Similar Documents at Perry |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License 1999-09-09
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License 1999-09-09
[Table view] |
Text
_
TliE C L EV E L A N D E L E CT RIC IL L U MIN ATIN G C O M P A N Y PO BOX 97 e PERRY, OHIO 44081 e TELEPHONE (216) 259-0737 m ADDR E S S - 10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan April 3, 1988 m ensiocnr PY-CEI/NRR-Od23 L NUCLEAR GAOUP U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Technical Specification Change Request; Administrative Controls and Definitioy Gentlemen:
The Cleveland Electric Illuminating Company (CEI) hereby requests amendment of Facility Operating License NPF-58 f or the Perry Nuclear Power Plant, Unit 1.
In accordance with the requirements of 10 C/R 170.12 a check in the amount of
$150.00 is enclosed. In accordance with the requirements of 10 CFR 50.91(b)(1), a copy of this request for amendment has been sent to the State of Ohio as indicated below.
This amendment tequests miscellaneous administrative changes to the Technical Specifications, inclading revisione to the Administ rativa Controls section, wording clarifications in Sections 1.0 and 6.8.4.a. correction of typographical e rrors *.n sections 4.7.7.1 and 4.8,1,1.!.e.2, and deletion of several footnotes that are no .1.onge: applicable. It also includes the rieletion of the Organizatiort Charts per the guidelines given f .1 Generic Letter 83-06.
Attachment 1 provides the Summary, Significant Hozarils and Environmentd Impact Considerations. Attachment 2 is a copy of the .ouked up Technical Specification pages.
Should you have any questions, please call.
Very truly ours,
. 0
/
$<(. J Al Kaplan Vice President Nuclear Group AK: cab At tachme n t s cc: K. Connaughton T. Colburn y' /g J. Harris (State of Ohio) 'J 7,.
U.S. NRC Region III 8 g
8804120420 880408 PDR ADOCK 05000440 P DCD
i . .
j j
Attachment 1 i PY-CEI/NRR-0823 L )
Page 1 of 4 Summary / Safety Analysis l
On December 28, 1987 CEI submitted a letter PY-CEI/NRR-0761 L indicating that ,
various Organizational titles had changed, and that the Technical l Specifications vould be revised during a subsequent Technical Specification change. The major portion of this change request is modifying Section 6 titles to come into conformance with the present organizational titles. No reduction in review or approval responsibilities have been requested via these title changes.
Numerous other administrative changes are also being requested. A brief description of each change is presented in Enclosure (1). An analysis of each general type is given below.
The Definition on page 1-7 and in section 6.6.1.a is being revised to clarify the definition of REPORTABLE EVENT making it consistent with the requirements of Generic Letter 83-43 dated December 19, 1983.
Technical Specification Surveillance Requirement 4.6.1.2.f is being revised to delete the footnote accompanying this surveillance requirement. The footnote was added in Amendment 5 to defer testing on HSIV's IB21-F022A and 1B21-F028A.
The exception expired on July 12, 1987, and is no longer applicable.
Technical Specification 3.7.3 is being modified to delete footnotes added in Amendment 1 and 4. These footnotes permitted continued operation with the automatic opening function of the RCIC injection valve disabled under certain plant ronditions. The footnotes are no longer applicable, and are therefore being deleted.
A typographical error in Technical Specification surveillance requirement 4.7.7.1.b.1 is being corrected. The surveillance requirements apply to Fuel Handling Building subsystems; this is correctly reflected throughout 4.7.7.1 except for a single reference,which states "system" rather than "subsystem".
Two more typographical errors are being corrected in Technical Specification surveillance requirement 4.8.1.1.2.e.2. First the load corresponding to one RHR pump for Division 1 is being corrected from 725 kw to 729 kv. The other correction is to the load corresponding to the HPCS pump on the Division 3 diesel generator. It is being changed from 2200 kw to 2400 kv. Surveillance Test data taken per 4.8.1.1.2.e verifies that the diesel generators have met
- the proposed requirements for 4.8.1.1.2.e.2 vith the corrected loading values.
1 The sixth proposed change is a deletion of the organizational charts (Figure 6.2.1-1 and 6.2.2-1), and the addition of statements in Sections 6.2.1 to compensate for the organization chart deletions. These changes meet all the guidance set forth in Generic Letter 88-06. The Generic Letter noted that proposed license amendments conforming to the guidance in the Letter vill be reviewed and approved without need for a detailed review.
, ,i* . .
Attachment 1 PY-CLI/NRR-0823 L Page 2 of 4 The next change is to delete the exception to Section 6.3.1 for the Senior Operations Coordinator. The person presently filling.this position meets the minimum qualifications of ANSI 18.1-1971 for comparable positions so this exception is no longer required.
Technical Specification 6.5.1.2, 6.5.1.3, and 6.5.1.5 have been revised as follows:
a) The PORC membership is being changed, for the following reasons:
- 1) The General Manager, Perry Plant Operations Department (PPOD) and the '
Director, Perry Plant Technical Department (PPTD) are being removed as PORC members / chairman /vice-chairman. The function of PORC is to advise the General Manager, (PPOD) and the Director, (PPTD). It is felt that this role can better be performed if these two positions are not also major contributors to PORC itself.
- 2) The Technical Superintendent PPTD has been assigned as the PORC Chairman, replacing the General Manager, PPOD.
- 3) The Manager, Operations Section has been elevated to Vice Chairman / member. This is to give some flexibility so that PORC meetings can occur in the absence of the Technical Superintendent, PPTD.
- 4) The Principal Nuclear Operations Engineer is being removed as a Vice Chairman / member. The Principal Nuclear Operations Engineer is presently functioning as the NSRC Chairman. It is felt that it is inappropriate for the same person to act as PORC Vice Chairman, and NSRC Chairman.
- 5) The Manager, Outage Planning Section is being removed. The remaining PORC members have an adequate knowledge of the various aspects of i Nuclear Pover Plant operations and therefore this position is not required. '
b) Due to the deletion of the various titles above, the definition of QUORUM in 6.5.1.5 is being changed to require the Chairman or his designated alternate and at least four members including alternates. Since the Quorum has been reduced, the number of Alternates permitted by 6.5.1.3 has been reduct-d to no more than 2. This vill maintain the present condition that there is always at least a majority at each PORC meeting who are permanent PORC members, c) Changes are being made to Technical Specifications 6.5.1.6.h, 6.5.1.6.1, 6.5.1.6n and 6.5.3.1.f to make these sections consistent with the Technical Specification required responsibilities of the NSRC described in Technical Specification section 6.5.2.7.
L _ _ . _ _ _ . - _ . _
.'s . .
Attachment PY-CEI/NRR-0823 L Page 3 of 4 The next change moved the requirements for approval of temporary procedure changes from Technical Specification section 6.5.3.la into a new section 6.8.3.
This is to improve the readability of Section 6.5.3.la, and also results in making the Technical Specifications more consistent with Standard Technical Specifications. Based on this new addition the old section 6.8.3 has been renumbered as 6.8.4.
The final change is a clarification to the systems addressed in Technical Specification 6.8.4.a. the "CS" is being deleted and the words "the hydrogen analyzer portion of Combustible Gas Control" is being added. This is to clarify what "CS" meant. This is consistent with the present wording in the FSAR Appendix 1A Item III.D.l.1, and the wording in Supplement 0 to the Perry Nuclear Pover Plant Safety Evaluation Report Section 11.5.
None of the above changes vould result in a reduction in safety. They are administrative in nature, and with the exception of tha reorganization of the PORC membership, are not significant. The PORC reorganization vill create a truly advisory review committee, to review safety issues and report their recommendations to the General Manager, PP0D and Director, PPTD. CEI feels this vill increase overall plant safety by having the PORC and the General Manager PP0D/ Director PPTD independently review and conclude on safety issues.
4 Significant Hazards Analysis The standards used to arrive at a determination that a request for amendment requires no significant hazards consideration are included in the Commission's Regulations, 10 CFR 50.92, which state that the operation of the facility in accordance with the proposed amendment vould not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. CEI has reviewed the proposed change with respect to these three factors.
The proposed change does not involve a significant increase in the probability or consequences of an accident previously evnluated.
The proposed changes as described above are administrative and as such can not involve a significant increase in the probability or consequence of an accident previously evaluated. The only non-administrative change is the reorganization of the PORC membership. The function of PORC remains the same; to advise the General Manager, PP0D and Director, PPTD on matters relating to safety. By creating a PORC independent from the General Manager, PPOD/ Director, PPTD, the Committee's ability to carry out its function should be enhanced. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed changes does not create the possibility of a new or different kind of accident.
l l
i
's -
Attachment 1 PY-CEI/NRR-0823 L Page 4 of 4 As stated above, most of the proposed changes are administrative changes which do not create the possibility of any new accident. The proposed changes to PORC memberships also can not create the possibility of a new or different kind of accident since the overall function of PORC remains the same.
The proposed change does not involve a significant reduction in the margin of
< safety.
The majority of these changes are administrative in nature, and as such involve no reduction in the margin of safety. The reorganization of PORC membership should enhance safety by. creating a truly independent safety review committee to advise the plant management. Thus, there is not a significant reduction in the margin of safety.
Therefore, CEI has concluded that this proposed amendment involves no significant hazards considerations.
Environmental Impact The Cleveland Electric Illuminating Company has reviewed the proposed Technical Specification change against the criteria of 10 CFR 51.22 for environmental considerations. As shown above, the proposed change does not involve a significant hazards consideration, nor increase the types and amount of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, CEI concludes that the proposed Technical Specificatian ch ange meets the criteria given in 10 CFR 51.22(c)(9) for a categcrical exclusion from the requirement for an Environmental Impact Statement.
I l
i -
Enclosure PY-CEI/NRR-0823 L Page 1 of 4 TECHNICAL SPECIFICATION PAGE CHANGE REASON 1-7 Delete reference to 10 Hake Specifications CFR 50.72 consistent with Generic Letter 83-43 3/4 6-5 Delete ** from 4.6.1.2.f This footnote expired
, and delete footnote ** at July 12, 1987 bottom of the page 3/4 7-6 Deletion of # sign and Footnote no longer accompanying footnote applicable 3/4 7-6a Deletion of entire page Note no longer applicable 3/4 7-17 Change surveillance To correct designation requirement 4.7.7.1.b.1 and make it consistent wording from system to with rest of the LCO to subsystem 3.7.7.1/4.7.7.1 3/4 8-5 Change surveillance Correct typographical requirement 4.8.1.1.2.e.2 error from 725 kv to 729 kv 3/4 8-6 Change surveillance Correct typographical 4.8.1.1.2.e.2 from 2200 kv error to 2400 kw 6-1 Change Manager to General Title Change Manager Delete references in 6.2.1 To comply with Generic and 6.2.2 to organization letter 88-06 guidance charts (Figures 6.2.1-1 and for deletion of 6.2.2-1) Add 6.2.la.b,c and organization charts d statements 6-3 Delete figure 6.2.1-1 To incorporate guidance of Generic Letter 88-06 6-4 and 6-5 Delete figure 6.2.2-1 To incorporate guidance of Generic Letter 88-06.
6-7 Section 6.2.3.1 changed Title change Manager to Director Section 6.2.3.4 changed Title change Manager to Director
o .
~
~c .
Enclosure PY-CEI/NRR-0823 L Page 2 of 4 TECHNICAL SPECIFICATION PAGE CHANGE REASON Deleted the exception for Person holding job the Senior Operations meets qualifications Coordinator to meet the minimum qualifications of ANSI N18.1-1971 for first cycle.
6-8 Section 6.4.1 changed Title change General Supervisor to Manager Section 6.5.1.1 changed Title change Managers to General Manager PPOD and Director PPTD Section 6.5.1.2 changed PORC composition by a) Deleting General Manager To make PORC PP0D/ Director PPTD, independent from NSRC Principal Nuclear and from General Engineer and Manager Manager / Director Outage Planning b) Establishing Technical Needed Chairman Superintendent as Chairman c) Establishing Manager, Alternate Chairman Operations Sectiun as Vice-Chairman / member d) Changing titles from Title change General Supervisor /
General Supervising Engineer to Manager Section 6.5.1.3 changed Reduction in PORC number of alternates membership requires from 3 to 2 similar reduction in Alternates 6-9 Section 6.5.1.5 reduced Reduction in PORC Ouorum from six to four membership requires (plus the Chairman) similar reduction in Quorum
Enclosure PY-CEI/NRR-0823 L Page 3 of 4 TECHNICAL SPECIFICATION PAGE CHANGE REASON Section 6.5.1.6h, i, & a There is no deleted requirement to accompanying send these changes to requirement for NSRC NSRC to review these changes Section 6.5.1.6k changed Title changes Manager to General Manager /
Director 6-10 Section 6.5.1.7a changed Title changes Managers to General Manager /
Director Section 6.5.1.7c changed Title change Manager to General Manager 6-14 Section 6.5.3.las a) Changed Managers to "both Title changes the General Manager PPOD and the Director PPTD" b) Deleted last 4 sentences Hoved these of paragraph requirements into a new Section 6.8.3 Section 6.5.3.lb changed Title change Manager NED to Director s
NED and changed managers IPD to "both the General Manager PPOD/ Directer PPID"
' action 6.5.3.1c changed Title change fianagers PPD to "both the General Manager PP0D/
Director PPTD" 6-15 Section 6.5.3.1d changed Title change appropriate Manager PPD to "General Manager PP0D or the Director PPTD as appropriate" Section 6.5.3.lf:
(a) Changed Manager to Title change Director in line 4 and 6
Enclosura PY-CEI/NRR-0823 L Page 4 of 4 TECHNICAL SPECIFICATION-PAGE CHANGE REASON (b) Deleted "and 6.5.2.7" on There is no line 6. accompanying
-Technical Specification requirement in section 6.5.2.7 for NSRC to review these changes (c) Added General Manager, Add additional Perry Plant Operations Technical Specification Department to line 6. requirement to have General Manager,.PP0D approve Security Plan and Emergency Plan Section 6.6.la delete To clarify "pursuant to the require- requirements and ments of Section 50.72 make them to 10 CFR Part 50" consistent with Generic Letter 83-43 6-16 Section 6.8.2 changed Title change Managers PPD to "General Manager PPOD and the Director, PPTD Inserted new section 6.8.3 Reorganized section to dealing with Temporary make it conform more changes that was deleted closely with standard from Section 6.5.3.la. No Technical Specifications change was made to the vording.
Renumbered old 6.8.3 to Due to inserting of nev 6.8.4 6.8.3 6.8.4a deleted "CS" and This is to clarify what added "the hydrogea "CS" meant as identified
, analyzer portion of in FSAR Appendix 1A Item Combustible Gas Control" III.D.1.1 and SER Supplement 8 Section 11.5