U-601736, Forwards Rev 8 to Pump & Valve Testing Program Plan. Rev Will Change Stroke Time Frequency from Three Months to Cold Shutdown for Listed Valves
| ML20059N218 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/27/1990 |
| From: | Spangenberg F ILLINOIS POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059N219 | List: |
| References | |
| U-601736, NUDOCS 9010100258 | |
| Download: ML20059N218 (1) | |
Text
(
e,
.'y
$lg g R
U-601736 g
L30-90(09-27)-LP WWW u H
. CLINTON POWER STATION. P.O. ISOX 678. CLINTON, ILLINOIS 61727 0678. TELEPilONE (2171935-8881 1A.120 September 27, 1990 r
Docket No. 50-461 f
r Nuclear Regulatory Commission Document Control Desk i
Washington, D.C.
20555
Subject:
Clinton Power Station
-l Pumn'and Valve Testing Program Plan
Dear Sir:
I Illinois Power Company (IP) is submitting the attached Revision 8 to Appendix V, of the Pump and Valve Testing Program Plan.
This appendix was revised to change the' stroke time frequency from three croaths to cold shutdown for valves IVQ004A, IVQOO4B, IVR001A, and '
IVR001B. This change is justified since the' valves. are normally closed.
and not operating during normal power operation. Therefore' the Inservice Inspection (ISI) stroke time testing would place u..necessary.
wear on the valve seats..Also, the required tests specified on Table II j
i of Appendix V for 1FC013A and IFC013B were changed from Exercise to Exercise Open and Exercise Close, i
Sincerely yours, F. A. Spangenberg Manager-Licensing and Safety.
f WSI/rgw Attachment cc:
NRC Clinton Licensing Project Manager NRC Regional Administrator, Region III NRC Resident Office Illinois Department of Nuclear Safety
'P v
f) *3 A 8-s 4
- 4. 4,A OM j
~~
9010100258 900927 PDR ADOCK 05000461 j