ML20155K120
| ML20155K120 | |
| Person / Time | |
|---|---|
| Site: | Perry, 05000000 |
| Issue date: | 12/30/1987 |
| From: | Kaplan A CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20155K026 | List: |
| References | |
| FOIA-88-165 PY-CEI-OIE-0297, PY-CEI-OIE-297, NUDOCS 8806210115 | |
| Download: ML20155K120 (1) | |
Text
_ _
PO BOX 97 e
PEARY OH+O 44081 e
T E L E PHO N E (2161 259 3737 e
ADDAESS-to CENTER AOAD Serv:n; ite Best Locat:cn in the Nanon PERRY NUCLEAR POWER PLANT Al Kaplan DF',:JhlIY POUIMO r.--
va mrsee87
- p[ g'.,u'jC-mera omua Dec embe r 30, 1987 V._t PY-CEI/01E-0297 L pj,+ t - (
,W.f y j yTyg]
Mr. A. Bert Davis j-y-
Regional Administrator, Region III U.S. Nuclear Regulatory Commission
- 6 DK5 799 Roosevelt Road Glen Ellyn, Illinois 50137 1
Perry Nuclear Power Plant j
Docket No. 50-440 Augmented Inspection Teams ( AIT)
Fi tal Repo rt Dea r Mr. Davis.
This letter provides the f ormal report of findings and conclusions requested in your Confirmatory Action Letters dated November 4 and 30,1987. The report
)
summa rizes the pertinent ana ly sis, root causes and corrective actions identified f ollowing the Main Steam isolation Valve solenoid f ailures of October 29, November 3 and November 29.
If you have any questions, please f eel f ree to contact me.
1 Very truly yours, j
Al Kaplan Vice President Nuclear Group AK cab Enclosure cc:
K. Connaughton T. Colburn Document Control Desk Cr 4N 8606:.10115 880613 JAtl PDR FOIA PDR
, MAXWELL 88-163
. -_ -..