MONTHYEARML19350D1211981-04-0101 April 1981 Ack Receipt of Transmitting Results of Feasibility Studies for NUREG-0737,Items II.K.3.16 & II.K.3.18.Recommendations & Conclusions Will Be Given Upon Completion of Review.Response to Be Submitted by 810417 Project stage: Other ML19347E2571981-04-16016 April 1981 Submits Plans for Reduction of Safety Relief Valve Failures: Replacement of three-stage w/two-stage Pilot Assemblies;Low Level Trip Setpoint for MSIV Lowered & Adoption of Procedure to Manually Open Valves After Pressure Relief Action Project stage: Other ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept Project stage: Other ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept Project stage: Other ML20077G9601983-07-28028 July 1983 Responds to NUREG-0737,Item II.K.3.18, Mod of Automatic Depressurization Sys Logic. Util Will Implement Second Option If Required Bypass Timer Setting Provides Significant Margin Above 2 Minute Delay in Current Logic Project stage: Other ML20112F7431984-04-30030 April 1984 Bypass Timer Calculation for Automatic Depressurization Sys Mod for Hatch Units 1 & 2 Project stage: Other ML20090L1851984-05-21021 May 1984 Advises That Mods to Automatic Depressurization Sys,Per NUREG-0737,Item II.K.3.18,will Be Completed by End of 1985 Refueling Outages Project stage: Other ML20091K4631984-06-0101 June 1984 Responds to 840412 Request for Info Re Implementation of NUREG-0737,TMI Action Item II.K.3.16, Reduction of Challenges & Failures of Relief Valves. Unit 1 Converted to two-stage Safety Relief Valves in 1978 Project stage: Request ML20112F7311985-03-19019 March 1985 Application to Amend License NPF-3,revising Tech Specs by Adding Limiting Conditions for Operation & Surveillance Requirements for Bypass Timers,Tmi Action Plan Item II.K.3.18.GE Bypass Timer Actuation... Encl.Fee Paid Project stage: Request ML20132E5471985-08-23023 August 1985 Rev 0 to Engineering Svc Procedure 42EN-ENG-011-OS, Scram/ Transient Reporting Project stage: Request ML20134L4631985-08-23023 August 1985 Proposed Tech Specs Re Automatic Depressurization Sys Instrumentation to Reflect Planned Logic Mod Project stage: Other ML20134L4471985-08-23023 August 1985 Application for Amend to License DPR-57,revising Tech Specs Re Automatic Depressurization Sys Instrumentation to Reflect Planned Logic Mod Per TMI Action Item II.K.3.18.Fee Paid Project stage: Request ML20151Y4631986-01-29029 January 1986 Safety Evaluation Supporting Amend 122 to License DPR-57 Project stage: Approval ML20141N0651986-02-21021 February 1986 Errata to Amend 122 to License DPR-57,providing Tech Spec Pages 3.2-10 & 3.2-33 Re Instrumentation Which Initiates or Controls Automatic Depressurization Sys Project stage: Other ML20141N0571986-02-21021 February 1986 Forwards Errata to 860129 Amend 122 to License DPR-57, Including Tech Spec Pages 3.2-10 & 3.2-33 Inadvertently Omitted from Original Submittal Project stage: Other ML20137X3821986-02-28028 February 1986 Requests Approval to Complete Installation of Automatic Depressurization Sys Manual Inhibit Switches Associated W/ NUREG-0737,Item II.K.3.18 During Spring 1987 Unit 1 & Spring 1988 Unit 2 Refueling Outages Project stage: Other 1984-05-21
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
'
Georgia Power Company 333 Piedrroit Avenue Atlanta, Georgia 30308 Telephone 404 5264526 t ff e ox 4545 Atlanta Georg;a 30302
- GeorgiaPower L T. Gucwa im soutwvn eecmc system Mana;;er Nuclear Safety and LKensirig Departrrent 0110C February 28, 1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 and 2 NUREG-0737 ITEM II.K.3.18: ADS LOGIC MODIFICATION Gentlemen:
By letters dated July 28,1983 (NED-83-398), March 18,1985 (NED-85-125) and August 23, 1985 (NED-85-578), Georgia Power Company (GPC) committed to implementation of Automatic Depressurization System (ADS) logic modifications with the exception of a manual inhibit switch in Hatch Units 1 and 2 during the 1985 refueling outages.
That partial implementation will be completed on schedule.
GPC hereby proposes to complete installation of the inhibit switch during the Spring 1987 Unit 1 and the Spring 1988 Unit 2 refueling outages respectively.
The ADS logic modification, which satisfies the requirements of NUREG-0737 Item.
II.K.3.18, consists of adding a timed bypass of the high drywell pressure permissive after a sustained low reactor water level and a manual ADS
" inhibit" ' switch.
GPC originally committed to implementing the entire modification during the 1985 refueling outages 'but later deferred the manual inhibit switch for reconsideration at a later date.
The inhibit switch, which is intended to prevent ~ automatic depressurization during an anticipated transient without scram (ATWS), was deferred so that its installation could be coordinated with resolution of the ATWS issue.
8603060178 860228 f
PDR ADOCK 05000321
'I p P
PDR,)
1 k
Georgia Power h Director of Nuclear Reactor Regulation l
Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 February 28, 1986' Page Two The schedule proposed for the installation of the manual inhibit switch is the same as that approved by NRC for ATWS-modifications required by 10 CFR 1
50.62 The proposed schedule also results in installation of the inhibit switch during the first outages following the scheduled implementation of j
Emergency Operating Procedures, thereby providing procedural guidance on use of the switch, i
Based on the above consideration, GPC requests NRC approval of the l
proposed schedule for installation of the ' inhibit switch associated with
~
N11 REG-0737,. Item II.K.3.18 l
Please contact this office if you have any questions.
f Very truly yours, erf7*+ = =
L. T. Gucwa I
l
)
JH/lc i
xc:
Mr. J. T. Beckham, Jr.
j Mr. H. C. Nix, J r.