ML20140G753
| ML20140G753 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, 05000000, 05000470 |
| Issue date: | 03/11/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Michael Scott COALITION FOR RESPONSIBLE ENERGY EDUCATION |
| Shared Package | |
| ML20140B723 | List: |
| References | |
| FOIA-86-45, REF-10CFR9.7 NUDOCS 8604030542 | |
| Download: ML20140G753 (7) | |
Text
7 i
Pb(2 0%
pu MCog I
y[g o,
UNITED STATES
- c. -
n, NUCLEAR REGULATORY COMMISSION y '-
c WASHINGTON, D. C. 20555 s,
n..s J P4AR : I y DOCKET NOS. 50-528/529/530 Mr. Myron L. Scott Intervcntion Coordinator Coalition for Responsible Energy Education 315 W. Riviera Drive IN RESPONSE REFER Tenoa, AZ 85282 TO F0IA-86-45
Dear Mr. Scott:
This is in partial resonnse to ycur letter dated January 16, 1986, in which vnu requested, pursuant to the Freedom of Inforr.ation Act (F0IA), copics of documents regarding the Combustion Engineering Auxiliary Pressurizer Spray Systen (APSS) at the Palo Verde Nuclear Generating Station and other plants, and any ACRS or other discussions pertaining to the APSS.
The documents identified on erclosed Appendix A are already available in the Public Document Room (PDR) located at 1737 H Street, NW, Washington, DC 20555. We have indicated the file location beside each document description.
We have a ko indicated which documents on Appendix A are also available at the Local Public Document Room (LPDR) for Palo Verde, located at the Phoenix Public Library, 12 East McDowell Road, Phoenix, Arizona 85004.
The documents identified on enciesed Appendix P are beinc placed in the LPDR.
The search for and review of drcuments that are subject to your request are continuing. We will notify you upon completion of the search and review.
Sincerely, L 0 Q,,.
3 Don ie H. Grirsley, Director Division of Pules and Records Office of Administration
Enclosures:
As stated kh40 2 860311 SCOTTB6-45 PDR
F01A-86-45 APPENDIX A ACRS DOCUMENTS IN THE PDR ACRS MEETINGS ACRS Accession Numbers Minutes Transcripts 1.
CESSAR System 80 Subcte Meeting, 111981 ACRS-1926 ACRST-1029 (8202040054)
(8112010471) 2.
Palo Verde Subcte Meeting, 1123-2481 ACRS-1927 ACRST-1030
- (8205060623)
- (8112010474/(T)
- (8112010465)(T) l 3.
260th ACRS Meeting, 1210-1281 ACRS-1936 ACRST-1039
- (8207110043)(0)
(8112140095/
8112160017/
8112160452) 4.
Decay Heat Removal Systems Subcte ACRS-1963 ACRST-1065 Mtg, 031682 (8205370066)
(8203180269) 5.
264th ACRS Meeting, 0401-0282 ACRS-1976 ACRST-1332 (8211060461)
(8408140133/
8408140306) 6.
292nd ACRS Meeting, 081084 ACRS-2233 ACRST-1332 (8412210084)
(8408140133/
8408140306) 7.
.Palo Verde Unit 1 Subcte Meeting, ACRS-2308 ACRST-1402 042685
- (8506110675)(0) *(8505030480)(T) 8.
Combined CE Reactors /Palo Verde Subcte ACRS-2371 ACRST-1465 Meeting, 110585
- (8601070255)(0) *(8511130299)(T) 9.
307th ACRS Meeting, 1107-0985 Not yet ACRST-1468 available (8511180540/
8511180357)
- 10. 308th ACRS Meeting, 1205-0785 Not yet ACRST-1474 available (8512120177/
8512120212)
- Indicates document is also available in the Local Public Document Room
Appendix A (Con't)
ACRS DOCUMENTS IN THE PDR (Cont'd)
ACRS LETTER REPORTS 1.
Mark ACRS ltr. 121581 to Palladino NRC, Rept. on ACRSR-0954 FDA for Combustion Engineering, Inc. Standard (8112210316)
NSSS Standard Reference System 80 2.
Mark ACRS ltr. 121581 to Palladino NRC, Rept. on ACRSR-0955 Palo Verde Nuclear Generating Station Units
- (8112210289)(0) 1, 2 and 3 3.
Shewmon ACRS ltr. 040582 to Dircks EDO, Reliability ACRSR-0970 of Shutdown Heat Removal System on System 80 Design (8204090289) 4.
Ward ACRS ltr. 051385 to Palladino NRC, Rept. on ACRSR-1132 Palo Verde Nuclear Generating Station Units 1, 2
- (8505170412)(P) and 3 (Operational Status) i 1
APPENDIX A (CON'T)
Other Documents Availablejn PDR 1.
11/03/8? Letter, E.E. Van Brunt, Jr., Arizona Public Service (APS)
Company to H.R. Denton, NRC, Accession No. 8211050143 2.
07/28/83 Letter, E.E. Van Brunt, Jr., APS, to G. Knighton, NRC, Accession No. 8308010404 3.
05/25/84 Letter, W.G. Counsil, Northeast Nuclear Energy Company, to R.C. DeYoung, NRC, Accession No. 8406080179 4.
11/28/84 Letter, E.E. Van Brunt, Jr., ASP, to NRC Region V, Accession Nos. 8412120070, 8412130628 and 8412140017 5.
09/13/85 Preliminary Notification Re: Unusual Event Associated with a Planned Load Rejection Test at Unit 1 Acc. No. 8509190416 (S)*
6.
09/13/85 Letter to NRC from E.E. Van Brunt Re: Palo Verde Nuclear Generating Station Unit 1 w/ enclosure Notification of Unusual Event, Accession No. 8509180209 (S)*
7.
09/17/85 Letter, J.B. Martin, NRC, to E.E. Van Brunt, Jr., APS, Accession No. 8509200155(S)*
I 8.
09/18/85 Letter, E.E. Van Brunt, Jr., to J.B. Martin, NRC, Accession No. 8510080353(S)*
c 9.
09/20/85 Letter, J.B. Martin, NRC, to E.E. Van Brunt, Jr., APS, Accession No. 8509270070
- 10. 09/20/85 Letter to E.E. Van Brunt from J.B. Martin Re: Return of Palo Verde 1 to Power Operations from Current Outage, Accession No. 8512030519(S)*
- 11. 09/20/85 Memo to Jack Martin from Hugh Thompson Re: Return of Palo Verde 1 to Power Operations of Current Outage w/ enclosure Confirmatory Action Letter, Accession No. 8509270063 (P)*
12.
10/02/85 Letter, J.L. Thompson, Jr., NRC, to E.E. Van Brunt, Jr., APS, Accession No. 8510110216(S)*
13.
10/08/85 Letter to J.B. Martin from E.E. Van Brunt, Jr. Re: Palo Verde Nuclear Generating Station Accession No. 8510220246 (P)*
14.
10/15/85 Letter, E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, Accession No. 8510170107 15.
10/22/85 Letter, E.E. Van Brunt, Jr. APS, to G.W. Knighton, NRC, Accession No. 8510240055(S)*
1 16.
11/25/85 Letter, E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, Accession No. 8512040021 17.
11/29/85 Letter, E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, Accession No. 8512030552 18, 12/04/85 Letter, E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, Accession No. 8512060313 19.
12/05/85 Letter, E.E. Van Brunt, Jr., APS, to G.W. Knighton, NRC, Accession No. 8512090195
- 20. 01/07/86 Meeting Summary Distribution w/ enclosures ltr. dtd. 01/7/86 from E. Licitra Re: Summary of Mtg. Concerning 9/12/85 Unusual Event During Loss of Load Test and Meeting Attendees, Accession No. 8601160145 (S)*
- 21. 01/13/86 Letter to Nunzio Palladino from Jesse Ebersole Re: Comments cn Operational Test Results of Palo Verde, Acc. No. 8602050398 (P)*
- 22. Undated NUREG-1122, Palo Verde Unit 1 Tech Specs, Acc. No. 8506240646
r APPENDIX B Documents Being Placed in the LPDR & PDR 1.
10/06/81 Memo to Combustion Engineering from C. Grimes' Re: Summary of 9/17/81 Meeting Regarding CE Appeal of Staff Positions w/ enclosures List of Attendees and Criteria (15 pages) 2.
08/31/84 Memo to J. Ebersole from A. Wang Re: Palo Verde follow-up Report w/ enclosure Ltr. dtd. 12/15/86 to Palladino from J. Carson Mark Re: ACRS Report on Palo Verde (14 pages) 3.
04/18/85 Memo to J. Ebersole from A. Wang Re: Project Status Report for the ACRS Palo Verde Subconnittee Meeting w/ attachments Project Status Report and Tentative Agenda with attachments (12 pages) 4.
06/05/85 Memo to David Ward from R. Fraley Re: Palo Verde Nuclear Power Plant w/ attachments memo from G. Reed, Minutes of the 292nd ACRS Meeting and Agenda Itens (19 pages) 5.
06/13/85 Memo to J. Ebersole, C. Michelson and G. Reed from Paul Boehnert Re: ACRS Conibustion Engineering Subcommittee Assignment of DHRS Issue (1 page) 6.
09/04/85 Memo to J. Ebersole from D. Houston Re: Status Report for Palo Verde, Unit 2 w/ attachment 1tr. dtd. 8/19/85 to George Knighton Re: Palo Verde (8 pages) r 7.
09/11/85 Memo to C. Sylie from G. Reed Re: Attached Morning Report on Palo Verde Incident w/ attachment Morning Report (2 pages) 8.
09/12/85' ANPP/NRC Meeting to Discuss PVNGS Auxiliary Spray Capability and the Startup Testing Event of 9/12/85 (13 pages) 9.
09/12/85 Sequence of Events PVNGS Unit 1 (3 pages)
- 10. 09/23/85 Memo to J. Ebersole from D. Houston Re: Palo Verde Unit 1 Loss of Load Event w/ attachments Morning Report and OR Briefing Slides (4 pages) 11.
10/08/85 Agenda - Pressurizer Auxiliary Spray Design Review (25 pages) 12.
10/09/85 Memo to J. Ebersole from D. Houston Re: Items for Consideration Regarding the Committee Position on Palo Verde Unit 2 w/ attachments viewgraphs used by ANPP and Memo to William Dircks from Samuel Chilk (59 pages) 13.
10/15/85 Memo to E. Licitra, M. Ley, R. Hernan, G. Knighton and L. Marsh from Dean Houston Re: CE/Palo Verde Subcommittee Meeting 12/5/85 w/ attachment ACRS Combined Engineering Sheet (3 pages)
14.
10/25/85 Letter to Morton Libarkin from Paul Boehnert Re: Meeting of the ACRS Subcommittee Palo Verde /CE Reactors 12/5/85 w/ attachment Proposed FR Notice (3 pages) 15.
10/30/85 Memo to J. Ebersole, C. Cylie, C. Michelson, G. Reed and D. Ward from Paul Boehnert Re: ACRS Combined Combustion Engineering Plants /Palo Verde Subcommittee Meeting 12/5/86 w/ attachment Tentative Schedule (9 pages) 16.
12/05/85 Attachment Re: Inoperable Pump (1 page) 17.
12/18/85 ACRS Review of the Palo Verde Nuclear Station, Units 1, 2 and 3 (1 page)
- 18. Undated Auxiliary Pressurizer Spray System (4 pages)
- 19. Undated Handwritten Notes Re: Auxiliary Pressurizer Spray System Comparison (2 pages)
- 20. Undatso Inspection Report 85 Review of Plant Activities (5 pages) 1 l}