IR 05000344/1985035
| ML20141K041 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 12/17/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20141K032 | List: |
| References | |
| 50-344-85-35, NUDOCS 8601220142 | |
| Download: ML20141K041 (42) | |
Text
,
.-.
_ -.
.,
.
,
' - 'd,
'/ s
'.i
,
..
6
,,,
'
' s-
,1 +
-
,
,
,
,
,.
f.
,
,s
'.x
^
.
s g g
,
,
'
,
.
" i
~ < -
,
,.
y f
.'q 4 ',
9. ?
>
.
,.
..
iU.S. NUCLEAR REGULATORY # COMMISSION s
_,
.. REGION V
,,
..
.,...
- +
,
,.
r
- -
,
.,
..
4
~
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE FOR PORTLAND GENERAL ELECTRIC COMPANY TROJAN NUCLEAR PLANT e
REPORT No.. 50-344185-35 i
EVALUATION PERIOD: '11/1/84-10/31/85-
.
'
~ ASSESSMENT CONDUCTED: December 17,.1985'
^
B601220142 86010$
,
PDR ADOCK 05000344 s
.
G PDR
[
l
.
..
-
-
se
._
s m
.-__.
m
_.__ _
..I_._.%
)
.7
- _ p h_
_.. -
~.
,
- -. _ -..
.
....
.
.
....
-
.
....
-,
.....,
..-
- g v le
,
i
'
i SUMMARY (11/1/84 - 10/31/85)
i
. TROJAN NUCLEAR PIANT
~
l
,
,
-
I
'
'
Inspections' Conducted
=
.
'#
'
'I
~H
' Inspection * Percent Enforcement Items
'
Functional Area
' Hours *'
Effort Severity Level **
,
i
_
_I _II III
- V_. _V Dev I
s
..
1.
Plant Operations 7 "1 1447 41.82
,
2.
Radiological Controls 191'
5.52
'
<
,
'
3.
Maintenance 185'1
'
5.35
1
-
l
,
,
4.
Surveillance 358,,
10.35
5.
Fire Protection 38
1.10
6.
229 6.62 7.
Security and Safeguards
2.08 8.
Refueling
2.86 9.
Quality Programs and 716 20.69
Administrative controls 10.
Licensing
0 11.
Engineering and
2.17
Construction 12.
Training
1.44 TOTAL 3460 100
't
- Allocations of inspection hours to each functional area are approximations based upon NRC Form 766 data,
!
- Severity levels are in accordance with NRC Enforcement Policy (10 CFR Part 2, Appendix C).
Data reficcts Reports 84-30 through 85-38 (85-37 omitted)
I I
.
!
-
-
(
o
,
'
-
o-
>
-
,-
,
,
$
'
,
TABLE _2
,
TROJENNUCLEARPLANTENFORCEMENTITEMS
..
(11/1/84 - 10/31/85)
Inspection Report No.
.
Severity Functional Subject Level Area 84-30 Fire Protection Personnel had no IV
drills for the year.
85-04 Total channel response time for IV
Reactor coolant pump undervoltage and underfrequency reactor trips had not been demonstrated every 18 months.
85-08 Testing Installation Results IV
section of Maintenance Request (HR)
'
forms was lef t blank and unsigned after completion of quality related maintenance.
Deviation - Overtime Authorization was not granted for various personnel.
,
a 85-14 Licensee failed to evaluate the IV
extremity exposures due to non-penetrating radiation following
the steam generator insert
!
handling occurrence.
!
85-16 Four of twelve SFP racks were not V
'
verified by signature as havinn the second set of rack feet properly installed.
Danger tag number 4 of clearance IV
85-1066 was on a drain valve off the 'B' train containment spray header downstream of the contain-ment penetration. The tag was shown as cleared on the clearance sheet that had been filed in the released clearance file.
85-20 Companion valves of failed valves IV
were not tested in accordance with ASME Section XI, Subsection IWV-3513.
- - - - - -. - -
. _.
- o o
TABLE 2 TROJAN NUCLEAR PLANT ENFORJEMENT ITEMS (11/1/84 - 10/31/85)
Inspection Severity Functional Report No.
Subj ect Level _
Area 85-32 Calibration of Pressurizer IV
Pressure Instruments.
85-34 Helium Gas Bottles attached to a IV
Seismic Category I line without safety evaluation being performed.
85-36 Inadequate Documentation of IV
.
Test equipinent and Setpoint l
Tests.
l l
85-38 Safety-Related Procurement.
IV
l l
l l
!
l l
l i
!
!
{
l l
I l
l
- -
-
-
-. - - -
.
-
.
.-.
- -.
.
-
-
-
...
l o
,
' TABLE 3 l
SYNOPSIS OF LICENSEE EVENT REPORTS **
,
l TROJAN NUCLEAR PLANT Functional SALP Cause Code *
Area A
B C
D E
X Totals 1.
Plant Operations
0
0
0
2.
Radiation Protection
0
0
0
3.
Maintenance
0
0
0
4.
Surveillance
0
1
0
i 5.
Fire Protection
0
0
0
6.
0
0
0
7.
Safeguards
0
0
0
!
8.
Refueling
0
0
0
9.
Quality Programs and
0
0
0
Administrative Controls (
Affecting Safety 10.
Licensing
0
0
0
l 11.
Engineering and
2
0
0
l Construction i
12. Training
0
0
0
TOTALS
2
1
0
f
- Cause Codes:
A-Personnel Error B-Design, Manufacturing or Ins'tallation Error C-External Cause D-Defective Procedures
E-Component Failure
'
X-Other
~
- Synopsis includes I.EH Nos. 84-21 through 85-12.
.
L
- -
. - -
-
- - - - - - - - -
-.-
-
-_
..-
-
..
.
'
. <,,
,.
'
.
-
s
'
TABLE 4
!
t
' TROJAN NUCLEAR PLANT
'
J Licensee Event _ Reports
!
t
,
(11/1/84
'10/31/85)
!
LER TITLE SALP AREA /CAUSE CODE *
,
t i
84-21 Service Water System Flow Rate Problems 11/B i
l 85-01 Incomplete Seismic Qualification of 11/B Auxiliary Feedwater Control Valve
'
j Control Elements i
85-02 Turbine Trip, Reactor Trip and Subsequent 1/E -
'
fleater Drain Pipina Failure i
l 85-03 Inadvertent Safety injection Due to 3/E l
Circuit Failure 85-04 Inadvertent Safety injection 4/A i
<
t 85-05 Penetrr. tion Failed Containment Local Leak 4/E
'
<
Rate Test 85-06 Pressurizer Level Transmitters out of Calibration 4/E i,
,.
!
l)
85-07 NIS Power Range Rate Trip setpoints Exceeded 4/D l
Allowable Values
1 85-08 Inadvertent Safety Injection 4/A
85-09 Reactor Trip Resulting From L' nit Auxiliary 1/E j
Transformer Cooling Failure
,
i
!
85-10 Reactor Trip Due to Overpower delta T and 3/E j
over temperature delta T trip nignals
,
85 11 Pressurizer Pressure Instruments Incorrectly 4/A Calibrated i
85-12 Reactor Trip from Personnel Error Causing Loss 1/A
'
of Main Feedwater Pump Suction
'
- Cause Codes:
A Personnel Error B-Design, Manufacturing or Installation Error C External Cause i
D-Defective Procedures E Component Failure X-Other
!
.
N
-.
-. -.. - - -..
.
- - - - - -.
. -
. - - - -
. -.. - - -..
-.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ ___ -__ _ _ _ _
_ _ _ _ _ _ _
_
-
_.
- o
,
.
TABLE 5 Inspections Conducted
.
Report
-
No.
Dates Inspector (s)
Area inspected llours 84-30 11/5-9/84 Engineering '
Fire Protections
84-34 11/5-12/21/84'
Residents Routine Monthly 133
,
Inspection
!
84-35 9/1/83-10/31/84
' " Staff SALP 200
,
85-01 1/7-11/85 Hadiation Radiological
Specialist Organization and
-
l
Management (
.
85-02 1/1-11/85 Reactor Projects Procedures, Indepen-38 dent inspection Effort l
85-03 1/18-2/8/85 Emergency Prep.
Emergency Planning
l 85-04 1/7-2/15/85 Residents Routine Monthly 173 Inspection 85 05 2/4-3/1/85 Safeguards Security / Safeguards
85-06 1/21-25/85 Heactor Projects TMI Action Plan
l Inspection Followup
!
LER Followup l
l 85-07 1/28-31/85 Engineering Inservice Inspection 30
!
85-08 2/11-15/85 Operations Team Inspection 208 i
l 85-09 2/25-3/1/85 Radiation Radiological Protec-73 l
Specialist tion, Plant Chemistry.
Training, Qualifications 85-10 2/25-4/1/85 Residents Routine Monthly 178 Inspection 85-11 2/11-3/1/85 Heactor Projects Follow IE Circulars, 76 Information Notices, Bulletins, Part 21 Followup 85-12 2/1/85 Staff SALP Management
Heeting
.
m
0 g
'
s t ' 41
!
t TABLE 5 (Cont'd)
i
'
Inspections Conducted l
'
Report No.
Dates Inspector (s)
Area Inspected Hours l
85-13 4/2-5/13/85 Residents Routine Monthly 266
Inspection 85-14 5/13-30/85 ludlation Outage Exposure.
'37 Specialist ALARA Program, Followup Inspt.
l Identified Problems 85-15 5/13-17/85 Reactor Projects Design Changes and
Modification Program
-
Maintenance Routine 85-16 5/14-7/1/85 Residents Routine Monthly 305 Inspection 85-17 6/3-6/7/85 Engineering Inservice Inspection 58 Procedure and Data Review 85-18 6/3-6/7/85 Reactor Projects Offsite Staff and
i i
Committee Review 85-19 5/30-6/6/S5 Radiation Radiological Controls 2 Specialist Test Sample Resulta 85 20 6/12-21/85 Engineering Surveillance 100 Procedures and Records 85-21 7/2-8/30/85 Residents Routine Monthly 342 Inspection 85-22 7/n-26/85 Engineering Followup on Salem
ATWS Events 85-23 7/29-8/2/85 Heactor Projects Document Control
Program Test and
'
,
Hemsurement Equipt.
,
l Program l
l 85 24 8/5-8/9/85 Radiation Internal Esposure,
Specialist transcortation,
- t
^
facility tour, and
!
followup on IE
!
Information Notices
1 4-
-..
- -... - -.
- e
.
TABLE *
(Cont'd)
Inspections Conducted
,
Report No.
Dates Inspector (s)
Area Inspected llours 85-25 8/9-8/16/85 llQ VPB Effectiveness of 183 Vendors of Safety-Helated equipment 85-26 8/8/85 Reactor Projects Management Meeting
on Auxiliary Feed-water system past
history and reliability
,
85-27 8/26-9/23/85 Security Security Safeguards
85-28 10/14-18/85 Emergency Emergency Planning 181 Preparedness 85-29 8/26-30/85 Engineering THI items, open
items followup, Followup IE Circulars, INF0,Bulletins 85-30 9/9-13/85 Reactor Requalif. Training
9/23-9/27/85 Projects Program 85-31 9/9-9/27/85 Radiation Radiological and
Specialist Chemistry Confirma-tory Measurements, Water Chemistry.
Control and Chemistry Analysts 85-32 8/31-10/2/85 Residents Routine Monthly 170 Inspection 85-34 10/3-11/16/85 Residents Routine Monthly 209 Inspection 85-36 10/21-25/85 Reactor Instriunent and
Projects Electrical Main-tenance and Open items Followup 85-38 10/30-10/31/85 11Q VPB Effectiveness of
Engineering Vendors of Safety-Related Equipment Followup Inspection
)