05000250/LER-2020-001, Technical Specification Action Not Taken for Unrecognized Inoperable Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrument Channel Functional Units
| ML20177A143 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/24/2020 |
| From: | Stamp B Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-2020-112 LER 2020-001-00 | |
| Download: ML20177A143 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(x) |
| 2502020001R00 - NRC Website | |
text
Florida Power & Light Company 9760 SW 344th St., Homestead, FL 33035 10 CFR 50.73 L-2020-112 June 24, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 RE: Turkey Point Unit 3 Docket No. 50-250 Reportable Event: 2020-001-00 Date of Event: May 7, 2020 Technical Specification Action Not Taken for Unrecognized Inoperable Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrument Channel Functional Units.
The attached Licensee Event Report 05000250/2020-001-00 is submitted pursuant to 10 CFR 50.73(a)(2)(i)(B) as a condition prohibited by the Technical Specifications, and 10 CFR 50.73(a)(2)(v)(D) as a condition that could have affected equipment required for event mitigation.
If there are any questions, please call Mr. Robert Hess at 305-246-4112 or e-mail Robert.Hess@fpl.com.
Sincerely, Brian Stamp Site Director - Turkey Point Nuclear Florida Power & Light Company Attachments: USNRC Forms 366 and 366A, current revision cc: USNRC Project Manager, Turkey Point Plant USNRC Site Resident Inspector, Turkey Point Plant Chief, Florida Bureau of Radiation Control
NRC FORM 366 (04-2020)
U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT (LER)
(See Page 2 for required number of digits/characters for each block)
(See NUREG-1022, R.3 for instruction and guidance for completing this form http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/)
APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2020
NRC FORM 366 (04-2020) 05000
- 3. Page 1
OF
- 4. Title
- 5. Event Date Month Day Year
- 6. LER Number Year Sequential Number Rev No.
- 7. Report Date Month Day Year
- 8. Other Facilities Involved Facility Name Docket Number 05000 Facility Name Docket Number 05000
- 9. Operating Mode
- 10. Power Level
- 11. This Report is Submitted Pursuant to the Requirements of 10 CFR §: (Check all that apply) 20.2201(b) 20.2201(d) 20.2203(a)(1) 20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)(iii) 20.2203(a)(2)(iv) 20.2203(a)(2)(v) 20.2203(a)(2)(vi) 20.2203(a)(3)(i) 20.2203(a)(3)(ii) 20.2203(a)(4) 50.36(c)(1)(i)(A) 50.36(c)(1)(ii)(A) 50.36(c)(2) 50.46(a)(3)(ii) 50.73(a)(2)(i)(A) 50.73(a)(2)(i)(B) 50.73(a)(2)(i)(C) 50.73(a)(2)(ii)(A) 50.73(a)(2)(ii)(B) 50.73(a)(2)(iii) 50.73(a)(2)(iv)(A) 50.73(a)(2)(v)(A) 50.73(a)(2)(v)(B) 50.73(a)(2)(v)(C) 50.73(a)(2)(v)(D) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(ix)(A) 50.73(a)(2)(x) 73.71(a)(4) 73.71(a)(5) 73.77(a)(1) 73.77(a)(2)(i) 73.77(a)(2)(ii)
Other (Specify in Abstract below or in Page of 05000-
- 3. LER NUMBER YEAR SEQUENTIAL NUMBER REV NO.
FAILED COMPONENTS IDENTIFIED None.
SIMILAR EVENTS
LER 2016-001-00 describes an event at Turkey Point Unit 4 where an incorrect calibration coefficient was installed for a Channel III RCS RTD, adversely affecting the Channel III OTDT and OPDT RPS setpoints. Channel III OTDT and OPDT had been inoperable for approximately 5 days with no Tech Spec-directed actions taken. The cause of the event described in LER 2016-001-00 was found to be the absence of a controlled engineering document describing the derivation of RTD coefficient data. Conversely, the cause of the event described in LER 2020-001-00 was an error in the approved implementing procedure that affected the accuracy of a calculated streaming constant.
4 4
Turkey Point Unit 3 250 2020 001 00