Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
ML20148C724
Person / Time
Site: Millstone 
Issue date: 05/22/1997
From: Anthes H
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148C729 List:
References
B16455, NUDOCS 9705290030
Download: ML20148C724 (2)


LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3361997019R00 - NRC Website

text

.

i Northeast

""i"*"Y "* ("""'" *'h **'"'""* "83 NuclearEnergy slaiston, Nua,a, po,u stauon Northeast Nudear Energy Company P.O. Box 128 Waterfont. CF 0638", 0128 (860) 447-1791 Fax (860) 444-4277 The Northcant Utilities System May 22,1997 Docket No. 50-336 B16455 Re: 10 CFR 50.73(a)(2)(i)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-019-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 22,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B).

The following are NNECO's commitments made within this letter.

B16455-01: Noise interaction will be isolated and corrected prior to entering Mode 4 4

from the current outage.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: J. A. Price Director - Millstone Unit 2 e p;00@-

BY:

4'2/4/w WIM H. W. Antifes Assistant Director Work Planning and Maintenance - Millstone Unit 2 f

cc: see page 2 I

9705290030 970522 gDR ADOCK0500g6 (wc422-$ REY.12 93

U. S. Nuclear Regulatory Commission l

B16455/Page 2 i

Attachment: LER 97-019-00 l

i cc:

W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 j

l l

I a