote 2 Yeer 2011 Stroke Time (Emercise)
Cold shutdown 2021 Ref 1 Position Indication 18 Month 1WO551A G
2 A
Mo O
C M05-1117/26;E-7 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Year Lenk Rete Refueling 2027,2011 1WO5518 C
4 2
A MO O
C N05-1117/26;E-7 Stroke Time (Emercise)
Cold Shutdown 2021 Ref 1 Position Indication 2 Yeer Leek Rete Refueling 2027,2011 1WO552A -
G 4
2 A
M0 O
C M05-1117/26;0-7 Position Indication 2 Year Stroke Time (Emerclse)
Cold Shutdoun 2021 Ref 1 Leek Rete Refueling 2027,2011
_A
ILLINOIS PWER CC tPANY CLINTON FWER STATION FUMP AND VALVE TESTING FROGRAM PLAN TABLE II--VALVES Page 55 EcolmENT CATE-ACTU-POSITIcel P110/SNEET; REQUIRED TESTS RELIEF COLD SHUTDCNw NUMSER TYPE SIZE CLASS CORY ATOR normal test coordinates (Adfftfonal Tests Satisfied)
FREQUENCY REQUEST JU5ftFICAT10N 1woSS2s G
4 2
A Mo O
C M05-1117/26;D-7 Position Indication 2 Year teak Rete Refueting 2027,2011 Stroke Tiene (Exercise)
Cold Shutdown 2021 Ref 1 a
1woS704 R
0.75m1 2
C C
0 M05-1117/26;E-7 sench 5 Yeer twos 708 A
0.75m1 2
C C'
C M05-1117/26;D-7 sench 5 Teer twx019 P
2 2
A AG 0
C M05-1089/2;F-6 Position Indication 18 Month teek Rete 2 Year 2011 Stroke Time (Emercise, toss of Power) 3 Month 2032 1WXC20 P
2 2
A A0 0
C M05-1089/2;F-5 Strcke Time (Exercise, toss of Power) 3 Month 2032 Leek Rete 2 Year 2011 Position Indication 18 Month i
l l
l
t.
ATTACHMENT 3
" Relief Request Listing" Rev. 9 Including:
i Relief Request 2013, Rev. 2 Relief Roquest 2020, Rev. 1 (deleted)
Relief Request 2032, Rev. 0 (issued)
I o
4 o
Revision 9
Dato Aoril 15, 1991 APPENDIX III RELIEF REQUEST LISTING Revision 9 is issued to add Relief Requests 2013 Rev. 2; 2032; and to delete Relief Request 2020 Rev.
1.
Submitted By:
7,/M PaA4h Approved:
/btw t
i APPENDIX /ISI2/4
ILLINDIS POWER COMPANY CLlW10N P0 TR STAil0N I
GENERAL RELIEF REQUEST ICtX Relief Reqxst Description Date Date Remarks WW*e r t'Jtvai t i ed Arproved 1001 Mantsun attowable extension for test 6 33-27 f regacy of valves ard purrs.
1002 Deferring testing if back-up 3 9 83 (Revision 1) subsysteW loop / train is out of service.
Pending approval by hRC.
e N
o i
RELREQ/IS!/1
l-t ILLIN0!$ POWER COMPANY CLINTON POWER $TAllDN VALVE RELIEF REQUEST INDEX
<l Relief j
Bequest Description Date Date Remarka Numter Submitted Aboreved j
2001 Deleted
?
2002 Test frequency for valve 1C11 F122 3 9 88 (Revision 1)
)
2003 Deleted j
i 2004 Test frequency for valves 6 30 87 1sx016 A/B 2005 Deleted 2006 Deleted 2007 Stroke time test for valve 63087 1E12 FD95 2003 Test frequency for individually 12-13 83 (Revision 2) exercising valves 1G33-F051 and F052 A/B 2009 Test f requency for the Manual 3 9 88 (Revision 1)
Deluge Valves listed in Table 2009-1 2010 Deleted 2011 Leak rate testing, differential test 12-13 88 (Revision 1) pressure, analysis of teakage rete and corrective action f or contain-ment isolation valves 2012 Test frequency for ADS valves 6-30-87 1821*F0418/C/D/F, F047 A/C and F051G. Stroke time evaluat ion.
2013 Stroke time trending of'the 4 15 91 (Revision 2) solenoid operated valves listed in Table 2013 1.
s 2014 Fult stroke exercising of check 5-27 88 (Revision 1) valves 1E12 F041 A/8/C, 1E21 FLO6, and 1E22 F005.
2015 Deleted 2016 Deteted RELREQ/ISI/1
~_ -
.. ~ __ _ - -.
s
!LLIN0!$ POWER COMPANY CLINTON POWER $1Afl0N VALVE REllEF REQUEST INDEX Relief Request Description Date Date Remarks Number S AvM t t t-d Anoroved 2017 Test frequency for valves 3 ?-88 (Revision 1) 1G33 F001, F004, F039, F040, 7053 and 7054 2018 fest frequency for valve 3 9-88 (Revision 1) 1E12 F475.
2019 Deleted 2020 Deleted 2021 Stroke time testing feitowing 3 9 E8 packing adjustment 2022 Exercise test for valve 11 A175 3-9 28 2023 CR0 valve 112 2 10 88 2024 CR0 valves 126, 127, 139 and 114 2 10 88 2025 CAD valve 138 2-10 88 2026 DG valves 1DG008A K 2 10 88 2027 Drywett isolation valves 52783 (Revision 1) 2028 1C41 F336 Exercise 12 13 88 (Revision 1) 2029 Alt. Leak Rate Testing to attow 5 27 88 pressure drop tests 2030 Exercise of 1C41 F006, 12-13 88 1E217050s, b and IE51 F040 2031 Alternate testing for Main Steam 10 03 89 Safety Relief Yalves 2032 stroke time trending of the air 4 15 91 operated valves listed in Tabte 2032 1 Pending approval by NRC.
RELREQilst/2
g.
e
+
ILLIN0l$ POWER COMPANT CLINf0N POWLR STAi!ON PUMP R[Ll[F RIQU($f 1NDIX Relief Request Description Date Date Remarks Ntrier Sutwi t t ed A mroved 3001 Arvual measurement of rp bearing 8 20 87 (Revisien 1) teoperatures.
3002 Flow rete sessurement of purps 10001PA, 3 9 83 (Revision 1) 01P8 and 01PC 3003 Flow rate acesurement of p.rps 3 9 B8 (Revision 1) 1C41 C001A erd C0018 3004 Deleted 3005 Time for prps 1C41 C001A em C0018 6 30 87 to run prior to eessuring/ observing ptrp parameters.
3006 Ranges for punp flow rates and 63087 differentist pressure.
Pending a mroval by NRC.
a s
RELREC/ISI/3
. _.. _... _ ~...,.
-. ~.
,. -. _ _ _.. ~. -
~ -....
- _ ~ -
a XLLIN0l$ POW [R COMFANf CLINTON POWER $1A110N NDE RELltF RICut$1 INDEX s
Relief Request Descr f ption Date Cate Remarks Wisdwr tutaitted Atoroved 4001 Weld examination of Class 2 lines 7 29 85 (Revision 1) which are open ended 4002 Deleted.
4003 Perform VT 3 exarninations per 83wS4 7 29 88 (Revision 1)
Code in lieu of all YT 3 and vi 4 examinations.
4004 flydraulle and Mechanical snutbers; 12 28 88 (Revision 1)
Frequency of Inspection, f estirn, and Corrective Action
- ' Pending approval by NRC.
t 9
RELREC/lS!/4'
e ILLtWols P%tR COMFAhY Cllkf0W P%TR $1A110N R[PA!R/ REPLACEMENT Rill [F R[QU($1 !NO[X Relief Request Description Date Date Remarks yitwr Sutei t t ed A p oved Disapproved 5001 Replacement tolting material 10 20 87 5002 Replacement parts for corponents 10 20 87 Disapproved 5003 Replacenent parts for Carrier withdrawn **
cor.pt s 5004 Replacement parts f or Hamel Dahl withdr' awn **
valves
- These relief requests are withdrawn due to incorporation of generic rules for procurement of ASME parts provided for in Generle Letter 87-09 as edopted in Revision 5 of the ist Program Manual.
RELREQ/ISI/5
ILLINOIS POWER COMPANY CLINTON POWER STATION SECTION XI RELIEF REQUEST RELIEF REQUEST NO. 2013 (Revision 2) l Relief Request 2013, Revision 2 was issued to delete those valves which are no longer part of the ISI Pump and valve Testing Program or those valves which are air-operated and have been moved to Relief Request 2032.
COMPONENT INFORMATION These valves are various rapid acting valves (see Table 2013-1) with various functions.
They are ASME Section III Code Class 2
.and 3,Section XI Category A and B valves.
It should be noted l
that changes to plant design may result in revisions to Table 2013-1..These changes-may be implemented prior to submittal of the revised table to the NRC.
CODE REOUIREMENT The ASME Code,Section XI, Subarticle IWV-3417(a) requires trending the stroke time test results for these valves and taking' appropriate corrective action.
RELIEF REOUEST/ JUSTIFICATION
-Illinois Power Company requests relief from the Code requirements j
for the following reasons:
As these valves stroke rapidly, measurement of the stroke time of these valves to the nearest second per IWV-3413(b) means that a very small increase in stroke time would result in an extremely large percentage of change.
The verification that these valves meet a specified maximum stroke time of a relatively-short duration provides adequate assurance of operability of these valves.
-ALTERNATE TESTING PROPC9ED.
Illinois Power Company will assign a maximum stroke time of two (2) seconds for these valves.
If this limiting stroke time is exceeded, the valve will be declared inoperable and corrective action will be taken.
M3/ISI/1
-_-. - _ _ ~. -.
- o o
ILLINOIS POWER COMPANY CLINTON POWER STATION SECTION XI RELIEF REQUEST RELIEF REQUEST NO. 2013 (Revision 2)
Table 2103-1 i
Valve No.
Sila Valve No.
Size ICM011 3/4 1PS022 1/2 1CM012 3/4 1PS023 1/2 1CM022 3/4 1PS031 3/4 3CM023 3/4 IPS032 3/4 1CM025_
3/4 1PS034 3/4 l
1CM026 3/4 1PS035 3/4
)
-1CM047 3/4 1PS037 3/4 J
1CM048 3/4 1PS038 3/4 1E12-F060A 3/4 1PSO43A 3/4 1E12-F060B
'3/4 1PSO43B 3/4 1E12-F075A 3/4 1PSO44A 3/4 1E12-F075B 3/4 1PSO44B 3/4 1E31-F014 1
1PSO47 3/4 1E31-F015 1
1PSO48 3/4 1E31-F017 1
1PS055 1/2 1E31-FG18 1
1PS056 1/2 1PS004:
3/4 1PS069 1/2 1PS005 3/4 1PS070 1/2 1PS009 3/4 1VR035 3/4 1PS010 3/4 IVR036 3/4 1PS016 1/2 1VR040 3/4 1PS017 1/2 1VR041 3/4-0 J
IM3/ISI/2
W ILLINOIS POWER COMPANY CLINTON POWER STATION SECTION XI RELIEF REQUEST RELIEF REQUEST NO. 2032 COMPONENT INFORMATION These air operated valves (see Table 2032-1) require a stroke time test per Appendix V, Table II of the ISI Program Manual.
These valves normally operate in the 1-6 second range.
CODE REOUIREMENT The ASME Code Section XI, Subarticle 1WV-3 417 (a ) requires trending the stroke time test results for these valves and increasing the frequbncy to monthly for a 50% increase from the previous stroke time test.
RELIEF REOUEST/ JUSTIFICATION These valves are relatively fast acting, (with an average stroke time of 1 to 6 seconds), where a 2 second increare can cause the testing frequency for the valves to be increased from quarterly to monthly.
As these valves are air operated, a change in stroke time of greater than 50% is a common occurrence.
Of the 73 occurrences at CPS where a valve was placed on increased frequency, 65 of the occurrences were for these air-operated valves (or 89%).
Over the last 4 years, 29 of the 63 valves (46%) listed have had their test frequencies increased on one or more occasions due to a " bad" trend.
When placed on increased frequency, none of the valves were found to have a physical problem and all were subsequently returned to normal frequency.
These valves fail to meet the stroke time test requirement due to the following factors:
Operator response time and stop watch inconsistencies play an important role in fast acting valves.
If one operator reacts slightly faster than another operator in starting /
stopping a stopwatch, this could cause a variance between successive tests and result in increased testing frequency if the 50% increase in stroke time criteria is exceeded.
In IWV-3413(b), valve stroke times are measured to the nearest second.
As a result, differences in stroke times from test to test due to operator or stopwatch inconsistencies are compounded by rounding the stroke times l
to the nearest second.
Unlike motor operated valves (MOVs), air operated valves (AOVs) are somewhat less consistent in their stroke time.
M1757/M89/1
b b
This is due to the fact that an AOV does not have a fixed gear ratio and motor speed like that of an MOV.
The verification that these valves meet a specified maximum stroke time provides assurance of operability of these valves.
ALTERNATE TESTING PROPOSED Illinois Power Company proposes to evaluate the test results for the air-operated valves on Table 2032-1 in accordance with the following:
The test frequency for these air-operated valves shall be increased to once per month if the valve exhibits an increase in stroke time of more than 100% from the last test.
If the limiting stroke time is exceeded, the valve shall be considered inoperable and corrective actions taken.
This alternate testing will significantly reduce the potential for operator stopwatch errors.
This testing method will also be helpful to alert the operator to actual valve degradation, such as air leaks, which cause the stroke time to increase with each successive stroke time test.
i M1757/M89/2
ILLINOIS POWER COMPANY CLINTON POWER STATION BECTION ZI RELIEF REQUEST Table 2032-1 Baseline Stroke Time (s) for Last 4 Years Valve No.
Stroke Time (sec.)
Minimum (sec.)
Maximum (sec.)
ORA 026 1,44 1
2 ORA 027 1.38 1
2 0RA028 1.10 1
2 ORA 029 1.16 1
2 OVC010A 4.31 3
6 OVC0108 1.91 2
4 OVCO22A 4.25 3
6 OVCO22B 4.44 3
6 IB33 F019 1.09 1
2 1B33 F020 2.11 2
3 1C11-F010 3.80 3
6 1C11-F011 1,91 1
3 1E51-F004 2.02 1
3 1E51 F005 2.65 2
3 1E51 F025 2.12 2
5 1E51-F026 1,56 1
3 1FC023 4.62 4
6 1RE019 3.74 4
6 1RE020 3.61 4
5 1RE021 4.68 5
6 1RE022 2.43 3
5 1RF019 3.74 4
6 1RF020 3.81 3
5 1RF021 4.69 4
6 1RF022 3.41 3
5 ISA030 4.93 5
6 1SA031 5.11 5
6 ISX010A 1.02 2
3 ISX010B 0.98 1
2 ISX010C 1.68 2
4 ISX023A 3.59 3
5 ISX023B 2.74 2
4 ISXO27A 3.05 2
8 ISX027B 3.64 3
5 ISX027C 2.55 2
4 ISX029A 3.16 1
4 ISX029B 4.04 3
6 ISX029C 1.80 2
3 ISXO33 2.16 2
6 ISX037 1.23 1
4 ISX041A 2.12 1
3 ISX041B 2.46 2
4 ISX181A 1.53 2
3 ISX181B 1.86 2
3 ISX185A 3.27 2
5 ISX185B 1,41 2
2 ISX189 1.40 2
3 M1757/M89/3
A k
ILLINOIS POWER COMPANY CLINTON POWER STATION SECTION XI RELIEF REQUEST Tabic 2032-1 Baseline Stroke Time (s) for Last 4 Years Valve No.
Stroke Time (sec.)
Minimum (sec.)
Maximum (q d ISX193A 2.15 2
3 ISX1938 1.52 2
3 ISX197 1.57 2
3 ISX209 2.05 1
3 IVQ003 4.11 2
5 IVQ004A 3.92 2
4 IVQOO4B 3.28 2
4 IVQ005 0.93 1
2 1VR001A 1.70 1
3 IVR001B 1.35 2
4 IVR006A 3.23 2
4 IVR006B 3.01 2
4 IVR007A 2.68 2
4 IVR007B 3.77 2
4 1k'X019 1.19 1
2 1WX020 1.34 1
2 t
4 M1757/M89/4
-