Letter Sequence Request |
---|
EPID:L-2020-LLE-0229, Covid 19 Preparedness Assessment NRC Letter Region III, 5.19.20 (Approved, Closed) |
|
MONTHYEARML20141L7952020-05-19019 May 2020 Covid 19 Preparedness Assessment NRC Letter Region III, 5.19.20 Project stage: Request ML20150A1102020-05-22022 May 2020 (FEMA Hq Letter 02-22-20) COVID-19 Preparedness Assessments for FEMA Region IX NPPs (5) Project stage: Request ML20154K6172020-05-27027 May 2020 FEMA Region VII Covid-19 Preparedness Assessment Results Project stage: Request ML20154K6962020-05-28028 May 2020 (FEMA Letter 05-28-2020) Covid-19 Preparedness Assessment for FEMA Region VII - Calloway Energy Center Calloway Energy Center (2) Project stage: Request ML20162A0562020-06-0101 June 2020 (FEMA Hq Letter 06-01-20) COVID-19 Preparedness Assessments for FEMA Region X - Columbia Generating Station Project stage: Request ML20345A1192020-12-21021 December 2020 Exemption from Requirements of 10 CFR Part 50, Appendix E, Sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0229 and EPID L-2020-LLE-0230 (COVID-19)) Project stage: Approval 2020-05-22
[Table View] |
|
---|
Category:Emergency Preparedness-FEMA Correspondence to NRC
MONTHYEARML20162A0562020-06-0101 June 2020 (FEMA Hq Letter 06-01-20) COVID-19 Preparedness Assessments for FEMA Region X - Columbia Generating Station ML16209A1472016-07-13013 July 2016 FEMA, Region X Letter to Marc Dapas Dated July 13, 2016 2016 Columbia Generating Station Exercises ML0901500592008-12-15015 December 2008 Plume and Ingestion Pathway Exercise - September 2008, Final Report - Radiological Emergency Preparedness Program, December 15, 2008 ML1201704462003-09-24024 September 2003 FEMA Columbia Generating Station, Final Exercise Report, Exercise Date - July 16, 2003 2020-06-01
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] |
Text
U.S. Department of Homeland Security Washington, DC 20472 June 1, 2020 Kathryn Brock Director, Division of Preparedness and Response Office of Nuclear Security and Response U.S. Nuclear Regulatory Commission Mail Stop T4D22A Washington, D.C. 20555 RE: COVID-19 Preparedness Assessments for FEMA Region X Columbia Generating Station, Richland, Washington
Dear Ms. Brock:
Pursuant to the FEMA Preparedness Assessment Framework - COVID-19 Memorandum dated May 13, 2020, FEMA Region X completed the assessment for the State of Washington and local communities within the 10-mile Emergency Planning Zone (EPZ) of the Columbia Generating Station. This assessment included the examination of the local offsite response organizations (OROs), in order to assess their continued capability to adequately respond to an incident at the station.
Based on the assessment conducted and the Regions review of available information gathered in discussions with the OROs, FEMA concludes that offsite radiological emergency preparedness remains adequate to provide Reasonable Assurance and that appropriate measures can be taken to protect the health and safety of the public in a radiological emergency at the station. At this time, FEMA is not initiating any further actions. If FEMA does become aware of any degradation of the offsite infrastructure or a significant reduction in OROs capabilities that could directly impact public health and safety, FEMA stands ready initiate assessments and forward those findings to the NRC for appropriate review and action.
www.fema.gov
U.S. Department of Homeland Security Washington, DC 20472 Page 2 June 1, 2020 Please contact me at 202-436-5838, if you have any questions or require any further assistance on this matter.
Sincerely, Digitally signed by HAMPTON H HART JR Date: 2020.06.01 07:57:56
-04'00' Hampton H. Hart, Jr.
Acting Director Technological Hazards Division
Attachment:
RX Assessment - Columbia Generating Station cc: Deputy Administrator, Resilience Assistant Administrator, National Preparedness Directorate Associate Administrator, Office of Response and Recovery REP Program Branch Chief Region X RAC Chair FEMA National Watch Center www.fema.gov
From: Hlavaty-LaPosa, Janet To: Hart, Hampton; Quinn, Vanessa; Bates, Kerris
Subject:
Columbia Generating Assessment Date: Friday, May 29, 2020 5:24:50 PM Good afternoon Hampton, Vanessa and Darren, On May 29, 2020, based on the assessment performed, our review of available information gathered in discussions with the OROs, FEMA Region X has concluded that offsite radiological emergency preparedness (EP) remains adequate to provide Reasonable Assurance and that appropriate measures can be taken to protect the health and safety of the public in a radiological emergency at the Columbia Generating Station. At this time, FEMA is not initiating any further action within the Columbia Generating Station 10-mile emergency planning zone. If FEMA does become aware of any degradation of the offsite infrastructure or a significant reduction in ORO capabilities that could directly impact public health and safety, FEMA stands ready to initiate assessments and forward its findings to the NRC for appropriate review and action.
I will continue to send the daily reports on the effects of COVID-19 on the OROs in the 10- and 50-mile EPZs. Our site specialist Jeremy Jones and I have stayed in constant contact with the OROs, offering support and assistance as needed. If you have any questions, please feel free to contact me at 425-487-4618, or at janet.hlavaty-laposa@fema.dhs.gov.
Regards, Jan Janet L. Hlavaty-LaPosa Regional Assistance Committee Chair &
Senior Site Specialist Radiological Emergency Preparedness Program National Preparedness Division, FEMA Region X Office: (425) 487-4618 l Mobile: (206) 953-2279 janet.hlavaty-laposa@fema.dhs.gov