TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol SN 157B Lookout Place FEB 271988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk
. Washington, D.C.
20555 centlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - MAINTENANCE INSTRUCTION (MI)
EN'iANCEMENT PROJECT SCHEDULE Enclosed is a listing and SQN's schedule for completion of the remaining identified mis to be completed in the second phase of the MI enhancement effort. Submission of this schedule was requested by WRC Inspector L. J. Watson during an NRC maintenance program inspection exit meeting (Inspection Report [IR) 50-327 -328/87-37) conducted at SQN on June 26, 1987. Enclosure 1 contains details of the MI enhancement schedule, and enclosure 2 contains the comitments contained in enclosure 1.
If you have any questions, please telephone M. R. Harding at 615/870-6422.
Very truly yours, TENNESSEE VALLEY AUTHORITY R. Cel.d ey, Directo Nuclear Licensing and Regulatory Affairs Enclosures cc:
See page 2 DD3 0 t
i 8803030076 880227 PDR ADOCK 05000327 0
DCD An Equal Opportunity Employer
.s 4 %; FEB 271988 U.S. Nuclear Regulatory Commission cc (Enclosures):
Mr.- K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
?
Mr. C. C. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North y
11555 Rockville Pike i
Rockville, Maryland 20852 l
t Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 i
f 1
I i
l
s o3 ENCLOSURE 1 MAINTENANCE INSTRUCTION (MI) i ENHANCEMENT PROJECT SCHEDULE i
This enclosure describes the improvements and schedules for SQN's enhancement project for mis.
Specifically, this program implements the commitments contained in Volume 2, section 4.2.2, of the Sequoyah Nuclear Performance Plan (SNPP), for improvements of mis. The first phase of the enhancement project 1
is currently underway and will be completed by May 30, 1988, as previously committed. This initial effort involves 58 mechanical, 23 electrical, and 59 instrument mis. Plant operating requirements have dictated some changes to this specific list. These changes are shown in attachment 1. which contains 228 mechanical, 526 electrical, and 237 instrument mis is a listing of the remaining mis to be enhanced or developed.
This listing is only an estimate based on present requirements and plant needs, and should be expected to change.
The Preventive Maintenance Program is one area where additional mis will be required that are not presently identified.
The schedule for completing the MI/ maintenance-related surveillance instruction (SI) effort is shown in attachment 3.
The number of instructions to be completed by the indicated milestone dates are for both mis and sis.
It is not possible at this time to give a definite commitment on each individual program. Plant needs will dictate the instructions to be completed first.
This project is also responsible for the maintenance-related sis. Presently, there are certain Instrument Maintenance Instructions (IMIs) that are used as supporting instructions to certain technical specification sis. These will be eliminated and covered under new sis.
Thekeyelementsoftheenhancementprojectareasfo$ lows:
1 Upgrading and standardization of instructions 1
j l
Simpitfication of instructions by reducing tiering and removing redundant loops / channels, etc., to make the instructions easier to perform Inclusion of procedural detail to ensure consistent performance and technical adequacy i
Conversion of IMIs to mis in order to standardize all mis e
Conversion of the appropriate IMIs to sis to ensure consistency with the SI program 4
i Elimination of equipment from sis that is not regulred to satisfy technical specifications Development of mis to address equipment eliminated from the sis Development of mis to address specific tasks that have generic applications 1
'9 ENCLOSURE 1 2
Development of mis necessary to support the Preventive Maintenance Program i
'r Cancellation of mis that are no longer needed In addition to the key elements identified above, verification / validation of instructions will be accomplished in accordance with SQN Standard Practice SQM1, "Sequoyah Nuclear Plant Maintenance Program."
i l
1 I
i i
i e
1 4
4 4
a l
i 1
l l
l
s
- 5 ENCLOSURE 1 ATTACHMENT 1 INSTRUCTION CHANCES TO ORIGINAL COMMITHRNT INSTRUMENT INSTRUCTIONS ORIGINAL LIST PRESENT LIST 1.
Generic Temperature Switch Calibration 1.
Calibration of Misc. Temperature Switches 2.
Calibration of Misc. Temperature 2.
Foxboro Model 694 Resistance to Indicators Current Converter 3.
Calibration check and Verification of 3.
Check of T/C's and RTDS T/C's and RTDS 4.
Calibration of Barton Model 332 Flow 4.
Calibration of Barton Model Transmitter 332/384 Flow Transmitter 5.
Vital Instrument Sense Line Insulation 5.
Calibration of Foxboro Model 43E Inspection Unit 1, 2 Electronic Controller 6.
P-250 Process Computer Maintenance Unit 6.
Calibration of Magan OptiMac 1 and 2 Electronic Recorder 7.
High Flux Adjustment Af ter Shutdown 7.
Nuc. Inst. Sys. Adjustments (Source Range Drawer) Unit 1, 2 Following Reactor Trip / Shutdown
- 8.
Channel Cal For Mid Range Accid. Rad.
8.
Channel Cal For Hi-Range Accid.
Monitors (18 months) Unit 0, 1 Rad., Monitors (18 months) Unit 0, 1 9.
Periodic Calibration of Nuc Inst Sys 9.
Calibration of Nuc Inst Sys Comparator and Rato Drawer (R)
Comparator and Rate Drawer Rate Unit 1, 2 Circult (R) Unit 1, 2 10.
Vorification of Computer Alarm Points 10.
Calibration of General Electric Unit 0, 1, 2 Model 550 MV/I conv.
11.
Channel Cal For Mid Range Accid Rad 11.
Calibration of Foxboro Model Monitor (18 Months) Unit 2 11/NE11 Series Pressure Trancmitter 12.
"Calibratien of Statis-O-Ring Model 12-12.
Calibration of Static-O-Ring Model Series Pressure Switch" 12-Series Pressure Switch 13.
Calibration of Schoppeneser-Barton Model 13.
Calibration of Amertap Diff 199 Pressure Diff Indicating Switch Pressure Indicating Switch 14 Calibration of General Electric Model 14.
Calibration of General Electric
)
531 - Series Recorder Model 530/531 - Series Escorder l
15.
Calibration of General Electric Model 15.
Calibration of General Electric 565 Series Savage Root Extractor 565 Series Square Root Extractor
l i
- 1 ENCLOSURE 1 ATTACHMENT 1 INSTRUCTION CHANGES TO ORIGINAL COMMITMENT j
INSTRUMENT INSTRUCTIONS ORIGINAL LIST PRESENT LIST 16.
Calibration of Rosemouns Model 444 16.
Calibration of Rosemount Model 444R Alphaline Temperature Transmitter Alphaline Temperature Transmitter 17.
Calibration of Moore Model 585 High 17.
Calibration of Moore Model RBA l
Pressure Selector Relay Temperature Switch 18.
Calibration of Foxboro Model 62HB 18.
Calibration of Foxboro Model 62H controller Controller 19.
Calibration of Brooks Model 552 -
19.
Calibrat,Lon of Foxboro Model 63U -
Series Flow Indicating Transmitter Alarm Unit 20.
"Removal, Installation and Calibration 20.
Removal Installation of IRD Model of RCP Vibration and Pressurizer Rel!.ef 544 Vibration Pickup for Reactor Valve Accoustic Monitors Unit 1 and 2" Coolant Pump 21.
Calibration of Foxboro Model 40N 21.
Calibration of Foxboro Model 40N Temperature Indicating Switch Temperature Indicating Switch / Con-troller 22.
Calibration of LFE Corporation Model 503 22.
Calibration of LFF Corporation Series Temp Indicatins Switch Model 503 Temp Indicating Switch 23.
Calibration of Conoflow Model T-25 (I/P) 23.
Calibration of Conoflow Model T-25 Series Converter (I/P) Converter 4
24.
Calibration of Magnetrol Model A153 24.
Calibration of Lecds & Northrup Level Switches Model 7075 Conductivity Indicating Switch 25.
Calibration of Hach Model 1720 Turbidity 25.
Calibration of Water Treatment Analyzer Filter A&B outlet (Loop 0-TU-28-19) 26.
Calibration of Robertshaw Model SP-220 26.
Calibration of Robertshaw Model Pressure Indicating Switch SP-200 Pressure Indicating Switch i
27.
Calibration of Barton Model 54018 27.
Calibration of Barton Model 227/
' ~
Pressure Differential Indicator 227A Pressure Differential j
Indicator 28.
Calibration of Foxboro Model 14 Series 28.
Calibration of Foxboro Model 14 Totalizer Series Integrator Totalizer i
b
i
+,
s ENCLOSURE 1 ATTACKMENT 1
_3 INSTRUCTION CHANCES TO ORIGINAL COMMITMENT INSTRUMENT INSTRUCTIONS f
+
ORIGINAL LIST PRESENT LIST 29.
Calibration of Morrold Model 221 Level 29.
Calibration of Honeywell Model Switch C-645A Diff/ Press Switch 30.
Calibration of Honeywell-Tradeline 30.
Calibration of Ellison Eagle Eye Model T675 Series Temperature Switch Flow Indicating Switch i
31.
"Calibration of Burline Model B 31.
Calibration of Burling Model F Tee.perature Switch" Temperature Switch 32.
Periodic Calib of Movable Incore 32.
Movable In-Core Detector Detector System (R) units 1 and 2 Inspection and Testing i
1 6
I r
[
1 h
l 1
2
ENCLOSURE 1 ATTACHMENT 1 INSTRUCTION CHANCES TO ORIGINAL COMMITMENT ELECTRICAL INSTRUCTIONS ORICINAL LIST PRESENT LIST 1.
CRDM Motor Generator Sets 1.
Bypass Trip Breaker Type DB50 and Switchgear Inspection Associated With System 99 2.
Monthly Maintenance on Non-Class Batts 2.
Monthly Battery Maintenance on 24 Volt Microwave Battery Bank (System 244) 3.
Annual Maintenance on Non-Class Batts 3.
Annual Battery Maintenance on 24 Volt Microwave Battery Bank (System 244) 4.
Quarterly Maintenance on Non-Class Batts 4.
Quarterly Battery Maintenance on 24 Volt Microwave Battery Bank (System 244)
O
+ e
=
ENCLOSURE 1 ATTACHMENT 1
! INSTRUCTION CHANCES TO ORIGINAL CONMITNENT MECKANICAL INSTRUCTIONS 0
l ORIGINAL LIST PRESENT LIST
[
1.
Instr.-Implementation of NRC Bulletin 1.
Repacking of Reciprocating 79-14 Charging Pump 1
2.
Base Metal Weld Repair of Carbon Steel 2.
This instruction was replaced by castings SQM-17. "General Requirements For Welding Heat Treatment, And Allied i
Field Operations At Sequoyah,-
i Units 0, 1, and 2" 4
3.
Instr Review Sampling Program IE 3.
Removal, Inspection, and Replacement l
Bulletin 79-14 of the SI Pump Seals 4.
Remove / Inspect / Replace MDAFW Pump
- 4. 1) Motor-Driven Auxiliary Feedwater i
Units 1 and 2 Pump Overhaul
- 4. 2) Replacement of Turbine-Driven Auxiliary Feedwater Pump Rotor Assambly - Ingersall Rand
(
Model No. SNMTA-5 stage l
S.
"Removal and Replacement of RPV Head 5.
Overhaul of SI Pump Element I
and Attachments Units 1 sed 2" (New Instruction in accordance
]
with Me'chanical Maintenance) l s
k 1
l i,
i j
1 i
j i
1 i
I r
a
.---._--v--.-
y
ENCLOSURE 1 ATTACHNENT 2 NECMANICAL MAINTENANCE TMSTRUCTIONS TO BB ENMANCED WUMatB IIILI 1.
MI-1.1.2 Repair of Cable Tray Fire Barrier and Mechanical Penetration Seals.
2.
MI-1.2.1 Disassembly and Reassembly of the Cavitating Venturies and Inspection of R-CON Connectors for the Motor-Driven Auxiliary Feedwater Pumps.
3.
MI-1.4 Removal and Replacement of the Reactor Vessel Lower Internal Package.
4.
MI-1.9.1 Bottom Mounted Instrument Thimble Tube Retraction and Reinsertion. Formerly MI-1.9 Unit 1. System 94.
5.
MI-1.9.3 Bottom Mounted Instrument Thimble Tube Retraction and Reinsertion Formerly MI-1.9, Unit 2,, System 94.
6.
MI-2.6 Disassembly Inspection, and Reassembly of Reactor Coolant Pump No. 1 Seal and Runner, Units 1 and 2.
7.
MI-3.1 Removal and Installation of Steam Generator Primary Manway Cover, Units 1 and 2.
8.
MI-3.8 Main Feedpump Turbine (MFPT) Turning Gear Engaging Device Adjustment Procedure, Units 1 and 2.
9.
MI-4.1 Repacking of Pressuriser Spray Valves.
10.
MI-4.2.1 Replacement of Emergency Standby Diesel Generator Fuel Injector.
11.
MI-4.2.2 Removal / Replacement of Diesel Engine Lube Oil Cooler.
12.
MI-4.2.3 Monthly Preventive Maintenance of Diesel Engines.
13.
MI-4.2.4 Annual Preventive Maintenance of Diesel Engines.
14.
MI-4.2.6 Two-Year Preventive Maintenance of Diesel Engines.
15.
MI-4.5 Removal and Replacement of Pressuriser Manway Cover, Units 1 and 2 16.
MI-4.6 Removal / Replacement of CSSC Rupture Discs.
17.
MI-4.8 Repair of Critical Structures, Systems and Components (CSSC) Safety Relief Valves.
18.
MI-5.2 Replacement of Ice Condenser Lower Inlet Door Casket Seals.
19.
MI-5.4 Blocking of Ice condenser Lower Inlet Doors During cold Shutdown.
20.
MI-6.1 Removal. Inspection, and Replacenent of Residual Heat Removal (RHR) Pump Seals and RHR Pump.
21.
MI-6.2 Removal. Inspection, and Replacement of Containment Spray Pump Mechanical Seals. Units 1 and 2.
22.
MI-6.13A Removal and Reinstallation of Hydraulic and Mechanical
'~
23.
MI-6.13F Overhaul of Mechanical Snubbers.
24.
MI-6.16 Removal and Installation of Equipment Access Hatch, Doors, Bridge, and Curbs, Units 1 and 2.
25.
MI-6.19 Reciprocating Charging Pump Fluid Drive.
26.
MI-6.24 Cleaning / Inspection of Migh-Pressure Fire Protection Strainers, Units 1 and 2.
ENCLOSURE 1 ATTACHMENT 2 i MECHANICAL MAINTENANCE INSTRUCTIONS
[
TO BE ENHANCED (Continued) t WUMBER TITLE 27.
MI-7.2 Removal and Replacement of Component Cooling Water I
Pump Packing, Units 1 and 2.
j 28.
MI-7.3 Component Cooling Water Pump Inspection, Units 1 and 2.
29.
MI-8.7.1 Maintenance Guidelines for Traveling Water Screens.
30.
MI-8.13 Emergency Cas Treatment Filter Changeout Units 1 and 2.
31.
MI-8.19 Contaminated Systems - Filter Changeout and Storage Requirements.
32.
MI-8.20 Disassembly and Reassembly of Waste Gas Compressors.
33.
MI-10.1 M/6Y Mechanical - Six-Year Diesel Generator Inspection.
34.
MI-10.2.1 Removal, Inspection, and Replacement of Reactor Coolant Pump Seals.
35.
MI-10.3.1 Inspection / Repair of Chemical Volume Control System (CVCS) Centrifugal Charging Pump, Units 1 and 2.
36.
MI-10.5.2 Inspection / Repair of CVCS Boric Acid Transfer Pump, Units 1 and 2.
37.
MI-10.5.3 Disassembly Inspection, and Reassembly of the Auxiliary Waste Evaporator Feed Pumps A and B,
{
0-PMP-077-0179 & -0180; Waste Evaporator Feed Pump B, 0-PMP-077-0143.
38.
MI-10.5.4 Disassembly, Inspection, and Reassembly of the Waste Evaporator Feed Pump A, 0-PMP-07{-0014.
39.
MI-10.5.5 Sump Tank Pumps 0-PMP-077-0012. 0-PMP-077-0014.
40.
MI-10.5.6 Inspection / Repair of the Chemical Drain Tank Pump, 0-PMP-077-0025.
ca.
MI-10.6.3 Inspection / Repair of the Gas Stripper Feed Pumps.
42.
MI-10.10.1 Disassembly / Reassembly Guidelines for Esrantial Raw Cooling Water (ERCW) Screen Wash Pumps.
43.
MI-10.10.2 Removal / Disassembly / Reassembly Instruction for ERCW Pumps.
44.
MI-10.11.1 Disassembly, Inspection, and Reassembly of the 1
Auxiliary Condensate Demineralizer Waste Evaporator Feed Pump 2-PMP-077-0307.
45.
MI-10.14.1 Inspection /Repr'.r of Wilson-Snyder Model 3060 Pumps.
46.
MI-10.31 Removal, Insrection, and Replacement of the Bearings in the Turbine-Driven Auxiliary Feedwater Pumps, l
Units 1 and 2.
~ ~
47.
MI-10.36 Auxiliary Control Air Compressor Rebuild, Unit 0.
48.
MI-10.38.1 ASCO Solenoid Valves 206-381-1R through 206-381-7R Resilient Seating - DC Service.
l 49.
MI-10.41 Replacement of Diesel Cencrator Turbocharger (Formerly i
SMI-82-1).
i 50.
MI-11.6.1 Disassembly, Inspection, and Reassembl, of Yarway Automatic Recirculation Valves.
W e+-
ENCLOSURE 1 ATTACHMENT 2
[ MECHANICAL MAINTENANCE INSTRUCTION 3 TO BE ENMANCEO (Continued)
NUMBER
.T_IIkt.
51.
MI-11.7.1 Mand-Operated Crinnell or Saunders-Type Diaphragm Valve Rebuilding for All Systems, i
52.
MI-11.7.2 Air-operated Crinnell Diaphragm Valve Rebuilding With Air-operated Model #3225 (AIR TO OPEN) for All Systems.
53.
MI-11.7.3 Air-Operated Grinnall Diaphragm Valve Rebuilding With Air-operated Model #32100 ( AIR TO OPEN) for All Systems.
54.
MI-11.8 Acceptable Weights of Appendages of Seismically Qualified Valves.
55.
MI-11.10 C. M. Bettis Actuator Maintenance Guidelines, t
Units 1 and 2.
56.
MI-11.10.3 C. M. Bettis Actuators Disassembly /A'esembly Culdelines for M. D. Series, Units 1 and 2.
57.
MI-11.12 Disassembly and Repair of Main Feedwater Regulating Valves 1,2-FCV-3-35
-48, -90, and -103, Units 1 and 2.
58.
MI-12.3.1 Centrifugal Charging Pump Speed Increaser Inspection and Maintenance.
59.
MI-12.4.1 Removal and Reinstallation of Flow Element Orifice Plate in Any System.
l 60.
MI-14.3 Freeze Plugging 4-inch and Smaller Diameter Carbon or
[
Stainless Steel Piping.
i 61.
MI-14.7 Adding Electrohydraulic Control (EMC) Fluid to the EMC i
system Reservoir.
l 62.
MI-15.2 Maintenance of Pressure Seal Valves.
63.
MI-15.3 Maintenance Inspection and Repair of Kerotest Manual l
"Y" Clobe Valves.
64.
MI-15.4 Maintenance and Stroke Adjustment of the Pressurizer Spray Valves.
5 65.
MI-16.2 Testing and Repale of MSA 401 Pressure Demand Regulator.
i 1
I a
?
^~
ENCLOSURE 1 ATTACHLENT 2
-4 NEW HKCHANICAL MAINTENANCE INSTRUCTIONS TITLE 1.
Inspection of the Units 1 and 2 Main Steam check Valves 1-623, -624,
-625, and -626 2.
Moisture Separator Reheater (MSR), High-Pressure (HP), and Low-Pressure (f.P) Heater Head Inspection and Repair, Units 1 and 2 3.
MSR Internal Inspection, Units 1 and 2 4.
Disassembly, Repair, Assembly, and Stroking of Main Steam Dump Valves 5.
Main Feedwater Pump Flange Repair, Units 1 and 2 j
6.
Inspection of Control Rod Guide Tube Flexures 7.
Repair of Reactor Cavity Nozzle Cover Sealing Surfaces 8.
Replacement of Swagelok Connections on the Reactor Coolant Bypass Resistance Temperature Device Manifold 9.
Emergency Diesel Generator Vibration Damper Installation, Units 1 and 2 10.
Seal Table High-Pressure Seal Repair 11.
Torque Pipe Support Clamp Bolting and Install Locking Devices 12.
Cavity Liner Repair i
13.
Centrifugal Charging Pump Casing Cladding Crack Repair / Blending l
14.
Decontamination of Reactor Cavity, Equipment Pit, and Transfer Canal Utilizing Heated Water (Steam), spray Vacuum Method 15.
Disassembly and Repale of Fuel Transfer Tube Cate Valve 16.
Inspection / Repair of Auxiliary Feedwater Pump Rotating Element 17.
Ventilation of Steam Valve Rooms, Units 1 and 2 18.
Opening of Containment Vessel 19.
Flood Preparation - Paris, Tools, and Equipment to be Moved Above Elevation 723.1 20.
Removal of Cold Les Accumulator Vent 1-Inch Blind Flange
}
21.
Installation of Reactor Cavity Seal 22.
UHI Spool Pieces Units 1 and 2 23.
Access to Spent Fuel Pit and Thermal Barrier Booster Pump Platforms 24.
Flood Preparation - Holdup Tanks 25.
Sampling Valves, Units 1 and 2 26.
Removal of Monitor Tank Manway, Unit 0 27.
Flooding of Drain Collector Tanks, Unit 0 28.
HtaS-Pressure Fire Protection System Spool Pieces, Units 1 and 2 29.
Auxil.ary Charging System Spool Pieces, Units 1 and 2 30.
Sample Heat Exchanger Spool Pieces, Units 1 and 2 31.
Spent Fuel Pit Cooling System (SFPCS) Heat Exchangers, RCP Thermal Barrier Booster Pumps, and RHR Heat Exchanger Spool Pieces, Units 1 and 2 j
32.
Open Mode Reactor Cooling Spool Pieces, Units 1 and 2 33.
Reactor Coolant Drain Tank (RCDT) spool Pieces, Unit 0 34.
Flood Preparation - Ice Condenser cooling Spool Piece Installation, Unit 0 35.
Disconnecting Linkage of Fuel Handling Area Exhaust Fan Damper 36.
Flood Preparation - Fuel Transfer Tube Flange Removal, Unit 0
ENCLOSURE 1 ATTACHMENT 2 NEW MECHANICAL MAINTENANCE INSTRUCTIONS (Continued)
TITLE 37.
Blocking of Ice condenser Clycol Valves 38.
Block open Cold Les Accumulator Drains to Reactor Coolant Drain Tank Valves 39.
Containment Floor and Equipment Drain Sump Discharge Line to Outside Containment Units 1 and 2 40.
Blocking of RCDT Discharge Valves FCV-1-77-9 and FCV-2-77-9 41.
Blocking of Steam Generator Blowdown Valves 42.
Removal of Control Rod Drive Mechanism (CRDM) Missile Shield, Units 1 and 2 43.
Sealing New ERCW Building Deck Drains.
44.
Auxiliary Building Gas Treatment System Filter Replacement 45.
Control Building Emergency Air Cleanup System Filter Replacement 46.
Purge Air Exhaust Filter Replacement 47.
Postaccident Sampling Facility Gas Treatment System Filter Replacement 48.
Target Rock Power Operated Relief Valve (PORV) Maintenance 49.
Target Rock Postaccident Sampling Valve Maintenance 50.
Kerotest "Y-Check" Valve Maintenance 51.
Vacuum Relief Valve Maintenance 52.
Valcor Solenoid Valve Maintenance 53.
Pratt Butterfly Valve Maintenance 54.
ASCO Solenoid valve Maintenance (Model NP8316A74E) and others, as applicable 55.
Rockwell-Edward Univalve Maintenance 56.
Masonellan 20,000 Series Valve Maintenance 57.
Tufline Figure 066/067 Valve Maintenance 58.
Kerotest T-Type Globe valve Maintenance 59.
Karat..'. T-Type Check Valve Maintenance 60.
Kerotest Y-Globe w/ Air Actuator Maintenance 61.
Daniel "Chexter" Check Valve Maintenance 62.
Class "A" Check Valve Maintenance 63.
Hoke Valve Maintenance 64.
Fisher Air-operated Valve Maintenance 65.
Masonellan Butterfly Valve Maintenance 66.
Copes-Vulcan "Reverse Acting" Valve Maintenance 67.
Swing Check Valve Maintenance 68.
Tilting Disc Check Valve Maintenance 69.
Piston (Lift) Check Valve Maintenance 70.
Parabolic Clobe Valve Maintenance 71.
Conventional Globe Valve Maintenance 72.
Butterfly Valve Maintenance 73.
Dual Disc Cate Valve Maintenance 74.
Conventional Cate valve Maintenance 75.
Ball valve Maintenance 76.
Diaphragm Operator Maintenance
l ENCLOSURE 1 ATTACHMENT 2 ITEW MECHANICAL MAINTENANCE INSTRUCTIONS (Continued) 3 l
IllkE 77.
Target Rock Y-Clobe Valve Maintenance
(
78.
High-Pressure Turbine Throttle and Covernor Valve Maintenance l
79.
Reheat Steam Stop and Interceptor Valve Maintenance 80.
Spent Fuel Pool Cate Removal and Installation 81.
Heater Drain Pump Removal / Disassembly / Reassembly l
82.
Condensate Pump Removal / Disassembly / Reassembly l
83.
Condenser Vacuum Pump Removal / Disassembly / Reassembly l
84.
Raw Cooling Water Pump Removal / Disassembly / Reassembly l
85.
Shaft Coupling Alignment 86.
Pulley Belt Tensioning 87.
Steam Generator Primary / Secondary Manway and Handhold Maintenance 88.
Heat Exchanger Tube Sleeving 89.
Reactor Vessel Head Removal 90.
Reactor Vessel Head Installation i
91.
Mechanical Blocking of Valves l
92.
Hydrogen (H ) Dilution Blower Bearings and Seal Replacement 2
93.
Emergency Core Cooling System (ECCS) Cooler Maintenance 94.
Packing of Pumps 95.
Reactor Coolant Temperaturo Detector Removal and Replacement 96.
Incore Monitor Piping Repair 97.
Inspection of Core Support Assembly Components 98.
Steam Trap Survey 99.
Air Trap Survey 100.
Manual Valve 101.
Emergency Diesel Generator (EDC) Fuel 011 Inlet Manifold Maintenance 102.
Water Treat. Bldg. Intake Structure Heating, Ventilating, and Coeling (HVAC) Comp. Disassembly / Reassembly 103.
Roto Mammer Remote Operator Maintenance 104.
Water Treatment Feed Pump Strainer Maintenance 105.
Waste cas Compressor Maintenance 106.
Reciprocating Air Compressor Disassembly / Assembly 107.
Fire Hydrant Maintenance 108.
Centrifugal Fan Removal / Assembly 109.
EDC Covernor Removal, Installation, and Adjustment 110.
CDC Starting Air Compressor Maintenance 111.
Buffalo Forge Axis 1 Fans Maintenance 112.
Crinnell Pipe Hanger 113.
EHC Filters Replacement 114.
EHC Accumulators Maintenance 115.
Limitorque (operators) 116.
Crosby Relief (numerous instructions) 117.
Hancock 118.
Lonergan 119.
Borg Warner 120.
Walworth
O ENCLOSURE 1 ATTACMMENT 2 7
NEW MECHANICAL MAINTENANCE INSTRUCTIONS (Continued) i TITLE 121.
Wm. powell 122.
ALOYC0 123.
Anderson Greenwood 124.
Rockwell 125.
Relief Valves (Broad category may require more instructions) 126.
Extraction Steam Valves 127.
Aux Steam Safety Valve 128.
Diesel Air Start System Relief Valve 129.
Fire Protection Alarm Check Valve 130.
Turbine Bypass Valve 131.
Service Water System Refuel Relief Valve 132.
Auto Deluge Valve 133.
Service Water (H O) Pump Motor Removal and Replacement 2
134.
EDC Fuel Oil Transfer Pump Maintenance i
135.
EHC Hydraulic Fluid Pump Maintenanen 136.
EHC Transfer FL1ter Pump Mait.tenance 137.
Hydrogen (H ) Sample Analyzer Pump Maintenance 2
138.
Water Treatment Degas Vacuum Pump Maintencnce I
139.
CVCS Pump Malt.tenance 140.
Auxiliary Boiler Feed Pump Maintenance 141.
Fuel 011 Transfer Pump Maintenance 142.
Spent Resin Transfer Pump Maintenance 143.
Instrument Air Receiver Tank Cleaning and Inspe,etion 144.
Instrument Alv Dryer Particulate Filter Cleaning and Inspection 145.
Instrument Air Drain Trap Inspection 145.
Instrument Air Dryer OL1 and Water Separator Profilter Cleaning i
and Inspection 147.
Instrument Air 3-Way Plug Valve Resual and Lubrication 148.
tnstrument Air Compressor After-Cooler Moisture separator Cleaning 149.
Instrument Air Dryer Water Valve Inspection / Maintenance 150.
Instrument Air Dryer Adsorbent Replenishment 151.
Missile Shield Removal and Reinstallation 152.
Service Air System Oil and Molsture Separator f
153.
UMI Isolation Hydraulic Valve Maintenance 154.
Rad Monitor Pump Maintenance (caseous & Liquid) t 155.
Removal of Arc Strike, Couge Indication, Weld Spatter, Rust PLtting, etc., on Piping and Hangers i
156.
Motor-Driven Auxiliary Feedwater Element overhaul 157.
Turbine-Driven Auxiliary Feedwater Pump Element Overhaul 158.
Copes / Vulcan Operators Adjustment, Units 1 and 2. FCV-62-93 159.
Reactor Cavity Decon (Kelly Decon Method) i 160.
Breaching Penetrations 161.
Crinnell Valve (4-inch) Maintenance 162.
Noncode Rollef Valve Testing / Setting 163.
Auxiliary Charging Pumps Maintenance i
t
ENCLOSURE 1 ATTACHMENT 2 i '
ELECTRICAL MAINTENANCE INSTRUCTIONS TO BE ENHANCED NUMBER TITLE 1.
MI-10.11 BATT PACK EMERGENCY LIGHTING 2.
MI-10.12 V-BATT INSP 3.
MI-10.15 SB SWTH & HEA RLY WRNG & MNTNG 4.
MI-10.16 SBM SWITCHES INSP I
5.
MI-10.17 TRIAX CONN, ASSEMBLY INSTR 6.
MI-10.18 500KV 161KV DISC SW, INSP/LUB 7.
MI-10.19 250V BATT SYS, GROUND DETECT 8.
MI-10.22 RX BLDG JUNCTION BOX INSP 9.
MI-10.23 ANNUNCIATOR SYS CHECKOUT 10.
MI-10.25 E-FIELD TROUBLESHOOTING 11.
MI-10.27 EDG BATT INSP 12.
MI-10.40 A-H STARTERS 13.
MI-10.44 EQUALIZE LOG SHEET 14.
MI-10.45 500KV PCB ITE IMPERIAL 15.
MI-10.46 LT MOV PREV MAINT 16.
MI-10.47 AGASTAT TDRS, CAL & MTG 17.
MI-10.56 EMERGENCY LIGHTING 18.
MI-10.51 TARGET ROCK VAT.VE MAINTENANCE 19.
MI-10.7 500KV PCB HITACHI INSP 20.
MI-10.8 161KV PCB DELLE INSP 21.
MI-11.2A LT MOV ACTUATOR CORR MAINT 22.
MI-11.2A LT MOV ACTUATOR CORR MAINT
~
23.
MI-11.2C LT MGV ACTUATOR CORR MAINT 24.
MI-11.2D LT MOV ACTUATOR CORR MAINT 25.
MI-12.1 STA SUMP PHP REMVL/DISASSY/RPL 26.
MI-13.1.17 SYS 311, CAL TDRS 27.
MI-13.1.30 CAL ANN, IM-7 INST PWR RK A&B 28.
MI-13.1.31 CAL ANN, 2M-7 INST PWR RK A&B i
29.
MI-13.2.1 CAL LEVEL SWITCH, SYS 78 1
30.
MI-13.3.13 CAL RLYS, 120V AC V-INVERTERS 31.
MI-14.1 WELDING M.'. CHINE MAINT 32.
MI-14.2 PM ON MTRS IN STORAGE 33.
MI-15.1.1 MFPT COV VLV MTR PMT 34.
MI-15.3.1 EP.CW MTRS UPPER PRG INSP i
35.
HI-15.4.1 ALLIS CHALMERS MIR LUBE 36.
MI-15.6.1 WESTINCHOUSE MTRS LUBE 37.
MI-2.7 RCP MTR ASSEMBLY / DISASSEMBLY
'~
38.
MI-9.1 RX BLDG POLAR CRANE INSP, U1 39.
MI-9.2.1 AUX BLDG CRANE INSP 40.
MI-9.3.1 MANIPULATOR CRANE INSP, U1 41.
MI-9.3.2 MANIPULATOR CRANE INSP, U2 42.
MI-9.4.1 TURB BLDG CRANE INSP, U1 43.
MI-9.4.2 TURB Bl.DG CRANE INSP, U2 44.
MI-9.5.1 TURB BLDG RAD CTRL CRANE, U1 45.
MI-9.5.2 TURB BLDC RAD CTRL CRANE, U2
l ENCLOSURE 1 ATTACKMENT 2
~ NEW ELECTRICAL MAINTENANCE INSTRUCTIONS TITLE i
1.
DISC OF SND PWR PHONE BEL 732 2.
REFUEL AREA EXH FANS 3.
RX BLDG FL EQUIP DRN PMP MTR 4.
OPENING OF AUX BLDG RR HATCH S.
DISCONNECTION OF BAT BANKS 6.
RX BLDG & AUX BLDG TEMP LTC j
7.
HEAT TTACE 8.
INSTAL OF CONAX CONN 9.
INSTAL CONTROL PWR/ SIGNAL CABL 10.
INSTAL CONDUIT & JUNCTION BOX 11.
CABLE TERM /SPLIC/ REPAIR
~
12.
BOLTED CONNECTIONS 13.
6.9KV CCW CLG TWR BD A 14.
6.9KV CCW CLG TWR BD B 15.
V-BATT BD I, GROUND DETECT 16.
V-BATT BD II, GROUND DETECT 17.
V-BATT BD III, GROUND DETECT 18.
V-BATT BD IV, GROUND DETECT 19.
V-BATT BD V, GROUND DETECT 20.
)
27.
CRDM/RPI CONN U1, RECONN/ISNP 29.
CRDM/RPI CONN U2, RECONN/ISNP 30.
BATTERY CLEANING, NON-1E 31.
BATTERY CLEANING, 1E 32.
MCR LIGHTING 33.
DISASSEMBLY /ASSEMBT.Y OF MN GEN 34.
DISASSEMBLY / ASSEMBLY OF KN GEN 35.
ASCO SOLdNOID VALVES 36.
ASCO SOLENOID VALVES 37.
EDG 1A-A, EXCITATION SYS TST 38.
~ ~
39.
EDG 2A-A, EXCITATION SYS TST i
40.
EDG 2B-B, EXCITATION SYS TST 41, 6.9KV SDBD 1B-B, CLEAN & INSP 42.
6.9KV SDBD 2A-A, CLEAN & INSP i
43.
6.9KV SDBD 2B-B, CLEAN & INSP 44, 6.9KV COM BD A, CLEAN & INSP 45.
6.9KV COM BD B, CLEAN & INSP
ENCLOSURE 1 ATTACMMENT 2
) NEW ELECTRICAL MAINTENANCE INSTRUCTIONS TITLE 46, 6.9KV UNIT BD 1A, CLEAN & INSP 47.
6.9KV UNIT BD 1B, CLEAN & INSP 48.
6.9KV UNIT BD IC, CLEAN & INSP 49.
6.9KV UNIT BD 1D, CLEAN & INSP 50.
6.9KV UNIT BD 2A, CLEAN & INSP 51.
6.9KV UNIT BD 2B, CLEAN & INSP 52.
6.9KV UNIT BD 2C, CLEAN & INSP 53.
6.9KV UNIT BD 2D, CLEAN & INSP 54.
6.9KV SDBD 1A-A, CLEAN & INSP 55.
FUEL XFER CTRL CONSOLE CHKOUT 56.
FUEL XFER CTRL CONSOLE CHKOUT 57.
GE TFK 58.
SQUARE D QOB 60.
HEINEMAN AM 61.
WESTINGHOUSE EB 62.
WESTINGHOUSE EHB 63.
WESTINGHOUSE MARK 75 HFB 64.
WESTINGHOUSE KB 65.
HEINEMAN CF 66.
480V RX VENT BD 1B-B 67.
480V RX VENT BD 2A-A 68.
480V RX VENT BD 2B-B
~
69.
480V CIA BLDG VENT BD 1A2-A 71.
480V RX V0M BD 2B1-B 73.
480V C&A BLDG VENT BD 2Al-A 74.
480V C&A BLDG VENT BD 2A2-A 75.
480V C&A BLDG VENT BD 2B1-B 76.
480V C&A BLDG VENT BD 2B2-B 77.
480V DIES AUX BD 1Al-A 78.
480V DIES AUX BD 1A2-A 79.
480V DIES AUX BD 1B1-B 80.
480V DIES AUX BD 1B2-B 81.
480V DIES AUX BD 2Al-A 82.
480V DIES AUX BD 2A2-A 83.
480V DIES AUX BD 2B1-B
~~
84.
480V C&A BLDG VENT BD 1B1-B 85.
480V C&A BLDG VENT BD 1B2-B 86.
480V CE-TED, CLEAN, INSP & TST 87.
480V W-MLP, CLEAN, INSP & TST 90.
480V RX VENT BD 1A-A l
~.
ENCLOSURE 1 ATTACHMENT 2 NEW ELECTRICAL MAINTENANCE INSTRUCTIONS TITLE 91.
480V GE TFJ, CLEAN, INSP & TST 94.
480V W-FB, CLEAN, INSP & TST 95.
480V C&A BLDG VENT BD 1Al-A 96.
480V GE-THED, CLN, INSP & TST 97.
480V DIES AUX BD 2B2-B 98.
480V AUX Bl.DG COMM MCC A 103.
480V FUEL & HDI,G BD A 104.
480V FUEL & HDLG BD B 105.
480V DX-206, CLN, INSP & TST 107.
V-BAT 1-I, CAPACITOR CHANGE 0UT 108.
V-BAT 1-II, CAPACITOR CHANGE 0UT 109.
V-BAT 1-III, CAPACITOR CHANGE 0UT 110.
V-BAT 1-IV, CAPACITOR CMANGEOUT 111.
V-BAT 2-I, CAPACITOR CHANGEOUT 112.
V-BAT 2-II, CAPACITOR CHANGE 0UT 113.
V-BAT 2-III, CAPACITOR CHANGEOUT 114.
V-BAT 2-IV, CAPACITOR CHANGEOUT 115.
V-BAT I, CELL RPLMT & BUSS RWK 116.
V-BAT II, CL RPLMT & BUSS RWK 117.
V-BAT III, CL RPLMT & BUSS RWK 118.
V-BAT IV, CL RPLMT & BUSS RWK 119.
V-BAT V, CL RPLMT & BUSS RWK 120.
EDG BAT 1A-A, CL RPLMT BUS RWK 121.
EDG BAT 18-B, CL RPLMT BUS RWK 122.
EDG BAT 2A-A, CL RPLMT BUS RWK 123.
EDG BAT 2B-B, CL RPI.MT BUS RWK 124.
ROTORK MOV CORR MAINT 127.
ELECTRODYNE MOV CORR MAINT 128.
~ ~
129.
MSIV, ISNP/ REPAIR /MAINT 130.
MSIV, ISNP/ REPAIR /MAINT 131.
CAL RLYS, SYS 72 132.
CAL RI.YS, SYS 72 133.
CAL RI.YS, SYS 82, TRAIN A 134.
CAL RLYS, SYS 82, TRAIN B l
135.
CAL RLYS, SYS 82, TRAIN A
i l
ENCLOSURE 1 ATTACHMENT 2 NEW ELECTRICAL MAINTENANCE INSTRUCTIONS TITLE 136.
CAL RLYS, SYS 82, TRAIN B 137.
CAL RLYS, SYS 62, TRAIN A 138.
CAL RLYS, SYS 62, TRAIN B 139.
CAL RLYS, SYS 62, TRAIN A 140.
CAL RLYS, SYS 62, TRAIN B 141.
CAL RLYS, MCR AHU A-A CHILLER 142.
CAL RLYS, MCR AHU B-B CHILLER 143.
CAL RLYS, EL BD RM CHILLER A-A 144.
CAL RLYS, EL BD RM CHILLER B-B 145.
CAL RLYS, SHDN BD RM CHILLER A-A 146.
CAL RLYS, SHDN BD RM CHILLER B-B 147.
CAL RLY, SYS 79 148.
CAL RLY, SYS 79 149.
CAL RELAYS, SYS 1 150.
CAL RELAYS, SYS 1 151.
CAL RLYS, SYS 32 152.
CAL RLYS, SYS 32 153.
CAL RLY, SYS 87 154.
CAL RLY, SYS 87 155.
CAL RLY, MCR CHILLER A-A, HLC 156.
CAL RLY, MCR CHILLER B-B, MLC 157.
CAL RLY, EL BD RM CHILLER A-A, MLC 158.
CAL RT.Y, EL BD RM CHILLER B-B, MLC 159.
CAL RELAYS, SYS 2 160.
CAL RELAYS, SYS 2 161.
CAL RI.YS, SHDN BD RM CHILLER A-A 162.
CAL RLYS, SHDN BD RM CHILLER B-B 163.
CAL RLYS, SHDN BD RM CHILLER A-A 164.
CAL RLYS, SHDN BD RM CHILLER B-B 165.
CAL ANN, 480V D/C AUX BD 1A 166.
CAL ANN, 480V D/G AUX BD 1B 167.
CAL ANN, 480V D/G AUX BD 2A 168.
CAL ANN, 480V D/C AUX BD 2B 169.
CAL ANN, 480V C&A VENT BD 1A 170.
CAL ANN, 480V C&A VENT BD 1B 171.
CAL ANN, 480V C&A VENT BD 2A 172.
CAL ANN, 480V C&A VEITT BD 2B 173.
CAL ANN, 480V RX VENT BD 1A
~~
174.
CAL ANN, 480V RX VENT BD 1B 175.
CAL ANN, 480V RX VENT BD 2A 176.
CAL ANN, 480V RX VENT BD 2B 177.
CAL ANN, 6.9KV SHDN BD 1A 178.
CAL ANN, 6.9KV SHDN BD 1B 179.
CAL ANN, 6.9KV SHDN BD 2A 180.
CAL ANN, 6.9KV SHDN BD 2B
ENCLOSURE 1 ATTACHMENT 2 NEW ELECTRICAL MAINTENANCE INSTRUCTIONS j
TITLE 181.
CAL RLYS, LOGIC PNL 1A-A, 202 182.
CAL RLYS, LOGIC PNL 1B-B, 202 183.
CAL RLYS, LOGIC PNL 2A-A, 202 184.
CAL RLYS, LOGIC PNL 2B-B, 202 185.
CAL ANN, FUEL AREA EXH FAN A 188.
CAL ANN, FUEL AREA EXH FAN B 189.
CAL ANN, CONTROL BLDG A 190.
CAL ANN, CONTROL BLDG B 191.
CAL RLYS, SYS 67. TRAIN A 192.
CAL RLYS, SYS 67, TRAIN B 193.
CAL RLYS, SYS 67, TRAIN A 194.
CAL RLYS, SYS 67, TRAIN B 195.
CAL RI.YS, SYS 67, HDR 1B TO 2B 196.
CAL ANN, D/G 1A 197.
CAf. ANN, D/G 2A 198.
CAL ANN, D/G 1B 199.
CAL ANN, D/G 2B
~
200.
CAL RLYS, SYS 30 D/G TRAIN A 201.
CAI. RLYS, SYS 30 D/G TRAIN B 202.
CAL RI.YS, SYS 30 D/G TRAIN A 203.
CAL RLYS, SYS 30 D/G TRAIN B 204.
CAL RLYS, SYS 30 CNTMT AIR 205.
CAL RLYS, SYS 30 CNTMT AIR 206.
CAL RLYS, SHDN BD 1A-A, SY 202 207.
CAL RLYS, SHDN BD 1B-B, SY 202 208.
CAL RLYS, SHDN BD 2A-A, SY 202 209.
CAL RLYS, SHDN BD 2B-B, SY 202 210.
CAT. RLYS, 480V BD RM 2A 213.
CAI. RLYS, 480V BD RM 2B 214.
CAL RLYS, Auxiliary Building Gas Treatment System (ABGTS) FAN A-A 215.
CAL Rt.YS, SYS 70, TRAIN A l
217.
CAL RLYS, SYS 70, TRAIN B i
218.
CAL RLYS, SYS 70, FLOW DIFF 219.
CAL RLYS, SYS 70, TRAIN A 220.
CAL RLYS, SYS 70, TRAIN B 221.
CAL RI.YS, SYS 70, FLOW DIFF 222.
COMP TANK A-A LEVEt, SWITCH 223.
COMP TANK B-B LEVEL SWITCH 224.
250V BAT BANK I, Mo MAINT 225.
250V BAT BANK II, Mo MAINT
.~
)
ENCLOSURE 1 ATTACKMENT 2 NEW RLECTRICAL MAINTENANCE INSTRUCTIONS TITLE 226.
48V TELE BAT BANK, MO MAINT
- 227, 48V PLANT BAT BANK, MO MAINT 228.
250V BAT BANK I, ANN MAINT 229.
250V BAT BANK II, ANN MAINT 230.
48V TELE BAT BANK, ANN MAINT 231.
48V PLANT BAT BANK, ANN MAINT 232.
250V STA I, ANN CHRG & DBS PM 233.
250V STA II, ANN CHRG & DBS PM 234.
48V TELE, ANN CHRG & BDS PM 235.
48V PLNT, ANN CHRG & BDS PM 236.
2.4V MICRO, ANN CHRG & BDS PM 237.
250V BAT BANK III, QRTLY MAINT 238.
250V BAT BANK II, QRTLY MAINT 239.
48V TELE BAT BANK, QRTLY MAINT 240.
48V PLNT BAT BANK, QRTLY MAINT 241.
RCP MRT REMOVAL 242.
RCP MRT REMOVAL 243.
PZR HTR RPLMT U-1 244.
PZR HTR RPLMT U-2 245.
CONDUIT SEAL INSP ECN-6808 246.
D/G 1A PMT'S 247.
D/G 1B PMT'S 248.
D/G 2A PMT'S 249.
D/G 2B PMT'S
~
250.
PZR HTR MECCER & CONT CHECK 252.
PZR HTR MEGGER & CONT CHECK 353.
HEAT TRACE TROUBLESHOOTINC 254-453 MTR MAINT (APPROX 200) 454.
EH FLUID TK LVL SW/U1 455.
EH FLUID TK LVL SW/U2 456.
FW HTR LVL SW/U-O 457.
GE AK-2 BKRS, LUBRICATION 458.
RCP MTR OIL LVL SW/1A, CAL 459.
460.
RCP MTR OIL LVL SW/lc, CAL 461.
RCP MTR OIL LVL SW/1D, CAL 462.
~ ~
463.
RCP MTR OIL LVL SW/2B, CAL 464.
RCP MTR OIL LVL SW/2C, CAL 465.
RCP MTR OIL LVL SW/2D, CAL 466.
l
=_=_
ENCLOSURE 1 ATTACHMENT 2 NEW ELECTRICAL MAINTENANCE INSTRUCTIONS TITLE 470.
SG BD FLASH TK LVL SW/U1 475.
SG BD FLASH TK LVI. SW/U2 476.
NN STM DUMP DRN TK LVI. SW/U1 477.
NN STM DUMP DRN TK I.VL SW/U2 478.
SEAL STM RTN/SPILLOVER SW/U1 479.
SEAL STM RTN/SPILLOVER SW/U2 480.
RX BI.DG ANNULUS DRN LVL SW/U1 481.
RX BLDG ANNULUS DRN I.VL SW/U2 l
l
ENCLOSURE 1 ATTACHMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS TITLE 1.
Calibration of Ashcroft Model Temperature Indicating Switch 2.
Calibration of Ashcroft Model 2152 Pressure Indicating Switch 3.
Calibration of ASCO Model F321 Controller 4.
Calibration of ASCO Model SE11 Pressure Switch 5.
Calibration of Air Pax Model FSS 1000 Signal Modifier 6.
Calibration of Air Pax Model 075-130 Switch 7.
Calibration of Amstek Model Skantran St Flow Indicating Transmitter 8.
Calibration of Balsbaugh Model 915M Conductivity Indicating Switch 9.
Calibration of Beckman Model 2000 Recorder 10.
Calibration of Beckman Model 4200/4400 Controller 11.
Calibration of Beckman Model 4300 Mand Indicating Controller 12.
Calibration of Beckman Model 4100 Diff. Press Transmitter 13.
Calibration of Beckman Model RE332 Conductivity Indicating Switch 14.
Calibration of Beeds Model MR-14-05 Te=p. Indicating Switch 15.
Calibration of Bradley Model 836 Pressure Switch 16.
Calibration of Brooks Model 8-110 Flow Switch 17.
Calibration of Chemetron Model C42068 Pressure Switch 18.
Calibration of Custom Component Model 674 Diff/ Pressure Switch 19.
Calibration of Cambridge Mark IV
~ ~
Mydrazine Analyzer 20.
Calibration of Consolidated controls Model 21A Pressure Switch 21.
Calibration of Emerson Electric Model ARC-240 Temperature Switch
e ENCI.OSURE 1 ali.': CEMENT 2 INSTRUMENT MAlifTENANCE NEW INSTRUCTIONS (continued) l l
TITLE 22.
Calibration of Fisher Model 2516 Level controller 23.
Calibration of Fluidynamic Model KN Modifier 24.
Calibration of Foxboro Model 66BC I/I Isolator 25.
Calibration of Ceneral Electric Model 550 MV/I converter 26.
Calibration of Ceneral Electric Model 180 Indicator 27.
Calibration of General Electric Model
~
i 563 Summer 28.
Calibration of Hach Model 651B Silica Analyzer 29.
Calibration of Hagan Model 47
{
Recorder 30.
Calibration of Hagan Model 109 Prassure Transmitter 31.
Calibration of HY-CAL Model CT-822 Relative Humidity Converter 32.
Calibration of Indikon Model VP/ LAC Vibration Indicator 33.
Calibration of Indikon Model Vibration Signal Converter 34.
Calibration of Indikon Model Vibration Transmitter 35.
Calibration of IRD Model 306 Vibration Indicator 36.
Calibration of Jo-Bell Products Model R25 Level Switch 37.
Calibration of Leeds & Northrup Model 440 Indicating controller 38.
Calibration of Leeds & Northrup 450 Indicator 39.
Calibration of Leslie Model PDA-1 Indicating Controller 40.
Calibration of Leslie Model PRA-1 Controller 41.
Calibration of Leslie Model VDDV Differential Controller 42.
Calibration of Masonellan Model 2700 Series Indicattn controller a
ENCLOSURE 1 ATTACKMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 43.
Calibration of Masonellan Model 12000 Series Level Controller 44.
Calibration of Magnetrol Model Level controller 45.
Calibration of Mercold Model DAW-7000 Pressure Switch 46.
Calibration of Robertshaw Model 553 Switch 47.
Calibration of Montadoro Whitney Model PHS-1L PM Analyzer 48.
Calibration of NEO-DYN INC Model 110P1-14CC3 Level Switch 49.
Calibration of Penn Controls Model 210AP Pressure Switch 50.
Calibration of Penn Controls Model A19 AAD-12 Temperature Switch 51.
Calibration of Penn Controls Model P45/P70 Pressure Switch 52.
Calibration of Robertshaw Model SP-222 Indicating controllers 53.
Calibration of Robertshaw Model 445 I/P converter 54.
Calibration of Robertshaw Model PD-11 Temperature Switch 55.
Calibration of Robertshaw Model 225 Recorder 56.
Calibration of Robertshaw Model 325 Indicating Controller 57.
Calibration of Robertshaw Model 121 NV/I Converter 58.
Calibration of Robertshaw Model i
117 D/P Transmitter 59.
Calibration of Rosemount Model f
1153 D/P Transmitter 60.
Calibration of Rosemount Model 1-DP4 D/P Indicating Transmitter 61.
Calibration of Ramapo Model SCA452 Signal Modifier 62.
Calibration of Ramapo Model 8452 Flow Indicator 63.
Calibration of Rustrak Model i
288 Recorder
ENCLOSURE 1 ATTACHMENT 2 INSTRUMENT MAINTENANCE _NEW INSTRUCTIONS (continued)
TITLE 64.
Calibration of RIS Model ET-1219 Moisture Switch 65.
Calibration of Rochester Model TM 400 Indicator 66.
Calibration of Rochester Model ISC-306. Indicating Controller 67.
Calibration of Rochester Model XET-214 Temp Switch 68.
Calibration of Schutte-Koerting Model 1853 Flow Indicating Switch 69.
Calibration of Square-D Model ACW Pressure Switch 70.
Calibration of Square-D Model AEW Diff/ Press Switch 71.
Calibration of Taylor Model 442 controller 72.
Calibration of Taylor Model 303/393 D/P Transmitter 73.
Calibration of Taylor Model 470 Indicator 74.
Calibration of Taylor Model 61 KN Indicating Switch 75.
Calibration of Taylor Model j
X202 Temperature Transmitter 76.
Calibration of Taylor Span Amplifier 77.
Calibration of Thermo-Dise Model 60T11 Temp-Switch 78.
Calibration of Transmation Model SW Temp Transmittee and Switch 79.
Calibration of Transmation Model 630/611 MV/I Converter 80.
Calibration of TEL-MAR Model 502 E/I Converter 81.
Calibration of United Electric Model 254 Diff/ Pressure Switch 82.
Calibration of United Electric Model 6BS Temp Switch
' ~
83.
Calibration of Walter-Kiddle Model S-16-R Temp Switch 84.
Calibration of Wes'cinghouse Model KR-241 Speed Indicator Transmitter
l ENCLOSURE 1 i
ATTACHMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued) i TITLE 85.
Calibration of Woksler Model SP/AR 16 Level Indicator Switch' 86.
Calibration of White-Rodgers Model 1619 Temperature Switch 87.
Calibration of Westronics Model M11E Recorder 88.
Calibration of Westronics Model M5E Recorder 89.
Calibration of Westronics Model 7201 Temp Indicator 90.
Loop. Check / Calibration of MFPT A LP/MP Gov Valve Position Indicators (Z-46-13) Unit 1 91.
Loop Check / Calibration of MFPT B LP/HP Gov Valve Position Indicators (Z-46-40) Unit 1 92.
Loop Check / Calibration of MFFT A LP/MP Gov Valve Position Indicators (Z-46-13) Unit 2 93.
Loop Check / Calibration of MFPT B LP/HP Cov Valve Position Indicators (Z-46-40) Unit 2 94.
Loop Check / Calibration of MFPT A and B Speed Control (S-46-20) Unit 1 95.
Loop Check / Calibration of MFPT A and B Speed Control (S-46-20) Unit 2 96.
Loop Check / Calibration of MFPT A Speed Indication and Zero Speed Detection (S-46-20A) Unit 1 97.
Loop Check / Calibration of MFPT B Speed Indication and Zero Speed Detection (S-46-20B) Unit 1 98.
Loop Check / Calibration of MFPT A Speed Indication And Zero Speed Detection (S-46-20A) Unit 2 99.
Loop Check / Calibration of MFPT B Speed Indication And Zero Speed Detection (S-46-20B) Unit 2 100. Calibration of NFPT A Thrust Bearing Wear Detector (X-46-23) Unit 1 101. Calibration of MFPT B Thrust Bearing Wear Detector (X-46-46) Unit 1 102.
Calibration of MFFT A Thrust Bearing
' ~
Wear Detector (X-46-23) Unit 2 103. Calibration of MFPT B Thrust Bearing Wear Detector (X-46-46) Unit 2 104.
Calibration of MFPT A&B Vibration (1-V-46-25) Unit 1
-w
.~."1.
- a
[
l e
ENCLOSURE 1 ATTACKMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 105. Calibration of MFPT A&B Vibration (2-V-46-25) Unit 2 106.
Calibration of AFWPT Motor-Operated Position Indication (X-46-54) Unit 1 107. Calibration of AFWPT Motor-Operated Pot Position Indication (X-46-54) Unit 2 108. Calibration of Turbine-Driven Aux Feedpump Overspeed (S-46-56) Unit 1 109.
Calibration of Turbine-Delven Aux Feedpump Overspeed (S-46-56) Unit 2 110. Calibration of Turbine-Driven Aux Feedpump Speed / Flow Control (F/S-46-57) Unit 1 111. Calibration of Turbine-Driven Aux Feed Pump Speed / Flow Control (F/S-46-57) Unit 2 112. Calibration of Turbo, Gen Throttle Valve #1 Position (1-2-47-28) Unit 1 113. Calibration of Turbo Gen Throttle Valve #1 Position (2-2-47-28) Unit 2 114.
Calibration of Turbo Gen Governor Valve #1 Position (1-Z-47-29) Unit 1 115. Calibration of Turbo Gen Governor Valve #1 Position (2-2-47-29) Unit 2 116. Calibration of Turbo Gen Throttle Valve #2 Position (1-Z-47-30) Unit 1 117.
Calibration of Turbo Gen Throttle Valve #2 Position (2-2-47-30) Unit 2 118. Calibration of Turbo Gen Governor Valve #2 Position (Z-47-31) Unit 1 119.
Calibration of Turbo Gen Governor Valve #2 Position (2-47-31) Unit 2 120.
Calibration of Turbo Gen Throttle Valve #3 Position (Z-47-32) Unit 1 121. Calibration of Turbo Gen Throttle Valve #3 Position (Z-47-32) Unit 2 122.
Calibration of Turbo Gen Governor Valve #3 Position (Z-47-33) Unit 1 123. Calibration of Turbo Gen Governor Valve #3 Position (Z-47-33) Unit 2
~ ~
124.
Calibration of Turbo Gen Throttle Valve 04 Position (1-2-47-34) Unit 1 125. Calibration of Turbo Gen Throttle Valvo 04 Position (2-2-47-34) Unit 2 l
ENCLOSURE 1 ATTACHMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
T'TLE 126. Calibration of Turbo Gen Governor Valve #4 Position (1-2-47-35) Unit 1 127.
Calibration of Turbo Gen Governor Valve #4 Position (2-2-47-35) Unit 2 128.
Calibration of Turbo Gen Reheater Temperature Control (1-T-47-49) Unit 1 129. Calibration of Turbo Gen Reheater Temperature Control (1-T-47-49) Unit 2 130.
Calibration of Turbo Gen Vibration (LV-47-121) Unit 1 131.
Calibration of Turbo Cen Vibration (1-V-47-131) Unit 1 132. Calibration of Turbo Gen Vibration (1-V-47-121) Unit 2 133. Calibration of Turbo Gen Vibration (1-V-47-131) Unit 2 134.
Calibration of Turbo con Eccentricity (1-X-47-141) Unit 1 135. Calibration of Turbo Gen Eccentricity (2-X-47-141) Unit 2 136.
Calibration of Main Turbine Speed /Cov Valve Position (1-S-47-151) Unit 1 137. Calibration of Main Turbine Speed / Gov Valve Position (2-S-47-151) Unit 2 138.
Calibration of Turbo Gen Rotor Diff/ Expansion (Z-47-161) Unit 1 139. Calibration of Turbo Gen Rotor Diff/ Expansion (Z-47-161) Unit 2 140.
Calibration of Turbo Gen Rotor Position / Casing Expansion (Z-47-166) Unit 1 141.
Calibration of Turbo Gen Rotor Position / Casing Expansion (Z-47-166) Unit 2 142.
Calibration of Turbo Gen Anales Electro, Hydraulic Control System Unit 1 143.
Calibration of Turbo Gen Analog Electro Hydraulle Control System Unit 2 144.
Calibration of Main Turbine l
~~
Reheater Temperature Control System Unit 1 145. Calibration of Main Turbine Reheater Temperature Control System Unit 2 146.
Calibration of Reactor Coolant Pump 1 No.
1 Seal Bypass Flow Alarm (FIS-62-12) Unit 1
)
l i
ENCLOSURE 1 ATTACHMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 147.
Calibration of Reactor Coolant Pump 2 No.
1 Seal Bypass Flow Alarm (FIS-62-25) Unit 1 148.
Calibration of Reactor Coolant Pump 3 No.
1 Seal Bypass Flow Alarm (FIS-62-38) Unit 1 140.
Calibration of Reactor Coolant Pump 4 No.
1 Seal Bypass Flow Alarm (FIS-62-51) Unit 1 150.
Calibration of Reactor Coolant Pump 1 No.
1 Seal Bypass Flow Alarm (FIS-62-12) Unit 2 151.
Calibration of Reactor Coolant Pump 2 No.
1 Seal Bypass Flow Alarm (FIS-62-25) Unit 2 152.
Calib. ration of Reactor Coolant Pump 3 No.
1 Seal Bypass Flow Alarm (FIS-62-38) Unit 2 153.
Calibration of Reactor Coolant Pump 4 No.
1 Seal Bypass Flow Alarm (FIS-62-51) Unit 2 154.
Calibration of Excess Letdown Heat Exchanger Flow Control (F-62-56) Unit 1 155. Calibration of Excess Letdown Heat Exchanger Flow Control (F-62-56) Unit 2 156.
Calibration of Letdown Heat Exchanger Outlet Temperature control (T-62-78) Unit 1 157.
Calibration of Letdown Heat Exchanger Outlet Temperature Control (T-62-7C) Unit 2 158.
Calibration of Low-Pressure Letdown Pressure Control (P-62-81) Unit 1 159.
Calibration of Low-Pressure Letdown Pressure Control (P-62-81) Unit 2 160. Calibration of RHR Letdown Flow Control (F-62-83) Unit 1 161.
Calibration of RHR Letdown Flow Control (F-62-83) Unit 2 162.
Calibration of Charging Header Flow Control (F-62-93) Unit 1 163.
Calibration of Charging Header Flow Control (F-62-93) Unit 2 164.
Calibration of volume Control Tank Level (f.-62-129C) Unit 1 165.
Calibration of Volume control Tank i
Level (L-62-129C) Unit 2
-~
166.
Calibration of Volume control Tank Level (L-62-130A) Unit 1 167.
Calibration of Volume Control Tank l
Level (L-62-130A) Unit 2 i
l l
l j
ENCLOSURE 1 ATTACKMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 168. Calibration of Volume Control Tank Level (L-62-130C) Unit 1 169. Calibration of Volume Control Tank Level (L-62-130C) Unit 2 170. Calibration of Boric Acid Flow to Blender (F-62-139) Unit 1 171. Calibration of Boric Acid Flow to Blender (F-62-139) Unit 2 172. Calibration of Primary Water Flow To Boric Acid Blender (F-62-142) Unit i 173. Calibration of Primary Water Flow to Boric Acid Blender (F-62-142) Unit 2 174. Calibration of Volume Control Tank Level (L-62-129A) Unit 1 175. Calibration of Volume control Tank Level (L-62-129A) Unit 2 176. Calibration of Feed Preheater Temperature Control (T-62-163) Unit 1 177.
Calibration of Feed Preheater
~
Temperature Control (T-62-163) Unit 2 178. Calibration of Evaporator Inlet Steam Control (P-62-176) Unit 1 179. Calibration of Evaporator Inlet Steam Control (P-62-176) Unit 2 180.
Calibration of Boric Acid Evaporator Level control (L-62-178) Unit 1 181. Calibration of Boric Acid Evaporator Level Control (L-62-178) Unit 2 182. Calibration of Boric Acid Evaporator Temp control (T-62-179) Unit 1 183. Calibration of Boric Acid Evaporator Temp control (T-62-179) Unit 2 184.
Calibration of Evaporator Condenser Level Control (L-62-192) Unit 1 185. Calibration of Evaporator Condenser Level Control (L-62-192) Unit 2 186. Calibration of Distillate Conductivity (C-62-193) Unit 1
'~
187. Calibration of Distillaie Conductivity (C-62-193) Unit 2 188. Calibration of Boric Acid From Boron Injection Tank (BIT)
Flow Indicating Switch (FIS-63-43) Unit 1
. ~ +.
ENCLOSURE 1 ATTACHMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 189.
Calibration of Boric Acid From BIT Flow Indicating Switch (F1S-63-43) Unit 2 190. Calibration of EGTS Train A Cooling Valve and Fan Interlock Flow Switch (0-FS-65-31A/B, B/A) 191.
Calibration of ECTS Train B Cooling Vlv and Fan Interlock Flow Switch (0-FS-65-44A/B, B/A) 192. Calibration of CDWE - Concentrate Density (0-D-77-5007) 193. Calibration of Full-Length Rod control System Unit 1 194.
Calibration of Full-Length Rod control System Unit 2 195.
Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank A Unit 1 196. Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank B Unit 1 197. Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank C Unit 1 198. Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank D Unit 1 199.
Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank A Unit 2 200. Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank B Unit 2 201. Calibration of Control Rod Insertion Limit and P/A Converter Channel Bank C Unit 2 202. Calibration of Control Rod Insecticn Limit and P/A Converter Channel Bank D Unit 2 203. Calibration of Rod Control System-Auto Speed Program Unit 1 204.
Calibration of Rod Control System-Auto Speed Program Unit 2 205. Calibration of Solid-State Protection System, Train A 206. Calibration of Solid-State Protection System, Train B 207. Calibration of Solid-State Protection System, Train A
~ ~
208. Calibration of Solid-State Protection System, Train B 209. Main Control Room CSSC Recorder Pen Replacement Unit 1
4e.
ENCLOSURE 1 ATTACMMENT 2 INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 210. Main Control Room CSSC Recorder Pen Replacement Unit 2 211.
Calibration for the Eberline Accident Rad. Monitoring System - Special Particulate Iodine and Noble Gas (SPING) Mon. (R-90-400) Unit 1 212.
Calibration for the Eberline Accident Rad.
Monitoring System - SPING Mon. (R-90-400) Unit 2 213.
Eberline Accident Mon Svs Shield Building Exhaust Mi Level Rad Mon Channels (RE-90-401, -402, -403) Unit 1 214.
Eberline Accident Mon Sys Shield Building Exhaust Mi Level Rad Mon Channels (RE-90-401, -402) Unit 2 215.
Eberline Accident Mon Svs Condenser Vacuum Exhaust Mi Level Rad Mon Channels (RE-90-404, -405) Unit 1
[
216.
Eberline Accident Mon Sys Condenser Vacuum Exhaust Mi Level Rad Mon Channels (RE-90-404, -405) Unit 2 217.
Eberline Accident Radiation Mon Svs Sample Flow Callb and Functional Test (R-90-400) Unit 1 218.
Eberline Accident Radiation Mon Svs Sample Flow Calib and Functional Test (R-90-400) Unit 2 219.
Eberline Accident Rad Mon Svs Sample Flow Calib and Functional Test (R-90-401) Unit 1 220.
Eberline Accident Rad Mon Svs Sample Flow Calib and Functional Test (R-90-401) Unit 2 221.
Eberline Accident Rad Mon Svs Sample Flow Calib and Functional Test (R-90-402) Unit 1 222.
Eberline Accident Rad Mon Svs Sample Flow Calib and Functional Test (R-90-402) Unit 2 223.
Eberline Accident Rad Mon Svs Sample Flow Calib and Functional Test (R-90-404) Unit 1 224.
Eberline Accident Rad Mon Sys Sample Flow Calib and Functional Test (R-90-404) Unit 2 225. Calibration of Aux Boiler "A" Safety Cycles and Limit control j
226.
Calibration of Aux Boiler "B" Safety Cycles and Limit Controls 227. Loop Check of (F-12-7A) Aux. Boiler A Steam Flow
~~
228. Loop Check of (F-12-7B) Aux. Boiler B Steam Flow 229. Loop Check of (F-12-7A) Aux. Boiler A Drum Level 230. Loop Check of (F-12-7B) Aux. Boiler B Drum Level
~-
l ENCLOSURE 1
\\
ATTACHMENT 2
- INSTRUMENT MAINTENANCE NEW INSTRUCTIONS (continued)
TITLE 231. Loop Check of (P-12-50) Aux Boiler Steam Pressure 232.
Loop Check of (F-12-50A) Aux Boller A Purge Air Flow 233. Loop Check of (F-12-50B) Aux Boller B Purge Air Flow 234.
Loop Check of (T-12-7A) Aux Boller A Flue Cas Temp.
235.
Loop Check of (T-12-7B) Aux Boller B Flue Gas Temp.
i 236.
Loop Check of (F-18-22A) Aux Boller A Fuel Flow 237.
Loop Check of (F-18-22B) Aux Boller B Fuel Flow l
4 e
e 1
___.L_
s l
i l
8 wumowx:E d
INSmVCTIOfG1WJNTENANCE 1988 1989 1990 1991 1992 FELATEDSrsEMMNCEnENT m
8 ll 1111 l l lll 1illll111ll 11111111111 11111111111 11l1lllll11 t=2 u
a l
0 1
MECHANCAL
______E I
b::::::
=:::::::::::: :::::::::::: _
g y------
f h
(MI/SI)
JLNE JLNE JUNE a6 (a
x rg a
r" n r-ELECE CAL I
I l
I l.__--______
2jm 3
2
,_g
,.==========-
u (MI/SI) l-JUNE JUME JUNE JUIE FEB 1
i r
l I
I E
NENT 12 0 200 212-3 5
I I
I
' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ '
MANTENANCE (MI/SI)
JUNE JUNE JUIE JUNE JAN a
'4 9
o (4
+ --e B
!?
i.U
.U
~
y o
PREVK)US EFFORT PLANPED EFFORT
2121 ROUREEFFORT 4
". )
o
- /o ENCLOSURE 2 LIST OF COMMITMENTS 1.
By June 1, 1989, the following numbers of mis / Maintenance-related sis will be revised / written to fulfill the key elements of the enhancement project listed in enclosure 1.
Instrument 320 Electrical 300 Mechanical 130 2.
By June 1,1989, SQN will update and provide listings of the instructions written / revised and those expected to be written / revised.
3.
By June 1, 1990, the following numbers of mis / Maintenance-related sis will be revisod/ written to fulfill the key elements of the enhancement project listed in enclosure 1.
Instrument 320 Electrical 300 vechanical 130 4.
By June 1,1990, SQN will update and provide listings of the instructions written / revised and those expected to be written / revised.
5.
By June 1, 1991, the following numbers of mis / Maintenance-related sis will be revised / written to fulfill the key elements of the enhancement project listed in enclosure 1.
Instrument 320 Electrical 300 I
6.
By June 1,1991, SQN will update and provide listings of the instructions written / revised and those expected to be written / revised.
7.
By February 1,1992, the following numbers of mis / Maintenance-related sis will be revised / written to fulfill the key elements of the enhancement project listed in enclosure 1.
Instrument 205 Electrical 196 8.
By February 1,1992, SQN will update and provide listings of the instructions written / revised and those expected to be written / revised.