Forwards Rev 1 of Vermont Operational QA Program (Voqam), Which Incorporates Clarifications & Organizational Updates to Program.Major Change in Rev Is Removal of All Ref to Yae & Yankee Nuclear Svcs Div,Per
ML20154N077
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/16/1998
From: Maret G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154N081 List:
References
BVY-98-93, NUDOCS 9810210137
Download: ML20154N077 (27)


Text

.- -- - ~ . - . - - _ . - . - . . - - . .

si VERMONT YANKEE y NUCLEAR POWER CORPORATION 185 Old Ferry Road, Brattleb'oro, VT 05301-7002 (802) 257-5271 October 16,1998 BVY 98-93 United States Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 l

References:

(a) VYNPC Letter to USNRC, Response to Request for Information Regarding  ;

Adherence to Quality Assurance Program Provisions, BVY 98-55 dated April 10, 1998

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Vermont Yankee Operational Ouality Assurance Manual (VOOAM) Revision 1 Enclosed for your inforrdon is Revision 1 of the Vermont Operational Quality Assurance Program (VOQAM). His revision incorporates clarifications and organizational updates to the Quality Assurance Program for Vermont Yankee Nuclear Power Corporation (VYNPC).

VOQAM Revision 0 (formally YOQAP-1-A, Revision 27) was adopted by VYNPC as described in Reference (a), and became effective on May 1,1998. Revision 28 of YOQAP-1-A was originally submitted to the NRC for information and review on June 23, 1997, and withdrawn via Reference (a). He ,

organizational changes defined in Revision 28 were implemented at the time of the submittal following  !

completion of a 10CFR50.54(a) evaluation that revealed no reduction in commitments as a result of the changes. Revision 1 of VOQAM includes those changes.

An evaluation has been performed on the changes in VOQAM Revision 1 to determine if any requirements in the QA Prcgram previously approved by the NRC were deleted or made less effective, thereby constituting a reduction in commitments. This evaluation also assessed the revised program for compliance p with the criteria of 10CFR50, Appendix B. ) ,

I I The major change in this revision is the removal of all references to the Yankee Atomic Electric Company 1 (YAEC) and its Yankee Nuclear Services Division (YNSD) as discussed in reference (a). All other changes reflect organizational adjustments as a result of realignment of responsibilities, title changes, or creation of new positions. These clarifications and organizational changes do not constitute a reduction in

< commitments, and the revised Program continues to satisfy 10CFR50 Appendix B criteria. (See Attachment A for a description of all changes.)

', 3 ',- - Jn e'n I

,.. J s 9810210137 981016 '

PDR ADOCK 05000271 P PDR

VERMONT YANKEE NUCLEAR POWER CORPORATION BVY 98 83, Page 2 of2 The VOQAM is a QA Manual exclusively for VYNPC and will not be maintained as a topical report.

Ifyou have any questions regarding this revision, please contact Mr. Robert J. Wanczyk at (802) 258-4140 or Mr. Walter K. Peterson at (978) 568-2877.

4 - ,

Sincerely, VERMONT Y KEE NUCLEAR POWFR CORPORA 110N

.1 _

. ego r

gL.Maret Director ofOperations

. Attachment cc: ' USNRC Region 1 Administrater USNRC Resident Inspector-VYNPS

' USNRC Project Manager-VYNPS Vermont Department of Public Service

,. 4 t:

l

ATTACHMENT A l

VOOAM Summary of Channes - Revision 1 Ite m N o. VOQAM Change Description Reason for Change l Section 1 Deleted references to Yankee Atomic Assumption by Electric Company (YAEC) Nuclear Vermont Yankee of Services Division (NSD) throughout responsibilities l the VOQAM. previously held by YNSD.

l 2 Editorial changes were made Editorial l throughout the VOQAM to (1) revise the grammar from plural to singular where necessary, and (2) delete the revision date from each page.

i 3 Page I Update due to Change in Manual Title, and titles and organizational l names of signatories. changes 4 Policy Page 1 of 2 Update Statement Deleted reference to Yankee Atomic Electric Company (YAEC).

5 Policy Page 1 of 2 Update Statement Changed final management authority from " Vermont Yankee Senior Vice President, Operations," to " Director of Operations."

6 Policy Page 1 of 2 Update Statement Changed program implementation responsibility from " President or a Vice President" to "Vice President / Director / Department Head."

7 Policy Page 1 of 2 Clarification Statement Added that the Executive Director of Quality Assurance reports to the Director of Safety and Regulatory Affairs.

8 Policy Page 1 of 2 Update Statement Changed Director of QA responsibility from " establishment" to " preparation" of the QA Program

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 2 of 25 Ite m N o. VOQAM Change Description Reason for Change l

- Section j 9 Policy Page 2 of 2 .

Update Statement . Changed " Plant Superintendent /

Manager" to " Plant Manager."

10 Policy. Page 2 of 2 Update l

Statement Changed " Cognizant Corporate -

Officer" to " Director of Operations."

11 I Page 1 of 46 Transfer of Deleted reference to Yankee Atomic responsibility to VY.

Electric Company Nuclear Services Division.

12 I Page 1 of 46 Update Changed " Senior Vice President, Operations, of Vermont Yankee Nuclear Power Corporation" to

" Director of Operations."

13 I Page 1 of 46 Clarification Added a paragraph pertaining to contracted services.

14 I Page1of46 Update Changed " Nuclear Services Division Quality Assurance Department" to

" Quality Assurance Department."

15 I Page1of46 Update Deleted reference to the Yankee Site.

16- I Page 2 of 46 Deletion of Yankee Changed " Figures 1 and 2" to " Figure from the Manual.

1."

17 I Page 2 of 46 Update Deleted reference to YNSD and Decommissioning Manager, 18 I Page 2 of 46 Update Replaced YNSD with "any contracted service organization."

. . . . .. .... -. .- _ , . - . . - . . . . - . - . - - . - . - - . ~ . . - .

' ATTACHMENT A VOQAM Summary.of Changes - Revision 1

~ Page 3 of 25 ~

i Ite m N o. VOQAM.' Change Description Reason for Change Section l' .

i

.I 19 Page 2 of 46 Update Added " discussion of job descriptions" to the " Organizational Responsibilities" paragraph. .

20 I Page 2 of 46 Update i Replaced VY " Senior Vice President, Operations" with VY " Director of Operations."

~

!. 21 I Page 2 of 46, Paragraph C . Update Replaced "VY Senior Vice President"

!~

with " cognizant VY organizations as stipulated in the contracts."

22 I Pages 2 and 3 of 46 Update Deleted paragraphs D.I.a and b.

referring to YNSD QA Program responsibilities.

23 I Page 3 of 46 Update Changed " Executive Director of Quality Assurance" to " Director of Quality Assurance," and moved this paragraph (I.C.I.c) to Section I.C.3.d.

24 I Page 4 of 46 Update Deleted " Training Coordinator" paragraph.

25 I Page 4 of 46 Update Deleted " Decommissioning Manager" paragraph.

26 I Pages 5 and 6 of 46 Update Deleted " Project Managers" paragraph.

w.  %% Ny -. k . , , . - . - . ~ -m - y-p. a 1

I l

l ATTACHMENT A

- VOQAM Summary of Changes -. Revision 1 l Page 4 of 25 Item No. -VOQAM. Change Description. Reason for Change .

Section .

27 I Page 6 of 46 ' Update l Changed " Management of Quality Assurance" to " Manager of Operational Quality Assurance," and moved paragraph (I.C.2.g) to Section I.C.3.e. 1 28 I Page 6 of 46 Update Deleted " Engineering Services s

Manager" paragraph. ,

29 I Page 6 of 46 Update Deleted " Director of Environmental Engineering" paragraph.

j i

30 I Page 7 or 46 Update -

Deleted " Director of Fuel Management" paragraph.

31 I Page 8 of 46 Update Deleted " Director of Environmental Laboratory" paragraph.

-32 I Page 9 of 46 - Update Deleted " Director of Nuclear Engineering" paragraph.

33 I' Page 9 of 46 Update Deleted " Plant Support Department Manager" paragraph.

34 I Page 10 of 46 Update Deleted " Engineering and Licensing Manager" paragraph.

35- I Page 11 of 46 Update l Deleted " Automation Technology i Depart (ATD) Manager" paragraph.

136 . I Page 11 of 46 Update Deleted " Site Manager / Manager of Operations" paragraph. 1

ATTACHMENT A

. VOQAM Summary of Changes - Revision 1 ,

Page 5 of 25 l

l I

Ite m N o. VOQAM Change Description 'leason for Change Section 37 I Page 12 of 46 Update Deleted " Plant Superintendent" i paragraph. l

, 38 I Page 14 of 46 Update -

Deleted " Shift Supervisors" paragraph. (

39 I Page 15 of 46 Update Deleted " Construction Manager" paragraph.

40 I Page 15 of 46 Update i Deleted " Training Coordinator" I paragraph.

l 41 I Page 16 of 46 Update Deleted " Site Services Supervisor" paragraph.

42 I Page 17 of 46 Update Deleted " Radiation Protection and )

Chemistry Manager" paragraph. l 43 I Page 18 of 46 Update Deleted " Health and Safety Manager" l paragraph.

44 I Page 19 of 46 Update Changed " Senior Vice President, Operations" to " Director of Operations."

45 I Page 19 of 46 Update Added paragraph defining the responsibilities of the "Vice President, l Engineering." ]

46 I Page 19 of 46 Update Deleted reference to VYNPC.

i

. i. _ _ . -_. . _ . . ._ .

l l

ATI'ACHMENT A VOQAM Summary of Changes - Revision i Page 6 of 25 i j

Ite m N o. VOQAM Change Description Reason for Change l Section -

1 47 i Page 2J af 46 Update Added responsibility for " review of j and compliance with federal and state l

regulations and standards for nuclear '

power facilities" to " Director of Safety and Regulatory Affairs" paragraph.

48 I Page 21 of 46 Update l

Moved " Director of Quality Assurance" paragraph from page 3 of 46.

49 I Page 21 of 46 l Added reporting line of the Executive Director of Quality Assurance to the Director of Safety and Regulatory Affairs.

50 I Page 21 of 46 Update Changed the responsibility of the Director of Quality Assurance to

" review" rather than " approve" the Operational QA Program.

51 I Page 21 of 46 Update Changed the responsibility of the Director of Quality Assurance to

" recommend" rather than to " provide" company policy relative to QA practices.

Deleted reference to YNSD.

52 I Page 21 of 46 Update Changed " Nuclear Services Division Quality Assurance Department" to

" Quality Assurance Department."

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 7 of 25 Ite m N o. VOQAM Change Description Reason for Change Section 53 1 Page 21 of 46 Update J Changed Director of QA responsibility

! from " establishment" to " preparation" of the QA Program.

54 I Page 22 of 46 Update Deleted the Director of Quality Assurance responsibility for review of and compliance with federal and state regulations and standards.

55 I Page 22 of 46 Update Moved " Manager of Operational Quality Assurance" paragraph from page 6 of 46.

F 56 I Page 23 of 46 Editorial Minor changes in sentence structure.

57 I Page 23 of 46 Update Deleted paragraph referring to inspection of Yankee Plant.

58 I Page 23 of 46 Editorial Minor changes in sentence structure.

59 I Page 24 of 46 Update Changed " Director of Procurement" to

" Procurement Manager."

60 I Page 24 of 46 Update Changed the reporting line from "Vice President Finance and Treasurer" to

" Director of Administration."

61 I Page 24 of 46 Update Added responsibility for " receipt inspection" to " Procurement Manager" paragraph.

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 8 of 25 Ite m N o. VOQAM Change Description Reason for Change Section 62 I Page 25 of 46 Update Changed " Director of Engineering" to

" Director of Design Engineering "

63 I Page 25 of 46 Update Changed the reporting line for the Director of Design Engineering from

" Senior Vice President, Operations," to "Vice President, Engineering."

64 I Page 25 of 46 Update Deleted "overall responsibility for design and plant engineering" from the responsibilities of the Director of Design Engineering, 65 I Page 25 of 46 Update Changed interface responsibility from "the Plant and the Yankee Nuclear Services Division" to "the Plant and Engineering."

66 I Page 25 of 46 Update Changed the reporting line for the Training Manager from " Senior Vice President, Operations," to " Director of Operations."

67 I Page 26 of 46 Update Changed the reporting line for the System Engineering Manager from

" Senior Vice President, Operations," to "Vice President, Engineering."

68 I Page 26 of 46 Update Added responsibility for Maintenance Rule to " System Engineering Manager" paragraph.

ATTACHMENT A i VOQAM Summary of Changes - Revision 1 l Page 9 of 25 l

Item No. VOQAM Change Description Reason for Change j Section i 69 I Page 27 of 46 Update I Changed " Director of Engineering" to "Vice President. Engineering."

70 I Page 27 of 46 Update Changed the reporting line for the Plant Manager form " Senior Vice President" to " Director of Operations."

71 I Page 28 of 46 Update Deleted requirement for Plant Manager I to provide information to and report to YNSD.

72 I Page 28 of 46 Update Changed " Senior Vice President, Operations," to " Director of I Operations."

73 I Page 28 of 46 Update Changed areas of responsibilities for the Maintenance Superintendent from

" Maintenance, and Instmmentation and Control" to " Electrical and Control, Work Controls, and Mechanical Maintenance and Facilities."

74 I Page 29 of 46 Update Deleted responsibility for Reactor Engineering, and added responsibility for Technical Support to the

" Technical Services Superintendent" paragraph.

75 I Page 30 of 46 Update Added paragraph listing responsibilities of the " Operations Superintendent."

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 10 of 25 Item No. VOQAM Change Description Reason for Change ,

Section 76 I Page 31 of 46 Update Changed the reporting line for the Operations Manager from " Plant Manager" to " Operations '

Superintendent."

77 I Page 32 of 46 Update Changed " Director of Engineering" to "Vice President, Engineering."

78 I Page 33 of 46 Update I Added responsibility for the Fire 1 Protection Program to the " Project l

Engineering Manager" paragraph. 1 79 I Page 33 of 46 Update Changed the reporting line for the Technical Support Manager from l

" Director of Engineering" to l

" Technical Services Superintendent." l 1

80 I Page 33 of 46 Update i From the " Technical Support Manager" paragraph, deleted l responsibility for overseeing and j managing the Fire Protection 81 I Page 33 of 46 Update Added the " Electrical Design i Engineering Manager" paragraph.

82 I Page 34 of 46 Update Deleted the " Nuclear Services Manager" paragraph.

83 I Page 35 of 46 Update Added the " Fluid Systems Engineering q Manager" paragraph.

y .. _ . _ . _ _ __._.. _ _ _ _ _ ..... _ ... _ _ __.- ____ _ .._ _ .. _ . _ ..-. __ . _ _ .

i 3;

i ' ATTACHMENT A ,

cy VOQAM Summary of Changes - Revision 1

. _ Page 11 of 25 f Ite m N o. -VOQAM Change Description Reason for Change Section

-84 I Page 35 of 46 Update.

Changed " Design Engineering -

Manager" to " Mechanical / Structural l y'

Design Engineering Manager."

-^

85 I Page 35 of 46 Update

, Changed " Director of Engineering" to

" Director of Design Engineering."

86 I Page 35 of 46 Update l Replaced " authority for the electrical /

I&C/ mechanical / fluid systems" with

" authority for mechanical / structural systems."

.9

87. I Page 37 of 46 Update Changed " Mechanical Maintenance

, Manager" to " Mechanical Maintenance and Facilities Manager." ]

, s 88 I Page 39 of 46 Update Deleted responsibility for the review of electrical failure frequency from the

" Mechanical Maintenance and 7 Facilities Manager" paragraph.

89 I Page 41 of 46 Update Added that the Radiation Protection it Manager has " direct access to the Plant Manager on all health physics matters."

90 I Page 42 of 46 Update Changed the reporting line for the

" Reactor Engineering Manager" from

" Technical Services Superintendent" to

" Operations Superintendent."

. i 4

91 I Page 43 of 46 Update Deleted reference to " Yankee" and j- unnecessary designation of" Vermont Yankee."

1

.1 l

t ATTACHMENT A VOQAM Summmy of Changes - Revision 1

. Page 12 of 25 I

Ite m N o. VOQAM. Change Description Reason for Change Section 92 I Page 43 of 46 Update Deleted references to Yankee Plant NSARC and PORC.

93 I Page 44 of 46 Update Deleted unnecessary designation of  ;

" Vermont Yankee Plant"in " Plant  !

Operatic as Review Committee"  ;

paragra. h and " Nuclear Safety Audit and Reuew Committee" paragraph.

94 I- Pages 45 of 46 Update Deleted Yankee Organizational chart i and renumbered the VY Organizational chart as Figure 1. j 95 I Page 46 of 46, Figure 1 Update Organizational chart revised to change the following titles: "Vice President Finance & Treasurer" to " Director of Administration"; " Director of Procurement" to " Manager of Procurement"; " Senior Vice President, Operations" to " Director of Operations."" Director of Engineering" to "" Director of Design Engineering";

" Executive Director Quality Assurance" to " Director Quality Assurance";" Quality Assessment De trtment Manager" to " Operational Quality Assurance Manager";

" Operations Manager" to " Operations Superintendent"; " Project Engineering Manager" to " Electrical Design Engineering Manager"; " Technical Support Manager" to " Mechanical Design Engineering Manager";

" Design Engineering Managers" to

" Fluid Systems Engineering Manager."

ATTACHMENT A VOQAM St imary of Changes - Revision 1 l Page 13 of 25 l l

l Ite m N o. VOQAM Change Description Reason for Change Section 96 1 Page 46 of 46, Figure 1 Update Organizational chart revised to add the following: "Vice President, Engineering" reporting to the

" President and Chief Executive Officer"; " Project Engineering Manager" reporting to the "Vice President, Engineering"; " Operations Manager" reporting to the " Operations Superintendent"; and " Technical

)

Support Manager" reporting to the

" Technical Services Superintendent."

97 I Page 46 of 46, Figure 1 Update ,

Organizational chart revised to delete j

" Nuclear Services Manager."

98 I Page 46 of 46, Figure 1 Update Organizational chart revised to change the reporting lines for the following:

" System Engineering Manager," and I

" Director of Design Engineering" who now report to the "Vice President, Engineering"; and the " Reactor Engineering Manager" who now reports to the " Operations Superintendent."

99 I Page 46 of 46, Figure 1 Update Organizational chart revised to add

" Note 5, Outsourced to Approved Contractor."

i 100 11 Page 1 of 7 Update l Deleted reference to the Yankee Safety l Classification of Systems Manual for .

l the Yankee plant.

l

. ...m.,. _.

l i

I ATTACHMENT A.

VOQAM Summary of Changes - Revision 1 Page 14 of'25  :

l Ite m N o. VOQAM Change Description . Reason for Change l I' Section j

-101- II Page 1 of 7 - Editorial

Changed "Each facility" to "The . l l

n Plant." l 102 II Page 4 of 7 Update i

Changed " Yankee Operational Quality l I Assurance Program" to " Vermont Operational Quality Assurance l Program."  ;

i 103 II Page 4 of 7 Update

.. Deleted reference toYankee.

u 104 11 Page 5 of 7 Update i Changed " Cognizant Corporate

Officer" to " Director of Operations." ..
r. I 105 II Page 6 of 7 Update Deleted paragraph referring to Vice

~

-l President and Manager of Operations ' 1 responsibilities regarding training. I o

106 II Page 6 of 7 Update l Deleted unnecessary designation of

" Vermont Yankee."

107 II. Page 6 of 7 Update Deleted reference to the Yankee Site i Training Coordinator. )

108 11 Page 6 of 7 Update Deleted reference to "YNSD."

109 III Page1of4 Update

Deleted references to "YNSD" and

" Project Depaitment."

110 III Page 1 of 4 Update Deleted " design" from responsibilities

( of the " Engineering department or the L Plant."

i I

[. ]

y .

ATTACHMENT A '

! ( VOQAM Summary of Changes - Revision 1 Page.15 of 25 Ite m N o. VOQAMl Change Description Reason for Change l

Section j 111 III Page 2 of 4 Update '1 Changed _" Plant Superintendent /

l Manager" to " Plant Manager."

112- III Page 2 of 4. Update  !

[ Changed " Plant Site Manager" to  !

l " Plant Manager."

113 - III-Page 2 of 4 - Update l Changed "Vice Presidents (s) and

Manager of Operations" to " Director of Operations."

-114- III Page 3 of 4 Update Changed " Nuclear Services Division Plant Support" to " Engineering Department."

115 III' Page 3 of 4 Update >

Deleted reference to NSD "and/c-plant."

l116 IV Page 1 of 3 Update ,

Deleted NSD procurement responsibilities and assigned the Quality Assurance Department responsibility for auditing the plocurement process.

I17 _ IV Page 1 of 3 Update Deleted unnecessary restriction to Vermont Yankee.

I18 IV Page 1 of 3 Update Changed the "NSD Engineering and/or Project Departments" to the

" Engineering Department."

-'t $ 7 9---- -Py- * - y y 9 i.-y- ,-

w m *

  • e -- -

ATTACHMENT A l VOQAM Summary of Changes - Revision 1 ,

Page 16 of 25 l ite m N o. VOQAM Change Description Reason for Change Section 119 IV Page 2 of 3 Update Deleted Yankee-specific and YNSD-specific requirements, and reference to q NSD.

120 IV Page 2 of 3 Update Changed the "NSD Plant Support I Department" to the " Plant."

121 IV Page 3 of 3 Update Deleted unnecessary reference to Vermont Yankee.

122 V Page 1 of 2 Update Deleted references to YNSD and Project Departments.

123 V Page 1 of 2 Update Changed "each department Director /

Manager" to "each department."

124 V Page 1 of 2 Update Added QA Department responsibility for preparation and approval of all QA Department procedures, and approval of selected plant prepared QA procedures.

125 V Page 1 of 2 Update Added Plant responsibility for selected QA procedures.

126 V Page 2 of 2 Update Changed " Plant Superintendent /

Manager" to " Plant Manager ."

127 V Page 2 of 2 Update Deleted YNSD responsibility regarding

instructions and procedures associated

! with Construction Services activities.

ATTACHMENT A

.-VOQAM Summary of Changes - Revision 1 -

Page 17 of 25-Ite m N o. VOQAM. Change Description Reason for Change Section 128 V Page 2 of 2 _

Update Deleted reference to NSD "and/or plant."

129 VI Page 2 of 4 Update Reassigned responsibilities from the NSD " Engineering and/or Project ,

Departments" to the " Engineering Department." '

-130' VI Page 2 of 4 .

Update Deleted 3.c which addressed

" maintenance and distribution" and moved " maintenance and distribution" to 3.a. Deleted " issuance"in 3.a.

131l VI Page 2 of 4 Update Changed "Vice President (s) and Manager of Operations" to "Vice President, Engineering"; deleted "their."

132 VI Page 2 of 4 Update Deleted reference to NSD.

133 VI Page 2 of 4 Update Changed " Executive Director of Quality Assurance" to " Quality Assurance Department."

134 VI Page 2 of 4 Update Changed " Operational Quality Assurance Program" to "VYNPC Operation Quality Assurance Manual."

135 -VI Page 3 of 4 Update Deleted reference to NSD and/or plant.

9 ,c--,p -cw ,..% -

9+< _ ,, p 7 - e---m- -- W

1

?* -

A'ITACHMENT A

/ VOQAM Summary of Changes - Revision 1 Page 18 of 25 Ite m N o. VOQAM Change Description Reason for Change

- Section -

136 VI Page 3 of 4 Update Changed " Engineering / Plant Design

, Change Requests" to Engineering L_ Design Change Requests."

137 VI Page 4 of 4 Update Deleted unnecessary reference to Vermont Yankee. 1 138 VII . Page 1 of 4 Update.  !

Deleted references to NSD, Yankee l Atomic Electric Company, and Project i Departments. j 139 VII -. Page1of4 Update Deleted reference to " Plant 4 1

Services / Administrative Department at the Yankee plant."

140 VII Pages 1 and 2 of 4 Update Changed " Material Manag.:r at Vermont Yankee" to " Manager of Procurement."

141 VII Page 2 of 4 Update Deleted reference to NSD and/or plant.

L , 142 VIII Page 1 of 2 Update Changed " Nuclear Service Division Quality Assurance Department" to i

~

" Quality Assurance Department."

143 VIII Page 1 of 2 Update l Changed " Nuclear Services Division l Engineering and/or Project l Departments and/or the Vermont

[ Yankee staff" to " Engineering Department."

!- 144 VIII- Page 1 of 2 Update l

Added " engineering."  ;

i- .

s" .

.(

l'..

t . . - . . . . . . . . - .- . _ = _ . - , ,-

..+ ,-. -. ~ ~ . - . - . - . . . ~ . - -.- - . -- --, - . - . - . . . - . - .

ATTACIIMENT A -

VOQAM Summary of Changes - Revision 1 Page 19 of 25 Ite m N o. VOQAM Change Description Reason for Change Section 145- VIII Page 2 of 2. Update ,

Deleted reference to NSD and/or plant.

146 VIII Page 2 of 2 Update Changed "Vice President (s) and Manager of Operations" to " Manager

  • L of Procurement."

147- . VIII Page 2 of 2 Update Deleted unnecessary instruction specific to Vermont Yankee.

148' IX - Page 1 of 2 - Update' .

Deleted reference to NSD QA Department.-

1491 IX Page 1 of 2 Update -

Deleted " Yankee Atomic Electric Company" from title of" Welding and Nondestructive Examination Procedures." .j i

150 IX Page 1 of 2 Update i Changed " Nuclear Services Division I Engineering / Project Departments" to

" Engineering Department."

151 IX .Page 2 of 2 Update.

I Deleted reference to NSD " Plant Support Department" and transferred responsibility for NDE training to the Plant.

152 IX Page 2 of 2 Update Changed "Vice President and Manager l L of Operations" to " Manager of l Procurement."

b p ,

153 IX Page 2 of 2 Update j Deleted unnecessary reference to VY. 1

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 20 of 25 Item No. VOQAM Change Description Reason for Change Section 154 IX Page 2 of 2 Update Deleted reference to NSD and/or plant.

155 X Page 1 of 3 Update Changed " Nuclear Services Division Quality Assurance Department"to

" Quality Assurance Department."

156 X Page1of3 Update Added responsibility for auditing and surveillance of plant inspection activities to Quality Assurance Department.

157 X Page 1 of 3 Update Deleted unnecessary reference to VY.

158 X Pages I and 2 of 3 Update Deleted requirements specific to Yankee Plant.

159 X Page 2 of 3 Update Deleted reference to NSD and/or plant.

160 XI Page 1 of 3 Update Changed " Nuclear Services Division Quality Assurance Department" to

" Quality Assurance Department."

161 XI Page 1 of 3 Update Changed " Nuclear Services Division Engineering / Project Departments" to

" Engineering Departments / Plant."

162 XI Page 2 of 3 Update Deleted reference to NSD and/or plant.

163 XII Page 1 of 2 Update Changed "Each Plant Department" to 1 l "The Plant."

l ATTACIIMENT A VOQAM Summary of Changes - Revision 1 Page 21 of 25 Ite m N o. VOQAM Change Description Reason for Change Section 164 XII Page 1 of 2 Update i Deleted reference to NSD and/or plant. I 165 XIII Page I of 2 Update Deleted reference to NSD and/or plant.

166 XIV Page 1 of 2 Update )

Deleted reference to NSD and/or plant. 1 I

167 XV Page 1 of 3 Update Changed " Nuclear Services Division 1 Quality Assurance Department" to

" Quality Assurance Department."

168 XV Page 1 of 3 Update  !

Deleted requirements specific to the Yankee Plant.

169 XV Page 1 of 3 Update

]

Deleted unnecessary references to Vermont Yankee. 1 170 XV Page 1 of 3 Update Changed " Yankee Atomic Electric Company" to " Plant." l 171 XV Page 1 of 3 Update Changed " Nuclear Services Division Engineering and/or Project l Departments" to " Engineering and/or l

Plant Department." l 172 XV Page 2 of 3 Update Changed "Vice President (s)" to

" Director of Operations."

l 173 XV Page 2 of 3 Update l Deleted reference to NSD and/or plant.

l

- ATI'ACHMENT A

- VOQAM Summary of Changes - Revision 1 ,

Page 22 of 25 I I

Ite m N o. VOQAM Change Description Reason for Change Section 174 XVI Page 1 of 3 Update Changed " Nuclear Services Division Quality Assurance Department" to

" Quality Assurance Department."

l 175 XVI Page 1 of 3 Update Changed "Vice President (s)" to

" Director of Operations."

176' XVI Page 1 of 3 Update Deleted requirement specific to the Yankee Plant. i 177 XVI Page 1'of 3 Update Deleted requirement for coordination of comments between NSD and the i Plant.

178 XVI Page 2 of 3 Update

]

Changed " Nuclear Services Division l Engineering and/or Project Departments" to " Engineering Department."

179 XVI Page 2 of 3 Upciate Deleted reference to NSD and/or plant.

180 XVI'I Page1of3 Update Changed " Nuclear Services Division Quality Assurance Department" to l

" Quality Assurance Department." l l'

181 XVII Page 1 of 3 Update Added the preparation, control and distribution of the Operational Quality Assurance Program and revisions to the QA Department responsibilities.

.. - _ _ _ __ . _ . . _ . _ . ._ __ . _ . ~ _ - - _ . _ . _ .

ATTACHMENT A VOQAM Summary of Changes -_ Revision 1 Page 23 of 25 Ite m N o. VOQAM Change Description Reason for Change Section 182 XVII Page 2 of 3 Update Changed " Nuclear Services Division Engineering and/or Project Departments" to " Engineering and/or Plant Department."

183 . XVII Page 2 of 3 Update Deleted Executive Director of QA responsibility for control and distribution of the Operational QA Program and revisions.

184 XVII Page 2 of 3 Update Deleted reference to NSD and/or plant.

185 XVIII Page 1 of 4 Update Changed " Nuclear Services Division Quality Assurance Department" to

" Quality Assurance Department." 1 186 XVIII Page 1 of 4 Update Deleted requirement specific to the )

Yankee Plant. i 187 XVIII Page 2 of 4 Update Deleted "YNSD."

188 XVIII Page 2 of 4 Update Changed "Vice President (s) and Manager of Operations" to " Director of Operations."

189 XVIII Page 2 of 4 Update Changed "Vice President and Manager i of Operations" to " Director of Operations."

190 XVIII Page; '4 Update Deletec quirement specific to the Yankee runt.

ATTACHMENT A VOQAM Summary of Changes - Revision 1 Page 24 of 25 Item No. VOQAM Change Description Reason for Change Section 191 ' XVIII Page 2 of 4 Update Deleted unnecessary references to Vermont Yankee.

192 XVIII Page 3 of 4 Update Deleted NSD Department responsibilities.

'193 XVIII Page 3 of 4 Update Deleted reference to NSD.

'194 Appendix B Page 1 of 26 Update Changed " Yankee Atomic Electric Company Operational Quality Assurance Manual" to " Vermont Yankee Operational Quality Assurance Manual" 195 Appendix B Pages 3, 5, 6, 7, 8, 9, 10, 1 1, 12, 13, 14, Update 15,16,17,18,19,20,21, and 26 of 26 Deleted references to the Yankee Plant.

196 Appendix B Page 13 of 26 Update Changed " Yankee operating plants" to

" Vermont Yankee operating plant."

197 Appendix B Page 17 of 26 Update Deleted requirement specific to Yankee.

198 Appendix B Page 19 of 26 Update Deleted requirement specific to Yankee.

199 Appendix B Page 19 of 26 UpdaL Changed statement referring to audit frequency from " completed within a period of no less than three (3) years" to " completed at least once within a three (3) year period."

1 j

. ATTACHMENT A' LVOQAM Summary of Changes - Revision 1 Page 25 of 25 '-

. Item No. VOQAM Change Description Reason for Change Section

-200  : Appendix B Page 24 of 26 Update Deleted unnecessary reference to Vermont Yankee Plant.

1 201 Appendix B Page 23 0f 26 .

Update Deleted " Operating Plant" from Exception on Subsection 5.3.9.

202 Appendix B Page 25 of 26 Update Changed statement referring to audit frequency from " completed within a period of no less than three (3) years" to " completed at least once within a three (3) year period."

203. Appendix D Page1of1 Specific to Yankee.- 'I Deleted.