l October 2, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lll 1400 Opus Place, Suite 500 l
Downers Grove, IL 60515
SUBJECT:
EVALUATION OF THE SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM REQUEST FOR RELIEF NO.12R-30 FOR BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. MA1612 AND MA1613)
Dear Mr. Kingsley:
By letter dated April 17,1998, as supplemented by letter dated August 3,1998, the
]
Commonwealth Edison Company (Comed) submitted the second 10-year interval inservice Inspection (ISI) program plan and associated relief requests for Braidwood Station, Units 1 and 2. The staff has reviewed and evaluated the information provided by Comed related to relief request 12R-30. This relief request provides attemative requirements for insulation removal at bolted connections in systems borated for the purpose of controlling reactivity. The staff finds that the proposed altemative provides an acceptable level of quality and safety. Relief Request 12R-30 is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the second 10-year interval.
Sincerely, ORIG. SIGNED BY Stuart A. Richards, Project Director Projet Directorate lll-2 Division of Reactor Projects - lil/lV Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosure:
Safety Evaluation cc w/ encl: See next page f
DISTRIBUTION:
Docket File PUBLIC PDlll-2 r/f E. Adensam, EGA1 S. Richards -
C. Mocce S. Bailey J. Davis OGC, G15518 ACRS, T2E26 G. Grant, Rll!
T. Sullivan DOCUMENT NAME: G:\\CM\\ BRAID \\BR30REL.LTR To rrceive e copy of thle document, indicate in the kox: "C" = Copy without enclosures *E* = Copy with enclosures *N" = No copy OFFICE PM:PDill-2 l(
EM9QW l 6 OGGN4/ b kMM BC: EMCB lC D:PDill-2 l C-NAME SBAILEY qB CM'OOhl4E AA7//rw TSULLIVAN (M SRICHARDScW' DATE del oA/98 09/ lb/98 09/#1 /98 09/ l7 /98 O
99f1/98 OFFICIAL RECORD COPY N
i 9810070220 981002 PDR ADOCK 05000456 G
PDR l
p urg i
- t UNITED STATES 3#
NUCLEAR REGULATORY COMMISSION WASHINGTON, D C. soseHe'.
(n*****
October 2, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
EVALUATION OF THE SECOND 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM REQUEST FOR RELIEF NO.12R-30 FOR BRAIDWOOD STATION, UNITS 1 AND 2 (TAC NOS. MA1612 AND MA1613)
Dear Mr. Kingsley:
By letter dated April 17,1998, as supplemented by letter dated August 3,1998, the Commonwealth Edison Company (Comed) submitted the second 10-year interval inservice inspection (ISI) program plan and associated relief requests for Braidwood Station, Units 1 and 2. The staff has reviewed and evaluated the information provided by Comed related to relief request 12R-30. This relief request provides altemative requirements for insulation removal at bolted connections in systems borated for the purpose of controlling reactivity. The staff finds that the proposed attemative provides an acceptable level of quality and safety. Relief Request 12R-30 is authorized pursuant to 10 CFR 50.55a(a)(3)(i) for the second 10-year interval.
Sincerely, 53 nm Stuart A. Richards, Project Director Project Directorate 111-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosure:
Safety Evaluation cc w/ encl: See next page 1
T 4
O. Kingsley Braidwood Station Commonwealth Edison Company Units 1 and 2 cc:
~
Michael Miller, Esquire Ms. Lorraine Creek Sidley and Austin RR 1, Box 182 One First National Plaza Manteno, Illinois 60950 Chicago, Illinois 60603 Mr. Ron Stephens Regional Administrator Illinois Emergency Services & Disaster Agency l
. U.S. NRC, Region 111 110 E. Adams Street 801 Warrenville Road Springfield, Illinois 62706 Lisle, Illinois 60532-4351 Chairman Illinois Department of Nuclear Safety Will County Board of Supervisors Office of Nuclear Facility Safety Will County Board Courthouse i
1035 Outer Park Drive Joliet, Illinois 60434 Springfield, Illinois 62704 Attomey General Document Control Desk-Lice'nsing 500 S. Second Street Commonwealth Edison Company Springfield, Illinois 62701 j
1400 Opus Place, Suite 400 Downers Grove, Illinois 60515 George L. Edgar Morgan, Lewis and Bochius Ms. C. Sue Hauser, Project Manager 1800 M Street, N.W.
Westinghouse Electric Corporation Washington, DC 20036
[
Energy Systems Business Unit Post Office Box 355 Commonwealth Edison Company Pittsburgh, Pennsylvania 15230 Braidwood Station Manager RR 1, Box 84 j
Joseph Gallo Braceville, Illinois 60407 Gallo & Ross 1250 Eye St., N.W., Suite 302 Commonwealth Edison Company Washington, DC 20005 Site Vice President - Braidwood 7
RR 1, Box 84 Ms. Bridget Little Rorem Braceville,IL 60407 Appleseed Coordinator 117 N. Linden Street Mr. David Helwig Essex, Illinois 60935 Senior Vice President Commonwealth Edison Company Howard A. Leamer Executive Towers West 111
- 1 Environmental Law and Policy 1400 Opus Place, Suite 900 Center of the Midwest Downers Grove,IL 60515 35 East Wacker Dr., Suite 1300
]
Chicago, Illinois 60601 Mr. Gene H. Stanley PWR's Vice President U.S. Nuclear Regulatory Commission Commonwealth Edison Company Braidwood Resident inspectors Office Executive Towers West til RR 1, Box 79 1400 Opus Place, Suite 900 Braceville, Illinois 60407 Downers Grove,IL 60515
_ _. _.. _ ~ _ _ _..
O. Kingsley Braidwood Station Commonwealth Edison Company Units 1 and 2 l
Commony ealth Edison Company Mr. Michael J. Wallace Reg. Assurance Supervisor-Braidwood Senior Vice President
)
RR 1, Box 79 Commonwealth Edison Company Braceville, Illinois 60407 Executive Towers West 111 l
1400 Opus Place, Suite 900 Mr. Steve Perry Downers Grove,IL 60515 BWR's Vice President Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 900 Downers Grove,IL 60515 Mr. Dennis Farrar Regulatory Services Manager 1
Commonwealth Edison Company Executive Towers West lll 1400 Opus Place, Suite 500 -
i Downers Grove, IL 60515 Ms. Irene Johnson, Licensing Director Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West til i
1400 Opus Place, Suite 500 Downers Grove,IL 60515 i
o l
t f
.