ML20141L990

From kanterella
Jump to navigation Jump to search
Notice of Withdrawal of Application for Amends to Licenses DPR-24 & DPR-27
ML20141L990
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/30/1997
From: Gundrum L
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20141L984 List:
References
NUDOCS 9706040029
Download: ML20141L990 (2)


Text

__ _.. -... - _ _ _ _ _.. _

7590-01-P I

UNITED STATES NUCLEAR REGULATORY COMMISSION WISCONSIN ELECTRIC POWER COMPANY DOCKET NOS. 50 266 AND 50-301 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Wisconsin Electric Power Company (WEPCO, the licensee) to withdraw its October 23,1995, application for proposed amendments to Facility Operating Licenses Nos. DPR-24 and DPR-27 for the Point Beach Nuclear Plant, Unit Nos.1 and 2, located in Manitowoc County, Wisconsin.

The proposed amendment would have revised the facility operating licenses and technical l

specifications to change the company name from Wisconsin Electric Power Company to l

l Wisconsin Energy Company.

l The Commission had previously issued a Notice of Consideration of issuance of Amendments published in the FEDERAL REGISTER on December 20,1995 (60 FR 65687).

l However, by letter dated May 19,1997, the licensee informed the Commission that the Boards i

of Directors of Northem States Power Company and WEPCO mutually agreed to terminate their proposed merger, and WEPCO withdrew the proposed change.

l l,

9706040029 970530 PDR ADOCK 05000266 P

pg

g __

l.

e 1

  • For further details -with respect to this action, see the application for amendments dated October 23,1995, and the licensee's letter dated May 19,1997, which withdrew the application for license amendments. The above documents are available for public inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW.,

Washington, DC, and at the local public document room located at the Joseph P. Mann Library,1516 Sixteenth Street, Two River, Wisconsin.

Dated at Rockville, Maryland, this 30th day of May 1997.

FOR THE NUCLEAR REGULATORY COMMISSION Linda L. Gundrum, Project Manager l

Project Directorate 111-1 Division of Reactor Projects -Ill/IV Office of Nuclear Reactor Regulation i

,