Letter Sequence Other |
|---|
|
Results
Other: ML19347E257, ML19350D121, ML20023A486, ML20076C428, ML20077G960, ML20090L185, ML20112F743, ML20134L463, ML20137X382, ML20141N057, ML20141N065
|
MONTHYEARML19350D1211981-04-0101 April 1981 Ack Receipt of Transmitting Results of Feasibility Studies for NUREG-0737,Items II.K.3.16 & II.K.3.18.Recommendations & Conclusions Will Be Given Upon Completion of Review.Response to Be Submitted by 810417 Project stage: Other ML19347E2571981-04-16016 April 1981 Submits Plans for Reduction of Safety Relief Valve Failures: Replacement of three-stage w/two-stage Pilot Assemblies;Low Level Trip Setpoint for MSIV Lowered & Adoption of Procedure to Manually Open Valves After Pressure Relief Action Project stage: Other ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept Project stage: Other ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20077G9601983-07-28028 July 1983 Responds to NUREG-0737,Item II.K.3.18, Mod of Automatic Depressurization Sys Logic. Util Will Implement Second Option If Required Bypass Timer Setting Provides Significant Margin Above 2 Minute Delay in Current Logic Project stage: Other ML20112F7431984-04-30030 April 1984 Bypass Timer Calculation for Automatic Depressurization Sys Mod for Hatch Units 1 & 2 Project stage: Other ML20090L1851984-05-21021 May 1984 Advises That Mods to Automatic Depressurization Sys,Per NUREG-0737,Item II.K.3.18,will Be Completed by End of 1985 Refueling Outages Project stage: Other ML20091K4631984-06-0101 June 1984 Responds to 840412 Request for Info Re Implementation of NUREG-0737,TMI Action Item II.K.3.16, Reduction of Challenges & Failures of Relief Valves. Unit 1 Converted to two-stage Safety Relief Valves in 1978 Project stage: Request ML20112F7311985-03-19019 March 1985 Application to Amend License NPF-3,revising Tech Specs by Adding Limiting Conditions for Operation & Surveillance Requirements for Bypass Timers,Tmi Action Plan Item II.K.3.18.GE Bypass Timer Actuation... Encl.Fee Paid Project stage: Request ML20132E5471985-08-23023 August 1985 Rev 0 to Engineering Svc Procedure 42EN-ENG-011-OS, Scram/ Transient Reporting Project stage: Request ML20134L4631985-08-23023 August 1985 Proposed Tech Specs Re Automatic Depressurization Sys Instrumentation to Reflect Planned Logic Mod Project stage: Other ML20134L4471985-08-23023 August 1985 Application for Amend to License DPR-57,revising Tech Specs Re Automatic Depressurization Sys Instrumentation to Reflect Planned Logic Mod Per TMI Action Item II.K.3.18.Fee Paid Project stage: Request ML20151Y4631986-01-29029 January 1986 Safety Evaluation Supporting Amend 122 to License DPR-57 Project stage: Approval ML20141N0651986-02-21021 February 1986 Errata to Amend 122 to License DPR-57,providing Tech Spec Pages 3.2-10 & 3.2-33 Re Instrumentation Which Initiates or Controls Automatic Depressurization Sys Project stage: Other ML20141N0571986-02-21021 February 1986 Forwards Errata to 860129 Amend 122 to License DPR-57, Including Tech Spec Pages 3.2-10 & 3.2-33 Inadvertently Omitted from Original Submittal Project stage: Other ML20137X3821986-02-28028 February 1986 Requests Approval to Complete Installation of Automatic Depressurization Sys Manual Inhibit Switches Associated W/ NUREG-0737,Item II.K.3.18 During Spring 1987 Unit 1 & Spring 1988 Unit 2 Refueling Outages Project stage: Other 1984-05-21
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
._ _
Decket No.: 50-321 FEB 211986 i
Mr. J. T. Beckham, Jr.
Vice President - Nuclear Generation Georgia Power Company P. O. Box 4545-Atlanta, Georgia 30302
Dear Mr. Beckham:
By letter dated _ January 29, 1986, the Commission issued Amendment No.
122 to Facility Operating License No. DPR-57 for the Edwin I. Hatch 1
Nuclear Plant, Unit No. 1.
This amendment revised the Technical Specifications (TSs) to provide operating and surveillance requirements for automatic depressurization system bypass timers that are to be added to Hatch Unit No. 1.
This amendment inadvertently omitted changes on TS 1
l pages 3.2-10 and 3.2-33 which had been made by Amendment No. 121 issued j-January 17, 1986. Accordingly,-updated TS pages 3.2-10 and 3.2-33 are enclosed. Please incorporate these updated pages into your TSs. We
{
apologize for any inconvenience caused by this oversight.
j Sincerely, j
04;mt signM by DaalglR.!A'f ofd Il Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing
Enclosures:
DISTRIBUTION:
Updated TS pages t.. Docket File OPA 3.2-10 and 3.2-33 NRC PDR LFMB Local PDR Gray. File i
cc w/ enclosures:
PD//2 R/F j
See next page RBernero SNorris GRivenbark OELD i
LHarmon EJordan BGrimes JPartlow TBarnhart-(4 cys for each docket'No.)
WJones F0B, DVasallo
{
ACRS (10) 0FFICIAL RECORD C(
DBL:PD#2 DBLa 2
DBL J:2:D P
SN is:nc GRiv ark D$lfra 2/A6f86 2/l /86 2/2//86 8603030499 860 Q^
PDR ADOCK 0 PDR-P
= -
6 i
r Mr. J. T. Beckham, Jr.
Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:
G. F. Trowbridge, Esq.
Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. L. T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Lcuis B. Long Southern Company Services, Inc.
P. O. Box 2625 Birmingham, Alabara 35202 Resident inspector U.S. Nuclear Regulatory Commission Route 1, P. O. Box 279 Baxley, Georgie 31513 Regional Administrator, Region II i
U.S. Nuclear Regulatory Commission,
~
101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning ano Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 4
c