Forwards Rev 7 to Byron & Braidwood Stations Updated FSAR in Response to Federal Govt Initiative to Reduce Unnecessary Burden of Govt Regulation by Extending Interval Between Updates of Licensee FSARs
ML20197J771
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/16/1998
From: Graesser K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20197J775 List:
References
BYRON-98-0312, BYRON-98-312, TAC-M86432, TAC-M86457, TAC-M86459, TAC-M86460, TAC-M86461, TAC-M86462, TAC-M86463, TAC-M86464, TAC-M86465, TAC-M86466, TAC-M86467, NUDOCS 9812160003
Download: ML20197J771 (3)


Text

-

Commonwealth himo ('ompan) 13)ron Generating Station p

4150 North German ( hurch i<oad lly ron. 11.61010 9"96

'fel N15-2 % $411

-w T

December 16, 1998 m

e s

LTR:

BYRON 98-0312

~

FILE:

2.1.407 U.S.

Nuclear Regulatory Commission Attn: Document Control Desk

[

Wcshington, D.C.

20555 h

]

SUBJECT:

Revision 7 to the Updated Final Safety Analysis Report j

j h Byron Nuclear Power Station, Units 1 and 2 l; j' NPF-37/66; NRC Docket Nos. STN 50-454-455 l

l Braidwood Nuclear Power Station, Units 1 and 2 l

NPF-72/77; NRC Docket Nos. STN 50-456 457 h

m l ~t

REFERENCE:

(1)

December 16, 1996 letter, K.L. Graesser (Comed) to NRC Document Control Desk, Updated Final Saf ety Analysis Report.

h, (UFSAR) j i

(2)

June 15,1993 letter, J.B. Hickman (NRC) to D.L.

Farrar F

(Comed), Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revi::.on Submittal Frequency ITAC j

f Nos. M86432, M86457, M85439, M86459, M86460, M86461, M8646' M86463, M86464, M86465, M8646E, and M86467) i In Reference (1) Commonwealth Edison Company (Comed) provided the Nuc] ear i

Regulatory Commission (NRC) Staff with Revision 6 to the Byron /Braidwood j j m.

Stations Updated Final Safety Analysis Report (UFSAR)

Previously, Title 10, j l code of Federal Regulations, Part 50, Section 71, Paragraph (b) Subparagraph j

(4) [10CFR50. 71 (b) (4 ) ) was revised in response to a federal government l

l y

initiative to reduce the unnecessary burden of government regulation by l

extending the interval between updates of licensee Final Safety Analysis c

4 Reports (FSARs)

In Reference (2) the Staff agreed with Comed's proposal to h) provide updates to the Byron /Braidwood Stations UFSAR to the NRC no later than 24 calendar months from the submittal date of the previous revision.

ll ll b

Accordingly, Revision 7 to the ' Byron /Braidwood Stations UFSAR is enclosed.

I 1

The changes included in Revision 7 are changes to the facilit'.es and i

l procedures that were in effect as of June 16, 1998.

1y

[

1 9812160003 981216 f

PDR ADOCK 05000454<

l g

PDR L

lb1 ll 1

y 0

1' p:\\9%yltrs\\980312.wpf l

lf q{l una om ( mmn.m, l'

\\\\I

. ~,

n

. ~... ~. -. -.. ~..~ -

.n.

.h 04 Oyron Ltr. #98-0312 December 16,l1998'

' Page 2 Pursuant to 10CFR50.4 (b) (6), one (1). signed original and ten (10) copies are being provided-to the Document Control Desk, plus one (1) copy to the NRC s

S Region:III. office and one (1) copy of each to the Byron and Braidwood Resident Inspectors offices.

Please! address!any questions or comments regarding this submittal to Bradley J.
Adams,1 Regulatory Assurance Manager, Byron Station, (815)234-5441,

. extension 2280~.

j Sincerely,.

.K L;;Graesser

-Site Vice President i

4

^ Byron. Nuclear Power Station i

~-KLG/PRG/clb 1

i'

,.cc :

James E.. Dyer, Regional Administrator, Region III Gene Cobey, Senior Resident Inspector - Byron Dave Pelton, Senior' Resident Inspector - Braidwood

]

l t

1 I

L i

4 g

L j..

,,.l' E

ij. m e

. e d

5.

5 l

,ps\\9Bbyltrs\\980312.wpf-s q

.- t rL

+

Date Transmitted:

December 16. 1998 BOOK (S) #:

Copy' Assigned to:

Dept:

LICENSING DOCUMENT TRANSMITTAL

( ') The following changes to the Updated Final Safety Analysis Report (UFSAR) are attached for insertion into your UFSAR-Books:

Station:

Byron /Braidwood Revision No.

7

..r-

.)

[

] OTHER - See instructions INSTRUCTIONS SEE ATTRCHED GREEN PAGES IN CONFORMING WITH NUCLEAR PROCEDURE #6, IMMEDIATELY REVISE j

YOUR DOCUMENTS AS INSTRUCTED ABOVE AND RETURN THIS SHEET TO:

P.

Gaddam - REGULATORY ASSURANCE COMMONWEALTH EDISON COMPANY BYRON NUCLEAR POWER STATION 4450 N. GERMAN CHURCH ROAD BYRON, IL 61010 I hereby acknowladge receipt of the above transmittal.

The additional and/or revised pages have been inserted in my assigned book and sup rseded pages removed as required.

/

/

PLEASE PRINT YOUR NAME ABOVE Date Note: If assigned copies have been transferred to another person or address, please fill out the spaces below.

NAME'OF HOLDER:

DEPARTMENT:

ADDRESS:

l Please direct any questions to Paul Geddes, B/B UFSAR L

Coordinator, at (815) 234-5441 x4082 i

l v