ML20077E279
| ML20077E279 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 12/16/1994 |
| From: | Pontious H COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20077E284 | List: |
| References | |
| TAC-M86432, NUDOCS 9412120220 | |
| Download: ML20077E279 (2) | |
Text
[D Comm:nw=lth Edl=n
[
)
1400 0 pus Place C
(O}
Downers Grove, Illinois 60515
%J December 16, 1994 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Document Control Desk
Subject:
Revision 5 to the Updated Final Safety Analysis Report Byron Nuclear Power Station, Units 1 and 2 NPF-37/66; NRC Docket Nos. STN 50-454/455 Braidwood Nuclear Power Station, Units 1 and 2 NPF-72/77: NRC Docket Nos. STN 50-456/457-
References:
(1)
December 16, 1992 letter, T. W.
Simpkin (Comed) to T.
E. Murley (NRC), Updated Final Safety Analysis Report (UFSAR)
(2)
June 15, 1993 letter, J.
B. Hickman (NRC) to D.
L.
Farrar (Comed), Commonwealth Edison Proposal for Updated Final Safety Analysis Report Revision Submittal Frequency (TAC Nos.
M86432, M86457, M86458, M86459, M86460, M86461, M86462, M86463, M86464, M86465, M86466, and M86467)
In Reference (1) the Commonwealth Edison Company (Comed) provided the Nuclear Regulatory Commission (NRC) Staff with Revision 4 to the Byron /Braidwood Stations Updated Final Safety Analysis Report (UFSAR)
Concurrent with the preparation of that submittal, Title 10, Code of Federal Regulations, Part 50, Section 71, Paragraph (b) Subparagraph (4) (10 CFR 50.71(b) (4) )
was revised in response to a federal government initiative to reduce the unnecessary burden of government regulation by extending the interval between updates of licensee Final Safety Analysis Reports (FSARs).
In Reference (2) the Staff agreed with Comed's proposal to provide updates to the Byron /Braidwood Stations UFSAR to the NRC no later than 24 calendar months from the subaittal date of the previous revision.
Accordingly, Revision 5 to the Byron /Braidwood Stations UFSAR is enclosed.
The changes included in Revision 5 are changes to the facilities and procedures that were in effect as of June 18, 1994.
1na e c, n
- 4. U v U.I i e
.. - ~.,
i 9412120220 941216 PDR ADOCK 05000454 k
PDR w
~
'l
'NRC Document Control Desk December 16, 1994' Attached to this" letter is a detailed l change log which' identifies and explains all changes from Revision 4 of the Byron /Braidwood Stations UFSAR.
This is being provided as an aid to the Staff to assist in the review of the changes made.
1 Pursuant to 10 CFR 50.4 (b) (6), one (1) signed original and ten (10) copies are being provided to the Document Control Desk, plus one (1) copy to the NRC Region III office and one (1) copy each to the Byron and Braidwood Resident-Inspectors offices.
J 2
Please address any questions or comments regarding this i
submittal to this office.
]
Sincerely, l
\\g Harold d'?PdEtious, Jr.
Nuclear Licensing Administrator Attachment j
cc:
J. B. Martin, Regional Administrator - Region III G.
F.
Dick Jr.,
Byron Project Manager - NRR i
R.
R. Assa, Braidwood Project Manager - NRR H.
Peterson, Senior Resident Inspector - Byron S. G.
DuPont, Senior Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS
- - -