7-6-20 Motion for Abeyance (DC Cir.) (Case No. 20-1187) (Consolidated with 20-1225)
ML20189A026
Person / Time
Site: HI-STORE
Issue date: 07/06/2020
From: Andrew Averbach, Grant E, Heminger J
NRC/OGC, US Dept of Justice, Environment & Natural Resources Div
To:
US Federal Judiciary, Court of Appeals, for the District of Columbia Circuit
References
1850204, 20-1187, 20-1225
Download: ML20189A026 (97)


Text

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 1 of 9 UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT BEYOND NUCLEAR, INC., )

Petitioner, )

)

v. ) No. 20-1187,

) consolidated with No. 20-1225

)

UNITED STATES NUCLEAR )

REGULATORY COMMISSION and the )

UNITED STATES OF AMERICA, )

Respondents. )

RESPONDENTS MOTION TO HOLD CASE IN ABEYANCE PENDING AGENCY RESOLUTION OF ADJUDICATORY PROCEEDING The U.S. Nuclear Regulatory Commission (NRC or Commission 1) and the United States of America move for an abeyance of these consolidated Petitions for Review pending the resolution of ongoing agency-level adjudicatory challenges to the license application at issue, which involves a proposed spent nuclear fuel storage facility in Lea County, New Mexico, to be constructed by Holtec International (Holtec), because the Petitions are not prudentially ripe for review.

The Petitioners in the consolidated cases oppose the requested relief.

1 We use the term NRC to refer to the agency as a whole, and the term Commission to refer to the collegial body that oversees the agency and is currently presiding the adjudicatory challenge to license application at issue in this case.

(Page 1 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 2 of 9 ARGUMENT The prudential ripeness doctrine prevents courts from entangling themselves in abstract disagreements over administrative policies and protect[s]

the agencies from judicial interference until an administrative decision has been formalized and its effects felt in a concrete way by the challenging parties. Abbott Laboratories v. Gardner, 387 U.S. 136, 149 (1967). Under Devia v. NRC, 492 F.3d 421 (D.C. Cir. 2007), this Court may consider whether a case is prudentially ripe for review, and whether an abeyance is therefore warranted by applying the two-part analysis in Abbott Laboratories which evaluates: (1) the fitness of the issue for judicial decision and (2) the hardship to the parties of withholding court consideration. Id. at 424 (quoting Abbott Laboratories, 387 U.S. at 149).

Although the Court has jurisdiction under the Hobbs Act to entertain the Petitions for Review that are currently before it (because the Commission denied the Petitioners party status to the license proceeding, see Alaska v. FERC, 980 F.2d 761, 763 (D.C. Cir. 1992)), the matters are not ripe for judicial consideration at this time. First, other parties that are still involved in adjudicatory proceedings before the agency raised the same legal argument as Beyond Nuclear (the Petitioner in Case No. 20-1187), and their arguments were addressed by the Commission in the same decision. It is inefficient and premature for this Court to consider the arguments raised by some parties when the other parties may raise additional 2

(Page 2 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 3 of 9 arguments after the Commission finally concludes its proceedings. Second, the adjudication before the agency involves assertions that the NRC has failed to comply with the National Environmental Policy Act (NEPA), the same question that the Petitioners in Case No. 20-1225 have raised before this Court. Third, there is a substantial likelihood that the adjudicatory proceedings pending before the agency and the terms of any license that may ultimately be issued will clarify, simplify, or perhaps even moot the challenges that the Petitioners have raised.

Fourth and finally, holding the Petitions in abeyance would not effect a hardship for either set of Petitioners.

1. The cases are not fit for judicial review.

In Case No. 20-1225, Beyond Nuclear challenges the Commissions decision that issuance of the proposed license would not violate the Nuclear Waste Policy Acts prohibition against the storage at a non-federal facility of fuel to which the Department of Energy holds title. See Exhibit A (April 2020 Commission Order) at 4-8. However, Beyond Nuclear was one of three parties that sought a hearing with respect to this issue, and the other two sets of parties Sierra Club and Fasken Land and Minerals, Ltd. and Permian Basis Land and Royalty Owners (Fasken)are still pursuing other claims before the agency and 3

(Page 3 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 4 of 9 therefore cannot (yet) petition for review of the Commissions decision. 2 Holding the existing Petitions for Review in abeyance would enable the Court to consider (and the Respondents to address) all the Nuclear Waste Policy Act-related arguments that these parties intend to make at once, rather than either requiring Sierra Club and Fasken to be bound by the arguments that Beyond Nuclear makes or requiring supplemental briefing at a later date.

Although Sierra Club and Fasken have moved to intervene in Beyond Nuclears Petition for Review, intervention arguably constitutes an end run around the Courts finality requirements because it would prematurely accelerate those parties right to judicial review. And, in any event, intervention would not cure the problems, discussed below, of rendering the Courts decision potentially contingent upon proceedings that remain ongoing at the agency level.

Moreover, the Petitioners in Case No. 20-1225 (referred to as Joint Petitioners in the April 2020 Commission Order) challenge the Commissions decision not to admit their contentions arising under NEPA, the National Historic Preservation Act, and the Atomic Energy Act and its implementing regulations.

2 In the April 2020 Order, the Commission reversed and remanded the dismissal of certain contentions that Sierra Club had raised, Exhibit A at 29, and instructed the Atomic Safety and Licensing Board Panel to consider certain additional contentions that Sierra Club and Fasken had raised, id. at 32, 55. On June 18, 2020, the Board issued an order declining to admit these contentions as originally proposed for hearing and reserving for future consideration Faskens motion for leave to file an amended contention. See Exhibit B.

4 (Page 4 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 5 of 9 See Exhibit A at 39-54. Although these issues do not directly overlap with the issues that are still before the Atomic Safety Licensing Board Panel and/or (in the event of an appeal) the Commission, they still require the Court, at a minimum, to examine the agencys compliance with NEPA, an issue that has not been fully resolved in proceedings before the agency.

Further, although Petitioners challenge final orders, the orders arise from ongoing adjudicatory proceedings over Holtecs pending application for a licenseproceedings in which other parties are still pursuing challenges before the Commission. Until the adjudicatory proceeding is concluded and the Commission has made a final decision on the license application, either by issuing a license or denying the application, the consolidated Petitions will not be fit for judicial review. Indeed, it is entirely conceivable that the license that Holtec seeks will not be issued, either because of the ongoing adjudicatory challenges before the agency or because of the NRC Staffs technical review of the application. That possibility alone renders the Petitions for Review unfit for judicial resolution.

Finally, it bears noting that Beyond Nuclear has challenged a term of the license applicationHoltecs request for permission to store spent nuclear fuel to which title is held by private parties or fuel to which the Department of Energy (DOE) owns title. Beyond Nuclear contends that the National Waste Policy Act prohibits the Commission from granting a license to store fuel to which DOE holds 5

(Page 5 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 6 of 9 title. But the Courts review of that argument at this time would be speculative and advisory because it would be based on Beyond Nuclears objections to Holtecs application, not to a decision by the Commission granting a license that would allow storage of fuel in the unlawful manner to which Beyond Nuclear objects.

See Devia, 492 F.3d at 425 (A claim is not ripe for adjudication if it rests upon contingent future events that may not occur as anticipated, or indeed may not occur at all. (quoting Texas v. United States, 523 U.S. 296, 300 (1998)). It is not yet certain that the license, if ultimately issued, will in fact permit such action and, in fact, both the Commission and Holtec have already acknowledged that it would be illegal to store DOE-titled fuel without a change in the law. See Exhibit A at 7.

At a minimum, therefore, consideration of the issue would benefit from a more concrete setting in which the Commission has issued a license that specifies what fuel may be stored and under what conditions or has denied the application.

Devia, 492 F.3d at 424 (internal quotation marks omitted).

In sum, an abeyance will not only reduce the risk of piecemeal adjudication but will eliminate the risk that the Court would be called upon to opine on issues that are, at this time, largely contingent on future events. See Devia, 492 F.3d at 425-26.

6 (Page 6 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 7 of 9

2. The Petitioners will not suffer hardship from an abeyance.

In order to outweigh institutional interests in the deferral of review, the hardship to those affected by the agencys action must be immediate and significant. Devia, 492 F.3d at 427. Here, the Petitioners cannot identify any legally cognizable hardship that they would endure as a result of abeyance.

The agency issued a draft environmental impact statement on March 10, 2020, and the comment period, extended because of the coronavirus pandemic, does not close until September 22, 2020. The agency cannot issue a license until it considers the comments and completes its technical review of the application, a process that will necessarily require substantial additional work and time after September 2020. As a result, there is no reason to believe at this time that time is of the essence, when issuance of a license is not imminent.

And, even if a license does ultimately issue, there is no reason that the harms that Petitioners claim they are likely to encounter cannot be vindicated in a consolidated litigation conducted after the proceedings before the agency are finalized and the terms of any license are known. Holding these petitions in abeyance is unlikely to create additional hardship and would simplify the briefing process for all parties involved and for the Court.

7 (Page 7 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 8 of 9 CONCLUSION For the foregoing reasons, Respondents request an abeyance of these consolidated Petitions for Review pending the resolution of the ongoing agency-level adjudicatory challenges to the license application at issue. Respondents further propose that the Court direct the parties to file motions to govern further proceedings in this case within 30 days of the completion of the agency proceedings.

Respectfully submitted,

/s/ Justin D. Heminger___ /s/ Andrew P. Averbach____

ERIC GRANT ANDREW P. AVERBACH Deputy Assistant Attorney General Solicitor JUSTIN D. HEMINGER Office of the General Counsel Senior Litigation Counsel U.S. Nuclear Regulatory Commission Environment & Natural Resources 11555 Rockville Pike Division Rockville, MD 20852 Post Office Box 7415 (301) 514-1946 Washington, D.C. 20044 andrew.averbach@nrc.gov (202) 514-5442 justin.heminger@usdoj.gov Dated: July 6, 2020 8

(Page 8 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 9 of 9 CERTIFICATE OF COMPLIANCE I certify that RESPONDENTS MOTION TO HOLD CASE IN ABEYANCE PENDING AGENCY RESOLUTION OF ADJUDICATORY PROCEEDING complies with the formatting and type-volume restrictions of the rules of the U.S.

Court of Appeals for the District of Columbia Circuit. The motion was prepared in 14-point, double spaced, Times New Roman font, using Microsoft Word 2013, in accordance with Fed. R. App. P. 32(a)(5) and Fed. R. App. P. 32(a)(6). The response contains 1,464 words and therefore complies with Fed. R. App. P.

27(d)(2)(A).

/s/ Andrew P. Averbach Andrew P. Averbach Solicitor U.S. Nuclear Regulatory Commission July 6, 2020 (Page 9 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 1 of 61 Beyond Nuclear v. NRC (20-1187, consolidated with 20-1225)

Respondents Motion to Hold Case in Abeyance Exhibit A (Page 10 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 2 of 61 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION COMMISSIONERS:

Kristine L. Svinicki, Chairman Jeff Baran Annie Caputo David A. Wright In the Matter of HOLTEC INTERNATIONAL Docket No. 72-1051-ISFSI (HI-STORE Consolidated Interim Storage Facility)

CLI-20-04 MEMORANDUM AND ORDER Today we address five separate appeals of the Atomic Safety and Licensing Boards denial of requests to intervene in the proceeding regarding Holtec Internationals application to construct and operate a consolidated interim storage facility (CISF) in Lea County, New Mexico.1 For the reasons described below, we affirm the Board in part and reverse and remand in part. We also remand to the Board two contentions filed after the deadline.

I. BACKGROUND Holtec submitted its license application in March 2017.2 The proposed license would allow Holtec to store up to 8680 metric tons of uranium (MTUs) (500 loaded canisters) in the 1 See LBP-19-4, 89 NRC 353 (2019).

2 See Letter from Kimberly Manzione, Holtec International, to Michael Layton, NRC (Mar. 30, 2017) (enclosing application documents including safety analysis report and environmental report) (ADAMS accession no. ML17115A431 (package)). By the time the Board ruled, Holtec had updated its application documents. The application revisions referenced in the Boards (Page 11 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 3 of 61 Holtec HI-STORE CISF for a period of forty years.3 Holtecs safety analysis currently encompasses only the canisters and contents approved under the generic docket 72-1040 for the HI-STORM UMAX canister storage system.4 According to its application, Holtec plans up to nineteen subsequent expansion phases over the course of twenty years, with each expansion requiring a license amendment.5 Holtecs environmental report (ER) anticipates operation of its proposed facility for up to 120 years (a forty-year initial licensing period plus eighty years of potential renewal periods) with up to 100,000 MTUs stored after all expansions.6 The Staff published a notice of opportunity to request a hearing on Holtecs application in July 2018.7 Petitions to intervene were filed by Sierra Club; Beyond Nuclear, Inc. (Beyond Nuclear); Fasken Land and Minerals, Ltd. and Permian Basin Land and Royalty Owners (together, Fasken); Dont Waste Michigan, Citizens Environmental Coalition, Citizens for Alternatives to Chemical Contamination, Nuclear Energy Information Service, Public Citizen, Inc., San Luis Obispo Mothers for Peace, and Nuclear Issues Studies Group (together, Joint Petitioners); Alliance for Environmental Strategies (AFES); and NAC International Inc. (NAC).

The Board heard oral argument on January 23 and 24, 2019.

decision are: Environmental Report on the Holtec International HI-STORE CIS Facility, rev. 5 (Mar. 2019) (ML19095B800) (ER); and Holtec, Licensing Report on the HI-STORE CIS Facility, rev. 0F (Jan. 31, 2019) (ML19052A379) (SAR). References in this decision refer to the same revisions unless otherwise noted.

3 See Proposed License for Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste SNM-1051, at 1 (ML17310A223) (Proposed License).

4 SAR § 1.0 at 1-2; see 10 C.F.R. § 72.214 (list of approved spent fuel storage casks).

5 See ER § 1.0.

6 Id.

7 See Holtec Internationals HI-STORE Consolidated Interim Storage Facility for Interim Storage of Spent Nuclear Fuel, 83 Fed. Reg. 32,919 (July 16, 2018).

(Page 12 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 4 of 61 The Board rejected all the hearing requests for either lack of standing, failure to offer an admissible contention, or both. The Board found that three petitionersBeyond Nuclear, Sierra Club, and Faskenhad demonstrated standing but had not offered an admissible contention.8 The Board concluded that Joint Petitioners and NAC had neither demonstrated standing nor offered an admissible contention.9 The Board did not rule on AFESs standingwhich it found to be a close callbut rejected AFESs petition because the organization had not proposed an admissible contention.10 All petitioners except for NAC have appealed. The Staff and Holtec oppose the appeals, as described below.

II. DISCUSSION A. Standard of Review Our regulations allow a petitioner whose hearing request has been wholly denied to appeal as of right.11 We generally defer to the Board on matters of contention admissibility and standing unless an appeal demonstrates an error of law or abuse of discretion.12 Similarly, we generally defer to the Board on questions pertaining to the sufficiency of factual support for the admission of a contention.13 8 See LBP-19-4, 89 NRC at 358.

9 Id.

10 Id. at 358, 370-71.

11 10 C.F.R. § 2.311(c).

12 See, e.g., Crow Butte Resources, Inc. (Marsland Expansion Area), CLI-14-2, 79 NRC 11, 13-14 (2014); Strata Energy, Inc. (Ross In Situ Uranium Recovery Project), CLI-12-12, 75 NRC 603, 608-13 (2012).

13 Pacific Gas and Electric Co. (Diablo Canyon Nuclear Power Plant, Units 1 and 2), CLI-16-9, 83 NRC 472, 482, Crow Butte, CLI-14-2, 79 NRC at 13-14.

(Page 13 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 5 of 61 B. Beyond Nuclear/Sierra Club Contention 1/Fasken Beyond Nuclear and Fasken each proposed a single contention, and Sierra Club proposed its Contention 1, all questioning whether it is lawful to issue the proposed license at all.14 These petitioners contend that the application must be rejected outright because it contemplates storage contracts with the U.S. Department of Energy (DOE) and such contracts would be illegal under the Nuclear Waste Policy Act (NWPA).15 Holtec envisions that its customers will either be nuclear plant operators or DOE, depending on which entity holds title to the spent nuclear fuel.16 Beyond Nuclear, Fasken and Sierra Club all argued that it would violate the NWPA for DOE to take title to spent nuclear fuel before it builds a permanent geological repository.

Section 123 of the NWPA provides that DOE will take title to the spent fuel when the Secretary 14 See Petition to Intervene and Request for Adjudicatory Hearing by Sierra Club (Sept. 14, 2018), at 10-17 (Sierra Club Petition). Fasken entered this proceeding through a motion to dismiss the licensing proceeding filed directly before us relating to this facility and another CISF proposed in Texas. See Motion of Fasken Land and Minerals and Permian Basin Land and Royalty Owners to Dismiss Licensing Proceedings for Hi-Store Consolidated Interim Storage Facility and WCS Consolidated Interim Storage Facility (Sept. 14, 2018). Beyond Nuclear filed a similar motion, which it attached as an exhibit to its hearing request and petition to intervene.

See Beyond Nuclear, Inc.s Hearing Request and Petition to Intervene (Sept. 14, 2018) (Beyond Nuclear Petition); Beyond Nuclear, Inc.s Motion to Dismiss Licensing Proceedings for Hi-Store Consolidated Interim Storage Facility and WCS Consolidated Interim Storage Facility for Violation of the Nuclear Waste Policy Act (Sept. 14, 2018). Beyond Nuclear also submitted a letter after filing its appeal. See Letter from Mindy Goldstein and Dianne Curran, Counsel for Beyond Nuclear, to the Commissioners (Apr. 7, 2020). The letter does not affect our analysis below.

15 See Nuclear Waste Policy Act of 1982, as amended, 42 U.S.C §§ 10101-10270 (2012).

Because our regulations do not provide for a motion to dismiss an application, the Secretary of the Commission referred Beyond Nuclears and Faskens motions to be considered as hearing requests and as proposed contentions in each licensing proceeding. See Order of the Secretary (Oct. 29, 2018) (unpublished) (issued in this proceeding and in Interim Storage Partners, LLC (WCS Consolidated Interim Storage Facility)).

16 See, e.g., Proposed License at 2, ¶ 17 ([T]he construction program will be undertaken only after a definitive agreement with the prospective user/payer for storing the used fuel ([DOE]

and/or a nuclear plant owner).).

(Page 14 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 6 of 61 of Energy accepts delivery of it.17 Section 302 of the NWPA provides that the Secretary of Energy will enter contracts with the spent fuel generators (nuclear power plant owners) that shall provide that the Secretary will take title to the spent fuel following commencement of operation of a repository.18 And a repository is defined in the NWPA as a system intended for permanent deep geological disposal of high-level radioactive waste and spent nuclear fuel.19 During oral argument on the petitions, Holtecs counsel acknowledged that the NWPA would prevent DOE from taking title to spent nuclear fuel and therefore (except for a relatively small quantity of waste it already owns) DOE could not be a CISF customer.20 Holtec also acknowledged that it hopes Congress will change the law to allow DOE to enter into temporary storage contracts with Holtec.21 But Holtec argued that because the application also contemplates that nuclear plant owners might be potential customers, the petitioners have not raised a litigable contention.

The Board rejected the argument that the mere mention of DOE renders Holtecs license application unlawful.22 The Board observed that Holtec is committed to going forward with the project by contracting directly with the plant owners.23 The Board held that whether that option is commercially viable was not an issue before the Board.24 And it noted that 17 42 U.S.C. § 10143.

18 Id. § 10222(a)(5)(A).

19 Id. § 10101(18).

20 Tr. at 249-50.

21 Tr. at 248, 250.

22 LBP-19-4, 89 NRC at 381.

23 Id.

24 Id. (citing Louisiana Energy Services, LP. (National Enrichment Facility), CLI-05-28, 62 NRC 721, 726 (2005); Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, N.M. 87174) CLI-01-4, 53 NRC 31, 48-49 (2001)). In Hydro, we observed that the NRC is not in the business of regulating the market strategies of licensees. Hydro, CLI-01-4, 53 NRC at 48-49. In Louisiana (Page 15 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 7 of 61 Holtec had committed not to contract unlawfully with DOE.25 The Board further pointed to DOEs publicly taken position that it cannot lawfully provide interim storage before a repository is operational.26 The Board found that the NRC can safely assume that DOE would not enter unlawful contracts because federal agencies enjoy a presumption of regularity that they will act properly in the absence of evidence to the contrary.27 The Board concluded that Holtec seeks a license that would allow it to enter into lawful customer contracts today, but also permit it to enter into additional customer contracts if and when they become lawful in the future.28 Beyond Nuclear argues that the NRC cannot issue the proposed license because the Administrative Procedure Act prohibits agency action that is not in accordance with the law or in excess of statutory jurisdiction, authority, or limitation.29 Beyond Nuclear frames the question as whether the NRC may approve a license application containing provisions that would violate NWPA if implemented.30 Similarly, Sierra Club argues that the Holtec project cannot be licensed if there is a possibility that the financial arrangements would be illegal.31 Fasken argues that Holtecs license application is outside of the ASLBs and the NRCs Energy Services, we denied review of the Boards decision to reject a portion of a contention that questioned the commercial viability of the proposed project, and we held that the license applicant did not have to demonstrate the potential profitability of the proposed facility.

Louisiana Energy Services, CLI-05-28, 62 NRC at 725.

25 See LBP-19-4, 89 NRC at 381.

26 Id. at 382.

27 Id. (citing United States v. Armstrong, 517 U.S. 456, 464 (1996); United States v. Chem.

Found. Inc., 272 U.S. 1, 14-15 (1926)); see also FCC v. Schrieber, 381 U.S. 279, 296 (1965).

28 LBP-19-4, 89 NRC at 382.

29 Beyond Nuclears Brief on Appeal of LBP-19-04 (June 3, 2019), at 7 (Beyond Nuclear Appeal)

(quoting Administrative Procedure Act, 5 U.S.C § 706(2)(A), (C)).

30 Id.

31 Sierra Clubs Petition for Review of Atomic Safety and Licensing Board Decision Denying Admissibility of Contentions in Licensing Proceeding (June 3, 2019), at 5 (Sierra Club Appeal).

(Page 16 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 8 of 61 subject-matter jurisdiction because approval would authorize a facility that violates the NWPA.32 The Staff and Holtec oppose the appeals.33 The three appellants characterization largely restates arguments already advanced to the Board.34 As the Board observed, Holtec seeks a license that would allow it to enter into lawful customer contracts today, but also permit it to enter into additional customer contracts if and when they become lawful in the future.35 The proposed license would authorize Holtec to take possession of the spent nuclear fuel in its CISF; the license itself would not violate the NWPA by transferring the title to the fuel, nor would it authorize Holtec or DOE to enter into storage contracts.36 Holtec and DOE acknowledge that it would be illegal under NWPA for DOE to take title to the spent nuclear fuel at this time, although Holtec states that it hopes that Congress will amend the NWPA in the future.37 We disagree with the assertions that the license 32 Fasken and PBLRO Notice of Appeal and Petition for Review (June 3, 2019), at 3-4 (Fasken Appeal).

33 See NRC Staff Answer in Opposition to Beyond Nuclears Appeal of LBP-19-4 (June 28, 2019); Holtec Internationals Brief in Opposition to Beyond Nuclears Appeal of LBP-19-4 (June 28, 2019); NRC Staff Answer in Opposition to Fasken Land and Minerals, Ltd. and Permian Basin Land and Royalty Owners Appeal of LBP-19-4 (June 28, 2019); Holtec Internationals Brief in Opposition to Fasken and Permian Basin Land and Royalty Owners Appeal of LBP 4 (June 28, 2019) (Holtec Opposition to Fasken Appeal); NRC Staffs Answer in Opposition to the Sierra Clubs Appeal of LBP-19-4 (June 28, 2019), at 5-7 (Staff Opposition to Sierra Club Appeal); Holtec Internationals Brief in Opposition to Sierra Clubs Appeal of LBP-19-4 (June 28, 2019), at 6-9 (Holtec Opposition to Sierra Club Appeal). Holtec challenges the Boards ruling on Faskens standing as well, which we discuss in section II.F.1 below. See Holtec Opposition to Fasken Appeal at 14-19.

34 Florida Power & Light Company (Turkey Point Nuclear Generating Units 6 and 7), CLI-17-12, 86 NRC 215, 219 (2017) (rejecting an appeal that only restated arguments previously raised before the board).

35 LBP-19-4, 89 NRC at 382.

36 See Proposed License at 2, ¶ 17.

37 See LBP-19-4, 89 NRC at 381-82.

(Page 17 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 9 of 61 would violate the NWPA.38 The NWPA does not prohibit a nuclear power plant licensee from transferring spent nuclear fuel to another private entity. We therefore affirm the Boards decision to reject this contention.

C. Sierra Club Appeal The Board found that Sierra Club had shown standing but that none of its twenty-nine proposed contentions were admissible. Sierra Club has now appealed with respect to ten of those contentions in addition to its Contention 1 discussed above.39 On October 23, 2019, Sierra Club also moved to admit a new contention concerning transportation risks.40

1. Sierra Club Standing As an initial matter, Holtec challenges the Boards finding that Sierra Club has standing in this proceeding.41 Although in matters involving construction or operation of a nuclear power reactor we allow a proximity presumption of standing to persons living within fifty miles of the proposed site, in non-power reactor cases, standing is examined on a case-by-case basis considering the petitioners proximity to the site in addition to other factors.42 This 38 To the extent Sierra Club argues that we should grant its appeal on Contention 1 because Holtec will use the license as leverage to encourage Congress to change the law, we also reject that line of argument for the reasons discussed below in response to Sierra Clubs appeal of Contention 26 and the Joint Petitioners appeal of their Contention 14. Sierra Club Appeal at
9. Fasken suggests that the Secretary of the Commission improvidently referred its motion to dismiss to the Board for consideration as a legal contention. Fasken Appeal at 1-4. But our regulations do not provide for a motion to dismiss, and Fasken has not demonstrated how consideration of its arguments under our contention admissibility standards negatively impacted its position. In any event, the Boards finding that Holtecs application does not violate the NWPA addressed the gravamen of Faskens motion to dismiss.

39 Sierra Club Appeal at 5-7.

40 Sierra Clubs Motion to File a New Late-Filed Contention (Oct. 23, 2019), (Sierra Club Motion for New Contention 30); Attach., Contention 30 (Sierra Club Contention 30).

41 Holtec Opposition to Sierra Club Appeal at 27-30.

42 Georgia Institute of Technology (Georgia Tech Research Reactor, Atlanta, Georgia),

CLI-95-12, 71 NRC 111, 116-17 (1995).

(Page 18 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 10 of 61 proximity-plus standard takes into account both the nature of the proposed activity and significance of the radioactive source.43 Sierra Club based its standing on declarations of its members who live and work near the proposed site.44 The Board observed that one of Sierra Clubs declarants, Daniel Berry, lives less than ten miles from the site and owns and operates a ranch just three miles away from the site.45 Mr. Berry stated that he, his wife, and his ranch hands spend time every day traversing the ranch on foot, horseback, and ATV, while managing their cattle.46 The Board found that Sierra Club had established standing based on the proximity of its member Mr. Berry. It observed that the distances of his home and activities are well within the limits that have been found to confer standing to challenge much smaller storage facilities.47 It rejected Holtecs argument that an individual who lives sufficiently close to a potentially massive facility for storing much of the nations spent nuclear fuel must first demonstrate with specificity how radiation might reach them.48 On appeal, Holtec claims that the Board erred by granting Sierra Club standing even though its pleadings lacked meaningful explanation as to how the activities at the CISF might lead to a 43 Id.

44 Sierra Club Petition at 6.

45 LBP-19-4, 89 NRC at 12-13. Mr. Berry submitted two declarations in this proceeding, one authorizing Sierra Club and the other authorizing Beyond Nuclear to represent his interest in this proceeding. Although the declaration submitted with the Sierra Club Petition stated that his home and ranch lie less than 10 miles from the site, the declaration submitted with Beyond Nuclears Petition was more detailed. In that declaration, Mr. Berry explained that his ranch, the T Over V ranch, consists of privately owned land and leased land, and he provided a map showing that a portion of the ranch lies about 3.2 miles away from the proposed CISF site. See Beyond Nuclear Petition, Attach. Ex. 2, Declaration of Daniel C. Berry III (Sept. 11, 2018) (Berry Beyond Nuclear Declaration).

46 Berry Beyond Nuclear Declaration at ¶¶ 4-5.

47 LBP-19-4, 89 NRC at 366.

48 Id. at 367.

(Page 19 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 11 of 61 release which could affect any of their members.49 Our standing precedents require petitioners to show a specific and plausible means for how the licensed-activities will affect them in the absence of obvious potential for offsite harm.50 We generally defer to a Boards ruling on standing in the absence of clear error or an abuse of discretion.51 In this case, the Boards finding of standing is reasonable given the size of the facility and Mr. Berrys activities in close proximity to that facility. We therefore reject Holtecs argument that Sierra Club failed to establish standing.

2. Sierra Club Contention 4 (Transportation Risks)

Sierra Club asserted in Contention 4 that section 4.9 of the ER inadequately addressed risks associated with transporting radioactive waste from the reactor sites to the CISF.52 It argued that the ER fails to account for severe rail accidents that could release radiation. In support of its argument, Sierra Club relied on an analysis performed by its expert, Dr. Marvin Resnikoff, of the radiological consequences of a spent fuel canister subject to the conditions of a rail tunnel fire similar to one that took place in the Howard Street Tunnel in Baltimore in 2001 (Baltimore Tunnel Analysis).53 The Baltimore Tunnel Analysis concluded that in a similar accident, a spent fuel cask would fail and the fuel rods would burst within eleven hours.54 The 49 Holtec Opposition to Sierra Club at 28.

50 Nuclear Fuel Servs., Inc. (Erwin, Tenn.), CLI-04-13, 59 NRC 244, 248 (2004).

51 See, e.g., Strata Energy, CLI-12-12, 75 NRC at 608-13 (2012) (deferring to boards finding of standing based on dust from project employees driving near petitioners house).

52 Sierra Club Petition at 22-27.

53 Matthew Lamb & Marvin Resnikoff, Radiological Consequences of Severe Rail Accidents Involving Spent Nuclear Fuel Shipments to Yucca Mountain: Hypothetical Baltimore Rail Tunnel Fire Involving SNF (Sept. 2001), available at http://www.state.nv.us/nucwaste/news2001/nn11459.htm (last visited Nov. 7, 2019). According to the report, the Baltimore Tunnel Fire burned for three days or more at temperatures of at least 1500°F. Id. at 9.

54 Id. at 8-9.

(Page 20 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 12 of 61 study also provided estimates for the population exposed and latent cancer fatalities.55 According to Sierra Club, Dr. Resnikoff has updated his 2001 Baltimore Analysis and now estimates that a major rail accident could release 20 million person-rem, 1250 times Holtecs estimate.56 Sierra Club also claimed that Holtec underestimates the likelihood of a severe rail accident because Holtec relies on the Department of Energys 2008 Yucca Mountain Final Supplemental Environmental Impact Statement (FSEIS), which Sierra Club claims is outdated and does not account for recent information about increased rail traffic, derailments, and fires.57 Holtec argued in its answer and at oral argument that because its ER incorporated specific portions of the DOE 2008 Yucca Mountain FSEIS, Sierra Club must specifically dispute the analysis in the DOE Supplemental Environmental Impact Statement (SEIS) in order to show a genuine dispute.58 Holtecs ER accident analysis tiered from section 6.3.3.2 of the Yucca Mountain FSEIS.59 In that section DOE responded to a 2001 study by Matthew Lamb and Dr.

Resnikoff that claimed that the latent cancer fatalities resulting from a severe accident in an urban area of Nevada could be between 13 and 40,868 (Nevada Accident Analysis).60 DOE 55 Id. at 13; Sierra Club Petition at 24-25.

56 Sierra Club Petition at 25.

57 Id. at 25-26; see U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada, (June 2008), vol. 1, § 6.3.3 (ML081750191 (package)) (Yucca Mountain FSEIS).

58 See Holtec Internationals Answer Opposing Sierra Clubs Petition to Intervene and Request for Adjudicatory Hearing on Holtec Internationals HI-STORE Consolidated Interim Storage Facility Application (Oct. 9, 2018), at 28-29 (Holtec Answer to Sierra Club); Tr. at 258 (The DOE analysis specifically addressed the higher estimates provided by Lamb and Resnikoff.).

59 See ER § 4.9.3.2 (transportation accident impacts).

60 Matthew Lamb, et. al, Worst Case Credible Nuclear Transportation Accidents: Analysis for Urban and Rural Nevada (Aug. 2001). The Yucca Mountain FSEIS refers to this document as DIRS 181756.

(Page 21 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 13 of 61 stated that this estimate was unrealistic because Mr. Lamb and Dr. Renikoff had used conservative or bounding values for multiple parameters in their computer analysis, resulting in unrealistically high yields.61 The Board rejected the contention on various grounds. The Board agreed with Holtec and found that Sierra Club had not shown a genuine dispute with the application because it had not address[ed] or disput[ed] the criticisms of the Lamb and Resnikoff Study contained in the Yucca Mountain FSEIS on which Holtecs ER had relied.62 The Board further found that the contention posed a worst case scenario, the consequences of which need not be discussed under NEPA.63 The Board observed that the intensity of the Baltimore Tunnel Fire was caused by the flammable contents of the railcars, and, according to statements by Holtecs counsel during oral argument, shipments to the CISF will be in dedicated trains without such contents.64 It concluded that a scenario similar to the Baltimore Tunnel Fire would be extraordinarily unlikely.65 It further found that Sierra Club had offered no facts or expert opinion to support its argument that Holtec failed to account for recent information about increased rail traffic and oil tanker rail cars.66 On appeal, Sierra Club reasserts its claim that the application has underestimated the consequences of an accident and argues that the Baltimore Tunnel Analysis was sufficient to 61 Yucca Mountain FSEIS at 6-23.

62 LBP-19-4, 89 NRC at 387.

63 Id. at 387-88 (citing Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-02-25, 56 NRC 340, 352 (2002)).

64 Id. (citing Tr. at 256-57).

65 Id. at 388.

66 Id. (citing Sierra Club Petition at 25-26).

(Page 22 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 14 of 61 raise a factual dispute.67 It does not reassert its arguments about the likelihood of a rail accident. Nor does it address the Boards conclusion that the proposed contention sought an analysis of an extraordinarily unlikely worst case analysis.

We conclude that Sierra Club identifies no Board error in rejecting the contention. The Board is correct that NEPA does not require a worst case analysis for potential accident consequences.68 In addition, the Board correctly found that Sierra Club offered no expert opinion or documentary support for its assertions about increased rail traffic or railroad fires.

And although Sierra Club argues that the Yucca Mountain FSEIS is out of date, the Baltimore Tunnel Analysis, on which Sierra Club relies, predates the Yucca Mountain FSEIS by several years.69 Moreover, the NRC has studied what would happen to various spent fuel transportation packages if they were subjected to the conditions of the Baltimore Tunnel Fire and concluded that the potential consequences are negligible.70 And contrary to the assertions in Sierra Clubs contention, Dr. Resnikoffs declaration provided no updated information on the subject except for a general statement that he reviewed and endorsed the claims in Sierra Clubs contentions.71 This is insufficient factual support for a contention. We therefore affirm the Boards decision to reject the contention.

67 Sierra Club Appeal at 9-11.

68 See Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 354 (1989).

69 See Yucca Mountain FSEIS vol. 1, § 6.3.3.2.

70 See Spent Fuel Transportation Package Risk Assessment (Final Report), NUREG-2125, at 127 (Jan. 2014) (ML14031A323); Spent Fuel Transportation Package Response to the Baltimore Tunnel Fire Scenario NUREG/CR-6886, rev. 2, § 8.3 (Feb. 2009) (ML090570742).

71 Sierra Club Petition, Attach., Declaration of Marvin Resnikoff (Sept. 13, 2018).

(Page 23 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 15 of 61

3. Sierra Club Contention 8 (Decommissioning Funds)

Sierra Club argued in Contention 8 that Holtecs application does not set forth a plan to provide adequate funds for decommissioning.72 Sierra Club argued that the amount that Holtec intends to set aside for decommissioning the site is completely inadequate to cover Holtecs

$23 million estimated decommissioning costs.73 In addition, Sierra Club argued that Holtecs decommissioning cost estimate only covers the first phase of the project and the application should explain how Holtec will fund decommissioning the site following the ensuing twenty phases.74 According to its application, Holtec plans to provide financial assurance for decommissioning by establishing a sinking fund coupled with a surety, insurance, or other guarantee as described in 10 C.F.R § 72.30(e)(3). Specifically, Holtec intends to set aside $840 per MTU stored at the facility and counts on a 3% rate of return.75 In its answer to Sierra Clubs hearing request, Holtec argued that Sierra Clubs calculations were incorrect for two reasons.

First, Sierra Club had assumed that Holtec would only accept up to 5000 MTU in its initial phase and therefore set aside only $4,200,000 for future decommissioning. But Holtecs application is for a license to store up to 8680 MTU, which would require Holtec to provide up to $7,291,200 for future decommissioning.76 Second, Holtec claimed that Sierra Club did not account for the 3% rate of return Holtec expects to earn on the funds set aside.77 Holtec also pointed out that 72 See Sierra Club Petition at 35-37.

73 Id. at 36 (citing Holtec International & Eddy Lea Energy Alliance (ELEA) Underground CISF -

Financial Assurance & Project Life Cycle Cost Estimates, Holtec Report No. HI-2177593 (undated), at 6 (ML18345A143) (Decommissioning Cost Estimate)).

74 Id.

75 Decommissioning Cost Estimate § 2.2.

76 Holtec Answer to Sierra Club at 44.

77 Id. at 44-45; see Decommissioning Cost Estimate § 2.2.

(Page 24 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 16 of 61 its decommissioning funding plan will have to be updated and resubmitted every three years.78 Further, it argued, even if there were some shortfall in Holtecs calculation of the amount of funds needing to be set aside (which there is not), it would be covered by the surety and therefore the contention raised no genuine material dispute with the application.79 Sierra Club responded to Holtec by questioning its reliance on compound interest.80 Sierra Club pointed out that if Holtecs fund were to earn only a 2% rate of return rather than the 3% upon which it relies, it would have only $10,941,921 after forty years, far below the $23 million estimate in the Decommissioning Funding Plan.81 It further argued that it was doubtful that any surety company would issue a bond for Holtecs facility.82 Holtec responded with a motion to strike the arguments concerning the rate of return and its ability to obtain a surety bond because these arguments were raised for the first time in the reply and therefore unjustifiably late.83 The Board found that Sierra Clubs proposed Contention 8 had not raised a genuine dispute with the application. The Board rejected the argument that Holtecs decommissioning plan must show how it would fund decommissioning of all future expansions of the project because the application only covers the first phase and Holtec will have to update its plan for 78 Holtec Answer to Sierra Club. at 45-46; see 10 C.F.R. § 72.30(c).

79 Holtec Answer to Sierra Club at 46.

80 Sierra Clubs Reply to Answers Filed by Holtec International and NRC Staff (Oct. 16, 2019), at 28 (Sierra Club Reply).

81 Id.

82 Id. at 29-30.

83 Holtec Internationals Motion to Strike Portions of Replies of Alliance for Environmental Strategies, Dont Waste Michigan et al., NAC International Inc., and Sierra Club (Oct. 26, 2018),

at 10-11.

(Page 25 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 17 of 61 any future expansions.84 The Board further rejected Sierra Clubs arguments that Holtec could not rely on a reasonable rate of return of 3% and that a surety bond is doubtful because those arguments were impermissibly late and factually unsupported.85 In its appeal, Sierra Club reiterates that the plan must provide for decommissioning all twenty phases of the project without identifying an error in the Boards analysis.86 The Board correctly explained that any future expansion of the facility will require a license amendment and an update to the decommissioning plan. Because Sierra Club does not point to a Board error, there is no basis for us to reverse the Board; it is not sufficient for an appellant merely to repeat the arguments it made before the Board.87 Sierra Club also reasserts its argument that Holtec provided no assurance that it will earn a 3% rate of return on the funds set aside for decommissioning.88 Sierra Club does not address the Boards finding that the argument was impermissibly late. The 3% figure was included in Holtecs Decommissioning Cost Estimate at the time Sierra Club filed its contentions, and therefore Sierra Club could have challenged it then.89 Moreover, Sierra Club does not counter the Boards finding that its argument was unsupported. In short, Sierra Club points to no Board error in rejecting this contention, and we affirm the Board.

84 LBP-19-4, 89 NRC at 393.

85 Id. at 393-94.

86 Sierra Club Appeal at 12-13.

87Turkey Point, CLI-17-12, 86 NRC at 219.

88 Sierra Club Appeal at 12-13.

89 See Decommissioning Cost Estimate § 2.2.

(Page 26 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 18 of 61

4. Sierra Club Contention 9 (Impacts from Beyond Design Life and Service Life of Storage Containers)

Sierra Club argued in Contention 9 that the application must consider the risk that the storage canisters will be left on the CISF beyond their design life of 60 years and expected service life of 100 years.90 Sierra Club pointed out that the HI-STORE UMAX canisters designated to be used at the site have only a 60-year design life and 100-year service life, whereas the ER states that the CISF may operate up to 120 years until a permanent repository is available to take the waste.91 Moreover, Sierra Club argued that the ER should consider the possibility that a permanent repository never becomes available, making the Holtec site a de facto permanent repository.92 Sierra Club further argued that the Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel (Continued Storage GEIS) is not applicable to the proposed Holtec facility.93 Sierra Club argued that the analysis in the Continued Storage GEIS assumes that an away-from-reactor spent fuel storage facility will have a dry transfer system (DTS) to repackage damaged or leaking canisters whereas the Holtec facility will have no DTS.94 Therefore, Sierra Club argued, the proposed Holtec facility is not like the hypothetical facility discussed in the Continued Storage GEIS.

The Board found that the contention presented both environmental and safety aspects, neither of which was admissible. It found that the environmental aspect of this contention impermissibly challenged the Continued Storage Rule and the Continued Storage GEIS 90 See Sierra Club Petition at 38-42.

91 Id. at 38-39 (citing ER § 1.0).

92 Id. at 40.

93 Id. at 40-41.

94 Id.; see Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel (Final Report), NUREG-2157, vol. 1, ch. 5 (Sept. 2014) (ML14196A105) (Continued Storage GEIS).

(Page 27 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 19 of 61 because Sierra Club did not seek a rule waiver.95 To the extent that proposed Contention 9 raised safety issues, the Board found that it did not raise a genuine dispute with the application because it ignore[d] the SARs discussion of retrievability, inspection, and maintenance activities.96 Sierra Clubs appeal essentially reasserts its arguments before the Board without confronting the Boards findings. The Continued Storage Rule provides that long term environmental effects associated with spent fuel storage are set forth in the Continued Storage GEIS and need not be reiterated in individual license proceedings. On appeal, Sierra Club does not address the Boards finding that it must request a rule waiver in order to argue that the Continued Storage Rule should not apply in this proceeding.97 Additionally, Sierra Club repeats the argument that the Continued Storage Rule does not apply to the proposed Holtec facility because the Continued Storage GEIS assumes the presence of a DTS.98 However, its factual premise is mistaken. The Continued Storage GEIS assumes that a DTS would be built in the long-term storage and indefinite timeframes.99 The Continued Storage GEIS assumes that a DTS will not be present initially and that is consistent with Holtecs proposed facility. The application therefore does not need to discuss the effects of a DTS (or the consequences of not 95 LBP-19-4, 89 NRC at 395; see 10 C.F.R. § 51.23 (Continued Storage Rule); 10 C.F.R.

§ 2.335 (no Commission regulation is subject to challenge in an individual licensing proceeding except when a waiver of the rule is sought and granted on the basis that application of the rule to the particular situation would not serve the purpose for which the rule was adopted).

96 LBP-19-4, 89 NRC at 395 (citing provisions of the SAR relating to monitoring, maintenance, and aging management).

97 See 10 C.F.R. § 2.335(b).

98 Sierra Club Appeal at 13-14.

99 Continued Storage GEIS § 1.8.2 at 1-14, § 5.0 at 5-2.

(Page 28 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 20 of 61 having a DTS). If Holtec receives a license and decides to build a DTS, then it would need to seek an amendment to its license.

Next, Sierra Club argues that the Board relied on Holtecs unsupported conclusory statement that it will somehow monitor and retrieve the waste in the future and reasserts its claim that once a crack starts in a canister, it can break through and cause a leak in [sixteen]

years.100 But Holtecs statements are not unsupported or conclusoryits SAR discusses plans for inspection, maintenance, retrieval, and aging management.101 The SAR specifically discusses the issue of stress corrosion cracking and concludes that, due to the low halide content of the air at the proposed CISF site, chloride-induced stress corrosion cracking is a remote possibility.102 The SAR also describes how it will monitor the canisters to detect any stress corrosion cracking in its aging management program.103 100 Sierra Club Appeal at 14. Sierra Club points to a YouTube video which it claims depicts Holtecs President Krishna Singh acknowledging that Holtec canisters cannot be inspected, repaired or repackaged. Id.; see also Sierra Club Petition at 41. But Dr. Singh does not say that the canisters cannot be inspected or repackaged. The video clip appears to show Dr.

Singh at an October 14, 2014 meeting, in which he stated that should a canister develop a through-wall hole, it would not be practical to repair it, and the solution would be to isolate the canister in a cask. See www.youtube.com/watch?v=euaFZt0YPi4 (last visited Oct. 21, 2019).

In its petition, Sierra Club cited an NRC Staff meeting summary where this statement was made, but it does not acknowledge that this discussion pertained to the specific phenomenon of chloride-induced stress corrosion cracking. See Sierra Club Petition at 41 (citing Memorandum from Kristina Banovac, Office of Nuclear Material Safety and Safeguards, to Anthony Hsia, Office of Nuclear Material Safety and Safeguards, Summary of August 5, 2014, Public Meeting with Nuclear Energy Institute on Chloride Induced Stress Corrosion Cracking Regulatory Issue Resolution Protocol (Sept. 9, 2014) (ML14258A081)).

101 See, e.g., SAR §§ 3.1.4.1 (inspection of incoming casks), 3.1.4.4 (surveillance during storage), 5.4.1.2 (the HI-STORM UMAX cask system allows retrieval under all conditions of storage); see generally, id. ch. 18, Aging Management Program.

102 See SAR §§ 17.11, 18.3.

103 See SAR §§ 18.3, 18.5.

(Page 29 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 21 of 61 The Board found that Sierra Club Contention 9 did not acknowledge or discuss these sections of the SAR or challenge the applications conclusion.104 On appeal, Sierra Club does not address the Boards finding that it had failed to dispute relevant portions of the SAR.

We agree with the Boards conclusion that Sierra Clubs petition did not challenge these discussions in the SAR.

We therefore conclude that Sierra Clubs appeal does not identify Board error in rejecting its proposed Contention 9, and we affirm the Board.

5. Sierra Club Contention 11 (Earthquakes)

Sierra Club argued in Contention 11 that the ER and SAR had inadequately discussed earthquake risks to the facility, including seismic activity induced by oil and gas recovery operations.105 Sierra Club asserted that the information in Holtecs SAR and in its ER used historical data that does not take into account the recent increase in drilling for oil and natural gas that creates induced earthquakes.106 It attached to its petition a 2018 scientific study (the Stanford Report), which it claimed documented the existence of prior earthquakes in southeast New Mexico and the existence of numerous faults in the area in and around the proposed Holtec site.107 It also claimed that the oil and gas industry is concerned that the Holtec facility would impact oil and gas operations in the area and cited the scoping comments 104 LBP-19-4, 89 NRC at 395.

105 See Sierra Club Petition at 44-48.

106 Id. at 45-46; see also ER § 3.3.2; SAR § 2.6.

107 Sierra Club Petition at 44-45 (citing Jens-Erik Lund Snee and Mark D. Zobeck, State of Stress in the Permian Basin, Texas and New Mexico: Implications for Induced Seismicity, The Leading Edge, Feb. 2018, at 127-32 (Stanford Report)).

(Page 30 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 22 of 61 that Fasken Oil and Ranch, Ltd. and PBLRO Coalition submitted to NRC with respect to the Holtec application.108 The Board rejected Sierra Clubs contention because it presented no genuine dispute with the application.109 The Board observed that the ER and SAR both used data from the 2016 U.S. Geological Survey, the latest available at the time of its 2017 application.110 It found that Sierra Club had not provided evidence of any significant seismic events around the proposed project site since 2016 and therefore rejected the claim that the application was outdated.111 The Board observed that both the ER and the SAR specifically discuss the effects of fracking.112 Finally, the Board found that there was no dispute between the Stanford Report and the SARs seismic analyses and noted that the illustrations provided in the report appeared to confirm the SARs claim that the closest Quaternary fault (active within the last 1.6 million years) is approximately seventy-five miles away and the nearest fault of any kind is forty miles from the site.113 On appeal, Sierra Club reasserts its claims that Holtecs information is out of date and that the Stanford Report contradicts information in the application. But the Sierra Club adds a new claim with respect to the Stanford Reportthat the report document[s] that due to 108 Id. at 47-48, Ex. 7, Letter from Tommy E. Taylor, Fasken Oil and Ranch, Ltd. to Michael Layton, NRC (July 30, 2018).

109 LBP-19-4. 89 NRC at 398.

110 Id.

111 Id.

112 Id. Holtecs ER and SAR discuss fluid injection and induced seismicity from the oil and gas industry. See SAR § 2.6.2; ER § 3.3.2.1. The Stanford Report does not use the term fracking, but it discusses fluid or wastewater injection. See, e.g., Stanford Report at 127 (noting that

[f]luid injection and hydrocarbon production have been suspected as the triggering mechanisms for numerous earthquakes that have occurred in the Permian Basin since the 1960s).

113 LBP-19-4, 89 NRC at 398-99; see SAR § 2.6.2 at 2-108.

(Page 31 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 23 of 61 increased fracking for oil and gas, new geologic faults are being induced, coming nearer to the Holtec site.114 We deny the appeal for many of the same reasons outlined by the Board. First, we agree with the Board that Holtecs use of 2016 USGS data was not out of date and Sierra Club provided no evidence of recent seismic activity near the site. The Board reasonably concluded that the maps included in the Stanford Report seemed to confirm, rather than contradict, the SARs statements that there were no Quaternary faults within the immediate area of the Holtec site.115 And although the Stanford Report discusses earthquakes occurring since 2017, there is no indication that these are stronger earthquakes than previously seen or that they occurred particularly near the site of the proposed Holtec facility.116 We are not persuaded by Sierra Clubs argument that the Stanford Report shows that oil and gas activities are inducing new geologic faults . . . coming nearer to the Holtec site.117 This argument is new on appeal; the original contention did not claim that fracking is causing new faults to form near the Holtec site.118 The claim also appears to be unsupported by the 114 Sierra Club Appeal at 15.

115 LBP-19-4, 89 NRC at 398-99.

116 See Stanford Report at 127. The report mentions that since January 2017, at least three groups of earthquakes, surrounded by more diffusely located events, have occurred in the southern Delaware Basin, near Pecos, Texas. A fourth group of events occurred mostly in mid-November 2017, farther to the west in northeastern Jeff Davis County [Texas]. In addition, a group of mostly small (ML < 2) earthquakes occurred between Midland [Texas] and Odessa

[Texas], in the Midland Basin. Id. The Holtec site is in the northern Delaware Basin.

117 Sierra Club Appeal at 15.

118 We do not consider on appeal new arguments or new evidence that the Board had no opportunity to consider. See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 458 (2006).

(Page 32 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 24 of 61 Stanford Report, which does not indicate that new faults or earthquakes are getting closer to the Holtec site.119 We therefore find no error in the Boards determination that Sierra Club had not raised a genuine dispute with the application in Contention 11.

6. Sierra Club Contentions 15-19 (Groundwater Impacts)

Sierra Clubs Contentions 15-19 all concerned potential impacts to groundwater from the CISF.120 Contention 15 argued that the ER had not adequately determined whether there is shallow groundwater at the site and therefore could not adequately assess the impact of a radioactive leak from the site.121 Contention 16 argued that the ER had not considered whether brine from a previous underground brine disposal operation was still present on the site and whether that brine could corrode the UMAX waste containers.122 Contention 17 argued that the ER and SAR did not consider the presence and effects of fractured rock beneath the site, which could allow radioactive leaks into groundwater from the cask or allow the aforementioned brine to enter the casks and corrode the canisters.123 Contention 18 argued that the ER had not discussed the possibility that waste-contaminated groundwater could reach the nearby Santa Rosa Formation aquifer, which is an important source of drinking water.124 Contention 19 119 The Stanford Report is generally about new measurements of stress orientation and how that information might be used to predict and prevent slip on mapped faults due to fluid injection or extraction. Stanford Report at 127. Sierra Club did not point out where the document provided information in support of its claim. A board is expected to examine the documents provided in support of a proposed contention to verify that the material says what a party claims it does, but we do not expect a board to search through a document for support for a partys claims. USEC Inc., CLI-06-10, 63 NRC at 457.

120 See Sierra Club Petition at 60-67.

121 Id. at 60-62.

122 Id. at 62-63.

123 Id. at 63-65.

124 Id. at 65-66.

(Page 33 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 25 of 61 argued that Holtec may have improperly conducted tests for hydraulic conductivity between the site and the Santa Rosa Formation.125

a. Groundwater Contentions as Challenge to Certified Design The Board rejected all the groundwater contentions. It found that they failed to dispute the applications conclusion that there is no potential for groundwater contamination because spent nuclear fuel contains no liquid component to leak out, and it is not credible that groundwater could leak into the canisters.126 The Board observed that the canisters are contained within a steel cavity enclosure container that has no penetrations or openings on the bottom, thereby preventing outside liquids from contacting the canisters or the spent nuclear fuel within them.127 The Board further found that Sierra Club had failed to dispute Holtecs conclusion that the canisters would not be breached during normal operations or any credible off-normal event or accident.128 The Board cited our holding in Private Fuel Storage that [t]o show a genuine material dispute, [a petitioners] contention would have to give the Board reason to believe that contamination from a defective canister could find its way outside a cask.129 The Board rejected Sierra Clubs argument that the material Sierra Club supplied in connection with its proposed Contentions 9, 14, 20, and 23 showed various mechanisms through which a canister could be breached. In doing so, the Board held that those contentions 125 Id. at 66-67.

126 LBP-19-4, 89 NRC at 404-05 (citing ER § 1.3 at 1-8).

127 Id. at 407.

128 Id. at 404, 408; see ER § 4.13 (off-normal operations and accidents).

129 LBP-19-4, 89 NRC at 405 (quoting Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 138-39 (2004)).

(Page 34 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 26 of 61 did not adequately support the groundwater contentions because they were also inadmissible.130 On appeal, Sierra Club argues that in rejecting its Contentions 9, 14, 20, and 23, the Board did not conclusively find that the information supporting them was incorrect.131 Therefore, Sierra Club argues, its petition to intervene did controvert Holtecs assertion that the containers are impervious to leaking.132 While it is true that in rejecting these contentions, the Board did not make a factual finding that the claims in them were incorrect, Contentions 9, 14, 20, and 23 were not rejected on mere pleading technicalities, as Sierra Club appears to suggest. The Board found that each of those contentions was inadmissible because (among other reasons) they challenged the certified design of the HI-STORM UMAX system. Because certified designs are incorporated into our regulations, they may not be attacked in an adjudicatory proceeding except when authorized by a rule waiver.133 A contention cannot attack a certified design without a rule waiver because this would challenge matters already fully considered and resolved in the design certification review. For example, Sierra Club Contention 14 argued that the HI-STORM UMAX casks are susceptible to overheating because the air intake and exhaust vents are both located at the top of the cask and that overheating could cause cladding degradation and corrosion.134 The Board noted that the SAR fully incorporates by reference the HI-STORM UMAX design and thermal analysis 130 Id. at 404.

131 Sierra Club Appeal at 18.

132 Id. at 17.

133 10 C.F.R. § 2.335.

134 Sierra Club Petition at 56-60.

(Page 35 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 27 of 61 conducted in the HI-STORM UMAXs own Final Safety Analysis Report and that therefore, any challenge to the HI-STORM UMAX system design characteristics that are already deemed compliant with Part 72, including those Sierra Club designates in Contention 14 . . . are barred in this proceeding by sections 2.335 and 72.46(e).135 We agree with the Boards conclusion that Sierra Clubs disagreement with the HI-STORM UMAX certified design cannot be used to support its claim that the CISF might leak.

To the extent that the groundwater contentions seek to raise design issues with the HI-STORM UMAX canister system, the Board correctly found that they challenged our regulations without seeking a waiver and are not admissible. Therefore, to the extent that the groundwater contentions are predicated on the argument that the system could leak, we affirm the Boards ruling that Sierra Club had not presented a sufficient factual basis for that claim and the contentions are not admissible.

b. Groundwater Contentions as Challenges to Site Characterization Sierra Club next argues that its groundwater contentions challenge the ERs characterization of the affected environment, which the ER must provide regardless of whether the canisters could leak.136 The Staff acknowledges that the ER must characterize the site, but it argues that impacts need only be discussed in proportion to their significance.137 Similarly, relying on the same passage in Private Fuel Storage quoted by the Board, Holtec argues that 135 LBP-19-4, 89 NRC at 402. Similarly, Sierra Club Contention 20 argued that the canisters stored at the facility would likely contain high burnup fuel, which, according to Sierra Club, can lead to thinned, embrittled or damaged cladding. Sierra Club Petition at 67-70. Sierra Club Contention 23 argued that high burnup fuel could damage the spent fuel cladding during transportation or storage and that damaged fuel would not be accepted at a permanent repository. Id. at 73-75. But the Board rejected the contentions because the HI-STORM UMAX canister storage system is approved for storage of high burnup fuel, and therefore, the contentions are barred by regulation. See LBP-19-4, 89 NRC at 412, 416-17.

136 Sierra Club Appeal at 17.

137 Staff Opposition to Sierra Club Appeal at 18 (quoting 10 C.F.R. § 51.45(b)(1)).

(Page 36 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 28 of 61 Sierra Clubs claims about groundwater characterization are not material to the outcome of this proceeding because Sierra Club has not shown that radionuclides could make their way outside the cask.138 Of the five groundwater contentions, only Contention 18 was based entirely on the premise that leaks from the facility would contaminate the groundwater. The other contentions all raised specific arguments about the adequacy of the hydrogeological site characterization, were supported by expert opinion, and identified the portions of the application in question. In proposed Contention 15, Sierra Club questioned Holtecs claim that there is no shallow groundwater at the site and argued that Holtec relies on data from a single well in the 1040-acre site, which has apparently not been checked since 2007.139 According to the declaration of Sierra Clubs expert, George Rice, there are various reasons why a saturated condition may not have been encountered during drilling even though the materials are saturated.140 In Contention 16, Sierra Club argued that Holtec should determine whether brine in the groundwater could contact the facility and what effect brine could have on its structures. It pointed to ER § 3.5.2.1, which acknowledges that as of 2007 saturations of shallow groundwater brine have been created in the region due to brine disposal.141 And in support of Sierra Club Contention 19, Mr. Rice identified three specific flaws that he claims undermine the reliability of Holtecs hydraulic conductivity tests.142 138 Holtec Opposition to Sierra Club Appeal at 24 (quoting Private Fuel Storage, CLI-04-22, 60 NRC at 138-39).

139 See Sierra Club Standing Declarations and Expert Declarations, Declaration of George Rice (Sept. 10, 2018), at 2 (ML18257A226 (package)) (Rice Declaration).

140 Id. at 3.

141 Sierra Club Petition at 62.

142 According to Mr. Rice, the report from Holtecs contractor did not confirm that it cleaned the well holes prior to the tests, used clean water, or took three or more readings at five-minute (Page 37 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 29 of 61 Our regulations require an admissible contention to show a genuine dispute exists with the applicant/licensee on a material issue of law or fact.143 A dispute at issue is material if its resolution would make a difference in the outcome of the licensing proceeding.144 Moreover, in the NEPA context we have warned, [o]ne can always flyspeck an [Environmental Impact Statement (EIS)] to come up with more specifics and more areas of discussion that could have been included.145 The Supreme Court has explained that to fulfill NEPAs mandate, for certain major Federal actions such as this one, an agency must prepare an EIS, which ensures that the agency, in reaching its decision, will have available, and will carefully consider, detailed information concerning significant environmental impacts and that such information will be available to the public.146 It is possible that, to the extent Sierra Clubs groundwater contentions are purely site-characterization disputes, they fail to show a material dispute with the application because they do not indicate how Sierra Clubs groundwater concerns would affect the ultimate discussion of environmental impacts.147 intervals as recommended by the U.S. Bureau of Reclamations field manual. See Rice Declaration at 8.

143 10 C.F.R. § 2.309(f)(1)(vi).

144 Duke Energy Corp. (Oconee Nuclear Station, Units 1, 2, and 3), CLI-99-11, 49 NRC 328, 333-34 (1999) (quoting Rules of Practice for Domestic Licensing Proceedings - Procedural Changes in the Hearing Process, 54 Fed. Reg. at 33,168, 33,172 (1989)).

145 Hydro Resources, Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-01-04, 53 NRC 31, 71 (2001).

146 Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 349 (1989).

147 While not binding precedent, licensing boards have generally considered site characterization claims under NEPA that explained why the site characterization was necessary to fully understand the impacts of the proposed action. E.g., Strata Energy, Inc. (Ross In Situ Recovery Uranium Project), LBP-15-3, 81 NRC 65, 89-92 (2015) (responding to a site characterization claim by noting, [a]t the crux of this contention is the issue of whether, to comply with NEPAs requirement to make an adequate prelicensing assessment of environmental impacts, more extensive monitoring. . . is required); Powertech (USA) Inc.

(Page 38 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 30 of 61 But initial determinations of contention admissibility rest with the Board, and the Board did not discuss whether any of the groundwater contentions contained a genuine issue apart from the claims that radioactive leaks from the canisters could contaminate the groundwater.

Within the context of the need to determine whether the groundwater concerns would affect the ultimate discussion of environmental impacts, we remand Contentions 15, 16, 17, and 19 to the Board for further consideration of their admissibility with respect to the site characterization.

7. Sierra Club Contention 26 (Material False Statement)

Joint Petitioners Contention 14 (Material False Statement)

Sierra Club submitted its new Contention 26, and Joint Petitioners their Contention 14, after Holtec amended its license application to provide that its clients would either be the DOE or nuclear plant owners.148 As the Board observed, the two contentions are substantially identical.149 Sierra Club and Joint Petitioners argued that even though Holtecs application represents that nuclear plant owners may be its future customers, in reality Holtec still intends to go forward with the project only if it is able to secure a contract with DOE. They argued that various public statements by Holtec officials show that Holtecs intention has always been to rely on DOE, not the nuclear plant owners, taking title to the waste.150 For proof, Sierra Club (Dewey-Burdock In Situ Uranium Recovery Facility), LBP-13-9, 78 NRC 37, 47-51 (2013)

(allowing site characterization issues to migrate to the extent they challenged applicants demonstration of aquifer confinement and impacts to groundwater).

148 See Sierra Clubs Motion to File a New Late-Filed Contention (Jan. 19, 2019) (Sierra Club Motion for Late Contention); Attach., Contention 26 (Jan. 19, 2019) (Sierra Club Contention 26);

Motion by Petitioners Dont Waste Michigan, Citizens Environmental Coalition, Citizens for Alternatives to Chemical Contamination, Nuclear Energy Information Service, Public Citizen, Inc., San Luis Obispo Mothers for Peace and Nuclear Issues Study Group for Leave to File a New Contention (Jan 17, 2019) (Joint Petitioners Motion for Late Contention); DWMs Contention 14 (Jan. 17, 2019) (Joint Petitioners Contention 14).

149 LBP-19-4, 89 NRC at 451.

150 Sierra Club Contention 26 at 3 (unnumbered); Joint Petitioners Contention 14 at 2 (unnumbered).

(Page 39 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 31 of 61 and Joint Petitioners cited a Holtec public email that stated that deployment of the CISF will ultimately depend on the DOE and the U.S. Congress.151 Sierra Club and Joint Petitioners argued that this email shows that representations in the application that nuclear plant owners may be Holtecs future customers are therefore materially false. They argue that this material false statement should be reason enough to deny an application because the Atomic Energy Act of 1954, section 186, expressly provides that a license may be revoked over a material false statement.152 The Board found the contentions inadmissible because the statements in the email did not indicate that there was a willful misrepresentation in Holtecs application.153 The Board found that Holtec readily acknowledges that it hopes Congress will change the law to allow DOE to contract directly with Holtec and that Holtec itself pointed out that the need for the project could be reduced or eliminated if DOE were to build a permanent waste repository.154 In short, the Board determined that Holtec has been transparent that deployment of this project may depend to some extent on actions of DOE and Congress as well as on the NRCs licensing decision.

Moreover, the Board found that whether Holtec would use its license if Congress does not change the law is not an issue material to the license proceeding: [T]he business decision of whether to use a license has no bearing on a licensees ability to safely conduct the activities the license authorizes.155 151 See Sierra Club Motion for Late Contention, Exhibit 11, Holtec Highlights, Holtec Reprising 2018 (Jan. 2, 2019) (also attached to Joint Petitioners Contention 14 as Ex. 1).

152 See Sierra Club Contention 26; Joint Petitioners Contention 14; 42 U.S.C. §§ 2011, 2236.

153 LBP-19-4, 89 NRC at 421, 452.

154 Id. at 421.

155 Id. at 422.

(Page 40 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 32 of 61 On appeal, Sierra Club and Joint Petitioners principally repeat the arguments the Board rejected. But Sierra Club further argues that Holtec is attempting to obtain a license on the false premise that nuclear plant owners will retain title to the waste. Then, once Holtec obtains the license, it will use that fact as leverage to persuade Congress to change the law to allow DOE to hold title to the waste.156 Even assuming Sierra Clubs characterization of Holtecs intent were accurate, we agree with the Board that the statements in the application are not false. We further agree that the material issue in this license proceeding is whether Holtec has shown that it can safely operate the facility, not its future political activity or business intentions.

We therefore affirm the Board with respect to Sierra Club Contention 26 and Joint Petitioners Contention 14.

8. Sierra Club Contention 30 Sierra Club filed its new proposed Contention 30 in response to a report by DOEs Nuclear Waste Technical Review Board (NWTRB) that discusses technical issues presented by transportation of nuclear waste and spent nuclear fuel.157 Sierra Club argues that the NWTRB report shows that various assumptions in the ER are invalid and that there are barriers to the implementation of the Holtec CIS project that must be discussed in the ER.158 Sierra Club filed this contention after the Boards jurisdiction terminatedthat is, after all contentions had been dismissed, the record closed and jurisdiction to consider the motion passed to the Commission. Although we have reopened the record for the limited purpose of 156 Sierra Club Appeal at 20-21.

157 See Sierra Club Motion for New Contention 30, Attach., DOE, Preparing for Nuclear Waste TransportationTechnical Issues that Need to Be Addressed in Preparing for a Nationwide Effort to Transport Spent Nuclear Fuel and High-Level Radioactive Waste (Sept. 2019); see also Holtec Internationals Answer Opposing Sierra Club New Contention 30 (Nov. 18, 2019);

NRC Staff Opposition to Sierra Club New Contention 30 (Nov. 18, 2019).

158 Sierra Club Contention 30, at 1 (unnumbered).

(Page 41 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 33 of 61 determining the admissibility of Sierra Clubs groundwater contentions, the record remains closed for any other purpose.159 Therefore, Sierra Clubs motion for a new contention must also meet the standards for reopening a closed record.160 Even where jurisdiction to consider reopening has passed to the Commission, however, we frequently remand such motions to the Board to consider the reopening standards in conjunction with contention admissibility, where appropriate.161 We find this action appropriate here. Therefore, we remand Sierra Clubs proposed Contention 30, including the issue of whether the reopening standards are met, to the Board.

D. AFES Appeal Alliance for Environmental Strategies (AFES) is an environmental group with members located near the proposed Holtec storage site in Lea and Eddy County.162 It proposed three contentions, all dealing with environmental justice concerns.163 The Board rejected all three contentions, and AFES has appealed.164

1. AFES Contention 1: Environmental Justice Analysis Includes Insufficient Consideration of Alternative Sites AFES proposed Contention 1 raised environmental justice concerns with Holtecs site alternatives analysis. It claimed that Holtec, as a matter of law, had not investigated enough 159 See, e.g., Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station), LBP-11-20, 74 NRC 65, 76 (2011), review denied, CLI-12-10, 75 NRC 479 (2012).

160 See, e.g., Virginia Electric & Power Co. (North Anna Power Station, Unit 3), CLI-12-14, 75 NRC 692, 699-700 (2012); Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station),

CLI-12-3, 75 NRC 132, 140-41 (2012); Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station), CLI-09-5, 69 NRC 115, 124 (2009).

161 North Anna, CLI-12-14, 75 NRC at 702.

162 Petition to Intervene and Request for Hearing (Sept. 12, 2018), at 1 (AFES Petition).

163 Id. at 11-24.

164 Petition for Review by Alliance for Environmental Strategies (May 31, 2019) (AFES Appeal).

(Page 42 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 34 of 61 sites to support a finding by the Nuclear Regulatory Commission that the selected site will not have a disparate impact on the minority population of Lea and Eddy County.165 Accordingly, proposed Contention 1 called for a new ER that both studies and addresses alternative sites nationwide, why such sites are rejected, and what impact the selected site will have on minority and low-income local populations.166 The Board ruled proposed Contention 1 inadmissible because Holtecs ER complied with applicable NRC guidance on environmental justice evaluations in licensing actions.167 The Board found that Holtecs ER describes the social and economic characteristics of the 50-mile region of influence (ROI) around Holtecs proposed facility and identifies percentages of minority and low-income communities within the Holtec facilitys ROI that would be subject to the impacts of the facility, as recommended by NRC guidance.168 The Board observed that according to applicable guidance, a difference of twenty percent or more in the percentage of minority or low-income population, when compared to the rest of the county and state, is a significant difference requiring further investigation.169 But the Board found that Holtec did not identify differences greater than twenty percent and therefore did not discuss environmental justice concerns any further.170 The Board also found that the ER contains an analysis of location alternatives including six other potential sites that were analyzed and considered for 165 AFES Petition at 11.

166 Id. at 21.

167 See Final Report, Environmental Review Guidance for Licensing Actions Associated with NMSS Programs, NUREG-1748 at 6-25 (Aug. 2003) (NUREG-1748); see also Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, 69 Fed. Reg. 52,040 (Aug. 24, 2004).

168 LBP-19-4, 89 NRC at 455.

169 Id. (citing NUREG-1748 at C-5).

170 Id.

(Page 43 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 35 of 61 suitability of the Holtec HI-STORE consolidated interim storage facilitys characteristics.171 The Board declined to admit proposed Contention 1 because AFES has not shown any legal requirement for Holtec to conduct a more in-depth inquiry into alternatives to the proposed action (i.e., the siting of the facility) or environmental justice analyses in its Environmental Report; therefore, the contention failed to show a genuine dispute with the application regarding a material issue of law or fact.172 On appeal, AFES argues that Holtecs environmental justice evaluation was insufficient because it failed to compare the population near the proposed site to the population of the United States as a whole.173 AFES argues the Board was wrong as a matter of law to credit the ERs discussion of alternative sites because Holtec merely re-hashed a prior investigation by a third party, with regard to a previously abandoned site for a different facility that includes no discussion of any environmental justice concerns, resulting in a precipitous narrowing of potential alternatives to a single site in southeastern New Mexico . . . directly contrary to the NRCs Policy Statements.174 By way of background, Holtec acknowledges that it relied on a previous study by the Eddy-Lea Energy Alliance (ELEA) for much of the environmental information in its ER. The ER explains that in 2006, DOE sought bids for locating a spent fuel recycling center and developed a set of criteria for an ideal site.175 Eddy, New Mexico and Lea, New Mexico formed the ELEA 171 Id.

172 Id. (internal citations omitted).

173 AFES Appeal at 17.

174 Id. at 5, 13-15.

175 ER § 2.3.

(Page 44 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 36 of 61 to find a site within their jurisdiction and propose it to DOE.176 The ELEA 2007 report analyzed six sites within the two counties with emphasis on the DOEs site selection criteria, which included low population density in the surrounding area, adequate size, low flood risk, and seismic stability. These factors also correspond to Holtecs needs for a waste storage facility.177 Holtec states that it reviewed ELEAs analysis and determined that the selected site is the best for its own project.178 The pertinent NRC Policy Statement in this case is the NRCs Environmental Justice Policy Statement.179 That Policy Statement provides that NRC will identify minority and low-income populations near proposed nuclear sites so that it can determine whether the environmental impacts associated with a given site will be different for those populations when compared to the general population of the surrounding area, not the country as a whole.180 An objective of the Policy Statement is that minority and low-income communities affected by the proposed action are not overlooked in assessing the potential for significant impacts unique to those communities.181 The Board found that Holtec provided information about the impacts to minority and low-income populations within the geographic region of the proposed action, that the demographics did not show a disproportionate number of minorities or low-income people in the vicinity of the 176 Id. See Letter from Johnny Cope, Chairman, ELEA, to Debbie Swichkow, DOE (Apr. 28, 2007), Encl. GNEP Final Detailed Siting Report for the Consolidated Fuel Treatment Center and Advanced Recycling Reactor (ML17310A225, ML17310A227, ML17310A230) (ELEA 2007).

177 ER § 2.3.

178 Id. at 2-16.

179 See Policy Statement on the Treatment of Environmental Justice Matters in NRC Regulatory and Licensing Actions, 69 Fed. Reg. 52,040 (Aug. 24, 2004).

180 See id. at 52,048.

181 See id.

(Page 45 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 37 of 61 site, and that AFES had not disputed the information provided.182 But on appeal, AFES argues that other sites [o]utside of these isolated, low-income communities need to be analyzed, including sites outside of New Mexico, because the targeting of rural, impoverished, low-income communities in a border state is precisely the sort of de facto result of the institutional racism embedded in prevailing dump site selection processes nationwide that was decried over thirty years ago . . . by the Licensing Board in [LES].183 However, we reversed on appeal the board decision in LES, upon which AFES relies, which admitted a contention claiming racial bias in the applicants site-selection process.184 In doing so, we explicitly rejected the idea that NEPA requires an elaborate comparative site study to explore whether an applicants siting criteria might perpetuate institutional racism.185 The Boards rejection of AFESs proposed Contention 1 in this case accords with our stated environmental justice policy. We therefore affirm the Boards holding that environmental justice does not require consideration of a wider range of alternative sites.186 182 AFES repeatedly asserts that Holtecs evaluation of alternative sites is deficient because it relies on information developed by third parties. See, e.g., AFES Appeal at 5, 8. AFES does not point out any factual error or omission in the third-party information relied upon, however, and reliance on prior studies is commonplace in environmental impact analysis. The Board was therefore correct in its conclusion that AFES presented no genuine factual or legal dispute with this argument.

183 Id. at 15-16 (citing Louisiana Energy Services, L.P. (Claiborne Enrichment Center),

LBP-97-8, 45 NRC 367 (1997)).

184 Louisiana Energy Services, L.P. (Claiborne Enrichment Center), CLI-98-3, 47 NRC 77 (1998); see also Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation)

CLI-98-13, 48 NRC 26, 36 (1998) (cautioning the Licensing Board that a contention not focused on disparate environmental impacts on minority or low-income populations but instead seeking a broad NRC inquiry into questions of motivation and social equity in siting would lay outside NEPA's purview.).

185 Louisiana Energy Services, CLI-98-3, 47 NRC at 104.

186 Our guidance for NEPA reviews of materials license applications provides limited guidance regarding how wide an area should be examined in identifying potential alternative sites for a proposed project. See NUREG-1748 § 5.2. Although Holtec elected to limit its evaluation to six sites in two counties within the same state, the Staff is not limited to considering only those sites (Page 46 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 38 of 61

2. AFES Contention 2: Disparate Impacts of Siting Process In proposed Contention 2, AFES asserted that New Mexico has been targeted for the dumping of nuclear waste, resulting in a per se discriminatory impact on New Mexicos minority population, in comparison with the rest of the country.187 It included an affidavit of Professor Myrriah Gomez entitled, Environmental Racism an Active Factor in the Siting and White Privilege Associated with the Holtec International HI-STORE Consolidated Interim Storage Facility Project.188 According to AFES, [t]his de facto discrimination is exacerbated by both the historical failure to include members of the minority population in decision making regarding the location of nuclear sites in New Mexico, and the specific failure . . . to include members of the local Lea and Eddy County minority population in decision making regarding the siting of Holtecs proposed CISF.189 The Board found proposed Contention 2 inadmissible because it did not show a genuine dispute with the application on a material issue of law or fact: Holtec addressed environmental justice matters to the depth recommended by NRC guidance, and neither AFESs petition nor Dr. Gomezs affidavit challenge the information in Holtecs Environmental Report.190 On appeal, AFES does not challenge the Boards finding that Holtecs ER comports with NRC policy and guidance on environmental justice evaluations. AFES reiterates its position that proposed by Holtec in its environmental impact statement. See, e.g., Final Environmental Impact Statement for the Construction and Operation of an Independent Spent Fuel Storage Installation on the Reservation of the Skull Valley Band of Goshute Indians and the Related Transportation Facility in Tooele County, Utah, NUREG-1714 (Dec. 2001), at 7-1 to 7-6 (ML020150217) (site selection process entailed evaluation of thirty-eight potential sites across fifteen states) (Private Fuel Storage EIS).

187 AFES Petition at 22.

188 Id.

189 Id.

190 LBP-19-4, 89 NRC at 456.

(Page 47 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 39 of 61 Holtecs environmental justice analysis was insufficient because it did not include an effective scoping process and an independent review of the impactincluding the cumulative impactof the site on minority and low-income populations along the border.191 But AFES provides no further information in support of that position, which the Board rejected. This is insufficient to sustain an appeal, and we find no error in the Boards decision to deny the admission of proposed Contention 2.

3. AFES Contention 3: Community Support AFESs proposed Contention 3 claimed that there is no factual basis for Holtecs assertions in its ER that there is community support for the project.192 Although AFES conceded that community support is not normally material to the findings NRC must make to issue a license, it argued that it should nevertheless be considered material in this case because Holtec had referred to community support in its siting analysis.

The Board ruled the contention inadmissible because the issue of public support for the proposed facility is not material to the findings the NRC must make in this licensing proceeding, and [a]ssertion of community support or opposition in a license application does not lend any weight to the environmental justice analysis to be conducted by the applicant.193 On appeal, AFES argues that proposed Contention 1 and proposed Contention 3 are linked, such that if the latter is inadmissible, the former must be admitted.194 It argues that if community support was an adequate reason to narrow Holtecs site selection to only the Eddy-Lea county area, then Holtec should have to show that community support actually exists. We 191 AFES Appeal at 18.

192 AFES Petition at 23.

193 LBP-19-4, 89 NRC at 457.

194 AFES Appeal at 18-19.

(Page 48 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 40 of 61 disagree. Holtec explained that community support was but one of many siting factors including seismic stability, low population density, and low flooding riskthat it used in its site selection process.195 Holtec did not discuss community support in its environmental justice analysisnor did it substitute community support for an environmental justice analysis, as AFES claims.196 The Board reasonably evaluated the proposed contentions against the admissibility standards in our regulations, and its decisions on each were, in our view, clear, well-reasoned, and with ample support in the record and in accordance with our established precedents.

E. Joint Petitioners Appeal The Board rejected the Joint Petitioners hearing request on both standing and contention admissibility grounds. It found that the Joint Petitioners based their standing not on their individual members proximity to the proposed facility but on the members proximity to transportation routes, which, it held, is too remote and speculative an interest to confer standing.197 Moreover, it examined each of Joint Petitioners fourteen proposed contentions (except two) and found them inadmissible.198 Joint Petitioners have appealed the Boards 195 ER §§ 2.3, 2.4.2; see Holtec Internationals Brief in Opposition to Alliance for Environmental Strategies Appeal of LBP-19-4 (June 25, 2019), at 10-11.

196 See ER § 3.8.5.

197 See Petition of Dont Waste Michigan, Citizens Environmental Coalition, Citizens for Alternative to Chemical Contamination, Nuclear Energy Information Service, Public Citizen, Inc.,

San Luis Obispo Mothers for Peace and Nuclear Issues Study Group to Intervene and Request for an Adjudicatory Hearing (Sept. 14, 2018) (Joint Petitioners Petition); LBP-19-4, 89 NRC at 367 (citing U.S. Department of Energy (Plutonium Export License), CLI-04-17, 59 NRC 357, 364 n.11 (2004); EnergySolutions, LLC (Radioactive Waste Import/Export Licenses), CLI-11-2, 73 NRC 613, 623 (2011); Pacific Gas and Electric Co. (Diablo Canyon Power Plant Independent Spent Fuel Storage Installation), LBP-02-23, 56 NRC 413, 434 (2002)).

198 See LBP-19-4, 89 NRC at 426-52. Joint Petitioners proposed Contention 8 was withdrawn and its proposed Contention13 was a motion to adopt Sierra Clubs contentions, which the Board rejected because a petitioner must establish standing and sponsor its own admissible contention before it can adopt another partys contentions. Id. at 451.

(Page 49 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 41 of 61 rulings with respect to standing as well as the admissibility of eight of its proposed contentions.199 As explained below, the Board correctly found that none of those eight contentions were admissible. Therefore, we need not reach the issue of Joint Petitioners standing.

1. Joint Petitioners Contention 1: Redaction of Historic and Cultural Properties Precludes Public Consultation and Participation Joint Petitioners argued in their proposed Contention 1 that Holtec violated section 106 of the National Historic Preservation Act (NHPA) by redacting 144 pages of the ER that contain information about two historic or cultural properties that will be destroyed to make way for the proposed CISF.200 The Board found that Holtec did not redact its ER. The Board explained that the Staff, having reached a preliminary conclusion that disclosure of Appendix C to the ER might risk harm to a potential historic resource, temporarily redacted it to comply with the NHPA, which requires withholding information from the public where public disclosure could risk such harm.201 On appeal, Joint Petitioners do not dispute the Boards findings that the Staff redacted Appendix C in accordance with the NHPA, or that the Staff would, after completing consultation with the Keeper of the National Register of Historic Places, make available to the public any information that would not harm any potential historic properties.202 Rather, Joint Petitioners explain why they did not request access to the sensitive information in Appendix C even though 199 Notice of Appeal of LBP-19-4 by Petitioners Dont Waste Michigan, Citizens Environmental Coalition, Citizens for Alternatives to Chemical Contamination, Nuclear Energy Information Service, Public Citizen, Inc., San Louis Obispo Mothers for Peace and Nuclear Issues Study Group, and Brief in Support of Appeal (June 3, 2019) (Joint Petitioners Appeal).

200 See Joint Petitioners Petition at 27-31.

201 LBP-19-4, 89 NRC at 427; see also 54 U.S.C. § 307103(a) (requiring an agency to withhold information that may cause harm to a historic place).

202 LBP-19-4, 89 NRC at 427.

(Page 50 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 42 of 61 they had the opportunity to do so.203 That explanation has no bearing on whether the Board abused its discretion or otherwise committed an error in denying the contention. We therefore see no basis to disturb the Boards ruling that proposed Contention 1 was inadmissible.

2. Joint Petitioners Contention 2: Insufficient Assurance of Financing Joint Petitioners argued in proposed Contention 2 that Holtec cannot provide reasonable assurance that it has or will obtain the necessary funds to build, operate, and decommission the CISF.204 Joint Petitioners argued that Holtecs application states that it will solely finance the CISF from internal resources, but inconsistently states at the same time that it must have definite contractual arrangements with the U.S. DOE and the outside funding that would come with those arrangements in order to undertake the CISF.205 Therefore, Joint Petitioners argued, Holtecs financial assurance depends on contracts that are not lawful.206 Joint Petitioners moved to amend their contention twice. The first amendment responded to Holtecs revision of the application to provide that nuclear power plant owners might be its customers and argued that the application is unlawful until all references to DOE are stricken from it.207 The Board allowed the first amendment but rejected the substance of the claim.208 Joint Petitioners do not appeal that ruling.

Joint Petitioners attempted to amend the contention a second time after Holtecs counsel conceded at oral argument on January 24, 2019, that DOE cannot currently contract with Holtec 203 See Joint Petitioners Appeal at 20-21; LBP-19-4, 89 NRC at 427.

204 See Joint Petitioners Petition at 31-36.

205 Id. at 32.

206 Id. at 32-33.

207 Motion by [Joint Petitioners] to Amend Their Contention 2 Regarding Federal Ownership of Spent Fuel in the Holtec International Revised License Application, (Feb. 6, 2019) at 8.

208 LBP-19-4, 89 NRC at 428-29.

(Page 51 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 43 of 61 to store nuclear power companies spent fuel.209 The Board denied Joint Petitioners second requested amendment because it sought to add arguments that could have been submitted with the original petition.210 The Board found the second requested amendment was therefore not based upon new information.211 Accordingly, the Board denied the amendment request because it did not satisfy the requirements for contentions filed after the deadline set forth in 10 C.F.R. § 2.309(c)(1).

The Board turned next to the timely aspects of proposed Contention 2, which claimed that Holtec would not have sufficient funds to build, operate, and decommission the CISF because its funding plans depended on illegal contracts with DOE. The Board found that while Holtec would prefer that Congress change the law to permit a contract with DOE, Holtec would attempt to negotiate storage contracts with nuclear power plant owners.212 The Board also found that Holtec would not begin construction until it has sufficient contracts established.213 The Board determined that an evidentiary hearing on Holtecs intent would not be useful and found Joint Petitioners proposed Contention 2 inadmissible for failure to raise a genuine dispute with the application.214 209 See Motion of [Joint Petitioners] to Amend Their Contention 2 Regarding Holtecs Proposed Means of Financing the Consolidated Interim Storage Facility (Feb. 25, 2019) (Joint Petitioners Second Motion to Amend).

210 LBP-19-4, 89 NRC at 429-432.

211 Id. at 430. The Board reached its decision after analyzing the sworn declaration of Joint Petitioners expert, which was submitted in support of the motion to amend proposed Contention

2. See id. at 429-32. The Board found the declaration fails to analyze any specific provision in Holtecs application and included virtually nothing that purports to relate directly to Holtec counsels January 24, 2019 concession. Id. at 430.

212 Id. at 433.

213 Id.

214 Id.

(Page 52 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 44 of 61 The Board further rejected Joint Petitioners argument that Holtec must provide financial assurance for periods beyond the license term. Joint Petitioners argued that 10 C.F.R.

§ 72.22(e) requires that Holtec must possess the necessary funds, have reasonable assurance of obtaining the necessary funds, or by a combination of the two, have the funds to undertake the CISF as a 20-year storage-construction program, and to operate it securely for 100 years total.215 The claim appeared again in Joint Petitioners second motion to amend proposed Contention 2, which cited the AEA and our financial assurance regulations at 10 C.F.R.

§ 72.22(e) for the argument that Holtec has not adequately estimated the operating costs over the planned life of the CISF.216 The Board rejected the claim and noted that Joint Petitioners claims about financial assurances for later phases or for storage beyond the license term are

. . . outside the scope of this proceeding and thus, inadmissible.217 On appeal, Joint Petitioners argue that this ruling improperly dispense[d] with full and thorough consideration of all aspects of the Holtec CISF plan under NEPA to a later time.218 This NEPA argument is raised for the first time on appeal and is therefore untimely.219 In addition, Joint Petitioners do not provide legal or factual support for this argument. Joint Petitioners cite no regulation, case, or other legal authority suggesting NEPA requires Holtec to provide more financial assurance information than it did nor do they point to any part of Holtecs ER as inadequate. In fact, Holtecs ER includes an analysis of the environmental effects expected from all twenty phases of its planned CISF activities, which undercuts Joint 215 Joint Petitioners Petition at 34 (emphasis added).

216 Joint Petitioners Second Motion to Amend, Encl. at 10-11.

217 LBP-19-4, 89 NRC at 432.

218 Joint Petitioners Appeal at 22.

219 See Yankee Atomic Electric Co. (Yankee Nuclear Power Station), CLI-96-1, 43 NRC 235, 260 (1996).

(Page 53 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 45 of 61 Petitioners argument that dismissal of proposed Contention 2 improperly avoids consideration of reasonably foreseeable environmental impacts associated with potential future phases of the CISF project.220 Our Part 72 regulations govern the financial assurance information Holtec must include in its CISF application. Holtec must provide information sufficient to demonstrate to the Commission the financial qualification of the applicant to carry out . . . the activities for which the license is sought.221 The Board found that Holtec had provided financial assurance information for the first phase of the CISF projectthe phase involving activities for which the license is soughtand that the information was not genuinely disputed by proposed Contention 2.222 While Holtec anticipates that there may be future, additional phases of its project, each phase would require a license amendment. Any application to amend the license to expand the capacity or extend the term of the license would in turn require updated financial assurance information. We therefore affirm the Boards dismissal of proposed Contention 2.

3. Joint Petitioners Contention 3: Underestimation of Low-Level Radioactive Waste Volume Joint Petitioners proposed Contention 3 asserted that Holtecs ER provides a seriously inaccurate picture of the true costs of constructing, operating, and decommissioning the proposed CISF because it grossly underestimates the amount of low-level radioactive waste (LLRW) that the project will generate.223 Specifically, proposed Contention 3 alleged the ER was deficient because it does not consider that the tons of concrete used at the site for 220 See ER §§ 1.0, 4.0.

221 10 C.F.R. § 72.22(e).

222 Id.

223 Joint Petitioners Petition at 36-37.

(Page 54 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 46 of 61 foundations and casks will become radioactively activated and that replacement of the canisters themselves during the operational life of the CISF will generate LLRW.224 In response to proposed Contention 3, both the Staff and Holtec argued that Joint Petitioners had not offered any specific facts or expert opinion to support the contention. Holtec explained that the storage casks and pads are not expected to have any residual radioactive contamination because (a) the spent nuclear fuel canisters will remain sealed while in the CISF; (b) the canisters will be surveyed at the originating reactor and again when they arrive at the CISF to ensure that there is no radiological contamination; and (c) the neutron flux levels generated by the spent nuclear fuel would be so low that any activation of the storage casks and pads would produce negligible radioactivity.225 The Staff argued that the Joint Petitioners had offered no facts or expert opinion to support their claims that millions of tons of material will be activated and become LLRW.226 With respect to the canisters, Holtec pointed out that the packaged canisters will be delivered to Holtecs site, ready for storage, and that fuel will be transported off-site in the same canister when a repository becomes available, such that no canisters would be opened at the facility.227 The Board agreed with Holtec and the Staff and 224 Id. at 36.

225 Holtec Internationals Answer Opposing the Dont Waste Michigan, Citizens Environmental Coalition, Citizens for Alternatives to Chemical Contamination, Nuclear Energy Information Service, Public Citizen, Inc., San Luis Obispo Mothers for Peace, and Nuclear Issues Study Group Petition to Intervene and Request for an Adjudicatory Hearing on Holtec Internationals HI-STORE Consolidated Interim Storage Facility Application (Oct. 9, 2018), at 41 (Holtec Answer to Joint Petitioners) (citing ER § 4.12.2).

226 Staff Consolidated Response at 36.

227 Holtec Answer to Joint Petitioners at 41 (citing ER § 4.12.2). See also ER § 4.12.4 (stating that all canisters of SNF would be removed and transported to a permanent repository prior to decontamination and decommissioning of the facility).

(Page 55 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 47 of 61 rejected proposed Contention 3 because Joint Petitioners had not met their burden in proffering facts or expert opinion supporting their claims.228 The Board also found that Holtec had addressed the impacts from spent fuel repackaging and cask disposal by appropriately relying on the description of those impacts contained in the Continued Storage GEIS, which is incorporated by reference into 10 C.F.R.

§ 51.23.229 Holtec referred to the Continued Storage GEIS in its discussion of environmental impacts of decontamination and decommissioning.230 The Continued Storage GEIS found that the potential environmental impacts from LLRW from decommissioning a large scale ISFSI after long term storage would be small.231 The Board therefore found that aspects of proposed Contention 3 dealing with the topics of repackaging of spent fuel and disposal of the spent fuel casks after repackaging were an impermissible attack on the NRCs regulations under 10 C.F.R. § 2.335, because they challenged the adequacy of ISFSI decommissioning analyses contained in the Continued Storage GEIS.232 On appeal, Joint Petitioners assert there exists evidence of significant volumes of unremediable concrete, soil and canisters, but do not point to any specific evidence.233 Joint Petitioners claim that during oral argument on contention admissibility the Board unreasonably required [Joint Petitioners] to explain why [the concrete] cannot all be decontaminated.234 But it does not appear to us that the Board imposed an undue burden on the Joint Petitioners.

228 LBP-19-4, 89 NRC at 434.

229 Id. at 435 (citing Continued Storage GEIS at 5-48).

230 See ER § 4.9.5.

231 See Continued Storage GEIS at 5-48.

232 LBP-19-4, 89 NRC at 435.

233 Joint Petitioners Appeal at 23.

234 Id.

(Page 56 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 48 of 61 Rather, the Board asked whether Joint Petitioners had any factual support for their assertions that concrete at the CISF would become activated or that concrete decontamination would not be possible.235 In response, counsel for Joint Petitioners offered only common sense as an explanation for how concrete would become radioactive and took no position on whether decontamination of concrete would be possible.236 The Board reasonably found that these unsupported assertions were insufficient to support an admissible contention.

Joint Petitioners further argue that the Board erred in relying on the Continued Storage Rule because the rule does not alter any requirements to consider environmental impacts of spent fuel storage during the term . . . of a license for an ISFSI in an ISFSI licensing proceeding.237 However, with respect to the environmental effects during the life of the CISF, the Board found that Joint Petitioners had not proffered any evidentiary support for their claim that the concrete pads and casks will become contaminated or for their claim that the canisters will need to be replaced during the operating life of the facility.238 The portion of the Continued Storage GEIS that the Board discusses refers to the expected consequences of temporary storage in an large scale ISFSIa facility like the proposed facilityand found that the expected consequences of replacing concrete pads, casks, canisters and the DTS would be small.239 Therefore, even assuming these materials did need to be replaced during the life of the proposed facility, the impacts have been studied and set forth in the Continued Storage 235 Tr. at 161-62; see 10 C.F.R. § 2.309(f)(5).

236 Tr. at 161-62. In answering the Boards questions, counsel for Joint Petitioners stated that it is arguing that the initial quantification [of LLRW] is tremendously off base, but provided no factual or expert support for that assertion. Id.

237 Joint Petitioners Appeal at 24.

238 LBP-19-4, 89 NRC at 434.

239 Id. at 435 (citing Continued Storage GEIS at 5-48).

(Page 57 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 49 of 61 GEIS, which are codified in the Continued Storage Rule. Joint Petitioners appeal provides no basis to overturn those Board findings.

In short, the Board found proposed Contention 3 failed to include support for its assertions of inadequacy regarding Holtecs evaluation of LLRW impacts. Joint Petitioners appeal does not dispute the Boards finding that the contention lacked evidentiary support.

Accordingly, we affirm the Boards rejection of proposed Contention 3.

4. Joint Petitioners Contention 4: Holtec Does Not Qualify For Continued Storage GEIS Presumptions Joint Petitioners argued in proposed Contention 4 that Holtec cannot rely on the Continued Storage GEISs generic environmental analysis of transportation and operational accidents because the proposed CISF differs from the type of facilities contemplated by the Continued Storage GEIS, particularly with respect to its lack of a DTS.240 The Board dismissed proposed Contention 4, ruling that Holtecs ER does not rely on the Continued Storage GEIS to avoid discussion of site-specific accidents but rather contains a site-specific impact analysis for the period of the proposed activity as the GEIS anticipates.241 The Board further found that

[n]either the Continued Storage GEIS nor NRC regulations require an analysis of a [DTS] at this time; therefore, proposed Contention 4 failed to raise a genuine dispute with the application on a material issue of law or fact.242 On appeal, Joint Petitioners do not dispute the Boards finding that Holtecs ER addresses site-specific environmental effects (including effects from transportation and 240 Joint Petitioners Petition at 46-49. Joint Petitioners provided three other bases for Contention 4, each of which the Board addressed in denying its admission. See LBP-19-4, 89 NRC at 437. Joint Petitioners raise none of those three bases on appeal. See Joint Petitioners Appeal at 24-25.

241 LBP-19-4, 89 NRC at 437.

242 Id.

(Page 58 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 50 of 61 operational accidents) during the period of expected facility construction and operation; rather, they continue to argue that the CISF must have a DTS during the current license period. Joint Petitioners argue that Holtec cannot consider the probability of leaking or contaminated canisters or casks arriving at the CISF to be zero; it cannot discount the need for a DTS well before the end of the first 100 years of operations for emergencies, remediation and repackaging.243 Joint Petitioners assert the Boards dismissal of proposed Contention 4 was wrong because the ASLB may not segment consideration of environmental effects, and Holtec may not avoid NEPA or AEA . . . scrutiny of its decision to not have a [DTS] available before the end of the first 100 years of operation because of the Continued Storage GEIS.244 The Continued Storage GEIS generically analyzes the environmental impacts of spent fuel storage after the operational life of a reactor or ISFSI in the short-term (60 years after cessation of operations), long-term (60 to 100 years), and indefinite timeframes.245 It generically assumes that a DTS would be built in the long-term and indefinite timeframes, which occur beyond the initial 40-year license term for the Holtec CISF, so that the environmental impacts of constructing a reference DTS can be considered, thus providing a complete picture of the environmental impacts of continued storage.246 But as the Board correctly held, this assumption does not impose a requirement that any particular facility build a DTS.

We agree with the Board that if the proposed CISF is licensed, built, and operated and Holtec later decides to construct and operate a DTS, a separate licensing action would be 243 Joint Petitioners Appeal at 25.

244 Joint Petitioners Appeal at 24. Joint Petitioners argument regarding NEPA segmentation is new on appeal and will not, therefore, be considered. See USEC Inc. (American Centrifuge Plant), CLI-06-10, 63 NRC 451, 458 (2006).

245 Continued Storage GEIS § 1.8.2.

246 Id. § 2.1.4.

(Page 59 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 51 of 61 required, which would entail additional environmental review.247 For now, Holtec has evaluated the site-specific environmental effects associated with the construction and operation of the proposed CISF (as required by the Continued Storage Rule). Joint Petitioners do not challenge that facility- and site-specific evaluation of the effects of transportation and operational accidents. 248 We thus find no error in the Boards conclusion that proposed Contention 4 stated no genuine dispute with the application and was therefore inadmissible.

5. Joint Petitioners Contention 7: Holtecs Start Clean/Stay Clean Policy Is Unlawful and Directly Causes a Public Health Threat In their proposed Contention 7, Joint Petitioners argued that Holtecs start clean/stay clean policy is illegal and unsafe because leaky and/or contaminated canisters might arrive at the proposed CISF, which Holtec intends to return . . . to their points of origin, thus risking immediate danger to the corridor communities through which they would travel back to their nuclear power plant or site of origin, likely violating numerous additional NRC and DOT regulations.249 Holtecs answer explained that its start clean/stay clean plan would mean that a defective canister would be shipped back in an approved transportation cask, which is lawful as long as applicable radiation standards are met.250 Holtec also pointed to our decision in Private Fuel Storage, wherein we noted that a similar contentions assertion that shipping [a defective]

canister back inside the approved transportation casks is not safe can be seen as an 247 LBP-19-4, 89 NRC at 437.

248 See ER §§ 4.9.3.2, 4.13.2. Holtec assumes for purposes of its environmental analysis that

[spent nuclear fuel] could be stored at the CIS Facility for approximately 120 years (40 years for initial licensing plus 80 years for life extensions), which could be reduced if a final geologic repository is licensed and operated . . .. ER § 1.0.

249 Joint Petitioners Petition at 61.

250 Holtec Answer to Joint Petitioners at 63-64 (citing 10 C.F.R. § 71.47).

(Page 60 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 52 of 61 impermissible attack on NRC regulations and rulemaking-related generic determinations that the transportation cask is sufficient to prevent the leakage of any radioactive material.251 The Board found the contention lacked factual or expert support, specifically finding that Joint Petitioners had not shown:

(1) how the spent fuel, when packaged at the reactor site, would leave the site leaking or damaged notwithstanding NRC-approved quality assurance programs; (2) how the spent fuel canister, within its transport overpack cask, would become credibly damaged in an accident scenario that results in an exceedance of dose rates while in transit; and (3) how the sequestration sleeve, as outlined in Holtecs SAR at the time the petitions were due in this proceeding, is an inadequate remedy should the cask and canister somehow become damaged.252 The Board agreed that our decision in Private Fuel Storage would require the proponent of a similar contention to posit a credible scenario where a canister is breached in transport.253 On appeal, Joint Petitioners attempt to distinguish Private Fuel Storage by suggesting that accidental canister breaches should be considered credible in this case because Holtecs start clean/stay clean policy necessarily supposes some breaches will occur.254 The Board already considered and rejected that argument, however, noting that Private Fuel Storage (like this case) also involved a policy to ship back a leaking or defective canister to its point of origin, and that the petitioner in that case (like this case) had failed to contest those very programs that provide that a transportation accident or breach of canister is not credible.255 We find that the Board appropriately relied on Private Fuel Storage in finding this contention inadmissible. Mere existence of Holtecs start clean/stay clean policy is not 251 Id. at 63 (citing Private Fuel Storage, CLI-04-22, 60 NRC at 138 n.53).

252 LBP-19-4, 89 NRC at 444.

253 Id. (citing Private Fuel Storage, CLI-04-22, 60 NRC at 136-37).

254 Joint Petitioners Appeal at 26.

255 LBP-19-4, 89 NRC at 444.

(Page 61 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 53 of 61 sufficient to undermine the requirements and safety analyses that have generically established the integrity of approved spent fuel canister designs.

6. Joint Petitioners Contention 9: Incomplete and Inadequate Disclosure of Transportation Routes Joint Petitioners argued in proposed Contention 9 that Holtec should disclose the transportation routes for the thousands of cask deliveries that are anticipated over the first twenty years of Holtecs proposed license.256 According to Joint Petitioners, the application only shows two probable routes, one from the site of the former Maine Yankee plant and another from the former San Onofre Nuclear Generating Station in California.257 Joint Petitioners argued that complete transportation information is necessary for their own participation in the NEPA process as well as for emergency response officials to understand the scope of Holtecs proposal.258 The Board found that Joint Petitioners failed to raise a genuine dispute with the application because they did not demonstrate that either NEPA or our regulations require a specific assessment of possible transportation routes.259 The Board found that Holtecs ER evaluated three representative routesone from San Onofre to the proposed CISF, one from Maine Yankee to the proposed CISF, and one from the proposed CISF to Yucca Mountainand that the use of representative routes is in keeping with past NRC practice to evaluate transportation impacts.260 The Board further found Joint Petitioners concerns that emergency 256 Joint Petitioners Petition at 66-68.

257 Id. at 66.

258 Id. at 67.

259 LBP-19-4, 89 NRC at 445.

260 Id. at 446 (citing Continued Storage GEIS at 5-49 to 5-54; Private Fuel Storage EIS at 5-39; 10 C.F.R. § 51.52, tbl. S-4).

(Page 62 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 54 of 61 response officials would need disclosure of transportation routes to be outside the scope of this licensing proceeding. The Board explained that the NRC reviews and approves spent nuclear fuel transportation routes separately, in conjunction with the Department of Transportation, including consultation with applicable States or Tribes, and coordination with local law enforcement and emergency responders.261 On appeal, Joint Petitioners largely repeat their arguments before the Board.262 However, the Board correctly found that determining exact transportation routes is an issue outside the scope of this licensing proceeding. Furthermore, the use of representative routes in an environmental-impacts analysis to address the uncertainty of actual, future spent fuel transportation routes is a well-established regulatory approach, the foundations of which Joint Petitioners have not challenged.263 Therefore, we affirm the Boards decision to deny admission of proposed Contention 9.

7. Joint Petitioners Contention 11: NEPA Requires Significant Security Risk Analysis Joint Petitioners asserted in proposed Contention 11 that Holtecs application should include an analysis of the environmental impacts resulting from a terrorist attack on the 261 Id.; see also 10 C.F.R. §§ 71.97, 73.37 (requiring advanced planning and coordination of spent fuel shipments with State and Tribal officials).

262 Joint Petitioners Appeal at 27. Joint Petitioners also raise a new argument on appeal that the Boards ruling effectively segments a single project into smaller projects by [s]eparating consideration of the transportation component from the storage component, and thus defies effective analysis and public understanding as required by NEPA. Id. That argument, which does not account for the evaluation of transportation impacts contained in ER section 4.9, is raised for the first time on appeal and therefore will not be considered. See South Carolina Electric & Gas Company (Virgil C. Summer Nuclear Station, Units 2 and 3), CLI-10-1, 71 NRC 1, 5 (2010).

263 See, e.g., Continued Storage GEIS § 5.16 (evaluating impacts of spent fuel transportation to an away-from-reactor ISFSI based on shipments over a representative route); Private Fuel Storage EIS § 5.7.2 (selecting one of the longest possible routes passing through some of the most populated regions of the country).

(Page 63 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 55 of 61 proposed CISF and on spent nuclear fuel shipments to the CISF.264 The Board found the contention inadmissible based on the policy decision we expressed in AmerGen Energy, which was upheld by the United States Court of Appeals for the Third Circuit.265 In AmerGen Energy, we held that terrorist attacks are too far removed from the natural or expected consequences of agency action to require environmental analysis in an NRC licensing proceeding.266 In AmerGen Energy, we specifically declined to follow a contrary ruling from the United States Court of Appeals for the Ninth Circuit for any facility located outside that Circuit.267 The Board found that because the proposed CISF would be in New Mexico, which is not within the Ninth Circuit, no terrorist analysis under NEPA is required.268 On appeal, Joint Petitioners reassert that the ER should contain an analysis of terrorist attacks as an environmental impact and cite the Ninth Circuits decision that we declined to follow in AmerGen Energy.269 But Joint Petitioners do not articulate a reason for us to reconsider our policy here. The Board correctly applied our prior rulings, and we affirm its decision to deny admission of proposed Contention 11.

264 Joint Petitioners Petition at 70-88. Proposed Contention 11 included twenty-eight sub-contentions that the Board found [fell] short of the Commissions contention admissibility standards. LBP-19-4, 89 NRC 448-49. Joint Petitioners did not appeal that ruling.

265 LBP-19-4, 89 NRC 448; see AmerGen Energy Company, LLC (Oyster Creek Nuclear Generating Station), CLI-07-8, 65 NRC 124 (2007), review denied, N. J. Dept of Envtl. Prot. v.

NRC, 561 F.3d 132 (3d Cir. 2009).

266 AmerGen Energy, CLI-07-8, 65 NRC at 129.

267 Id. at 128-29 (declining to follow San Luis Obispo Mothers for Peace v. NRC, 449 F.3d 1016 (9th Cir. 2006)).

268 LBP-19-4, 89 NRC at 448 (observing that New Mexico is in the Tenth Circuit).

269 Joint Petitioners Appeal at 28.

(Page 64 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 56 of 61 F. Fasken Motion to Admit New Contention On August 1, 2019, Fasken filed a motion for leave to file a new contention claiming that Holtec does not control mineral rights beneath the proposed site as represented in its application.270 Fasken bases its contention on a June 19, 2019, letter from the State of New Mexico Commissioner of Public Lands to Krishna Singh, President and CEO of Holtec, a copy of which was sent to NRC and served on the parties in this proceeding on July 2, 2019.271 Both the Staff and Holtec opposed the motion on various grounds, including that Fasken had failed to file a motion to reopen the proceeding or address the standards for doing so.272 Thereafter, Fasken filed a motion to reopen, but it subsequently withdrew that motion without withdrawing its initial motion for leave to admit a new contention.273 Although we could determine the admissibility of Faskens new proposed contention ourselves, we decline to do so in this instance. The Board is the agencys expert in contention admissibility, and typically, the parties have the opportunity for oral argument before the Board on matters of contention admissibility. We therefore remand the contention to the Board for consideration of the contentions admissibility, timeliness, and capacity to meet the reopening standards.

270 Fasken Oil and Ranch and Permian Basin Land and Royalty Owners Motion for Leave to File a New Contention (Aug. 1, 2019) (Fasken Motion for New Contention).

271 Letter from Stephanie Richard, New Mexico Public Lands Commissioner, to Krishna Singh, President of Holtec International (June 19, 2019) (ML19183A429) (attached to Fasken Motion for New Contention as Ex. 5) (New Mexico Letter).

272 See NRC Staff Answer in Opposition to Fasken Oil and Ranch, Ltd. and Permian Basin Land and Royalty Owners Motion to File New Contention (Aug. 26, 2019), at 9-10 (Staff New Contention Response); Holtec Internationals Answer Opposing Faskens Late-Filed Motion to File a New Contention (Aug. 26, 2019), at 12-13 (Holtec New Contention Response).

273 See Fasken Oil and Ranch and Permian Basin Land and Royalty Owners Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 3, 2019); Fasken and PBLROs Withdrawal of Their Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 12, 2019); Holtec Internationals Answer Opposing Faskens Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 13, 2019).

(Page 65 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 57 of 61 III. CONCLUSION For the foregoing reasons, we affirm in part and reverse and remand in part the Boards ruling denying the petitions. We further remand to the Board Faskens new proposed contention and Sierra Club Contention 30 for determination of their admissibility.

IT IS SO ORDERED.

For the Commission NRC SEAL Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 23rd day of April 2020.

(Page 66 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 58 of 61 Chairman Svinicki, Dissenting in Part I join my colleagues disposition of the many appeals in this proceeding with one exception: the majoritys decision to remand portions of Sierra Clubs Contentions 15, 16, 17, and 19 (the groundwater contentions). Generally, these contentions asserted that Holtec inadequately characterized groundwater on site and therefore the environmental impacts could be greater than acknowledged should the storage canisters become compromised and contaminate the groundwater.1 However, the Board concluded that challenges to the integrity of the storage canisters effectively sought to litigate our regulations certifying the designs of those canisters and were therefore outside the scope of this proceeding.2 The majority does not disturb this finding, but instead remands the limited question of whether these contentions could stand as challenges to Holtecs site groundwater characterization on their own.3 In my view, the Board correctly dismissed the entirety of the groundwater contentions upon concluding that Sierra Clubs claim that the canisters could leak was inadmissible.

Without that component, the groundwater contentions no longer challenge the discussion of environmental impacts in the application and therefore fail to raise a material, genuine dispute with the application.4 While I would certainly disagree with an open-ended remand to the Board on this issue, here the majority has instead focused this remand on the material (although in my view already resolved) issue of whether the challenges to groundwater characterization could impact the analysis of environmental impacts in this proceeding. On balance, however, I find even this narrow remand to be an exercise in elevating form over substance.

1 Sierra Club Petition at 60-67.

2 LBP-19-4, 89 NRC at 404-05.

3 Order at 29.

4 10 C.F.R. § 2.309(f)(1)(iv), (vi).

(Page 67 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 59 of 61 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

)

HOLTEC INTERNATIONAL ) Docket No. 72-1051-ISFSI

)

)

(HI-STORE Consolidated Interim Storage )

Facility) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing COMMISSION MEMORANDUM AND ORDER (CLI-20-04), have been served upon the following persons by Electronic Information Exchange (EIE).

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16B33 Mail Stop: O-16B33 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail.resource@nrc.gov E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop - O-14A44 Washington, DC 20555-0001 Washington, DC 20555-0001 Paul S. Ryerson, Chair Sheldon Clark, Esq.

Administrative Judge Joseph I. Gillespie, Esq.

Esther Houseman, Esq.

Nicholas G. Trikouros Sara B. Kirkwood, Esq.

Administrative Judge Mauri Lemoncelli, Esq.

Patrick Moulding, Esq.

Dr. Gary S. Arnold Carrie Safford, Esq.

Administrative Judge Thomas Steinfeldt, Esq.

Alana M. Wase, Esq.

E-mail: paul.ryerson@nrc.gov Brian Newell, Senior Paralegal nicholas.trikouros@nrc.gov E-mail: sheldon.clark@nrc.gov gary.arnold@nrc.gov joe.gillespie@nrc.gov esther.houseman@nrc.gov sara.kirkwood@nrc.gov Ian Curry, Law Clerk mauri.lemoncelli@nrc.gov Stephanie Fishman, Law Clerk patrick.moulding@nrc.gov Molly Mattison, Law Clerk carrie.safford@nrc.gov Taylor Mayhall, Law Clerk thomas.steinfeldt@nrc.gov E-mail: ian.curry@nrc.gov alana.wase@nrc.gov stephanie.fishman@nrc.gov brian.newell@nrc.gov molly.mattison@nrc.gov taylor.mayhall@nrc.gov (Page 68 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 60 of 61 Holtec International - Docket No. 72-1051-ISFSI COMMISSION MEMORANDUM AND ORDER (CLI-20-04)

Counsel for Holtec International Counsel for Dont Waste Michigan Pillsbury Winthrop Shaw Pittman LLP 316 N. Michigan Street, Suite 520 1200 Seventeenth Street, NW Toledo, OH 43604-5627 Washington, DC 20036 Terry J. Lodge, Esq.

Meghan Hammond, Esq. E-mail: tjlodge50@yahoo.com Anne Leidich, Esq.

Michael Lepre, Esq. Counsel for Sierra Club Jay Silberg, Esq. 4403 1st Avenue SE, Suite 402 Timothy Walsh, Esq. Cedar Rapids, IA 52402 E-mail: meghan.hammond@pillsburylaw.com Wallace L. Taylor, Esq.

anne.leidich@pillsburylaw.com E-mail: wtaylor784@aol.com michael.lepre@pillsburylaw.com jay.silberg@pillsburylaw.com Counsel for NAC International Inc.

timothy.walsh@pillsburylaw.com Robert Helfrich, Esq.

NAC International Inc.

Counsel for Beyond Nuclear 3930 E Jones Bridge Rd., Ste. 200 Harmon, Curran, Spielberg & Eisenberg LLP Norcross, GA 30092 1725 DeSales Street NW E-mail: rhelfrich@nacintl.com Suite 500 Washington, DC 20036 Hogan Lovells LLP Diane Curran, Esq. 555 13th Street NW E-mail: dcurran@harmoncurran.com Washington, DC 20004 Sachin S. Desai, Esq.

Turner Environmental Law Clinic Allison E. Hellreich, Esq.

1301 Clifton Road E-mail: sachin.desai@hoganlovells.com Atlanta, GA 30322 allison.hellreich@hoganlovells.com Mindy Goldstein, Esq.

E-mail: magolds@emory.edu Counsel for Fasken Land and Oil and Permian Basin Land and Royalty Owners Counsel for Alliance Environmental Strategies Monica R. Perales, Esq.

Law Office of Nancy L. Simmons 6101 Holiday Hill Road 120 Girard Boulevard SE Midland, TX 79707 Albuquerque, NM 87106 E-mail: monicap@forl.com Nancy L. Simmons, Esq. Kanner & Whiteley, LLC E-mail: nlsstaff@swcp.com 701 Camp Street New Orleans, LA 70130 Allan Kanner, Esq.

Eddy-Lea Energy Alliance Elizabeth Petersen, Esq.

102 S. Canyon Cynthia St. Amant, Esq Carlsbad, NM 88220 Conlee Whiteley, Esq .

E-mail: a.kanner@kanner-law.com John A. Heaton e.petersen@kanner-law.com E-mail: jaheaton1@gmail.com c.stamant@kanner-law.com c.whiteley@kanner-law.com 2

(Page 69 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 61 of 61 Holtec International - Docket No. 72-1051-ISFSI COMMISSION MEMORANDUM AND ORDER (CLI-20-04)

Eddy County, NM* City of Hobbs, NM 101 W. Greene Street 2605 Lovington Highway Carlsbad, NM Hobbs, NM 88242 Rick Rudometkin Garry A. Buie E-mail: rrudometkin@co.eddy.nm.us E-mail: gabuie52@hotmail.com

  • Eddy County not served due to no representative for the County assigned at the time of Mr. Rudometkins departure. City of Carlsbad, NM 1024 N. Edward Carlsbad, NM 88220 Lea County, NM 100 N. Main Jason G. Shirley Lovington, NM 88260 E-mail: jgshirley@cityofcarlsbadnm.com Jonathan B. Sena E-mail: jsena@leacounty.net Office of the Secretary of the Commission Dated at Rockville, Maryland, this 23rd day of April 2020 3

(Page 70 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 1 of 27 Beyond Nuclear v. NRC (20-1187, consolidated with 20-1225)

Respondents Motion to Hold Case in Abeyance Exhibit B (Page 71 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 2 of 27 LBP-20-06 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

Paul S. Ryerson, Chairman Nicholas G. Trikouros Dr. Gary S. Arnold In the Matter of Docket No. 72-1051-ISFSI HOLTEC INTERNATIONAL ASLBP No. 18-958-01-ISFSI-BD01 (HI-STORE Consolidated Interim Storage June 18, 2020 Facility)

MEMORANDUM AND ORDER (Ruling on Remanded Contentions and Denying Motion to Reopen)

This proceeding concerns requests for a hearing on a license application by Holtec International (Holtec) to construct and operate a consolidated interim storage facility for spent nuclear fuel in Lea County, New Mexico. The factual background and prior proceedings before this Licensing Board are set forth in our Memorandum and Order of May 7, 2019, in which the Board denied all hearing requests. 10F On April 23, 2020, in response to petitioners appeals, the Commission substantially affirmed the Boards rulings in LBP-19-04, but reversed in part and remanded for further consideration four contentions (Sierra Club Contentions 15, 16, 17, and 19). 2 Also, the 1F Commission remanded, for the Boards ruling on admissibility, two contentions that were proffered several months after we had initially terminated this proceeding at the Licensing Board 1

LBP-19-04, 89 NRC 353, 358 (2019).

2 CLI-20-04, 91 NRC __, __, __-__ (slip op. at 1, 23-29) (Apr. 23, 2020).

(Page 72 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 3 of 27 level (Sierra Club Contention 30 and Fasken Land and Minerals Ltd. and Permian Basin Land and Royalty Owners (Fasken) Contention 2). 3 2F On May 4, 2020, Sierra Club moved to reopen the record to allow consideration of its Contention 30. 4 Sierra Club asserts that, in CLI-20-04, the Commission implicitly rejected 3F arguments that it should have moved to reopen the record when it initially proffered Sierra Club Contention 30 in October 2019. 5 4F On May 11, 2020, Fasken moved to reopen the record to allow consideration of an amended version of Fasken Contention 2 that is based on the NRC Staffs March 2020 Draft Environmental Impact Statement. 6 5F In this Order, on further consideration, the Board determines that Sierra Club Contentions 15, 16, 17, and 19 are not admissible. We deny Sierra Clubs motion to reopen the record, and we also deny Sierra Clubs motion to late-file Sierra Club Contention 30 for separate and independent reasons. We deny Faskens motion for leave to file Fasken Contention 2 as originally submitted.

The Board will address Faskens motion to amend Fasken Contention 2, and the associated motion to reopen the record, in a subsequent Order.

I. SIERRA CLUB CONTENTIONS 15, 16, 17, AND 19 In CLI-20-04, the Commission determined that Sierra Club Contentions 15, 16, 17, and 19 all appear to raise claims about the hydrogeologic characterization of the site for Holtecs proposed facility that are independent of Sierra Clubs claim that leaks from the facility would 3

Id. at __, __ (slip op. at 3, 55).

4 Sierra Clubs Motion to Reopen the Record (May 4, 2020) at 1-2.

5 Id. at 3.

6 Fasken Motion to Reopen the Record (May 11, 2020) at 1; Fasken Motion for Leave to File Amended Contention No. 2 (May 11, 2020) at 1.

(Page 73 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 4 of 27 contaminate groundwater. 7 (The Commission agreed that concerns about leaks from spent fuel 6F storage containers that are separately approved and licensed by the NRC may not be adjudicated in this proceeding. 8) The Commission therefore remanded these four contentions 7F for the Boards further consideration of their admissibility [w]ithin the context of the need to determine whether the groundwater concerns would affect the ultimate discussion of environmental impacts. 9 8F Under 10 C.F.R. § 51.45(b), Holtecs Environmental Report must describe the affected environment and discuss environmental impacts in proportion to their significance. 10 As9F explained infra, we conclude that Sierra Clubs contentions do not set forth any admissible challenge to Holtecs site characterization. Moreover, in light of the required assumption that Holtecs NRC-approved storage containers will not leak, Sierra Club fails to show why Holtecs Environmental Report must address hydrogeologic issues in any more detail.

A. Sierra Club Contention 15 Sierra Club Contention 15 stated:

The [Environmental Report] fails to adequately determine whether shallow groundwater exists at the site of the proposed [consolidated interim storage]

facility. It is important to make this determination in order to assess the impact of a radioactive leak from the [consolidated interim storage] facility on the groundwater. 11 10F Insofar as Sierra Club Contention 15 purports to challenge Holtecs site characterization, separate and apart from concerns about leaks from the storage facility, on further consideration 7

CLI-20-04, 91 NRC at __ (slip op. at 27).

8 Id. at __-__ (slip op. at 50-51).

9 Id. at __ (slip op. at 29).

10 10 C.F.R § 51.45(b)(1).

11 Petition to Intervene and Request for Adjudicatory Hearing by Sierra Club (Sept. 14, 2018) at 60 [hereinafter Sierra Club Pet.].

(Page 74 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 5 of 27 the Board concludes it raises no concerns that affect Holtecs ultimate discussion of environmental impacts.

As Holtec points out, 12 Sierra Club Contention 15 and the accompanying declaration of 11F George Rice fail to set forth an admissible claim that Holtecs discussion of groundwater is inadequate. As explained in Holtecs Environmental Report, pursuant to Holtecs Radiological Environmental Monitoring Program samples of media and effluents, including gases and vapor, air particulates, soil, sediment, fauna, vegetation, surface water, waste waters, and groundwater, are and will continue to be collected and analyzed. 13 None of this is controverted.

12F What Sierra Club does challenge is the conclusion in Holtecs Environmental Report that, [b]ased upon information obtained from the onsite drilling, shallow alluvium is likely non-water bearing at the Site. 14 However, Sierra Club neither acknowledges nor disputes the 13F information in Holtecs license application that supports this conclusion.

Sierra Club posits that Holtecs conclusion is based entirely on the absence of water in a single monitoring well observed in 2007. Mr. Rice claims that more recent wells installed at the site are completed entirely in the Dockum and [t]hus, they cannot be used to determine whether [any] groundwater exists at the alluvium/Dockum interface. 15 14F 12 Holtec Internationals Answer Opposing Sierra Clubs Petition to Intervene and Request for Adjudicatory Hearing on Holtec Internationals HI-STORE Consolidated Interim Storage Facility Application (Oct. 9, 2018) at 80-81 [hereinafter Holtecs Answer Opposing Sierra Clubs Petition to Intervene].

13 Holtec Internationals Environmental Report on the HI-STORE CIS Facility (rev. 6 May 2019) at 40-50 (ADAMS Accession No. ML19163A146) [hereinafter ER]. Generally, the Board cites to the versions of Holtecs application documents that were available at the time contentions were proffered.

14 ER at 3-40.

15 Declaration of George Rice, Comments on Proposed Facility (Sept. 6, 2018) at 3 [hereinafter Rice Decl.].

(Page 75 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 6 of 27 But that is not correct. Mr. Rice overlooks the Work Plan in Holtecs 2017 Geotechnical Data Report. 1615F Holtec drilled five groundwater monitoring wells. 17 Although wells were only completed 16F below the alluvium, in fact as wells were drilled the borings were regularly monitored to determine the appropriate depth. 18 As explained in Holtecs Work Plan, it was expected that the 17F actual depth of wells would be adjusted in the field based on the soil, rock, and groundwater conditions encountered. 19 The Work Plan provided that [if] groundwater is not encountered in 18F a boring planned for monitoring well installation, the borehole may be backfilled with cement-bentonite grout with no monitoring well installed. 20 19F Thus, as reflected in Holtecs Work Plan, the personnel performing the geotechnical exploration were regularly monitoring for groundwater conditions encountered during drilling.

The boring logs for Holtecs drilling in 2017 contain extensive data and observations supporting its conclusion concerning the absence of groundwater in the shallow alluvium. 21 Sierra Club 20F fails to address this information.

16 GEI Consultants, Geotechnical Data Report, HI-STORE CISF Phase 1 Site Characterization (Dec. 2017) (ADAMS Accession No. ML18023A958) [hereinafter Geotechnical Data Report].

17 Holtecs Answer Opposing Sierra Clubs Petition to Intervene at 84-85.

18 Id. at 9, 88.

19 Letter from Kimberly Manzione, Holtec Licensing Manager, to Jose Cuadrado, Project Manager, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards (NMSS) (Dec. 21, 2017) (ADAMS Accession No. ML17362A093), attach. 5 Geotechnical Data Report, attach. A at 53 (GEI Consultants, GEI Work Plan 1, HI-STORE CISF Site Characterization - Phase 1 (rev. 3 Nov. 2017) [hereinafter GEI Work Plan]).

20 GEI Work Plan at 53.

21 See, e.g., Geotechnical Data Report, attach. C at 72-73 (Final Boring Log for Boring No. B-101); id. at 88-89 (Final Boring Log for Boring No. B-101A (specifically noting groundwater not encountered at the interface of the residual soil and the Chinle)); id. at 95 (Final Boring Log for Boring No. B-102 (observing that the sample at the interface of the residual soil and the Chinle was dry)); id. at 102 (Final Boring Log for Boring No. B-105, p.2, observing that the sample at the interface was dry); id. at 110 (Final Boring Log for Boring No. B-105A, p. 2, specifically noting groundwater not encountered at the interface of the residual soil and the Chinle); id. at 128 (Final Boring Log for Boring No. B-109 (observing that the sample at the interface of the residual soil and the Chinle was dry)).

(Page 76 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 7 of 27 Contrary to the requirements of 10 C.F.R. § 2.309(f)(1)(vi), Sierra Club Contention 15 fails to raise a genuine dispute with Holtecs license application. Therefore Sierra Club Contention 15 is not admitted.

B. Sierra Club Contention 16 Sierra Club Contention 16, as considered by the Board, 22 stated:

21F The [Environmental Report] does not contain any information as to whether brine continues to flow in the subsurface under the Holtec site. 2322F Insofar as Sierra Club Contention 16 purports to challenge Holtecs site characterization, separate and apart from concerns about leaks from the storage facility, on further consideration the Board concludes it raises no concerns that affect Holtecs ultimate discussion of environmental impacts and thus is not material.

Sierra Club Contention 16 does not set forth an admissible claim that brine might be present in shallow groundwater below Holtecs proposed facility. The supporting declaration of Mr. Rice relies solely on a 2007 Eddy Lea Siting Study. 24 As the Siting Study shows in Figure 23F 2.11.3-2, the seeps and springs in which brine was located are on the eastern side of the site, near the Laguna Gatuna, 25 where multiple facilities discharged brine produced from oil and gas 24F production. 26 As both Holtecs Environmental Report and the Siting Study acknowledge, 25F saturations of shallow groundwater brine have been created in a number of areas associated 22 As explained in LBP-19-04, 89 NRC at 407-10, the Board denied Sierra Clubs motion to amend Contention 16 for failure to demonstrate good cause.

23 Sierra Club Pet. at 62.

24 Rice Decl. at 6 & nn.29-31.

25 Eddy Lea Energy Alliance, LLC, Final Detailed Siting Report and Final Communications Report (Apr. 28, 2007) at 2.11-5 (Fig. 2.11.3-2) (ADAMS Accession No. ML102440738)

[hereinafter ELS].

26 ER at 3-40; ELS at 2.4-3.

(Page 77 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 8 of 27 with the playa lakes. 27 The proposed storage facility, however, is located on the western side 26F of the site, away and upgradient from the Laguna Gatuna. 28 27F Rather than providing factual support for concluding that brine might exist below the proposed facility, Mr. Rices declaration merely asks questions (e.g., do the seeps and springs continue to flow, could brine come in contact with the canisters?). Merely asking questions, however, does not raise a genuine dispute with a license application. 29 Contrary to the 28F requirements of 10 C.F.R. §§ 2.309(f)(1)(v) and (vi), Sierra Club Contention 16 fails to set forth an adequate factual basis or raise a genuine dispute with Holtecs license application.

Therefore Sierra Club Contention 16 is not admitted.

C. Sierra Club Contention 17 Sierra Club Contention 17 stated:

The [Environmental Report] and [Safety Analysis Report] do not discuss the presence and implications of fractured rock beneath the Holtec site. These fractures could allow radioactive leaks from the [consolidated interim storage]

facility to enter groundwater or for the brine described in Contention 16 to corrode the containers contain[ing] the radioactive material. 30 29F Insofar as Sierra Club Contention 17 purports to challenge Holtecs site characterization, separate and apart from concerns about leaks from the storage facility, on further consideration the Board concludes it raises no concerns that affect Holtecs ultimate discussion of environmental impacts.

Sierra Club Contention 17 claims that Holtecs Environmental Report and Safety Analysis Report (SAR) fail to note the presence of fractured rock. But that is not correct. Both 27 ER at 3-41; ELS at 2.4-3.

28 See Holtec Internationals HI-STORE CIS Facility Safety Analysis Report at 81 (Fig. 2.1.6(a))

and 146 (Fig. 2.4.7) (rev. 0F Jan. 2019) (ADAMS Accession No. ML19052A379) [hereinafter SAR].

29 PPL Susquehanna, LLC (Susquehanna Steam Electric Station, Units 1 & 2), LBP-07-04, 65 NRC 281, 324 (2007) (referencing the standard under 10 C.F.R. § 2.309(f)(1)(vi)).

30 Sierra Club Pet. at 63-64.

(Page 78 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 9 of 27 documents acknowledge that the water-bearing zone measured in well ELEA-2 consists of either fractures or tight sandy loams between the depths of 85 and 100 feet, and reference the 2007 Eddy Lea Siting Study. 31 As Mr. Rice acknowledges, fractures are also reported in the 30F logs of the monitoring well drillings for the 2007 Siting Study and the 2017 Geotechnical Data Report. 32 Apart from Sierra Clubs inadmissible concerns about leaks from the proposed 31F facility, Sierra Club Contention 17 sets forth no significant dispute regarding the presence of fractured rock.

Contrary to the requirements of 10 C.F.R. §§ 2.309(f)(1)(v) and (vi), Sierra Club Contention 17 fails to set forth an adequate factual basis or raise a genuine dispute with Holtecs license application. 33 Therefore Sierra Club Contention 17 is not admitted.

32F D. Sierra Club Contention 19 Sierra Club Contention 19 stated:

Holtec performed two sets of packer tests in the Santa Rosa Formation to estimate the hydraulic conductivity (permeability) of the formation. These tests were conducted in conjunction with the preparation of the [Environmental Report]. It does not appear from the report of Holtecs consultant that these tests were conducted properly. Therefore, the [Environmental Report] has not presented an adequate evaluation of the affected environment. 34 33F Insofar as Sierra Club Contention 19 purports to challenge Holtecs site characterization, independent of concerns about leaks from the storage facility, on further consideration the Board concludes it raises no concerns that affect Holtecs ultimate discussion of environmental impacts.

31 ER at 3-40; SAR at 151.

32 See Rice Decl. at 6 & nn.34-35.

33 In addition to challenging whether the description of fractured rock in Holtecs Environmental Report satisfies 10 C.F.R. § 51.45(b), Sierra Club raises a safety challenge under 10 C.F.R.

§ 72.103 to Holtecs analysis of geologic characteristics of the site. This claim fails for the same reasons.

34 Sierra Club Pet. at 66.

(Page 79 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 10 of 27 Sierra Club Contention 19, which alleges that two sets of packer tests in the Santa Rosa Formation do not appear to have been conducted properly, 35 is inadmissible. Although Mr. Rice 34F claims, citing the Geotechnical Data Report, that the test hole does not appear to have been cleaned before conducting the packer tests, 36 in fact the Geotechnical Data Report is silent on 35F this point and thus does not provide grounds to assume that the test was performed improperly. 37 36F Moreover, the 2017 geotechnical work was performed under a nuclear quality assurance program, 38 and the design of the field and laboratory program was based on NRC guidance. 39 37F 38F Mr. Rices mere speculation that acceptable procedures may not have been followed raises no genuine dispute. Similarly, while Mr. Rice states that there is no description of the water used in the tests, 40 that does not show that the tests were improperly performed.

39F Contrary to 10 C.F.R. § 2.309(f)(1)(v) and (vi), Sierra Club Contention 19 fails to set forth an adequate factual basis or raise a genuine dispute with Holtecs license application.

Therefore Sierra Club Contention 19 is not admitted.

II. SIERRA CLUB CONTENTION 30 Sierra Club proffered its Contention 30, together with a motion to file a late-filed contention, on October 23, 2019more than five months after we issued LBP-19-04, which 35 Id.

36 See Rice Decl. at 8 & n.49.

37 Indeed, Holtec expressly denies that the test was performed improperly, although at this stage of the proceeding we do not rely on Holtecs denial. See Holtecs Answer Opposing Sierra Clubs Petition to Intervene at 90. As Holtec explained in its answer, although the page of the Geotechnical Data Report cited by Mr. Rice (Rice Decl. at 8 n.48 (citing 2017 Geotechnical Data Report at 12)) does not discuss whether the hole was cleaned, GEIs procedures for the packer tests do require the borehole to be flushed with clean water for at least 2 minutes and until return water is visually clear. According to Holtec, this is simply detail beyond that discussed in the report.

38 Geotechnical Data Report at 5-6.

39 Id. at 49.

40 Rice Decl. at 8.

(Page 80 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 11 of 27 initially terminated this proceeding before the Board. Holtec and the NRC Staff both opposed, 41 40F and Sierra Club did not file a reply.

Sierra Club Contention 30 states:

The [Environmental Report] submitted by a license applicant must evaluate the potential impact on the environment of the transportation of the nuclear waste. A report issued by the Department of Energys Nuclear Waste Technical Review Board (NWTRB) identifies 18 technical issues regarding transportation of nuclear waste. These issues remain unresolved and pose barriers to the implementation of the Holtec [consolidated interim storage] project. The issues identified in the NWTRB report are not discussed in Holtecs [Environmental Report]. The

[Environmental Report] therefore does not adequately evaluate the environmental impact of the transportation of the nuclear waste from various reactor sites to the proposed [consolidated interim storage] facility. 42 41F Sierra Club Contention 30 is similar to a contention (Sustainable Energy and Economic Development Coalition (SEED) Contention 17) that was proffered in an adjudication concerning another application for a license to construct an interim storage facility (the Interim Storage Partners LLC (ISP) proceeding). 43 The two contentions were filed the same day. Each was 42F accompanied by a motion to file a late-filed contention. Each was based on the same NWTRB Report. 44 Each was supported by the same experts declaration. Indeed, Sierra Club 43F 41 Holtec Internationals Answer Opposing Sierra Clubs Motion to File Late-Filed Contention 30 (Nov. 18, 2019) at 1 [hereinafter Holtecs Answer Opposing Contention 30]; NRC Staff Answer in Opposition to Sierra Club New Contention 30 (Nov. 18, 2019) at 1 [hereinafter NRC Staffs Answer].

42 Sierra Clubs Motion to File a New Late-Filed Contention (Oct. 23, 2019) at 5 [hereinafter Sierra Club Motion].

43 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), LBP-19-11, 90 NRC 358, 359-360 (2019).

44 U.S. Nuclear Waste Technical Review Board, Preparing for Nuclear Waste Transportation:

Technical Issues that Need to Be Addressed in Preparing for a Nationwide Effort to Transport Spent Nuclear Fuel and High-Level Radioactive Waste, (Sept. 23, 2019) (ADAMS Accession No. ML19297D146) [hereinafter NWTRB Report].

(Page 81 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 12 of 27 mistakenly submitted the substantively identical declaration of Robert Alvarez in this proceeding under the caption of the ISP proceeding. 4544F As explained infra, we deny Sierra Clubs motion to late-file Contention 30 for substantially the same reasons that the ISP Board rejected SEED Contention 17 in that proceeding. 46 But here we deny Sierra Clubs motion for an additional reason. Because Sierra 45F Club submitted Contention 30 after this proceeding had already been terminated, as directed by the Commission 47 we must first consider whether Sierra Club has satisfied the requirements for 46F reopening a closed record. It has not.

A. Reopening a Closed Record To reopen a closed record, a petitioner must file a motion demonstrating that its new contention (1) is timely; (2) addresses a significant safety or environmental issue; and (3) demonstrates that a materially different result would be or would have been likely had the newly proffered evidence been considered initially. 48 The petitioner must attach an affidavit that 47F separately addresses each of these criteria, with a specific explanation of why each criterion has been satisfied. 4948F The Commission considers reopening the record for any reason to be an extraordinary action, 50 and places an intentionally heavy burden on parties seeking to reopen the record. 51 49F 50F The Commission does not favor never-ending adjudications. On the contrary, the Commission 45 Declaration of Robert Alvarez in Support of Motion of Intervenor Sustainable Energy and Economic Development Coalition for Leave to File Late-Filed Contention (Oct. 23, 2019) at 1

[hereinafter Alvarez Decl.].

46 LBP-19-11, 90 NRC at 359-360.

47 CLI-20-04, 91 NRC __, __ (slip op. at 32) (Apr. 23, 2020).

48 10 C.F.R. § 2.326(a)(1)-(3). However, an exceptionally grave issue may be considered in the discretion of the presiding officer even if the contention is found untimely. Id. § 2.326(a)(1).

49 Id. § 2.326(b).

50 Tenn. Valley Authority (Watts Bar Nuclear Plant, Unit 2), CLI-15-19, 82 NRC 151, 156 (2015).

51 Id. at 155.

(Page 82 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 13 of 27 has cautioned that [o]bviously, there would be little hope of completing administrative proceedings if each newly arising allegation required an agency to reopen hearings. 52 51F When it proffered Contention 30 in October 2019, Sierra Club did not address, much less satisfy, the requirements for reopening a closed record. Nor did Sierra Club submit the necessary affidavit demonstrating compliance. This alone is sufficient reason not to reopen the record. 53 52F Like the NRC Staff and Holtec, 54 the Board does not read CLI-20-04 as inviting Sierra 53F Club to submit, in May 2020, a motion to reopen the record that should have accompanied its motion to late-file Contention 30 in October 2019. 55 If that were the Commissions intent, given 54F the Commissions position that reopening a closed record should be an extraordinary action, we assume the Commission would have said so explicitly.

Rather, the Commissions language suggests just the opposite. In remanding Sierra Club Contention 30 for the Boards initial ruling on admissibility, the Commission clarified that Sierra Clubs motion for a new contention must meet the standards for reopening a closed record. 56 We interpret the Commissions remand as a direction to make that determination 55F 52 Private Fuel Storage, LLC (Independent Spent Fuel Storage Installation), CLI-05-12, 61 NRC 345, 350 n.18 (2005) (quoting Vt. Nuclear Power Corp. v. Nat. Res. Def. Council, 435 U.S. 519, 555 (1978)).

53 See Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Unit 3), CLI-09-05, 69 NRC 115, 124 (2009) (Even had [petitioners] contentions passed muster under 10 C.F.R.

§ 2.309(f)(1), its motion would still fail for failing to address, let alone meet, our reopening standards.)

54 NRC Staff Answer in Opposition to Sierra Clubs Motion to Reopen the Record (May 13, 2020) at 3-4; Holtec Internationals Answer Opposing Sierra Clubs Motion to Reopen the Record (May 14, 2020) at 4-5.

55 In reaching this conclusion, the Board has considered the unauthorized reply that Sierra Club submitted on May 18, 2020. Sierra Clubs Joint Reply to Holtecs and NRC Staffs Answer to Sierra Clubs Motion to Reopen the Record (May 18, 2020) at 1. Under 10 C.F.R. § 2.323(c),

replies in support of most motions (including motions to reopen a closed record) may not be filed as of right, but only by leave upon a demonstration of compelling circumstances. We have nonetheless reviewed Sierra Clubs reply and find it unpersuasive.

56 CLI-20-04, 91 NRC at __ (slip op. at 32).

(Page 83 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 14 of 27 based on the existing record. Sierra Club clearly fails, because it did not even mention, much less satisfy, the reopening standards when it moved to late-file Contention 30 in October 2019.

Moreover, as discussed below, even if it were the Commissions intent to allow Sierra Club to move to reopen the record at this late date, we would necessarily deny the motion in any event. Sierra Clubs recent motion to reopen fails for the same reasons that Sierra Clubs original motion failed to demonstrate good cause for filing out of time. Additionally, we conclude that Sierra Club Contention 30 is not admissible.

B. New or Amended Contentions In addition to meeting the requirements for reopening a closed record (where applicable), a petitioner that proffers a new or amended contention after the initial deadline for hearing requests must demonstrate good cause for doing so. 57 To establish good cause, a 56F petitioner must show that (1) the information upon which the new or amended contention is based was not previously available; (2) the information upon which the contention is based is materially different from information previously available; and (3) the contention has been submitted in a timely fashion after the new information on which it is based becomes available. 58 57F Sierra Club satisfied the third requirement by proffering Contention 30 within thirty days of publication of the NWTRB Report on which Contention 30 relies. 59 Both Holtec and the NRC 58F Staff have argued, however, that the information in the NWTRB Report was either previously available or not materially different from information that was previously available. 60 We agree.

59F The NWTRB Report does not purport to document any new scientific or engineering 57 10 C.F.R. § 2.309(c)(1).

58 Id. at §§ 2.309(c)(1)(i)-(iii).

59 NWTRB Report at 107-17.

60 Holtecs Answer Opposing Contention 30 at 23; NRC Staffs Answer at 5-7.

(Page 84 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 15 of 27 research. Rather, as required by the Nuclear Waste Policy Amendments Act of 1987, 61 the 60F purpose of the NWTRB Report is to review the DOEs preparedness to transport spent nuclear fuel and high-level radioactive waste. 62 61F In undertaking this review, the NWTRB Report relies on and cites approximately 150 earlier references. 63 Indeed, the report explicitly acknowledges that, in identifying the issues 62F that its recommendations address, the NWTRB drew upon these earlier sources. These included both issues that the NWTRB itself had previously identified during past Board public meetings, technical workshops, and Board reports (spanning 2012-2018) and [a]dditional relevant technical issues that had been previously identified and documented in reports and presentations by DOE, the United States nuclear industry, and researchers in other countries. 64 63F All or virtually all of these original sources were publicly available before the reports issuance in September 2019. 65 64F Sierra Clubs Contention 30 also claims that Holtecs Environmental Report is deficient because it does not include the issues regarding transportation of nuclear waste that were presented in the NWTRB Report. 66 For example, the Environmental Report states that 100,000 65F metric tons of uranium (MTU) will be transported to and stored at the proposed facility in the first 20 years after a license is issued. 67 Sierra Club states that the NWTRB concluded that there 66F 61 Nuclear Waste Policy Amendments Act of 1987, Pub. L. No.100-203, § 5051, 101 Stat. 1330-248 (1987), 2 U.S.C. §§ 10261-10270.

62 NWTRB Report at xxi.

63 Id. at 107-17.

64 Id. at 23.

65 See id. at 107-17.

66 Sierra Club Motion at 6.

67 ER at 4-49. The petitioners originally-filed contentions in this proceeding are based on the earlier version of Holtecs Environmental Report. See Holtec Internationals Environmental Report on HI-STORE CIS Facility Environmental Report (rev. 1 Dec. 2017) (ADAMS Accession No. ML18023A904).

(Page 85 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 16 of 27 are technical issues that will make the transportation of nuclear waste to a proposed facility in the 20-year time frame infeasible. 68 67F As the NWTRB Report acknowledges, however, these same conclusions were first presented at an NWTRB public workshop in 2013. 69 Because this information was publicly 68F available years ago, Sierra Club fails to show good cause for failing to raise this aspect of Contention 30 earlier.

For the most part, the Declaration of Sierra Clubs expert, Mr. Alvarez, merely repeats conclusions in the NWTRB Report. But his Declaration also demonstrates that Sierra Club Contention 30 is based on facts and theories that were available long before the contention was filed. For example, Mr. Alvarez states that the NWTRB concluded in 2016 that the Nuclear Regulatory Commission and the Energy Department lack a technical basis in support of the safe transport of high burnup [spent nuclear fuel]. 70 Indeed, Mr. Alvarez cites his own work in 2013 69F for the proposition that [h]igh burnup fuel temperatures make the used fuel more vulnerable to damage from handling. 71 70F Sierra Club fails to demonstrate that Contention 30 is based on new and materially different information, as required by 10 C.F.R. § 2.309(c)(1).

68 ER at 4-49.

69 NWTRB Report at 77. The Report cites as authority a November 2013 presentation at a public NWTRB technical workshop by Jeffrey Williams, the director of DOEs Nuclear Fuels Storage and Transportation Planning Project. Mr. Williams discussion of the timeframe for transporting all spent nuclear fuel from reactor sites appears at page 54 of the workshop transcript, which is publicly available at https://www.nwtrb.gov/docs/defaultsource/

meetings/2013/november/13nov18.pdf?sfvrsn=9.

70 Alvarez Decl. at 1.

71 Id. at 6 n.26.

(Page 86 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 17 of 27 C. Contention Admissibility Even if Sierra Club had demonstrated good cause for proffering Contention 30 after the initial deadline for filing a hearing petition, Contention 30 would also have to satisfy the NRCs requirements for contention admissibility. 72 71F Among other things, an admissible contention must (1) show that a genuine dispute exists on a material issue of law or fact by referring to specific portions of the application that the petitioner disputes; and (2) state the alleged facts or expert opinions that support the petitioners position. 73 Moreover, a contention must raise an issue that is within the scope of the 72F proceeding. 7473F Sierra Club fails to raise a genuine dispute with Holtecs application, as required by 10 C.F.R. § 2.309(f)(1)(vi). Contrary to Sierra Clubs claims, the findings of the NWTRB Report do not contradict Holtecs plans.

While the NWTRB concludes that some technical issues must be resolved before the nations entire inventory of waste can be transported, 75 it agrees that not all such issues must 74F be resolved before the first of the waste can be transported. 76 Contrary to 10 C.F.R.

75F

§ 2.309(f)(1)(v), therefore, the NWTRB Report does not support Sierra Clubs suggestion that 100,000 MTU could not possibly be moved to Holtecs facility within the first 20 years of operation. It most certainly does not support the conclusion that 8,680 MTU could not be moved during the term of the license Holtec is initially requesting. 77 76F 72 See 10 C.F.R. § 2.309(f)(1).

73 Id. § 2.309(f)(1)(v)-(vi).

74 Id. § 2.309(f)(1)(iii).

75 NWTRB Report at xxiii.

76 Id.

77 See ER at 14. Holtec seeks to store 8,680 MTU in two different models of Holtec canisters, up to 500 canisters in total, for a license period of 40 years.

(Page 87 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 18 of 27 As we stated in LBP-19-04, the NRC in any event is not concerned with the commercial viability of the facilities it licenses because the business decision whether to use a license has no bearing on a licensees ability to safely conduct the activities the license authorizes. 78 Sierra 77F Club claims that the NWTRB Report identified issues that could affect the availability of spent fuel for storage at Holtecs facility. 79 But the NWTRB has no role in the NRCs licensing 78F process.

As explained supra, the NWTRBs responsibility under the Nuclear Waste Policy Amendments Act of 1987 is to evaluate the technical and scientific validity of activities undertaken by the Secretary [of Energy] . . . including activities relating to the packaging or transportation of high-level radioactive waste or spent nuclear fuel. 80 The NWTRB does not 79F license private spent fuel transportation systems; the NRC does. The NWTRB has no ability to revise the scope of Holtecs project or of this adjudication.

Holtecs Environmental Report states that spent nuclear fuel will be transported to Holtecs proposed facility only in transportation packages that are approved and certified as safe by the NRC under 10 C.F.R. Part 71. 81 Holtecs license application lists the specific, currently 80F approved packages it proposes to accept for storage. 82 Holtecs application, however, is for a 81F storage facility under Part 72, not for a transportation system under Part 71. A challenge to the safety of NRC-approved transportation packages is outside the scope of this proceeding, contrary to 10 C.F.R. § 2.309(f)(1)(iii), as the ISP Board ruled in LBP-19-11. 8382F 78 See LBP-19-04, 89 NRC at 386.

79 Sierra Club Motion at 1-2.

80 NWTRB Report at 1.

81 ER at 1-8.

82 See Letter from Kimberly Manzione, Holtec Licensing Manager, to Michael Layton, Director, Division of Spent Fuel Management, NMSS (Mar. 30, 2017) (ADAMS Accession No. ML17362A093).

83 LBP-19-11, 90 NRC at 367.

(Page 88 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 19 of 27 As we ruled in LBP-19-04, although 10 C.F.R. § 72.108 requires consideration of transportation impacts in Holtecs Environmental Report, section 72.108 does not require that the environmental report prove the safety of transportation packages, because 10 C.F.R. Part 71 separately addresses these issues. 84 Sierra Club fails to address, much less challenge, the 83F parts of Holtecs Environmental Report that do, in fact, analyze the potential environmental impacts associated with transportation of spent nuclear fuel. 85 Likewise, Sierra Club fails to 84F acknowledge or dispute any safety analyses, aging management plans or quality assurance programs described in Holtecs application.

Sierra Club instead claims that such safety-related transportation issues as moving high burnup spent nuclear fuel and when to require repackaging to [different] sized canisters 86 85F must be addressed in the Environmental Report for a consolidated interim storage facility under Part 72. 87 Sierra Club makes such claims even though Holtec has committed to accepting at its 86F facility only transportation packages that have been approved by the NRC and licensed under Part 71. Such claims would improperly expand a Part 72 application process into a dispute over the adequacy of the NRCs Part 71 requirements. Plainly, these claims are outside the scope of this Part 72 proceeding, in contravention of 10 C.F.R. §2.309(f)(1)(iii). And, insofar as they attack Commission regulations without seeking a waiver, Sierra Clubs claims violate 10 C.F.R.

§ 2.335 as well.

Sierra Club Contention 30 is not admitted.

84 LBP-19-04, 89 NRC at 415.

85 ER 4-49.

86 Sierra Club Motion at 1.

87 Id. at 6, 9.

(Page 89 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 20 of 27 III. FASKEN CONTENTION 2 Fasken submitted Fasken Contention 2, together with a motion for leave to file, on August 1, 2019 88more than twelve weeks after we issued LBP-19-04, terminating this 87F proceeding at the Licensing Board level.

Fasken Contention 2 states:

Statements in Holtecs SAR and Facility Environmental Report (FER) regarding control over mineral rights below the site are materially different and inaccurate.

Reliance on these statements nullifies Holtecs ability to satisfy the NRCs siting evaluation factors. 89 88F Fasken submitted Contention 2 in response to a June 19, 2019 letter from Stephanie Garcia Richard, State of New Mexico, Commissioner of Public Lands, to Krishna P. Singh, President and CEO of Holtec International. 90 In that letter, Ms. Richard expresses concern that 89F Holtec has characterized the site of its proposed facility as under Holtecs control. In fact, Ms.

Richard states, although Holtec may control the surface estate, the State of New Mexico, through the New Mexico State Land Office, owns the mineral estate. 91 She asserts that in its 90F filings with the NRC, Holtec appears to have entirely disregarded the State Land Offices authority over the Sites mineral estate. 92 91F 88 Fasken Motion for Leave to File a New Contention (Aug. 1, 2019) [hereinafter Fasken Motion].

89 Id. at 2.

90 See Fasken Motion, ex. 5 (Letter from NRC Acting Secretary Denise McGovern to Stephanie Garcia Richard, Commissioner of Public Lands, State of New Mexico, unnumbered attach. (July 2,2019) (Letter from Stephanie Garcia Richard, Commissioner of Public Lands, State of New Mexico, to Krishna P. Singh, Holtec President and CEO (June 19, 2019) (ADAMS Accession No. ML19183A429) [hereinafter Richard Letter]).

91 Richard Letter at 2.

92 Id.

(Page 90 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 21 of 27 On August 26, 2019, both the NRC Staff and Holtec opposed Faskens motion. 93 On 92F September 3, 2019apparently in response to the Staffs and Holtecs arguments that it failed to submit a timely motion to reopen the recordFasken did so belatedly. 94 On September 12, 93F 2019, however, without explanation Fasken abruptly withdrew its motion to reopen the record. 95 94F Although Fasken withdrew its motion to reopen, and did not reply to the NRC Staffs and Holtecs oppositions, it never withdrew its initial motion for leave to file Fasken Contention

2. We therefore address that motion and deny it.

First, as explained supra, Faskens failure to address the reopening requirements and to submit the necessary affidavit is, by itself, sufficient grounds not to reopen a closed record. 96 95F Here, we confront the extraordinary situation of a petitioner who not only failed to move to reopen, as required by the NRCs regulations, but has actually refused to do so.

Second, Fasken fails to show that Contention 2 satisfies the requirements for late filing.

As discussed supra, any petitioner that proffers a new or amended contention after the initial deadline for hearing requests must demonstrate good cause for doing so. 97 To establish good 96F cause, a petitioner must show that (1) the information upon which the new or amended contention is based was not previously available; (2) the information upon which the contention is based is materially different from information previously available; and (3) the contention has been submitted in a timely fashion after the new information on which it is based becomes 93 NRC Staff Answer in Opposition to Faskens Motion to File a New Contention (Aug. 26, 2019); Holtec Internationals Answer Opposing Faskens Late-Filed Motion for Leave to File a New Contention (Aug. 26, 2019).

94 Fasken Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept.

3, 2019).

95 Fasken and PBLROs Withdrawal of Their Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019 (Sept. 12, 2019).

96 Millstone, CLI-09-05, 69 NRC at 120.

97 See 10 C.F.R. § 2.309(c)(1).

(Page 91 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 22 of 27 available. 98 97F The creation of a document that collects, summarizes, and places into context previously available information does not make that information new or materially different. 99 Fasken fails 98F to satisfy 10 C.F.R. § 2.309(c)(1)(i) because the information on which Contention 2 is based was previously available in Holtecs Environmental Report and in its responses to the NRC Staffs requests for additional information (RAIs).

Pointing to Ms. Richards letter, Fasken claims that Holtec failed to disclose to the NRC the New Mexico State Land Offices authority over mineral rights at the proposed site. 100 But 99F that is not so. Holtecs Environmental Report has always acknowledged that the subsurface mineral rights are owned by the State of New Mexico. 101 More recently (but months before 100F Fasken proffered Contention 2), Holtec clarified in an RAI response that [t]he mineral rights for Section 13 [the proposed site] and certain adjacent areas are held in trust by the New Mexico Commissioner of State Lands. 102 Fasken Contention 2 is based on information that was 101F available in Holtecs application materials long before Fasken moved for leave to file it.

98 See id. §§ 2.309(c)(1)(i)-(iii).

99 N. States Power Co. (Prairie Island Nuclear Generating Plant, Units 1 & 2), CLI-10-27, 72 NRC 481, 496 (2010).

100 Fasken Motion at 4 n.7 (citing Richard Letter at 2).

101 ER at 58 (Fig. 3-2).

102 Holtec License Application Responses to Requests for Supplemental Information (Apr. 9, 2019) at 1.

(Page 92 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 23 of 27 Fasken therefore did not meet the requirements for reopening the record and late filing Contention 2 when it was submitted. For that reason (and also because Fasken has recently proffered a substantially amended version of Contention 2), we do not address its admissibility under 10 C.F.R. § 2.309(f)(1).

IV. ORDER For the reasons stated:

A. On further consideration, as directed by the Commission, Sierra Club Contentions 15, 16, 17, and 19 are not admitted.

B. Sierra Clubs motion to reopen the record is denied.

C. Sierra Clubs motion to late-file Sierra Club Contention 30 is denied. Sierra Club Contention 30 is not admitted.

D. There being no admitted Sierra Club contention pending, Sierra Clubs petition is again dismissed.

E. Faskens motion for leave to file Fasken Contention 2 (as originally submitted) is denied. Fasken Contention 2 (as originally submitted) is not admitted.

(Page 93 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 24 of 27 F. Briefing having only recently been completed on Faskens May 11, 2020 motion for leave to file an amended Fasken Contention 2 and associated motion to reopen the record, 103 those motions will be addressed in a subsequent Order.

102F It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

Paul S. Ryerson, Chairman ADMINISTRATIVE JUDGE

/RA/

Nicholas G. Trikouros ADMINISTRATIVE JUDGE

/RA/

Dr. Gary S. Arnold ADMINISTRATIVE JUDGE Rockville, Maryland June 18, 2020 103 See supra note 6. The NRC Staff and Holtec filed answers opposing those motions on June 4 and 5, 2020, respectively, and Fasken filed a reply on June 11, 2020. See NRC Staff Answer in Opposition to Faskens Motions to Amend Contention 2 and Reopen the Record (June 4, 2020) at 1; Holtec Internationals Answer Opposing Fasken Motion to Reopen the Record and Motion for Leave to File Amended Contention No. 2 (June 5, 2020) at 3-4; Faskens Combined Reply to NRC Staffs and Holtec Internationals Oppositions to Motion for Leave to File Amended Contention and Motion to Reopen the Record (June 11, 2020) at 1-2.

(Page 94 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 25 of 27 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

)

HOLTEC INTERNATIONAL ) Docket No. 72-1051-ISFSI

)

)

(HI-STORE Consolidated Interim Storage )

Facility) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM AND ORDER (Ruling on Remanded Contentions and Denying Motion to Reopen) (LBP-20-06) have been served upon the following persons by Electronic Information Exchange (EIE).

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16B33 Mail Stop: O-16B33 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail.resource@nrc.gov E-mail: hearingdocket@nrc.gov U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop - O-14A44 Washington, DC 20555-0001 Washington, DC 20555-0001 Paul S. Ryerson, Chair Sheldon Clark, Esq.

Administrative Judge Joseph I. Gillespie, Esq.

Esther Houseman, Esq.

Nicholas G. Trikouros Sara B. Kirkwood, Esq.

Administrative Judge Mauri Lemoncelli, Esq.

Patrick Moulding, Esq.

Dr. Gary S. Arnold Carrie Safford, Esq.

Administrative Judge Thomas Steinfeldt, Esq.

Rebecca Susko, Esq.

E-mail: paul.ryerson@nrc.gov Alana M. Wase, Esq.

nicholas.trikouros@nrc.gov Brian Newell, Senior Paralegal gary.arnold@nrc.gov E-mail: sheldon.clark@nrc.gov joe.gillespie@nrc.gov esther.houseman@nrc.gov Ian Curry, Law Clerk sara.kirkwood@nrc.gov Stephanie Fishman, Law Clerk mauri.lemoncelli@nrc.gov Molly Mattison, Law Clerk patrick.moulding@nrc.gov Taylor Mayhall, Law Clerk carrie.safford@nrc.gov E-mail: ian.curry@nrc.gov thomas.steinfeldt@nrc.gov stephanie.fishman@nrc.gov rebecca.susko@nrc.gov molly.mattison@nrc.gov alana.wase@nrc.gov taylor.mayhall@nrc.gov brian.newell@nrc.gov (Page 95 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 26 of 27 Holtec International - Docket No. 72-1051-ISFSI MEMORANDUM AND ORDER (Ruling on Remanded Contentions and Denying Motion to Reopen) (LBP-20-06)

Counsel for Holtec International Counsel for Dont Waste Michigan Pillsbury Winthrop Shaw Pittman LLP 316 N. Michigan Street, Suite 520 1200 Seventeenth Street, NW Toledo, OH 43604-5627 Washington, DC 20036 Terry J. Lodge, Esq.

Meghan Hammond, Esq. E-mail: tjlodge50@yahoo.com Anne Leidich, Esq.

Michael Lepre, Esq. Counsel for Sierra Club Jay Silberg, Esq. 4403 1st Avenue SE, Suite 402 Timothy Walsh, Esq. Cedar Rapids, IA 52402 Sidney Fowler, Esq. Wallace L. Taylor, Esq.

E-mail: meghan.hammond@pillsburylaw.com E-mail: wtaylor784@aol.com anne.leidich@pillsburylaw.com michael.lepre@pillsburylaw.com Counsel for NAC International Inc.

jay.silberg@pillsburylaw.com Robert Helfrich, Esq.

timothy.walsh@pillsburylaw.com NAC International Inc.

sidney.fowler@pillsburylaw.com 3930 E Jones Bridge Rd., Ste. 200 Norcross, GA 30092 Counsel for Beyond Nuclear E-mail: rhelfrich@nacintl.com Harmon, Curran, Spielberg & Eisenberg LLP 1725 DeSales Street NW Hogan Lovells LLP Suite 500 555 13th Street NW Washington, DC 20036 Washington, DC 20004 Diane Curran, Esq. Sachin S. Desai, Esq.

E-mail: dcurran@harmoncurran.com Allison E. Hellreich, Esq.

E-mail: sachin.desai@hoganlovells.com Turner Environmental Law Clinic allison.hellreich@hoganlovells.com 1301 Clifton Road Atlanta, GA 30322 Counsel for Fasken Land and Oil and Permian Mindy Goldstein, Esq. Basin Land and Royalty Owners E-mail: magolds@emory.edu Monica R. Perales, Esq.

6101 Holiday Hill Road Counsel for Alliance Environmental Strategies Midland, TX 79707 Law Office of Nancy L. Simmons E-mail: monicap@forl.com 120 Girard Boulevard SE Albuquerque, NM 87106 Kanner & Whiteley, LLC 701 Camp Street Nancy L. Simmons, Esq. New Orleans, LA 70130 E-mail: nlsstaff@swcp.com Allan Kanner, Esq.

Elizabeth Petersen, Esq.

Cynthia St. Amant, Esq Eddy-Lea Energy Alliance Conlee Whiteley, Esq .

102 S. Canyon E-mail: a.kanner@kanner-law.com Carlsbad, NM 88220 e.petersen@kanner-law.com c.stamant@kanner-law.com John A. Heaton c.whiteley@kanner-law.com E-mail: jaheaton1@gmail.com 2

(Page 96 of Total)

USCA Case #20-1187 Document #1850204 Filed: 07/06/2020 Page 27 of 27 Holtec International - Docket No. 72-1051-ISFSI MEMORANDUM AND ORDER (Ruling on Remanded Contentions and Denying Motion to Reopen) (LBP-20-06)

Eddy County, NM* City of Hobbs, NM 101 W. Greene Street 2605 Lovington Highway Carlsbad, NM Hobbs, NM 88242 Rick Rudometkin Garry A. Buie E-mail: rrudometkin@co.eddy.nm.us E-mail: gabuie52@hotmail.com

  • Eddy County not served due to no representative for the County assigned at the time of Mr. Rudometkins departure. City of Carlsbad, NM 1024 N. Edward Carlsbad, NM 88220 Lea County, NM 100 N. Main Jason G. Shirley Lovington, NM 88260 E-mail: jgshirley@cityofcarlsbadnm.com Jonathan B. Sena E-mail: jsena@leacounty.net Office of the Secretary of the Commission Dated at Rockville, Maryland, this 18th day of June 2020 3

(Page 97 of Total)