Forwards Rev 1 to EGG-NTA-7356, Technical Evaluation Rept for Conformance to NRR Generic Ltrs 83-36 & 83-37 by Fort Saint Vrain Nuclear Generating Station. Meeting Will Be Arranged within Next 60 Days to Resolve Issues
ML20151S289
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/19/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20151S293 List:
References
TASK-2.B.1, TASK-2.B.3, TASK-2.E.1.1, TASK-2.F.2, TASK-3.D.3.4, TASK-TM GL-83-36, GL-83-37, TAC-54535, NUDOCS 8804280271
Download: ML20151S289 (4)


Text

__ _ _ _ _ _ - -.

l s

, [*pa neg UNITED STATES

~%

h NUCLEAR REGULATORY COMMISSION

p WASH!NG TO N, D. C. 20555

%, j# April 19,1988

....+

Oceket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840 Dea- Mr. Williams:

SUBJECT:

CONFORMANCE TO GENERIC LETTERS 83-36 AND 83-37 FOR FORT ST. VRAIN (TAC NO. 54535)

We have completed our review of your submittal dated May 15,1987(P-87133) responding to the requirements of the Generic letters 83-36 and 83-37. Your submittal has been reviewed by our contractor, Idaho National Engineering Laboratory (INEL). The INEL Technical Evaluation Report (TER) is enclosed.

This TER is a revision to an earlier TER sent to you by our letter dated November 24, 1986. The revision reflects your May 15, 1987 submittal.

We have reviewed the INEL TER and agree with its conclusions. This letter evaluation sumarizes our position as follows:

1. As per the original TER, the previous conclusions on certain items remain as folicws:

Your proposed changes or existing Technical Specifications (TSs) provided responses for the following items which are acceptable:

Post-AccidentSampling(II.B.3)

Sampling and Analysis of Plant Effluents (II.F.1.2)

ContainmentHigh-RangeRadiationMonitor(II.F.1.3)

ContainmentPressureMonitor(II.F.1.4).

We have also concluded that the following items have been designated as not applicable to Fort St. Vrain:

Reactor Coolant System Vents (II.B.1)

Containment Water Level Ponitor (II.F.1.5)

ContainmentHydrogenMonitor(II.F.1.6).

Instrumentation for determination of inadequate core cooling Item II.F.2, would be tracked separately relative to Regulatory Guide 1.97 (Multi-Plant Action A-17).

t 0804280271 880419 PDR ADOCK 05000267 P PDR r

A

= ' e Any changes on the above items are already reflected in the Technical Specification Upgrade Program (TSUP) and need to be tracked to completion by TSUP,

2. The Generic Letter item entitled Long Term Auxiliary Feedwater System Evaluation (II.E.1.1) has largely been covered in the TSUP. Specifically we conclude that the TSUP review of the safety related cooling functions has resolved the most significant concerns about the inadecuacy of your existing Technical Specificaticns. These items will be tracked to ~

cortpletion by the staff in the TSUP. We recommend that you carefully review the TER discussion of this item and the remaining concerns.

However, we consider this iten resolved in terms of the original Generic Letter request.

3. The TER concludes that you continue not to be in ccmpliance with the Generic Letter guidance on the following itens:

Noble Gas Eff'ient Monitors (II.F.1.1), and Control Room habitability Requirements (III.D.3.4).

We request that you review the TER discussion of these items. We will arrange a meeting with your licensing staff, and the contractor within the next 60 days to resolve these issues. Your staff should be prepared to address these itens at the meeting. No femal response is requested at this time.

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NPC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner OGC-Rockville E. Jordan J. Partlow ACRS(10l J. Stachew, INEL D. Moses, ORNL R. Sarworth, NRR PD4 Plant File PD4/LA@;( PD4/FM M PD4/D / M PNoonan r KPoitner:sr JCalvo 04//]/88 04/19/88 04//1/88

s Any changes on the above items are already reflected in the Technical Specification Upgrade Program (TSUP) and need to be tracked to completion by TSUP.

2. The Generic Letter item entitled Long Tem Auxiliary Feedwater System Evaluation (II.E.1.1) has largely been covered in the TSUP. Specifically we conclude that the TSUP review of the safety related cooling functions has resolved the most significant concerns about the inadecuacy of your existing Technical Specificaticns. These items will be tracked to completion by the staff in the TSUP. We recommend that you carefully review the TER discussion of this item and the remaining concerns.

However, we consider this item resolved in terms of the original Generic letter request. )

3. The TER concludes that you continue not to be in compliance with the l Generic Letter guidance on the following items:

Noble Gas Control Effluent Room Monitors Habitability (II.F.1.1),(and Requirements III.D3.4).

We request that you review the TER discussion of these items. We will arrange a meeting with your licensing staff, and the contractor within the next 60 days to resolve these issues. Your staff should be prepared to address l

these itens at the meeting. No femal response is requested at this time.

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor rrojects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NPC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner OGC-Pockville E. Jordan J. Partlow ACRS(10)

J. Stachew, INEL D. Moses, ORNL R. Sanworth, NRR PD4 Plant File PD4/LA PD4/PM M PD4/D /E PHoona KFeitner:sr JCalvo Da//f/88 04/e/88 04//f/88

t  ;

j 2

Any changes on the above iters are already reflected in the Technical Specification Upgrade Program (TSUP) and need to be tracked to completion by TSUP,

2. The Generic letter item entitled Long Tem Auxiliary Feedwater System ,

Evaluation (II.E.1.1) has largely been covered in the TSUP. Specifically )

we conclude that the TSUP review of the safety related cooling functions  ;

has resolved the most significant concerns about the inadequacy of your j existing Technical Specifications. These items will be tracked to j completion by the staff in the TSUP. We recomend that you carefully review the TER discussion of this item and the remaining concerns. )

i However, we consider this item resolved in terms of the original Generic letter request.

3. The 1ER concludes that you continue nct to be in compliance with the Generic letter guidance on the following items:

Noble Gas Effluent Monitors (II.F.1.1), an(

Control Room Habitability Requirements (III.J.3.4).  !

We request that you review the TER discussion of these itens. We will arrange a meeting with your licensing staff, and the contractor within the next 60 days to resolve these issues. Your staff should be prepared to address these items at the meeting. No femal response is requested at this time.

Sincerely, Kenneth L. Heitner, Project Manager Project Directorate - IV ,

Division of Reactor Projects - III, l IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page I

~ 1 i .

- I

~

Mr. R . O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain l

cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director  ;

Nuclear Engineering Division P.adiation Control Division l Public Service Company Department of Health '

of Colorado 4210 East lith Avenue I Denver, Colorado 80220 P. O. Box 840 Denver, Colorado 80201-0840 .

1 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc. Nuclear Production Division i Post Office Box 85608 Public Service Company of Colorado l San Diego, California 92138 16805 Weld County Road 19-1/2 l Mr. H. L. Brey, Manager Nuclear LicensinD and Fuel Division Mr. P. F. Tomlinson, Manager 1 Public Service Company of Colorado Quality Assurance Division 1 P. O. Box 840 Public Service Company of Colorado  !

Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector l

U.S. Nuclear Regulatory Comission Mr. R. F. Walker J P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 '

Kelley, Stansfield & 0'Donnell  !

Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Comissioners I of Weld County, Colorado l Greeley, Colorado 80631 -