MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Directors Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20046D4211993-08-11011 August 1993 Notification of Significant Licensee Meeting 93-108 W/Util on 930820 in King of Prussia,Pa to Discuss Cost Control & Procedure Adherence ML20035F2141993-04-14014 April 1993 Notification of 930428 Meeting W/Util & Naesco in Rockville, MD to Discuss Use of Fixed Incore Detector Sys & Setpoint Methodology ML20044C2081993-03-16016 March 1993 Notification of 930323 Meeting W/Util in Berlin,Ct to Discuss Various Licensing Issues of Common Interest.Agenda Encl ML20012G6181993-03-0101 March 1993 Submits Third Progress Rept Re Initial Data Evaluation & Development of Recommendations of Current Programs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant ML20126J6211992-12-24024 December 1992 Forwards LER 88-009-01 Issued on 921113,discussing Increased Thrust Bearing Loading for RHR Pumps When Pumps Run at Reduced Flows.Concern Raised That Inservice Testing May Not Detect Problem Soon Enough to Avoid Failure ML20125B4461992-11-30030 November 1992 Notification of 921203 Licensee Meeting in King of Prussia, PA to Discuss Auxiliary Operator re-licensing Plans 1999-09-16
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N4611999-10-22022 October 1999 Forwards Revised Pages 11,14 & 71 of Rept & Order Dtd 990608.Revs Are Textual Changes to Clarify & Confirm Action Taken by Nuclear Decommissioning Financing Committee ML20217J8951999-10-21021 October 1999 Staff Requirements Memo Re Affirmation Session on 991021, Rockville,Md (Open to Public Attendance) ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Directors Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210K4141999-08-0404 August 1999 Forwards Signed Originals of DD Issued Under 10CFR2.206. Without Encl ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20206U9631999-05-18018 May 1999 Notification of Significant Licensee Meeting 99-27 with Util on 990602 to Discuss Predecisional Enforcement Conference - NRC Investigation ML20206R1691999-05-0707 May 1999 Rev 1 to Notification of 990602 Significant Licensee Meeting with Listed Attendees in King of Prussia,Pa Re Predecisional Enforcement Conference Concerning NRC Investigation.Rev Sighted Date Change ML20207G5681999-03-0808 March 1999 Informs That Commission Memorandum & Order (CLI-99-06), Issued on 990305,appointed TS Moore as Presiding Officer for Seabrook License Transfer Proceeding.With Certificate of Svc.Served on 990309 ML20207F5021999-03-0505 March 1999 Staff Requirements Memo Re 990305 Affirmation Session, Rockville,Md (Open to Public Attendance).Commission Approved Memo & Order Which Granted Util Intervention Petition & Request for Hearing ML20197H1211998-12-0808 December 1998 Forwards Exam Rept with as Given Written Exam for Test Administered at Facility on 981019-23 ML20195C7641998-11-13013 November 1998 Forwards Pages That Were Faxed to J Peschel on 981113 in Preparation for Telcon That Will Be Scheduled Wk of 981116. Info in Attached Pages Based on Info Obtained from Licensee & Includes Specific Subjects to Be Discussed with Licensee ML20153G0231998-09-24024 September 1998 Informs That Office of Secretary Experienced Problems with Dedicated e-mail Address.In Effort to Maintain Electronic Mailbox for Parties Filing by e-mail,alternate Mailbox Created.With Certificate of Svc.Served on 980924 ML20153E4211998-09-24024 September 1998 Informs That Ofc of Secretary Experienced Problems with Listed e-mail Address.Alternate Mailbox Has Been Created in Effort to Maintain Electronic Mailbox for Parties Filing by e-mail.With Certificate of Svc.Served on 980924 ML20239A3361998-09-0404 September 1998 Forwards Request for Hearing & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League & New England Coalition on Nuclear Pollution Re Proposed License Amend for Seabrook Unit 1 ML20249A6691998-06-15015 June 1998 Forwards Request for Hearing, & Submitted by RA Backus on Behalf of Seacoast Anti-Pollution League. Petition Was Filed in Response to Notice of Proposed Determination by Staff ML20217M7161998-04-0303 April 1998 Notification of 980219 Meeting W/North Atlantic Energy Svc Corp in Rockville,Md to Discuss Great Power Corp Response to RAI Re Decommissioning Funding Assurance ML20216G5891998-03-0606 March 1998 Notification of Significant Licensee Meeting 98-25 W/Util on 980324 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Rept 50-443/97-08 (EA-98-073) ML20198S4161998-02-26026 February 1998 Submits Impact of New Decommissioning Funding Rule on Great Bay.Staff Intends to Propose Some Addl Mechanisms That Appear to Offer Assurance Equivalent to What Existing Mechanisms Provide ML20203B9021998-02-0909 February 1998 Notification of 980219 Meeting W/North Atlantic Energy Service Corp in North Bethesda,Md to Discuss Proposed License Amends to Support Current Operating Cycle & Plans for Conversion to Improved Standard TSs ML20199E8881998-01-23023 January 1998 Notification of 980204 Mgt Meeting W/North Atlantic Energy Svc Corp in Rockville,Maryland to Discuss SALP for Period Covering 960505-971206 as Documented in SALP Rept 50-443/97-99 ML20198N0191998-01-0909 January 1998 Forwards Draft Rept, ,to Docket for Seabrook Station,Unit 1.Draft Rept Provides Licensee Preliminary Root Cause Analysis for Leaks in Piping of B Train of RHR System.Leakage Reported by Licensee on 971205 ML20203D2971997-12-0909 December 1997 Notification of 971216 Meeting W/Utils in Rockville,Md to Discuss Decommissioning Funding Assurance ML20211E7301997-09-23023 September 1997 Notification of 971028 Meeting W/North Atlantic Energy Service Corp in Rockville,Md to Discuss Approach for Extending Surveillances to 24-month Intervals ML20217B0471997-09-11011 September 1997 Notification of 970924 Meeting W/Eastern Utility Associates & North Atlantic Energy Service Corp in Rockville,Md to Discuss Proposed Electric Generating Asset Divestiture Plan ML20141D8191997-06-26026 June 1997 Forward 970624 Memo from P Milano to C Hehl Re Response to TIA Concerning Vantage 5H ZIRLO Fuel Problems at Plant,To Be Placed on Docket 50-443 & Made Publicly Available ML20141C9921997-06-24024 June 1997 Responds to 970605 TIA Re VANTAGE-5H ZIRLO Fuel Problems at Seabrook.Staff Has Not Identified Any Restart Concerns Re Reloading of VANTAGE-5H ZIRLO Fuel Used During Cycle 5 & W/Fresh VANTAGE-5H ZIRLO Fuel for Cycle 6 at Plant ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134H7931996-11-0606 November 1996 Partially Deleted Memo Re 950502 Meeting W/Northeast Utilities Re Listed Topics ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20129C0271996-10-11011 October 1996 Notification of 961030 Public Meeting of Nuclear Decommissioning Committee ML20129E2011996-09-25025 September 1996 Notification of 960930 Meeting W/Util in Rockville,Md to Discuss Status of Great Bay Power Corp as Electric Util ML20147J3281996-07-10010 July 1996 Discusses Staff Response to SRM M960612, Briefing on Part 100 Final Rule on Reactor Site Criteria. Staff Believes That Draft Final Rule Language May Be Misinterpreted as Implicity Overruling in Conflict W/Seabrook Decision ML20129D1831996-07-10010 July 1996 Informs of 960716 Visit W/B Patricelli,Cm Cleveland & Gw Davis of Northeast Utilities,Inc Re Introductions & Discussions of Millstone Point & Haddam Neck Issues ML20134B6681995-10-13013 October 1995 Forwards Briefing Package on Status of Listed Plant Units,As Background for Visit by Northeast Utils on 951018-19 ML20087B8531995-07-25025 July 1995 Forwards State of Nh Nuclear Decommissioning Finance Committee Third Supplemental Order Approving Revised Funding Schedule by North Atlantic Energy Svc Corp ML20134B5861995-06-0101 June 1995 Forwards Briefing Package on Status of Plants as Background for Util Visit on 950608 ML20134B5721995-04-26026 April 1995 Forwards Briefing Package on Status of Listed Plants,As Background for Visit by Util on 950502.Supporting Documentation Encl ML20078S9391994-12-23023 December 1994 Forwards State of Nh Nuclear Decommissioning Finance Committee (Ndfc) Ndfc 93-1, Brief of Nh Public Utilities Commission Staff ML20134B4931994-02-16016 February 1994 Forwards Updated Briefing Package for Visit by Util Officials W/Nrc Chairman,Commission,Edo,Director OI & Director Oe.Requests Replacement of Encls 1 & 2 in 940215 Package,Retaining Supporting Attachment 1 Documentation ML20059J8371994-01-0606 January 1994 Notification of Significant Licensee Meeting 94-05 W/Util Emergency Preparedness Mgt Working Group on 940210 ML20058L9281993-12-15015 December 1993 Notification of 931221 Meeting W/North Atlantic Energy Svc Corp,Yaec & Intl Tech Svcs,Inc in Rockville,Md to Discuss Application of YAEC-1856P Methodology to Plant ML20058C9681993-11-19019 November 1993 Notification of Significant Licensee Meeting 93-147 W/Util on 931208 Re SALP Mgt Meeting for Period of 920301-930828 ML20059J2321993-11-0505 November 1993 Forwards Safety Evaluation Accepting LAR 92-14,submitted Via for TS Changes to Allow Independent Fixed Incore Detector Sys at Facility to Be Used for Periodic in-core Power Distribution TS SRs ML20046D4211993-08-11011 August 1993 Notification of Significant Licensee Meeting 93-108 W/Util on 930820 in King of Prussia,Pa to Discuss Cost Control & Procedure Adherence ML20035F2141993-04-14014 April 1993 Notification of 930428 Meeting W/Util & Naesco in Rockville, MD to Discuss Use of Fixed Incore Detector Sys & Setpoint Methodology ML20044C2081993-03-16016 March 1993 Notification of 930323 Meeting W/Util in Berlin,Ct to Discuss Various Licensing Issues of Common Interest.Agenda Encl ML20012G6181993-03-0101 March 1993 Submits Third Progress Rept Re Initial Data Evaluation & Development of Recommendations of Current Programs ML20128K8601993-02-0202 February 1993 Notification of Significant Licensee Meeting 93-13 W/Util on 930210 to Discuss General Engineering Programs ML20126K1461993-01-0505 January 1993 Notification of 930106 Meeting W/Util in Rockville,Md to Discuss Transfer of Control of Interest of Eua Power in Plant 1999-09-16
[Table view] |
Text
- 'd. z.
r,,
f}
dl 13.~.
/go ce c.,,*i, NUCLE AR REGULATOp(tCOJqMI ff.,
(
UNIT ED ST ATE
[ 1 A 4- _.
j
- - -. *i wass Noto 'o c. ejs 7
h
's
/
M-6
(
[
/
h[
jig {(~
E'E MEMORA!1DUM TOR:
David C.
Williams r
/[
Inspector General V
TROM:
Samuel J.
Chilk, Secr SU BJ ECT:
MATERIAL SUBMITTED BY ST PHEli COMLEY Mr. Stephen Comley gave my office the attached set of
.aterials at the. Commission's March 1, 1990, Affirmation Session on Seabrook.
We have discussed the disposition of the materials with the General Counsel's offica and are referring this set to you for your appropriate action.
With regard to the photograph (see last attachment), Mr. Comley claims it is a picture of his giving former President Reagan a letter in October 1987 which indicated that there was a problem with substandard parts-in the nuclear industry.
Mr. Comley has been advised of this referral.
The attachments are also being placed 4.n the (orrespondence file for Seatrook and in the Public Document Room.
Attachments:
1.
Speech, 3/1/90 2.-
Press release, 3/1/90 3.
Press Pockets Summaries 4.
Additional press clippings 5.
Photo e c:
Chairman Carr Commissioner Roberts Commissioner Rogers Commissioner Curtiss Commissioner Remick OGC EDO C.PA/ PA h
/ }
N,%-
l 9208130095 911209 4/
O PDR FOIA
/
ROBINSO91-351 PDR.
6 l
- = -.. -
x NQCt89372
')
S SI'f'891001
/
s New Hampsh.ire
\\
Yankee g
u.sya i
- - ~ -
I Subject QSR b.
057 and 89-058 I'0*
S. P. Euchwald D to July 11, 1989 To Reference H. D. Ifarrington Attached please find a copy of the Surveillance Report which documents the N!!Y surveillance of repair / fabrication activities performed by Neles.
Jamesburg (formerly ITT Hamel Dahl) their Warwick RI facility on June 8 at and 9, 1989 and June 15, 1989.
The surveillante involved the witnessing of activities associated with the fabrication of three (3) stems, and the installation of carbon graphite rings, restoring / verifying concentric bore of cages, and restoring surface finish and senting surface of plugs / cages for valves 1-MS-V-393, and 89-058.
1-MS-V-394 and 1-MS-V-395 as requested by QSR 87-057 All requested services have been completed and all items have been shipped.
QSR 89-057 and 89-058 are considered complete.
If there are any questions, call G.L. Jasinski (x3148).
) 7 AueA.. nf{'
S. P. Buchwald Quality Assurance Supervisor SPB/TRF/ caw cc:.J.J. Warnockr R.L. Martin (YAEC)
M.E. Kenney G.J. Kline J.E. Cade P.R. Lovett File 17.2.5.32 6d, b,%g 17.2.10.8.2 File (2) f[ f m
I New Hampshira Yankee Division of Public Service Company of New Hampshire P.O. Box 300
r.
f SURVEILLANCE OF SHOP ACTIVITIES i
~
AA.
OF NELES-JAMESEURG
- n (Tormerly ITT Hammel-Dahl)
Vendor Personnel _ contacted Durinn Surveillance e
Neles-Jamesburg-Donald 4. Quelette (ITT Hammel Dahl)
Quality Assurance Manager
-174 Port Road Varwick RI 02888 i
Dates of Surveillances Purchase Orders i
June 8.and 9, 1989 PO 67386-(MPR'320835)
{
. June 15, 1989' PO 67399 (MPR 320340)
~(
PO 67400 (MPP 320341)
I Purnose-The purpose of toe: surveillance was to witness activities directly
.o affecting the fabrication of three (3) spare stems and the reworking of-the cages.and plugs for valves 1-MS-V-393,1-MS-V-394 and 1-MS-V-395.
-Surveillance The. vendor has a. currently approved quality program in place which has o
been audited _by YAEC and several other utilities which meets the requirements of 10CFR50 Appendix B.
The QA Manual issue is Rev. 2 dated May 1 1987, o The shop is very clean, neat and well equipped. ' Controlled materials
.l are stored in locked" areas. Materials issued for a particular job are carefully palletized or placed in containers and tagged for t
identification.-'The three bars for.the stems were identified with the heat: number at the time-of cutting.
The cages and plugs were temporarily identified by NHY Inventory personnel prior to release.
The cages and plugs original-permanent markings were still legible, Material-traceability was maintained.
The hard-surfacing of.the stems was-witnessed.. Welding electrodes are o
kept under' lock with-keys available only to the plant foreman and QA' Manager.
Stellite-Alloy ~ No. _6_ Heat No. '2-0405 ve s issued to two welders.
' y; The hard_ surfacing electrodes'ma'terial certifications met the
- requirements.of' SFA :5.13 AVS Classi fication RC0CR-A.
The qualifications papersiand the maintenance of proficiency-_for each weldcr was reviewed and found acceptable. -The welding was monitored and found to meet the-essential and non-essentia1' variables;of. welding procedure SP42 Rev. 3.
' Af ter the hard" surfacing.was applied. to each bar, the bar was buried in vermiculite"and allowed to cool overnight. 'The velding machine (B-6? was
-calibrated 3-9-89 and was not due for calibration until 9-15-89.
Most of_the micrometers used in the: facility are privately owned. All' o-personnel: and company micrometers 'are tracked. by the Compr'y's rolling calibration program.' All tools' requiring calibration are oken down 71nto' twelve groups with a different group of micrometers beang calibrated
- cach month ~.
~. An-informational'11guid penetrant was performed on the three rough o
machined stems. 'LP. procedure 106-200 Rev.14 was used by W. Gosselin.
, I_.
_ _, _.. _ _, _., =,,. _., _, _ _ _ _ _. _ _
4, _,.
V Page 2 The inspector's LP Level 11 certification acceptab'e tc Code and the vendor's prog 4am, eye exam ewed and found During the two visits, critical measurements were o
verification and recording done by myself.
made by the vendor with were FAX'd to Tech Support.
Cage and plug measurements Copies were attached to Qualtiy Shipment
- Releases, The lapping of all three plugs along with the pinni o
MS-V-394 the installation of carbon graphite ringsng of the stem for 1-marking snd packaging of all three cage / plug assemblies, the cleaning, and determined to meet procurement requirements.
were witnessed June 15, 1989's visit covered the measuring o
packaging and document review of the three (3), fina. LP, cleaning, A5, and A6.
slight deviation of non-critical dimensions was disAn Inspec addressed a measurements were reviewed by the vendor's ergineering g cussed.
The acceptable, roup and found J. Santis, o
illness of W. Cosselin.the LP Level III, did the final LP on th e stems due to the used as previously reviewed.The same test procedure and test materials were Three indications were evaluated by J.
Santis and found acceptaLle.
I J.
III certifications uere reviewed and found acceptSantis's eye examination a b).e.
Manager and NHY's ANII.A Manufacturer's Data Report was prepared o
gned by the Vendor's QA A documentation package was presented to myself and the N!!Y ANII consisting of a Certificate of Compliance -
Conformance, Manuf;cturer's Data Report Velding Data Reports (2),
, QA Check-List.
CMTR for the hard surfacing electrodeMaterial CMTR.
Penetrant Test R9 port (2) and Inspection Report Control No
, Liquid
. N52110.
o The three (3)
A 32 3/4" long remaining piece of the NHY suppli dscem me.
returned with the miss-marked heat number (X11103) o e round was supplied by Cardinal.
89QA409/CID56516205 Inventory's temporary markingson one end as was still legible on the sid e, The vendor had two (2) o 6405811RA purchased and machined specially for 1 Mspare carbt n gra use to the vendor.
NQG will confer with MRD concerning how to getThese rings hav Inventory.
these rings into er..
Three Quality Shipment Release forms were issu d f o
required by QSR-057 and QSR 89-058, e
or the activities conclusion facility is neat,The vendor is well organized, knowledgeable and well versed in the quality requirements ana rerpclean, well orga The The personnel are on sibili tie s.
They take h
Page 3 great pride in their work.
It can be safely stated that the facility has a
)
quality program meeting the requirements of 10CFR50. Appendix B.
All the requirements of the purchase orders were met.
-7 O
n mf M d or'I Prepared By q "5E.au R. Frolom 46k' Approved Ey s.
/in<h
/'
Th
~
S. P. Buchwald l
Q. A. Engineer QA Superviror Nuclear Quality Group Nuclear Quality Group 1
References
- 1. Po 67386 MPR 3203335
- 2. PO 67399 HPR 320340
- 3. PO 67400 HPR 320341
- 4. NHY Procurement Clauses:
000D OllB 305B 418A 907C 004C 012B 332A 630C 007B 013C 334B 631C 010C 015C 40/B 633C 5.
QSR 89-057 and 89-058
)
.