TXX-6838, Forwards Rev 1 to Comanche Peak Response Team Results Rept Isap:Vi.B, Polar Crane Shimming

From kanterella
(Redirected from TXX-6838)
Jump to navigation Jump to search
Forwards Rev 1 to Comanche Peak Response Team Results Rept Isap:Vi.B, Polar Crane Shimming
ML20235S173
Person / Time
Site: Comanche Peak  
Issue date: 10/05/1987
From: Counsil W, John Marshall
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235S175 List:
References
TXX-6838, NUDOCS 8710080353
Download: ML20235S173 (4)


Text

. _ -.

l' c

F Log # TXX-6838 CPRT-1003

_=

=

File # 10068 1UELECTRIC wmiam c. counsu October 5, 1987 Esecutuve Vsce Presodent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 CPRT RESULTS REPORT Gentlemen:

We transmit herewith the following SRT approved Results Report:

VI.b Polar Crane Shimming This report should be placed in sequence behind the tab " Mechanical" in the results reports binders previously transmitted.

The' files that contain supporting documentation for this Results Report have been reproduced in their entirety and are available for public inspection in our Dallas office.

Anyone wishing to inspect these files should contact Ms.

Debra Anderson (214-812-4379).

We shall issue further Results Reports on a periodic basis as they are approved by the CPRT Senior Review Team.

Very truly yours, h 5. bouwsr W. G. Counsil B

4K S. Marshall Supervisor, Generic Licensing JCH/mgt c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

W IM 8710000353 071005 l

PDR ADDCK 0500 5

i MK) North Obsc Street Lil El Dallas, Texas 75:01

t jn ;

c;

,s.

3 TABLE OF CONTENTS COLLECTIVE SIGNIFICANCE REPORT

- L'ater -

COLLECTIVE EVALUATION" REPORTS

- Later -

.RESULTS REPORTS Electrical I.a.1 Heat-Shrinkable Cable Insulation Sleeves -

i Revision 1 I. a.'2 Inspection Reports on Butt-Splices, Revision 1 1.a.3

' Butt-Splice Qualification - Revision 1

1. a. 4-Agreement Between Drawings and Field Terminations

- Revision 2 1.a.5-NCR's on Vendor Installed Amp Terminal Lugs

- Revision 1 1.b.1 Flexible Conduit to Flexible Conduit Separation

- Revision 1 1.b.2 Flexible Conduit to Cable Separation - Revision 1 1.b 3 Conduit to Cable Tray Separation - Revision 1 I.b.4 Barrier Removal - Revision 1 Civil / Structural II.b Concrete Compression Strength - Revision 1 II.c Maintenance of Air Gap Between Concrete Structures

- Revision 1 II.e Rebar in the fuel Handling Building - Revision 1 I

l 1

?

~

Testing Ill.a.1 Hot functional Testing - Revision 1 III.a.2 JTG Approval of Test Data - Revision 0 III.a.3 Technical Specification for Deferred Tests

- Revision 0 III.a.4 Traceability of Test Equipment - Revision 0 III.a.5 Preoperational Test Review and Approval of Results, Revision 1 Ill.b Conduct of the CILRT - Revision 0 III.c Prerequisite Testing - Revision 1 Ill.d Preoperational Testing - Revision 1 Mechanical V.a Inspection for Certain Tyses of Skewed Welds in NF Supports - Revision 1 wit 1 Errata V.c Design Consideration for Piping Systems Between Seismic Category I and Non-Seismic Category 1 Buildings - Revision 1 V.d Plug Welds - Revision 1 V.e Installation of Main Steam Pipes - Revision 1 VI.a Gap between Reactor Pressure Vessel Reflective Insulation and the Biological Shield Wall, Revision 1 VI.b Polar Crane Shimming - Revision 1 9

\\'

.y 0A/0C 1.d.2 Guidelines for Administration of QC Inspector Test Revision 1 1.d.3 Craft Personnel Training - Revision 1 Vll.a.1 Material Traceability - Revision i Vll.a.2 Nonconformance and Corrective Action System -

Revision 1

VII.a.3 Document Control - Revision 1 Vll.a.4 Audit Program and Auditor Qualification -

Revision i Vll.a.5 Periodic Review of QA Program - Revision i VII.a.6 Exit Interviews - Revision 1 VII.a.7 Housekeeping and System Cleanliness - Revision i Vll.a.8 Fuel Pool Liner Documentation - Revision 1 VII.b.1 Onsite Fabrication - Revision i Vll.b.2 Valve Disassembly - Revision i Vll.b.4 Hilti Anchor Bolt Installation - Revision 1 DSAPs IX Piping and Supports Discipline Specific Action Plan Revision 1 l

l l

_ _ _ _. _ _ - - - - - - -