Commonwealth F4ison Company Byron Generating Station 4450 North German Church Road By ron, IL 6:0109794 Tel 8152344441 1
- I f
December 16,1996 2
l LTR: BYRON 96-0278 FILE: 2.1.407 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i
/
Attention:
Document Control Desk i
SUBJECT:
Revision 6 to the Updated Final Safety Analysis Report Byron Nuclear Power Station, Units 1 and 2
- f NPF-37/66
- NRC Docket Nos. STN 50-454/455 Braidwood Nuclear Power Station, Units 1 and 2 NPF-72/77: NRC Docket Nos. STN 50-456/457 i
References:
(1)
December 16,1994 letter, H. D. Pontious (Comed) to NRC 7
Document Control Desk, Updated Final Safety Analysis Report (UFSAR)
(2)
June 15,1993 letter, J. B. Hickman (NRC) to D. L. Farrar (Comed),
Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revision Submittal Frequency (TAC Nos. M86432, M86457, M86458, M86459, M86460, M86461, M86462, M86463, M86464, M86465, M86466, and M86467)
In Reference (1) Commonwealth Edison Cunpany (Comed) provided the Nuclear Regulatory Commission (NRC) Staff with Revision 5 to the Byron /Braidwood Stations Updated Final Safety Analysis Report (UFSAR). Previously, Title 10, Code of Federal q
Regulations, Part 50, Section 71, Paragraph (b) Subparagraph (4) [10 CFR 50.71(b)(4)]
was revised in response to a federal govemment initiative to reduce the unnecessary 9701060040 961216 PDR ADOCK 05000454 K
PDR A l'nicom Company
burden of government regulation by extending the interval between updates of licensee Final Safety Analysis Reports (FSARs). In Reference (2) the Staff agreed with Comed's proposal to provide updates to the Byron /Braidwood Stations UFSAR to the NRC no later than 24 calendar months from the submittal date of the previous revision.
1 Accordingly, Revision 6 to the Byron /Braidwood Stations UFSAR is enclosed.
The changes included in Revision 6 are changes to the facilities and procedures that were in effect as of June 16,1996.
Attached to this letter is a detailed change log which identifies and explains all changes from Revision 5 of the Byron /Braidwood Stations UFSAR. This is being provided as an aid to the Staff to assist in the review of the changes made.
Pursuant to 10 CFR 50.4(b)(6), one (1) signed original and ten (10) copies are being provided to the Document Control Desk, plus one (1) copy to the NRC Region lll office and one (1) copy each to the Byron and Braidwood Resident inspectors offices.
Please address any questions or comments regarding this submittal to Marcia Lesnisk, Nuclear Licensing Administrator, at (630) 663-6484.
g Sincerely, O
q K. L. Graesser Site Vice President Byron Nuclear Power Station KLG/LAL Attachment cc: A. B. Beach, Regional Administrator - Region 111 1
G. F. Dick Jr., Byron Project Manager - NRR R. R. Assa, Braidwood Project Manager-NRR S. D. Burgess, Senior Resident inspector - Byron C. Phillips, Senior Resident inspector - Braidwood Office of Nuclear Facility Safety - IDNS O
Commonwealth Edison Company 15yron Generating Station 4450 North German Church Road flyron. IL 61010-9794 Tel H15-234 5441 t
\\a' December 16,1996 LTR: BYRON-96-0278 FILE: 2.1.407 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Revision 6 to the Updated Final Safety Analysis Report Byron Nuclear Power Station, Units 1 and 2 NPF-37/66: NRC Docket Nos. STN 50-454/455 Braidwood Nuclear Power Station, Units 1 and 2 NPF-72/77: NRC Docket Nos. STN 50-456/457
References:
(1)
December 16,1994 letter, H. D. Pontious (Comed) to NRC Document Control Desk, Updated Final Safety Analysis Report (UFSAR)
(2)
June 15,1993 letter, J. B. Hickman (NRC) to D. L. Farrar (Comed),
Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revision Submittal Frequency (TAC Nos. M86432, M86457, M86458, M86459, M86460, M86461, M86462, M86463, ML2464, M86465, M86466, and M86467) in Reference (1) Commonwealth Edison Company (Comed) provided the Nuclear Regulatory Commission (NRC) Staff with Revision 5 to the Byron /Braidwood Stations Updated Final Safety Analysis Report (UFSAR). Previously, Title 10, Code of Federal Regulations, Part 50, Section 71, Paragraph (b) Subparagraph (4) [10 CFR 50.71(b)(4)]
C)T was revised in response to a federal government initiative to reduce the unnecessary L
A l'nicom Company t
\\-
N burden of government regulation by extending the interval between updates of licensee g
Final Safety Analysis Reports (FSARs). In Reference (2) the Staff agreed with Comed's proposal to provide updates to the Byron /Braidwood Stations UFSAR to the NRC no later than 24 calendar months from the submittal date of the previous revision.
Accordingly, Revision 6 to the Byron /Braidwood Stations UFSAR is enclosed.
The changes included in Revision 6 are changes to the facilities and procedures that were in effect as of June 16,1996.
Attached to this letter is a detailed change log which identifies and explains all changes from Revision 5 of the Byron /Braidwood Stations UFSAR. This is being provided as an aid to the Staff to assist in the review of the changes made.
Pursuant to 10 CFR 50.4(b)(6), one (1) signed original and ten (10) copies are being provided to the Document Control Desk, plus one (1) copy to the NRC Region 111 office and one (1) copy each to the Byron and Braidwood Resident inspectors offices.
Please address any questions or comments regarding this submittal to Marcia Lesniak, Nuclear Licensing Administrator, at (630) 663-6484.
Sincerely, O
K. L. Graesser Site Vice President Byron Nuclear Power Station KLG/LAL Attachment cc: A. B. Beach, Regional Administrator - Region lll G. F. Dick Jr., Byron Project Manager - NRR R. R. Assa, Braidwood Project Manager-NRR S. D. Burgess, Senior Resident inspector - Byron C. Phillips, Senior Resident inspector - Braidwood Office of Nuclear Facility Safety - lDNS J