ML20069G025
| ML20069G025 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/11/1983 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20069G023 | List: |
| References | |
| TAC-07757, TAC-08173, TAC-7757, TAC-8173, NUDOCS 8303240361 | |
| Download: ML20069G025 (2) | |
Text
m 7590-01
~,
(
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-266 AND 50-301 WISCONSIN ELECTRIC POWER COMPAHY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICEN5ES The U. S. Nuclear Regulatory Comission (the Comission) has
~
issued Amendment No. 69 to Facility Operating License No. DPR-24, and Amendment No. 74 to Facility Operating License No. DPR-27 issued to Wisconsin Electric Power Company (the licensee), which revised Tech-nical Specifications for 5peration of Point Beach Nuclear Plant, Unit Nos.1 and 2 (the facilities) located in the Town of Two Creeks, Manitowoc County, Wisconsin. The anendments are effective _as of the date of issuance.
The amendments revise the Appendix B Environmental Technical
-Specifications to delete non-radiological water quality requirements as permitted by the Federal Water Pollution Control Act Amendments of 1972.
~
The application for the amenaments complies with the standards and_ requirements of the Atomic Energy Act of 1954, as anended (the
. Act),- and the Comission's rules and regulations. The Comission has
- ~
made appropriate findings as required by the Act and the Comission's~
rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. ' Prior pu.blic notice of these amendments was not required since the amendments do not involve a significant hazards consideration.
~
B303240361 830311 PDR ADOCK 05000266 P
, 7.590 ;
t-i' 2-
-i The Commission has determined that the issuance of these amendments t
will not result in any significant environmental impact and that pur-
[
scant to 10 CFR 51.5(d)(4) an environmental impact' statement or negative declaration al.d environmental inpact appraisal need not=be prepared in cc,nection with issuan,ce o'f these amendments.
For further details with respect to this action, see (1) the applica-tion for amendments dated September 21, 1978 as ' modified October 1,1981, (2) Amendment Nos. 69 and'.;74 to License Nos. DPR-24 and DPR-27, and (3).
the Commission's letter to the licensee dated March 11, 1983 All of these items are available for public inspection at the Commission's Pt.blic Document Roon,1717 H Street, N.W., Washington, D.C. 20555, and at the Jose ~ph Mann Library, 151616th Street,.Two Rivers, Wisconsin '54241.
A copy of itens (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this lith day of March,1983.
FOR THE NUCLEAR REGULATORY COMMISSION
. 2..
n J
l Ayw Robert A. Clark, Chief.
Operating Reactors Branch #3 Division of Licensing
,p w-
, -