Requests All Technical Staff Be Advised to Use Listed Procedures for Future Contract Actions
ML20151H883
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/16/1983
From: Vollmer R
Office of Nuclear Reactor Regulation
To: Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML082390697 List:
References
CON-FIN-A-3720, FOIA-88-99 NUDOCS 8310180082
Download: ML20151H883 (3)


Text

...

i.

[

NUCLE AR REGULATORY COMMISSION g

se a;j wAssmorou, o. c. nus

%, ' ",/

w1nm flD40RANDUM FOR:

J. Knight, AD/CSE W. Johnston, AD/MCET FRCH:

R. Vollmer, Director OE

SUBJECT:

NEW PROCEDURES FOR APPROVAL OF FUNDING REQUESTS Please advise all technical staff to use the following procedures for all future contract actions:

1)

PID's must be resigned by DE management when funding requirements are modified.

2)

New PID's must be sutcitted with all contracting packages involving funding changes.

Packages I

submitted without new PIDs will be returned to the project manager.

l These new procedures will help eliminate confusion and delays in processing l

of contracting actions, and will provide better control in monitoring DE funds.

If you have any questions, please call Diane Money on X28377.

1 3

/-

/ R. Vollmer, D.ector, DE cc:

DE Branch Chiefs DE Project Managers E. Pentecost N~

G,3coi800S$3ff.KW I

-. - - - - - ~ < - - -, -, - - -. _.., - - _

- mmaannas- -,

l-I"*(r[gd)*

OFFICE OF NUCLEAR REACT 07 REGULATION PROJECT IDENTIFICATION SU!'.f'ARY (PIDS)

I TITLE: Diablo Canyon Verificati,on FIN. A3720 t

l f

CONTRACT llUMBER (Non,-DOE):

B&R NUMBER:

NRR OPERATlHG PLAN IHOEX HO.:

20-19-40-41-2

(

i DIVISION: DE BRANCH:

SGEB PROJECT PANAGER: Harold Polk L

r CONTRACTOR:

BNL

.~

CONTRACT METHOD:

...a..

CITY, STATE (Non-00E):

SMALL BUSINESS / MINORITY CONTRACT (Non-D0!

SUB-CONTRACTOR (S):

YES / /

NO / /

},

l PROJECTED PERIOD OF PERFORMANCE START:

1/18/83 END: 10/31/83 PROJECTED FINANCI AL DATA (000's)

FEE REdVERABLE:, Y'E S / /.

NO / /

E TOTAL CURRENT FY liEXThY NEXT +1 VALUE BUDGET BUDG EUDG

$275,000

$11,000 I

APPLICATION (RELATE THE PROJECT TO A SPECIFIC PLANNED ACCOMPLISP. MENT)

'estore the low power and testing license of' Diablo Canyon Nuclear Plant 1.

R j

l 9

e 8

  • IP, 1+

l

(

2 i

WORY. REQUIREMENTS (DESCRISE WHAT IS TO BE PERFORMED) 1.

Independentlyabalyzesthecontainment annulus steel structure and.the buried diesel oil tanks for the Hosg i' seismic event and provides timely briefings to the staff and the 10VP.

2.

Assist the NRC. staff in the review and audit of technical submittals b'y PGLE and Teledyne Engineering Services relative to analysis. work currenti underway.

3.

Attend technical interchange m.eetings as requested by the staff.

4.

Carry out necessary work required to respond to Teledyne's request'for information, RFI 5511-0151 c5511-0152 0.-d 55116 89.

l S.

Assist the NRC staff in preparing the Safety Evaluation Report.

6.

Prepare testimony and participate.,in public hearings'as an expert' witness

~

j MODITICATIONS (0ESCRIBE MAJOR CHANGES Tb THE PROJECT)'

Total cost of project is $290,000.

1 l

l l

1 l

l CO:'.? TETE AS AP?LICABLE -

Re::.snded:

Endorse.e E-

"ndo. sed-A: proved:

," D I R.

D4V. OlR F*0 JECT LIANA 7ED.

SECTION LOR i

?

).bicht R.

V o l l me r ( f ritia'.

y P.

T G. Lt

])g

.94.

n,D,.

r.